“TAKING PRESSURE VESSELS FROM CRADLE TO GRAVE”SEMINARINSPECTIONOFPRESSURE VESSELSTOASME Section VIII Div. 1Manish WaghareABSG Consulting Inc.,SingaporeJanuary 28, 2011May 29, 20111

Presentation Outline What is Authorized Inspection? Overview of ASME Codes Code Stamps Inspection responsibilities: Manufacturer & AuthorizedInspector ASME Section VIII: Scope & organization Section VIII Division 1 Inspection requirements Question & Answers2

What is Authorized Inspection?ASMEABSG Consulting IncAUTHORIZED INSPECTION AGENCY- Develop Codes- Accreditation of AIAs- Issue Certificates of Authorization- Conducts Joint Review- Conducts Investigations-Writes Boiler & PV InsuranceEmploys & Designates InspectorsEmploys & Designates SupervisorsProvide Support for FieldActivities- Certify ASME Data ReportsJurisdiction- Adopts CodeUSHA-Enforces ASME CodeFunction as AIAConduct Joint ReviewsConduct InvestigationsFABRICATORS-Agreement with AIAQ.C. Program/ ManualCertificate of AuthorizationComply with CodeCertify ASME Data ReportsRegister Items with The National BoardNational Board- Commission Authorized Inspectors- Register Data Reports- Conduct Joint Reviews- Conduct Investigations- Issues The NBIC-“R” Stamp Program3

Hierarchy of Standards Laws and Regulations at the place of Installation(e.g. Minnesota, New York City, Quebec.) ASME - Boiler & Pressure Vessel CodeConstruction-CodeSection IPower BoilerSection IIINuclear PowerReference CodeSection IVHeating BoilerSection VIIISection XSection XIIPressure Vessel Fiber PlasticsASMEASME B31.1B31.1Power PipingPipingTransportTransport TanksTanks PowerASME B31.1Section IISection VSection IXPower PipingMaterialNDEWeldingSection VISection VIISection XIHeating BoilerPower BoilerNuclear Power"Inservice"-CodeStandards, RecommendationsANSIASTMAWSASMEASME B31.3B31.3ProcessProcess PipingPipingASNT National Board Inspection Code NBIC4

Brief History of ASME1911 –cASME set up the B&PV Committee – to formulate std rules forconstruction of boilers and pressure vessels1915 –first Code issued – ASME 1 – Power Boilers1923 –Heating Boilers – Section IV1924 –Materials – Section II1925 –Pressure Vessels – Section VIII Div 11941 –Welding & Brazing – Section IX1963 -Nuclear Codes – Section III1968 –Pressure Vessels – Section VIII Div 21971 -NDE – Section V1997 -Pressure Vessels – Section VIII Div 35

INTRODUCTION ASME establishes rules for new construction ofpressure vessels that will perform in a safe & reliablemanner. ASME also interprets these rules when questions ariseregarding their intent Code does not address all aspects and those notaddressed should not be considered prohibited. Code does not fully address tolerances. Code is not a design handbook, designer must useengineering judgement consistent with Code philosophywhich do not overrule mandatory requirements of theCode.6

ASME CODEEditions:Every 3 years new issuance (2004, 2007, 2010.)Addenda:Issuance every year.Replacement page format (coloured).Mandatory 6 months after issuance.Interpretations:Issued by ASME Code committees upon request.Not part of the Code.Code Cases:Formulated by the ASME Code Committee toclarify existing requirements or to provide rulesnot covered by the existing Code.Errata:Are mandatory immediatelyre-affirmed:referenced Codes & StandardsASME B16.5 - E20037

ASME Code Manufacturer- ASME Shop Approval is a prerequisite- QC-System according to the ASME Code- Audit by ASME, renewal every 3 years (U, U2)- valid Inspection-Service-Agreement between Manufacturerand an AIA- Authorized by ASME to use the Code Symbol Stamp(s).- Certificate of Authorization, validity 3 years (U, U2)8

ApprovalsASME shop approvals are not required for:¾Material Manufacturers (except Section III)¾Manufacturers of Welding Consumables (exceptSection III)¾Valve Manufacturers (except Section III and SafetyValves)¾Suppliers of Services (Design, Heat Treatment,Machining)¾Piping Manufacturers (except Section III)9

Procedure of ASME Authorization Obtain Application Forms from ication/Application Forms 2.cfm Submit Application Forms to ASME and remit Fees Purchase ASME Code Books Describe a QC-System according ASME Code Prepare a Demonstration Item Qualify Procedures and Personnel Pre-Joint Review by the Supervisor of AIA Joint Review (Audit) with ASME Designee, Inspector undSupervisor Issuance of Certificate and Stamp by ASME10

ASME and National Board StampsASME Boiler & Pressure Vessel CodeSection I - Steam BoilersSAEMPPV*steam boilers (master)assembly onlyelectric boilersminiature boilerspower piping (B31.1)safety valvesSection IV - Heating BoilersH*HHLWHV *cast iron heating boilerswrought steel heatig boilerspotable water heaterssafety valvesSection VIII Div. 1 - Pressure VesselsUUM *UV *UD *pressure vesselsminiature vesselssafety valvesrupture disk devicesSection VIII Div. 2 - Alternative RulesU2pressure vesselsSection VIII Div. 3U3UV3*High Pressure Vesselssafety valvesSection X - Fibre reinforced Plastic PressureVesselsRPpressure vesselsSection XII – Transport TanksNational Board Inspection CodeRVR*repair and alterationrepair of safety valvesTTV*TD*Transport tankssafety valvesrupture disk devices* Components not subject to Authorized Inspection, ASME Audit of the Manufacturer11

Responsibilities U-2, UG-90Manufacturer's Responsibilities- comply with all of the applicable requirements of the Code.- assure that all work done by others also complies.- have design calculation available.- assure that QC is performed.- assure that examinations are performed as required by the Code.- arrange Inspection and free access of the Inspector.12

Authorized Inspector Responsibilities U-2(e) To make all of the inspections specified by the rules of thisDivision Monitoring the quality control and the examinations madeby the Manufacturer. Make such other inspections as in his judgment are necessaryto permit him to certify that the vessel has been designed andconstructed in accordance with the requirements. Verifying that the applicable calculations have been made andare on file at Manufacturer’s plant at the time the DataReport is signed. Any questions concerning the calculations raised by theInspector must be resolved.13

ASME Code Key Wordsshallmandatory rulesmay notprohibitionmaycanrecommendations orexemptions from prohibitionsshouldrecommendations14

ASME CODE SEC VIIISection VIII Division 1 up to 3,000 psi (20 MPa) simple stress calculation formulas no stress analysis required widespread use for Pressure VesselsSection VIII Division 2 up to 10,000 psi (70 MPa) user specifies service conditions (user s design specification - UDS) UDS shall be certified by a Registered Professional Engineer (RPE) provisions for stress analysis, fatigue, creep, experimental analysis) reduced wall thickness larger extend of NDE higher design stress levels Registered Professional Engineer (RPE) shall certify Design ReportSection VIII Division 3 over 10,000 psi stress analysis is mandatory consideration of prestressed components extensive mandatory NDE small range of permitted material two RPEs are required15

ORGANIZATION OF SEC VIII DIV.1ForwordIntroduction:U-1, U-2, U-3, U-4Subsection A: UG – General RequirementsSubsection B: Methods of FabricationUW – welded pressure vesselsUF – forged pressure vesselsUB – brazed pressure vesselsSubsection C: Classes of Material - Special UHX-Carbon and Low Alloy SteelNon ferrous MaterialsHigh Alloy SteelCast IronCladding and LiningCast Ductile IronFerritic Steels with Heat TreatmentLayered ConstructionsLow Temperature ServiceShell and Tube Heat ExchangerMandatory and Nonmandatory AppendicesIndex16

ASME VIII Div. 1INSPECTION REQUIREMENTS17

Inspection and Tests - ManufacturerThe inspection and testing shall conform to thegeneral requirements in UG-90 & in addition, to thespecific requirements for Inspection and Tests givenin the applicable Parts of Subsections B and C. the drawings and design calculations for the vessel orpart [10-5 and 10-15(d)];18

Inspection and Tests - Manufacturer examination of all materials before fabrication to make certainthey have the required thickness, to detect defects [UG-93(d)],to make certain the materials are permitted by this Division (UG4), and that traceability (UG-77) to the material identification(UG-93) has been maintained identification for all material used in the fabrication of the vesselor part (UG-93); MTR’s for plates¾ correct Material¾ visual Inspection for cracks specifically for impact testedmaterial¾ Markings original/ transferred¾ securing Partial Data Reports [UG-120(c)]19

Inspection and Tests - Manufacturer documentation of impact tests when suchtests are required (UF-5, UCS-66, UHA-51,UHT-6, and ULT-5); concurrence of the Inspector prior to anybase metal repairs (UG-78 and UF-37); examination of the shell and head sections toconfirm they have been properly formed tothe specified shapes within the permissibletolerances (UG-79, UG-80, UG-81, UF-27,and UF-29);20

Forming Requirements21

Plate Forming22

23

Allowable Forming Code allows two types of forming:¾ Cold forming¾ Heating to shape Flat spots along the longitudinal joints mustbe avoided24

Cold Forming Bumping to form the head dish Spinning to form the knuckle portion25

Bumping26

Head Measurement27

Marking for Identification28

Head Spinning29

Flange End Cutting30

Hot Forming31

Forming Carbon SteelAdditional requirements when forming carbon steel:¾ Cold forming by blows is not permitted¾ Forming by blows may be permitted when steel is atforging temperature provided the blows do notobjectionably deform the plate and followed byPWHT¾ Cold forming by those other than the Manufacturerrequires a certification per UCS-7932

Heat Treatment UCS-79Requires material heat treatment when:¾ Resulting fiber elongation is more than 5% from the asrolled condition¾ P-1 group 1 & 2 materials may have fiber elongation asgreat as 40%, provided none of the following conditionsexist Vessel is for lethal services Material requires impact testing Material thickness exceeds 5/8” Reduction by cold forming from the as-rolled thicknessis more than 10% Temperature of the material during forming is 250 oF to900 oF33

UCS-79 – Fiber elongation34

Interpretation: VIII-1-95-50Subject: Section VIII, Division 1 (1992 Edition, 1993 Addenda); UCS-79(d)Date Issued: March 13, 1995Question (1):Reply (1):Question (2):Reply (2):A cold formed head has to be heattreated to fulfill the requirements of UCS-79(d)in Section VIII, Division 1. Does the term “heattreated subsequently” mean just after forming andprior to any other operation?No.If Reply (1) is no, then will PWHT in accordancewith UCS-56 satisfy the requirements of UCS-79(d)following welding of the head to the vessel?Yes.35

36

UG-80: Out-Of-Roundness Internal PressureMaximum ID - Minimum IDx 100% 1%Nominal IDDmaxDminDmaxDminDminDmax37

Out of Roundness – Internal Pressure38

Out of Roundness – Internal Pressure39

Out-of-RoundnessUG-80: External Pressure¾ Must meet requirements for internal pressure¾ Must meet requirements in Figure UG-80.1¾ Measurement shall be made from a segmentalcircular template, having the design inside oroutside radius and chord length equal to twice thearc length (Fig UG-29.2)40

External Pressure41

42

43

44

Inspection and Tests - Manufacturer qualification of the welding and/or brazing proceduresbefore they are used in fabrication [UG-84(h), UW28(b), and UB-31]; qualification of welders and welding operators andbrazers before using the welders or brazers inproduction work (UW-29, UW-48, UB-32, and UB43);Welding Processes Arc Welding processes¾ SMAW, GTAW, SAW, GMAW Stud Welding Electroslag Welding Electrogas Welding45

Permitted Welding Processes46

UW-28 Welding Procedures¾ Welding of pressure parts and of joining loadcarrying, nonpressure-bearing parts to pressureparts shall be qualified in accordance with ASMESection IX¾ Welding of nonpressure-bearing attachmentswith no load-carrying function to pressure partswelded manually, semi-automatically or machinewelded shall be qualified in accordance withASME Section IX.47

UW-28: Welding Procedures Welding of nonpressure bearing attachments,with no load-carrying function to pressureparts, welded using automatic welding requiresa procedure but qualification is not required48

Welder Qualification Welders must be qualified when weldingpressure parts or load-carrying, nonpressurebearing parts Welders may be qualified using productionwelds49

Inspection and Tests - Manufacturer examination of all parts prior to joining tomake certain they have been properly fittedfor welding or brazing and that the surfaces tobe joined have been cleaned and thealignment tolerances are maintained (UW-31,UW-32, UW-33, and UB-17);50

Alignment Requirements51

Butt Joint Definition: Per ASME Code IX, a joint aligned onthe same plane, not exceeding 30 degrees30o maximum52

Alignment ToleranceJoint Categories53

Unequal Thickness Butt joints of unequal thickness shall have atapered transition of not less than 3:1 whenthe difference in thickness varies more than1/4t (thinner plate) or 1/8”, whichever is less Taper may be machined or welded Weld metal build up shall be subject to therequirements of UW-42 3154

55

Inspection of Finished Welds56

Root Area57

Lack of Penetration Nozzle Weld58

Attachments Non-pressure retaining parts welded overpressure retaining welds must be notched orthe weld ground flush Pressure retaining parts welded over pressureretaining welds must be ground flush59

UG-82LUGS AND FITTING ATTACHMENTSAll lugs, brackets, saddle type nozzles, manhole frames,reinforcement around openings, and other appurtenances shallbe formed and fitted to conform reasonably to the curvature ofthe shell or surface to which they are attached.(a) When pressure parts, such as saddle type nozzles,manhole frames, and reinforcement around openings, extendover pressure retaining welds, such welds shall be ground flushfor the portion of the weld to be covered.(b) When nonpressure parts, such as lugs, brackets, and supportlegs and saddles, extend over pressure retaining welds, suchwelds shall be ground flush as described in (a) above, or suchparts shall be notched or coped to clear those welds.60

Notched SupportOption “A”Option “B”61

UW-9(d): Long SeamsVessels made up of two or more shell courses Long seams between courses shall be staggered ata distance at least 5 times the thickness of thethicker plateor4” of the joints on each side of the girth seam shallbe radiographed62

5 “t”Where “t” is thethickness of thethicker plate63

UW-35: Undercut Longitudinal and Girth Welds¾ Undercut is allowable if within 1/32” or10% on the nominal plate thickness,whichever is less¾ Reduction in thickness is not less thanthe minimum required thicknessNote: It is not the intent of this Code paragraph to require measurement ofreductions in thickness due to the welding process. If a disagreementbetween the Manufacturer and the Inspector exists as to the acceptabilityof any reduction in thickness, the depth shall be verified by actual measurement.64

Measurement for Undercut65

Finished Weld ReinforcementMaximum Reinforcement, inches66

Welder Traceability67

Openings At or Near a Weld UW-14 allows openings at weld seamprovided:¾ Reinforcement calculation meets UG-37/ UG-39¾ Openings meeting UG-36(c)(3) may be located atcategory B or C joints provided a length of 3 timethe diameter on both sides are radiographed¾ Openings should be located at least 1/2” fromseams on plate thickness up to 1-1/2”68

69

UW-1470

Inspection of Welds WPS, WPQ Materials are acceptable to Code Fit-up geometry meets the requirements of theWPS and tacks welds are acceptable Root pass is inspected Inspect back gauge to sound metal Inspection of finished weld on both sides Welder traceability Perform required NDE71

Inspection and Tests - Manufacturer examination of parts as fabricationprogresses, for material marking (UG-94),that defects are not evident (UG-95), and thatdimensional geometries are maintained (UG96 and UF-30);¾ shape verification by use of template¾ Vessel attachments like nozzles to be checked to ensure that they properlyfit vessel curvature verification to assure that all required heattreatments are performed (UW-2, UW-10,UG-85, UF-31, and 10-11);72

When required UCS-56“Except as otherwise specifically provided in thenotes to Table UCS-56, all welds in pressurevessels or pressure vessel parts shall be givena PWHT at a temperature not less thanspecified in those tables when the nominalthickness including corrosion allowanceexceeds the limits of those tables.”¾ UCS - 56 Thickness considerations¾ UW-2 Service considerations73

ExemptionsThickness exemptions for differentNumbers:P-¾ P-No.1 Group 1,2,3 up to 1-1/4”¾ P-No.3 Group 1,2 up to 5/8”¾ P-No.4 Group 1,2 No exemption forplates¾ P No.5 A,B,C No exemption forplates74

PWHT need not be in one continuous cycle. It may beperformed in multiple cycles Welding of parts with different P nos., use table withthe higher PWHT temperature Welding pressure parts to non pressure parts: PWHTtemp for pressure parts shall govern75

Interpretation: VIII-1-89-30Subject: Section VIII, Division 1 (1986 Edition, 1987 Addenda)Table UCS-56Date Issued: September 20, 1988File: BC88-192Question:A P-No. 1 Group No. 2 plate has a specifiednominal thickness of 1-1/2 in. It has a measuredmaximum thickness which exceeds this value, butis in accordance with the tolerances permitted inTable A1.1 of SA-20 in Section II, Part A. Is thisplate exempt from post weld heat treatment byNote (2)(a) of Table UCS-56, provided the preheat is performed asrequired by this Note?Reply:Yes.

Inspection and Tests - Manufacturer making the required hydrostatic or pneumatic test and havingthe required inspection performed during such test (UG-99, UG100, and UW-50); applying the required stamping and/or nameplate to the vesseland making certain it is applied to proper vessel (UG-116, UG118, and UG-119); preparing required Manufacturer’s Data Report and having itcertified by the Inspector (UG-120); retention of radiographs (UW-51), ultrasonic test reports (12-4),Manufacturer’s Data Reports (UG-120), and other documents asrequired by this Division (10-13).77

Hydrostatic TestUG-99 STANDARD HYDROSTATIC TEST(b) Except as otherwise permitted in (a) above and 27-4, vesselsdesigned for internal pressure shall be subjected to ahydrostatic test pressure which at every point in the vessel is atleast equal to 1.3 times the maximum allowable workingpressure to be marked on the vessel multiplied by the lowestratio (for the materials of which the vessel is constructed) of thestress value S for the test temperature on the vessel to thestress value S for the design temperature (see UG-21).78

Hydrostatic TestUG-99 STANDARD HYDROSTATIC TEST(f) Single-wall vessels designed for a vacuum orpartial vacuum only, and chambers ofmultichamber vessels designed for a vacuumor partial vacuum only, shall be subjected toan internal hydrostatic test or when ahydrostatic test is not practicable, to apneumatic test in accordance with theprovisions of UG-100. Either type of test shallbe made at a pressure not less than 1.3 timesthe difference between normal atmosphericpressure and the minimum design internalabsolute pressure.79

Marking80

Inspection and Tests – Authorized InspectorAll inspections specifically required of him plus such other inspections ashe believes are necessary to enable him to certify that all vessels whichhe aut

ASME B31.1ASME B31.1 Power Piping Section IIISection III ASME B31.3ASME B31.3 Nuclear PowerNuclear Power Section VIIISection VIII Pressure VesselPressure Vessel Process Piping Section XSection X Fiber PlasticsFiber Plast

Related Documents:

Cradle to Cradle CertifiedCM is a certification mark licensed by Cradle to Cradle Products Innovation InstituteTM Executive Summary Construction Specialties, Inc is applying to have its Pedisystems Entrance Flooring Products, recertified in the Cradle to Cradle CertifiedCM program by the Cradle to Cradle Products Innovation Institute under

V ERSION 3.0 CRADLE TO CRADLE CERTIFIEDCM PRODUCT STANDARD iii FOREWORD This version of the Cradle to Cradle CertifiedCM Product Standard (Version 3.0) replaces Version 2.1.1. The Cradle to Cradle Products Innovation Institute will begin certifying products using . In 2002, the book

The goal of the cradle-to-cradle approach is to create a circular resource management process rather than a linear process like a cradle to a grave. The cradle-to-grave concept is simply the process from birth to death, and its main goal is to reduce waste. The cradle to cradle

4.1 Making the way the organisation operates Cradle to Cradle-proof 7 4.2 Choosing a suitable procurement strategy 8 4.3 Procuring Cradle to Cradle products that meet the minimum requirements for public sustainable procurement 8 4.4 Applying the Cradle to Cradle-related criteria from the criteria documents 9

The Cradle to Cradle is a concept for reducing resource use and pollution Cradle to Cradle is a concept for eliminating waste Materials should either go back to nature or be "food" for new products. The Cradle to Cradle concept Obtain material Manufacturing Assembly Operation Disassembly Waste / 'downcycling'

Une approche est offerte par le concept Cradle to Cradle (du berceau au berceau) mis au point par le chimiste allemand Michael Braungart. Le Cradle to Cradle décrit le principe de deux flux continus de matériaux : D'un côté, les biens de consommation sont biodégradables et retournent dans le cycle des composants élémentaires biologiques.

The Cradle to Cradle guidance in public procurement was developed by the C2C Platform in collaboration with Accsys Technologies, Desso, Greenspeed, Gyproc, Jules Clarysse, Wienerberger and Mosa. 4. FAQ (Frequently Asked Questions) Cradle to Cradle products are always more expensive

for designing the composite pressure vessels shapes of pressure vessels [27]. During the past two decades, several authors have performed detailed analyses of composite pressure vessels by using the theory of orthotropic plates. Composite pressure vessels tend to fail in their composite pressure vessels parts; the design of these parts is the .