Concrete Inspection and Repair Strategy forOnshore Wind TurbinesFrancis Mongeon , P.EngConstruction Chemicals – Master Builders SolutionsKey Account Manager - Power, Infrastructure & Industry

This presentation reviews key industry best practices toperform quality construction and could help establishingthe basis of inspection programs related to concretefoundations, grouts and concrete components.2The information, views and opinions presented or expressed during this presentation are those of the presenter or derived from published third party

Why monitoring and inspecting ?MonitoringObserve and check the progress or quality of (something) over a period of time; keep undersystematic reviewCondition assessment / condition evaluationInvestigation and appraisal of the condition of a structureNon destructive testing (NDT)Examination of materials and structures in ways that do not impair future usefulness andserviceability in order to detect, locate, and measure discontinuities, defects, and otherimperfections to assess integrity, properties, and uniformity, and to measure geometricalcharacteristics.

“A wind turbine is a complete, dynamic system: interactions are felt from blade tip to foundation. Betterunderstanding of the relations and capturing them in models helps reduce material use and furtherincrease the cost effectiveness of turbines”EWEA 2013 conference announcementWeatherRotationBendingTorsionAxial loadVibrations Loads need to be transferred bythe grout connecting the tower tothe foundation structure. A careful design and selection ofthe grouting material is thereforeof utmost importance. Safe and durable installation ofwind turbines largely depend onthe materials which connect thetower to its base / foundation.

Current Situation Current tests for concrete and grouts on projects Compressive strengths (concrete and grout) Cement grout: ASTM C-1107 (confined cubes in mold) Not CSA A23.2, not ASTM C-109 Epoxy grout: ASTM C-579 Slump testing (concrete) No fatigue tests requirements (eg. DNV-OS-C502-458) in design, butsuggested in CSA Guide to Canadian wind turbine codes and standards Shim packs stay in place (contrary to API RP 686) No expansion joints (API RP 686)

Inspection and Monitoring Approach Global visual inspection Detection of obvious or extensivedamage Performed at distance (eg.Binoculars) Close visual inspection Examination of specific surfacearea (eg. Drones) Non-destructive inspection/testing Destructive testing Instrumentation based conditionmonitoring

Onshore wind turbine installationsAnchor cage design foundationsCurrent situation Increasing number of failures Concrete foundation Grout materials Failures occur within 1 – 2 years Complex installation prone to mistakesMajor causes: Too low characteristic strength Need meeting specs Too slow strength development “Good enough” No safety factor built-in Not resistant to loads Thermal Mechanical

Onshore wind turbine installationsCan design foundations - ChallengesCurrent situationIncreasing number of failures observed in foundation areas 30% of all installed wind turbine installations have revealed problems Failures occur within 3 – 5 yearsCauses: Dynamic loads - load cyclesDesign mistakesMaterial selection “use the same as last job”Ever growing wind turbines

Objective of Concrete Repairs Concrete repairs is directly linked to the quality of the inspection and assessmentperformed Not all NDE tools will work for all issues. Examiner needs to have a comprehensive knowledge of the tools and techniques that areavailable. Common techniques include: In-situ concrete strength (relative strength comparison unless correlated with laboratorystrength tests, e.g. core compressive strength tests) Location and extent of reinforcement Location and extent of concrete cracking Severity, location and delaminations due to reinforcement corrosion Location, size and distribution of r frost damage Location and extent of void/honeycombing Thickness of concrete members Presence and rate of reinforcement corrosion activity

Visual Inspection GeneralDescription of StructureMaterial usedNature of Environmental and LoadingConditions Distress indicators Present condition of structure (surfacecondition only)

Non - Destructive Evaluation Techniques Improved understanding of concrete conditions prior to repairBetter repair methodology Repair design Repair materials Repair methodsAlternative to drilling and coring

ICRI 210.4 Guide for Non-destructive Evaluation Methods for Condition Assessment,Repair, and Performance Monitoring of Concrete Structures

Sonic Echo (ASTM D5882), Impulse Response and Impedance Imaging Sonic echo reads wavesecho Impulse Response readsfrequency domain off sonicecho tests Impedance imaging can giveidealized axisymmetric 3Dpile shapeSource: ICRI Guideline 210.4-2009

Ultrasonic Pulse-Echo Short ultrasonic pulses (50-70 kHz)transmitted to concrete Reflects changes in stiffness Reflects changes in density, eg.Voids, cracking, honeycombing,etc Helps to locate flaws, henceidentifying repair location and sizes

Cracks in concrete and groutSituation Fatigue occurs when material issubjected to repeated loading andunloading Cracks begin to form Cracks reach a critical size andfurther damage occur, eg.Fracture, water ingress, failure,etc.Solutions (ACI 224.1)1) rout and seal the crack, thus treating it as a joint;2) establish a joint that will accommodate the movement and then inject the crack withepoxy or other suitable material;3) install additional support or reinforcement at the crack location to minimizemovement.Source: Cracks in onshore wind power foundations , causes and consequences. Elforsk rapport 11:56, Manouchehr Hassanzadeh, January 2012

Example of cracks in concrete and groutShrinkage cracking (Non-Critical)Segregation / Separation (Critical)Excess material (Non-Critical)Voids(Critical)

When to inspect ? During construction (first 28 days) Surface sealing of surface cracks Repair as needed Surface preparation for repairs (!) – ICRI Higher frequency in first year to identify earlyproblems Non-critical cracks VS critical cracks MTO/AASHTO’s : 0.3mm for injection Active cracks vs passive cracks (ACI 224.1) Reduce/Increase frequency as needed On damaged foundation, inspection to be carriedevery 6 months Verify success of repairs Every climate is different and every project is different Need to build historical data in Canada Large country Different project locations (eg. Ontario vs BC)Camera inspection

Sonic Echo (ASTM D5882), Impulse Response and Impedance Imaging Source: ICRI Guideline 210.4-2009 Sonic echo reads waves echo Impulse Response reads frequency domain off sonic echo tests Impedanc

Related Documents:

ACI 304R-00, Guide for Measuring, Mixing, Transporting, and Placing Concrete (Reapproved 2009) ACI 311.4R-05, Guide for Concrete Inspection ACI 311.5-04, Guide for Concrete Plant Inspection and Testing of Ready-Mixed Concrete ACI 347-04, Guide to Formwork for Concrete ACI 207.1R-05, Guide to Mass Concrete (Reapproved 2012)

THE REPAIR AND PROTECTION OF REINFORCED CONCRETE WITH SIKA – IN ACCORDANCE WITH EN 1504 CONCRETE REPAIR AND PROTECTION The European Standards EN 1504 consist of 10 parts and is a systematic approach to rehabilitating concrete. With these docu-ments products for the protection and repair of concrete structures are defined.

2011 ktm 690 smc service repair manual 2011 ktm 250 sx-f,xc-f service repair manual 2011 ktm 65 sx service repair manual 2011 ktm 50 sx, sx mini service repair manual 2011 ktm 400/450/530 , service repair manual 2011 ktm 125 duke, service repair manual 2011 ktm 1190 rc8 r, service repair manual 2011 ktm 450 sx-f service repair manual

Concrete Beams 9 Lecture 21 Elements of Architectural Structures ARCH 614 S2007abn Reinforced Concrete - stress/strain Concrete Beams 10 Lecture 21 Elements of Architectural Structures ARCH 614 S2007abn Reinforced Concrete Analysis for stress calculations steel is transformed to concrete concrete is in compression above n.a. and

Redi-Mix Concrete, LLC 10K11521 . While EPDs can be used to compare concrete mixtures, the data cannot be used to compare between construction products or concrete mixtures used in different concrete products unless the data is integrated into a comprehensive LCA. For example, precast concrete, concrete masonry units and site cast concrete all .

repair is one of the oldest techniques and it is applied for the repair of spalled concrete. Patching is done using mortar, concrete, resin based mortar, sprayed concrete. The sprayed concrete is especially suitable for of those spalled concrete, which damaged due to fire. HoweverThe sprayed technique itself originated in the U.S.A in 1907 and

2.2. choosing a repair method 3 2.3. choosing a repair material 3 2.4. surface preparation 4 2.5. application of the repair material 6 2.6. prestressing of the repair material (optional) 8 2.7. anchorage system 9 2.8. strand splicing (if needed) 10 2.9. repair for shear 11 2.10. repair for flexure 14 2.11.

V3.0 -LED & LCD TV Repair Tips ebook "More information on T-con Board & Mainboard Secret Repair Tips!" V2.0- LCD TV Repair Tips & Case Histories V1.0- Collection of LCD TV Repair Tips Vol-3 LCD/LED Monitor Repair Case Histories by Jestine Yong LCD/LED & 3D TV Repair Membership Site Plasma & 3D TV Repair Membership Site Projection TV &