ENERGOCENTROMONTAZH INTERNATIONAL Ltd.(ECM Inter)Steam and GT power plants1

ECM Group overviewSteam, GT &combined cyclepower plantsSubstations andtransmissionlinesDesign, consulting,supply of equipment,supervision, testing,erection, installation,commissioning,training. EPC andEPCM contracting.Design, consulting,supply of equipment,supervision, testing,erection, installation,commissioning,training. EPC andEPCM contracting upto 500 kV range.HydropowerPlantsErection &CommissioningDesign, consulting,supply of equipment,supervision, testing,erection, installation,commissioning,training. EPC andEPCM contracting.Major equipmentdesign.Design, supervisioncommissioning,testing andcommissioning ofhydro, nuclear powerplants, transportnetworks and powersubstations.

ECM Group in briefSince the date of its incorporation,ECM Group has installed the followingpower facilities: turbine generators of 60 429 MW totalpower; package boilers producing 214 312 tonsof steam; power transformers of 163 302 MVAinstalled capacity; high-voltage transmission lines of 5 570km.3

ECM Group staffThe high competence of ECM specialists and workers who, having decades ofexperience in power plants engineering and construction, allows us to solve, at ahigh quality level, a wide range of problems in the field of construction and operationof power projects in difficult natural environments and climatic conditions. Engineers852 Administration121 High Skilled Workers3 807 R&D244 Total5 0244

Core ActivitiesECM Inter is a Russian leading company that, relying on its own resources, performsany work related to design, engineering, construction, installation andcommissioning during the construction of power facilities: Owner Engineer, EPC or EPCM Contractor; Designing of thermal, gas turbine power plants, heating networks and boilerhouses, renewable energy sources (solar, wind, etc.); Procurement of equipment; Construction, installation, expansion, reconstruction, re-equipping, all kinds ofrepairs and adjustment of energy facilities and equipment; Surveying, engineering, servicing, erection, installation and commissioningworks for rehabilitation, construction and operation of power facilities; Operation and maintenance of power plants of different type and capacity; Transportation of heavy cargo, handling operations, passenger transportation.5

6

Selected references 2008 – 2013Steam and Gas turbine power plantsAdler CCPP-360Two combined cycle co-generation units with a totalcapacity of 360 MW, thermal capacity – 227 Gcal/h.4xGT: V64.3A type (Ansaldo Energia 4x65 MW),2xST: T-48/62-7,4/0,12 (Power Machines, 2x60 MW),4xHRSG: (Podolsk Machine Building Factory).Vologda CCPP-110One combined cycle co-generation unit with a totalcapacity of 110 MW, thermal capacity – 75 Gcal/h.1xGT: PG 6111FA type (GE 1x75 MW),1xST: Power Machines, KTZ 1x35 MW),1xHRSG: (Podolsk Machine Building Factory).7

Selected references 2008 – 2013Steam and Gas turbine power plantsNyagan CCPP-420Unit No.1: combined cycle units with capacity 420 MW.1xGT: SGT5-4000F type (Siemens 1x285 MW),1xST: SST-800 (Siemens, 2x135 MW),4xHRSG: (LOOS, Germany).Kirishi CCPP-800Unit No.6: combined cycle unit with capacity 800 MW.2xGT: SGT-5-4000F type (Siemens 2x279 MW),1xST: К-245-13,3 (Power Machines, 1x260 MW),2xHRSG: П-132 (EMAlliance).8

Selected references 2008 – 2013Steam and Gas turbine power plantsKharanorskaya TPPCoal-fired steam power plantUnit #3: steam coal-fired unit with capacity 225 MW.1xST: К-225-12.8-3Р (Power Machines, 2x225 MW),1xSteam boiler: Еп-630-13.8 565БТ (ТПЕ-216М)(EMAlliance).Krasnodar CCPP-410Combined cycle co-generation unit 410MW.1xGT: M701F4 type (Mitsubishi Heavy Ind., 2x280 MW),1xST: Т-113/145-12,4 (Ural turbomachinery, 1x130 MW),2xHRSG: (EMAlliance).9

Selected references 2008 – 2013Steam and Gas turbine power plantsPervomayskaya Co-generationPlant (2 x CCPP-180 units)Two combined cycle co-generation units with a totalcapacity of 2x180 MW, thermal capacity – 227 Gcal/h.4xGT: V64.3A type (Ansaldo Energia 4x65,8 MW),2xST: Т-50/64-7,4/0,12 (Power Machines, 2x60 MW),4xHRSG: (Podolsk Machine Building Factory).Kirov TPP-4Peat & lignite fired PPRehabilitation of steam co-generation units of peatfired. Replacement of existing steam turbines to thenew ones type Тп-65/75-12,8 (Ural TurbomachineryWorks).10

ECM InterSubstations11

Core ActivitiesECM Inter is the Russian leading company that, relying on its own resources,performs any work related to design, engineering, construction, installation andcommissioning of HV substations: Construction expansion, renovation, restructuring,technical upgrading, all kinds of technical repair/overhaul services of electrical facilities andequipment; Designing and marketing of industrial equipment:power/electrical equipment, electrical facilities; Design and survey service, developing equipmenttechnology, materials, licensing, patenting. Complex electrification activities both for industrialand economic/private facilities as well as individualbuildings; Mounting of overhead and cable transmission linesup to and over 110 kV; General contractor and general designer services fornew electrical/power facilities.12

13

Major turn-key projects2010-2013Novo-Orekhovo SubstationGIS 110 / 20 kV, 2 х 80 MVAMeschanskaya SubstationGIS 220 / 20 kV 3 x 100 MVA.14

Major turn-key projects2010-2013Pererva Substation GIS 220 / 20 kV, 2 х 100 MVA Location: South-East Administrative District,Moscow The standard switchgear GIS-220 kV includes 9standard gas-insulated cells, switchgear-20 kVof 49 cells. The substation building is of 3stores of 57.1 x 42 m Inlets of cable lines of 220 kV “Pererva-ППSaburovo-Baskakovo” – route length of 1,865m Commissioned in Q3 201015

Major turn-key projects2010-2013Pervomayskaya SubstationGIS 220 / 20 / 10 kV , 3 х 100 MVANovo-Kuzminki SubstationGIS 220 / 20 kV 2 x 160 MVA.16

Major turn-key projects2010-2013Krasnoselskaya SubstationGIS 220 / 20 kV , 3 х 100 MVAMnevniki SubstationGIS 220 / 20 kV 3 x 100 MVA17

Major turn-key projects2010-2013Novo-Izmaylovo Substation GIS 220 / 20 kV 3 x 100 MVA Location: East Administrative District,Moscow The installed capacity of the substationis 3 x 100 MVA. The integrated switchgear GIS-220 kVincludes 7 standard gas-insulated cells,switchgear-20 kV of 56 cells. The substation building is of 3 stores of72 x 36 m. Commissioning – Q1 201318

THANK YOU!19

Selected references 2008 – 2013 Steam and Gas turbine power plants Unit No.1: combined cycle units with capacity 420 MW. 1

Related Documents:

X24 HRV ECM, X24 HRV ECM-N, X30 HRV ECM AND X30 HRV ECM-N ENERGY RECOVERY VENTILATOR MODELS X24 ERV ECM, X24 ERV ECM-N, X30 ERV ECM AND X30 ERV ECM-N Venmar Ventilation ULC, 550 Lemire Blvd., Drummondville, QC, Canada J2C 7W9 www.venmar.ca These products earned the ENERGY STAR by meeting strict energy efficiency guidelines set by

Billericay Dental Supply Co. Ltd Birds (Derby) Ltd Blackpool Pleasure Beach (Holdings) Ltd Bloom and Wild Ltd BOC Ltd Boohoo.Com UK Ltd Booker Group Ltd Borax Europe Ltd Borden International Holdings Ltd Bowman Ingredients Ltd BP International Ltd Brake Bros Ltd Brand Addition Ltd Brand-Rex Ltd Brenntag UK Ltd Bridport Ltd Brightstar 20:20 UK Ltd

Documents Released on June 3 DHCS has released the following set of finalized ECM & ILOS program documents. They are available on the ECM & ILOS Website. 1. ECM and ILOS Change Memo 2. DHCS-MCP ECM and ILOS Contract Template 3. ECM and ILOS Standard Provider Terms and Conditions 4. ECM and ILOS Model of Care (MOC) Template 5.

GE. Since the early 1990ʼs most manufacturers have used the GE ECM by Regal-Beloit motor in their variable speed products. The brand name for this motor is the Think Tank which covers models ECM 2.0, 2.3, 2.5 and 3.0. ECM 2.0 ECM 2.3/2.5 ECM 3.0 The three main benefits of this

Service Guide Table of ConTenTs ECM Start Here: Using the ECM Service Guide 1 HVAC System Troubleshooting Basics 2 Tech Tips 4 Motor Identification Chart 6 Using the ECM Service Guide Motor Diagnostics & Replacement MODELS 2.0 / 2.3 / 2.5 Premium ECM Motor Diagnostics 9 MODEL X13 Standard ECM Motor Diagnostics 13 TECMATE TECMate Usage Chart

Using the ECM Service Guide Motor Diagnostics & Replacement MODELS 2.0 / 2.3 / 2.5 Premium ECM Motor Diagnostics 9 MODEL X13 Standard ECM Motor Diagnostics 13 TECMATE TECMate Usage Chart Troubleshooting with the TECMate 19 20 MODULE REPLACEMENT ECM Control Module ECM Motor Module 23 28 X13 MOTOR REPLACEMENT 29 FiNAL iNSTALLATiON ChECkS 30

Follow the instructions for upgrading the ECM server from 3.4.1 to OpenLAB ECM 3.5. See the document entitled ECM 3.5 Upgrade Guide from the OpenLAB ECM 3.5 Server documentation. Upgrade the Database 1 Start the SQL Server Management Studio program and connect as the system administrator. 2 On the toolbar, select the ECM database.

used when setting windows hooks . Relies on the user api hook . User Api Hook Special hooking mechanism introduced to support Windows themes RegisterUserApiHook Can only be registered by privileged processes Requires the TCB privilege Caller must be running as SYSTEM Allows Windows to load a theme client module into every GUI application . Smashing the Atom . Theme Subsystem Introduced in .