ESID 03-06 Installation Manual V1.0

3y ago
83 Views
7 Downloads
1.65 MB
20 Pages
Last View : 21d ago
Last Download : 3m ago
Upload by : Javier Atchley
Transcription

www.esid.seName of document:Page:1 / 20Version:eSID 03-06 Installation Manual1.0eSID 03-06Installation Manualextended Saab Information Display (eSID)for new generation Saab 9-3 (MY2003-2006)with HPD (High Position Display)

www.esid.seName of document:eSID 03-06 Installation ManualPage:2 / 20Version:1.0Introduction. 3eSID 03-06 components. 5eSID-HPD. 5eSID-GW. 5System Overview . 6Electrical Architecture with eSID 03-06 . 6Schematic eSID 03-06. 7Installation . 8

Page:www.esid.se3 / 20Name of document:Version:eSID 03-06 Installation Manual1.0IntroductionThe eSID2 (extended Saab Information Display) product was released to the market in late 2014 togive the owners of a new generation Saab 9-3 MY2007 to MY2014 the possibility to use the display inthe instrument cluster to show hidden vehicle data like for instance torque, power, tire pressure,read fault codes and instantaneous fuel consumption but also non-display related functions like”Three-Blink” if the driver touches the turn indicator stalk while changing lanes or a manualselectable wiper arm speed.However based on market response, there was also a need for an eSID for the customers of the firstmodel years of the new generation Saab 9-3 (2003-2006), and the answer is eSID 03-06!The early NG9-3 vehicle (2003-2006) is equipped with two CAN-communication buses (P-bus, and Ibus) and one fiber optic bus (O-bus) as illustrated in the figure below:Saab 9-3 Electrical Architecture (2003-2006)

Page:www.esid.se4 / 20Name of document:Version:1.0eSID 03-06 Installation ManualThe ICM exist in three-different levels: ICM1 – No DisplayICM2 – Monographic DisplayICM3 – LCD DisplayThe figure below shows how these three components look like (vehicle in figure equipped withICM3):SIDSIDCICM3Components related to the SIDThe ICM unit reads the status of the switches from SIDC (SID Control) and controls the output to theSID (marked yellow in Figure 1).

Page:www.esid.se5 / 20Name of document:Version:1.0eSID 03-06 Installation ManualeSID 03-06 componentsThe eSID 03-06 consists of two components: eSID-HPD that mainly controls the display and eSID-GWthat is a data collection and pre-processing unit.eSID-HPDHPD is short for “High Position Display” and was the internal development name of the displaylocated near the windscreen on these model years (commonly known as SID, Saab InformationDisplay).eSID-HPD needs to be installed behind the SID, in series with the display cables between ICM andSID. This operation also requires that four new cables are installed in the vehicle (more informationlater in this document).eSID-HPD has two connectors, one VEHICLE-connector that is for the original SID connector (withextra cables) and one DISPLAY-connector where a small adapter cable is installed to the SID.eSID-HPDeSID-GWeSID-GW (Gateway), needs to be placed in the diagnostic connector under the steering wheel abovethe driver feet. eSID-GW is easily installed within a few seconds.eSID-GW

www.esid.seName of document:Page:6 / 20Version:eSID 03-06 Installation ManualSystem OverviewElectrical Architecture with eSID 03-06Saab 9-3 Electrical Architecture (2003-2006) with eSID 03-061.0

Page:www.esid.se7 / 20Name of document:Version:1.0eSID 03-06 Installation ManualSchematic eSID 03-06AOS(US/CA) CA) -11V-12V-4X1-7X1-8X1-9eSID-HPD InstalledSIDElectrical Schematic ICM/SID/SIDC/eSID-HPDICM

www.esid.seName of document:eSID 03-06 Installation ManualPage:8 / 20Version:1.0InstallationIt is recommended to look in the Saab Workshop Instruction System (WIS) when performing some ofthese steps.Step 1)Remove the center ventilation (see WIS) or YouTube:https://www.youtube.com/watch?v 9jR4k2kOQ6QStep 2)Remove ICM (two screws and remove the rear connector)

www.esid.seName of document:eSID 03-06 Installation ManualStep 3)Remove the center speaker grillePage:9 / 20Version:1.0

www.esid.seName of document:eSID 03-06 Installation ManualStep 4)Remove the SID(Two screws, and two connectors in the back)Page:10 / 20Version:1.0

www.esid.seName of document:eSID 03-06 Installation ManualStep 5)Page:11 / 20Version:1.0Drill a hole from the SID basket to place four new cables to be installed(Ensure that the drill does not hit the air channels below, look with a lamp into theinstrument panel. It is recommended to use at least 4.5mm drill to fit all the cables and todrill slightly forward in the direction of the steering wheel for easier installation)Note! The drilling will be through two layers.

www.esid.seName of document:eSID 03-06 Installation ManualPage:12 / 20Version:1.0Step 6)Push all four cables through the hole (terminals shall be on SID side)Step 7)Remove the connector housing to the SID (will be used later for adapter cable betweeneSID and SID. It’s a tricky connector (crap design actually). The inside part needs to beslided out and there are two small hooks that holds it in place, one on each side

Page:www.esid.se13 / 20Name of document:Version:1.0eSID 03-06 Installation ManualStep 8)Remove the SIDC from the Instrument Panel(Press together the lock from the back and pushed forward)Step 9)Push the four cables into the eSID/SID connector:eSID PinPin 1Pin 4Pin 11Pin 12Cable ColourGreenPinkGreen/GreyBrown/OrangeCable descriptionICM – LS CANSIDC - Switch PWMSIDC - Switch Encoder 1SIDC - Switch Encoder 2

www.esid.seName of document:eSID 03-06 Installation ManualStep 10)Page:14 / 20Version:1.0Use a cutter and cut off one edge from the SID connector as the figure below shows. Thisis needed when connecting it to eSID-HPD.

Page:www.esid.se15 / 20Name of document:Version:1.0eSID 03-06 Installation ManualStep 11)Splice three of the new cables from eSID with the cables from the SIDC connector.SIDCPinPin 1eSID-HPDPinPin 11Cable ColorMY03-05Green/GreyCable ColorMY06Brown/GreenPin 2Pin 12Brown/Orange Grey/BlueBrown/OrangePin 4Pin 4PinkPinkWhiteNew CablesCable descriptionGreen/GreyINFO-switchEncoder 1INFO-switchEncoder 2SIDC Switchstatus (PWM)

www.esid.seName of document:eSID 03-06 Installation ManualStep 12)Page:16 / 20Version:1.0Open the ICM connector by lifting the lock and slide out the part that has only standardcables (to avoid damages to the fiber-optic cables when splicing)

Page:www.esid.se17 / 20Name of document:Version:1.0eSID 03-06 Installation ManualStep 13)Splice the last of the new cables from eSID-HPD with the I-bus cable in the ICM connector.ICMPinPin 1SID/eSIDPinPin 1Cable ColorMY03-06GreenNew CableCable descriptionGreenI-Bus (LSCAN)

www.esid.seName of document:eSID 03-06 Installation ManualStep 14)Page:18 / 20Version:1.0Move the SID connector housing that was removed in the earlier step and attach it to theshort adapter cable that will be placed between eSID-HPD and SID. It shall be put on theside where the connector is NOT cut.

www.esid.seName of document:eSID 03-06 Installation ManualStep 15)Page:19 / 20Version:1.0Cut a piece off the plastic of the SID cover where the hole was drilled, so that the neweSID cables doesn’t get squeezed.

Page:www.esid.se20 / 20Name of document:Version:1.0eSID 03-06 Installation ManualStep 16)The eSID-HPD must be installed in a 45 degree angle related to the windscreen in thecorner next to the hole (otherwise the SID with cover doesn’t fit!) with the VEHICLEconnector down. Recommendation when installing: First connect all the cables, thenremove the tape cover from the back and install the eSID HPD in the corner.eSID-HPD positionStep 17)Remount the SID, SIDC and ICMStep 18)Install the eSID-GW in the OBD-connectorStep 19)Turn on the Ignition; The ICM and normal SID operation shall be active. Press and hold theINFO button on the SIDC panel, then the SID shall go black and shortly after shall the eSIDfunctionality be activatedStep 20)Remount the speaker grille and the center ventilation

3 / 20 Name of document: eSID 03-06 Installation Manual Version: 1.0 Introduction The eSID2 (extended Saab Information Display) product was released to the market in late 2014 to give the owners of a new generation Saab 9-3 MY2007 to MY2014 the possibility to use the display in

Related Documents:

We are happy to present you with the ESID 2019 Exhibition Techninal Manual. The Exhibition will be held in conjunction with the 2. nd ESID Focused Meeting, which will be held from 18-21 September 2019, in Brussels, Belgium. This manual covers important information and is designed to assist in preparing for 2019 ESID . Exhibition.

The eSID works only on Saab 9-3 MY07-12 and it’s plug and play. Just connect it to the OBD-connector located near the accelerator pedal and start using it directly. Installation time: Expert: 5 seconds Beginner: 1 minute Dont connect eSID while driving, focus on the road! 3

5.3. STAFInst Uninstall 6. Platform Installation Notes 6.1. Linux installation 6.2. AIX installation 6.3. HP-UX IA64 64-bit installation 6.4. IBM i 32-bit (previously known as i5/OS or OS/400) installation 6.5. z/OS installation 6.6. FreeBSD installation 6.7. Mac OS X installation 6.8. Solaris installation 7. Environment Variable Settings 7.1.

This installation manual is part of and shipped with the unit, and contains information on its safe installation. Read this installation manual completely before installing the unit. This installation manual must be kept available to installers at all times at the installation loca- tion. Keep this installation manual on hand throughout

Manual Part 3, Installation and Commission 1 VTA100004 Manual Part 4, Communication 1VTA100005 Motor Protection with ATEX Certification, Manual 1MRS755862 Operator’s Manual 1MRS755869 Protection Manual 1MRS755860 Technical Catalogue 1MRS755859 Technical Reference Modbus RTU 1MRS755868 Web Manual, Installation 1MRS755865 Web Manual, Operation .

Electronics 2.35 Drying 0.68 Refrigeration 2.55 Water Heating 3.54 Lighting 4.35 Ventilati on 1.61 Cooling 3.84 2014 Residential and Commercial Building Primary Energy Use (Quads) Total primary energy use in buildings 38.5 Quads R esid ntial 37% Other Industrial 24% Industrial HVAC and Ligh

the basis for analysing the impact of our case study NGO. Section 4 then provides a brief overview of the NGO sector in Uganda and its relations with the state. Section 5 deals with the description of TASO and its Mini-TASO project (MTP), the methodology employed and an introduction to the study sites.

Dr. Alfredo López Austin [National University of Mexico (UNAM)] Golden Eagle Ballroom 3:00 pm 3:15 pm BREAK 3:15 pm 4:00 pm BREAKING THROUGH MEXICO'S PAST: DIGGING THE AZTECS WITH EDUARDO MATOS MOCTEZUMA Dr. David Carrasco (Harvard University) Golden Eagle Ballroom 4:00 pm 4:30 pm 4:30 pm 5:00 pm TLAMATINI AWARD PRESENTATION to Dr. Eduardo Matos Moctezuma (Bestowed by Dr. Rennie Schoepflin .