Instruction Manual For Single Stage 350, 500, And 700 .

2y ago
7 Views
2 Downloads
3.66 MB
295 Pages
Last View : 1m ago
Last Download : 3m ago
Upload by : Emanuel Batten
Transcription

Instruction Manual forSingle Stage 350, 500, and 700 FrameSteam TurbinesManual 107-A

How to Use This ManualDresser-RandSST 350, SST 500, and SST 700Single Stage TurbineInstruction ManualMarch 2011INSTRUCTION MANUAL 107Revision A

How To Use This ManualSST Turbine Instruction ManualRevision A SSTTurbineInstruction

How to Use This ManualHow to Use This ManualTHIS MANUAL APPLIES TO SST 350, 500, AND SST 700 SINGLE STAGETURBINES.This instruction manual contains installation, operation, and maintenanceinstructions for the Dresser-Rand Turbine identified on the Turbine Data Sheetincluded with this manual. It should be reviewed thoroughly by the user beforeattempting to install and operate the turbine, and should be kept in a locationconvenient to the user for ready reference during operation and maintenance.WARNINGA complete reading of this manual by personnel in contact withthe steam turbine is essential to safety. INCORRECTINSTALLATION, OPERATION, MAINTENANCE, OR PARTSREPLACEMENT CAN RESULT IN INJURY TO PERSONNEL,AND DAMAGE TO THE TURBINE, DRIVEN MACHINERY,AND PLANT.The Instruction Manual consists of 15 sections, as listed in the table of contents.Each section is further broken down into subsections.This is a general instruction manual, describing a standard ring oiled or pressurelubricated turbine with hydraulic or electronic governors. The description andillustrations contained herein may differ in minor details from the unit actuallysupplied. All general installation, operation, and maintenance procedures areapplicable.For turbines supplied with options such as forced or circulating lubricationsystems, alternative speed control systems, accessories, instrumentation, speedreducers or other special configurations, refer to the appropriate accessory manualsand turbine certified drawing package included in Appendix A and Appendix Bfollowing this manual.March 2011Revision A1

How To Use This ManualSST Turbine Instruction ManualWARNINGThroughout this manual, it is assumed that the motive flow applied atthe turbine inlet is high-pressure steam. Therefore, the word “steam”is used in reference to various aspects of turbine installation,operation, and maintenance. For some specialized applications, highpressure gasses such as Freon, natural gas, or other vapors mayprovide the motive flow. In these cases, it can generally be assumedthat the name of the gas in use may be used to replace the word“steam.” The user of the equipment must address all hazardsassociated with the nature of the specific motive flow in use with theturbine. If flammable or toxic gasses are used as the motive fluid or ifoil vapor could be emitted, the user/installer must pipe leak-offs anddrains to a safe location. Explosive gas mixtures must not be used asthe motive fluid.The instructions contained in this manual do not attempt to cover all details, nordoes it provide for every possible contingency to be met in connection withinstallation, operation, or maintenance of the supplied equipment.The supplying of instructions does not imply, in any manner, that Dresser-Randaccepts liability for work carried out by a customer or contractor personnel.Liability is limited to and as stated in our Terms and Conditions of Sale.Should further information be desired, or should particular problems arise, thematter should be referred to Dresser-Rand.This manual is intended for use by personnel with a general knowledge of properoperation and maintenance of steam turbines. Special training or the assistance ofa trained Dresser-Rand service representative is suggested for personnel with lessthan a general working knowledge of this type of equipment.All inquiries regarding installation, operation, maintenance, spare parts, or serviceshould be directed to your Dresser-Rand manufacturer’s representative, or to:Dresser-RandSteam Turbine Business fer to Section M, Replacement Parts/Factory Service, for information on how torequest factory service or order replacement parts.2Revision A SSTTurbineInstruction

SST Turbine Instruction ManualEU ComplianceEU ComplianceThe following warning and notes apply only to turbines for whichcompliance with European Union Directives has been specified.NOTEIf there is a CE mark on this turbine nameplate it indicatescompliance with the ATEX Directive. Machinery DirectiveCompliance and Machinery Directive CE marking of the turbineand driven equipment is the responsibility of the assembler orinstaller. See the Machinery Directive Declaration ofIncorporationWARNINGATEX Certified turbines will have a mark –c C X on the turbinenameplate. This indicates that the turbine casing temperaturewill become that of the motive fluid (steam or gas) inlettemperature, this may exceed the ignition temperature of somegasses. See the ATEX Directive Risk Assessment SummaryList accompanying the ATEX Declaration of Conformance.NOTERefer to the Machinery Directive – List of Residual Risks andATEX Directive-Risk Assessment Summary List for warningsrelated to EU Compliance.Additional cautions and warnings are located throughout thismanual and in the Safety Precautions Section.SST Turbine Instruction ManualRevision A3

Table of ContentsSST Turbine Instruction ManualTable of ContentsHow to Use This Manual. 1EU Compliance . 3Table of Contents. 4List of Figures. 13List of Tables. 15Safety Precautions . 17Section A Introduction and General Description. 25A.1Turbine Description . 25A.2Construction . 25A.3Main Components . 27A.4Factory Test . 36A.5Shipping Preparation/Crating . 37A.6Uncrating and Inspection . 37A.7Short-term Storage. 38A.8Long-term Storage . 39A.9Dresser-Rand Factory Service/Replacement Parts. 41A.10Re-Rating and Upgrades . 42A.11Nameplate Information. 43Section B Technical Data. 45B.1General. 45B.2Lifting . 45B.3Alignment . 46B.4Thermal Growth. 47B.5Lubricants. 484Revision A SSTTurbineInstruction

SST Turbine Instruction ManualTable of ContentsB.6Major Fits, Clearances, and Rotor Balance Criteria.49B.7Piping Forces.56B.8Bolt Torques and Materials.57B.9Sealants and Joint Compounds .58B.10Cooling Water to Bearing Housing Water Jackets .60B.11Steam Pressure and Temperature Limits.60B.12Steam Quality and Steam Purity .60B.13Turbine Rotor Data .62Section C Installation.63C.1General .63C.2Foundation.65C.3Piping.67C.3.1Piping Forces.68C.3.2Isolating Valves.69C.3.3Full Flow Relief Valve .70C.3.4Inlet Piping .71C.3.5Exhaust Piping.72C.3.6Piping Blow Down.73C.3.7Steam Strainer.73C.3.8Check Valve.74C.3.9Expansion Joints .74C.3.10Leak-Off Piping .77C.3.11Gland Seal Leak-Off Piping – Vacuum Exhaust.78C.3.12Gland Seal Intermediate Leak-Off Piping – High Back Pressure Exhaust.78C.3.13Drain Piping .81C.3.14Water Cooling Piping to Bearing Housing Water Jackets .82C.4Alignment Requirements .84C.5Couplings.86C.6Preparation for Alignment.87C.7Compensation for Thermal Movement .89C.8Cold Alignment Check .91C.8.1Angular Alignment .91C.8.2Parallel Alignment.92C.9Grouting .93SST Turbine Instruction ManualRevision A5

Table of ContentsSST Turbine Instruction ManualC.10Hot Alignment Check . 94C.11Fire Protection . 95C.12Decommissioning. 94Section D Speed Control System . 96D.1General. 96D.2Standard Governor. 96D.3Lubrication and Maintenance . 99D.4Speed Range and Droop Adjustment . 99D.5Optional Governors . 99D.6Throttle Valve . 100D.7Throttle Linkage. 102D.8Hand Valves . 102Section E Overspeed Trip System. 105E.1General. 105E.2Warnings . 107E.3Description and Function . 109E.3.1Overspeed Governor Cup Assembly . 109E.3.2Trip Valve . 110E.3.3Trip Linkage. 113E.4Trip System Operation . 113E.4.1Manual Reset . 113E.5Adjustment of Trip Speed. 116E.5.1Trip Speed Setting. 116E.5.2Magnetic Pickup Clearances . 117E.6Testing the Overspeed Trip Mechanism . 118E.6.1General. 118E.6.2Overspeed Trip Test Procedure. 119Section F Lubrication System . 120F.1General. 121F.2Lubrication Requirements . 122F.3Oil Ring Lubrication. 123F.4Mist Oil System Lubrication. 124F.5Circulating Oil Cooling System. 1256Revision A SSTTurbineInstruction

SST Turbine Instruction ManualTable of ContentsF.6Pressure Lubrication System.125F.6.1Design Parameters for Turbine Pressure Lubrication Oil Systems.126F.7Cooling Water to Bearing Housing Water Jackets .128F.7.1Bearing Housing Cooling Water Requirements .130F.7.2Governor Oil Cooling Water Requirements.130F.8Recommended Oil Sump and Bearing Temperatures .130F.9Constant Level Oiler .131F.10Bearing Housing Oil Levels and Capacities .132F.11Maintenance/Oil Changes .132F.12Lubricating Oil Selection Guidelines.133F.13Air Purge of Bearing Housings .134Section G Optional Gland Condensers, Eductors and Ejectors .135Section H Optional Instruments and Controls .137H.1Sentinel Warning Valve .137H.2Pressure and Temperature Gauges.137H.3Solenoid Trip.138H.4Other Optional Instruments and Controls.138Section I Start-Up and Operation .139I.1I.2I.3Warnings.139146GeneralTurbine Installation and Start-Up Checklist .145I.3.1Turbine Information .145I.3.2Site Information.146I.3.3Installation.147I.3.4Start Up - Uncoupled .149I.3.5Start Up - Coupled .150I.4Start-Up Procedure.152I.4.1Restoration of Turbine from Shipping Condition .

the steam turbine is essential to safety. INCORRECT INSTALLATION, OPERATION, MAINTENANCE, OR PARTS REPLACEMENT CAN RESULT IN INJURY TO PERSONNEL, AND DAMAGE TO THE TURBINE, DRIVEN MACHINERY, AND PLANT. The Instruction Manual con

Related Documents:

Bruksanvisning för bilstereo . Bruksanvisning for bilstereo . Instrukcja obsługi samochodowego odtwarzacza stereo . Operating Instructions for Car Stereo . 610-104 . SV . Bruksanvisning i original

10 tips och tricks för att lyckas med ert sap-projekt 20 SAPSANYTT 2/2015 De flesta projektledare känner säkert till Cobb’s paradox. Martin Cobb verkade som CIO för sekretariatet för Treasury Board of Canada 1995 då han ställde frågan

service i Norge och Finland drivs inom ramen för ett enskilt företag (NRK. 1 och Yleisradio), fin ns det i Sverige tre: Ett för tv (Sveriges Television , SVT ), ett för radio (Sveriges Radio , SR ) och ett för utbildnings program (Sveriges Utbildningsradio, UR, vilket till följd av sin begränsade storlek inte återfinns bland de 25 största

Hotell För hotell anges de tre klasserna A/B, C och D. Det betyder att den "normala" standarden C är acceptabel men att motiven för en högre standard är starka. Ljudklass C motsvarar de tidigare normkraven för hotell, ljudklass A/B motsvarar kraven för moderna hotell med hög standard och ljudklass D kan användas vid

LÄS NOGGRANT FÖLJANDE VILLKOR FÖR APPLE DEVELOPER PROGRAM LICENCE . Apple Developer Program License Agreement Syfte Du vill använda Apple-mjukvara (enligt definitionen nedan) för att utveckla en eller flera Applikationer (enligt definitionen nedan) för Apple-märkta produkter. . Applikationer som utvecklas för iOS-produkter, Apple .

Figure 2. Example buffer tank sizing for heating with online Calculator Single Stage Two StageSingle Stage Single Stage Two Stage Single Stage Two Stage Single Stage Two Stage Hot Water Only HCT-R4 HCT-R2 HCT-R4 HCT-R 5HCT-R4 HCT-R8 HCT-R4 HCT-R8 HCT-R Chilled Water HCT-R4 HCT-R4 H CT-R5 H 4 HCT-R8 HCT-R5 HCT-R9 HCT-R5 HCT-R9 HCT-R8

KRSP2 Two Stage Global leader in air compressor efficiency KRSP Single Stage Patented 'SKY' air end, triple SKF bearings KRSD Single Stage Direct drive, TEFC motor, low sound enclosure KRSB Single Stage Belt drive, economical to own and operate KRST Single Stage Belt drive, tank mounted KRSH Two Stage High Pressure Pressure up to 580 PSI

50 TRX mining cost), with stage 2 beginning once total mined reaches 2M tokens. The mining cost breakdown for each stage is the following: Stage #: Mining Cost, Stage Beginning Token Supply Stage 1 (beginning): 50 TRX, 100K Stage 1: 50 TRX, 1M Stage 2: 200 TRX, 2M Stage 3: 450 TRX, 3M Stage 4: 800 TRX, 4M Stage 5: 1.25K TRX, 5M