Substation Automation Systems:from Engineering to Automated TestingEugenio Carvalheira, OMICRONAndreas Klien, OMICRONPower & Energy Automation ConferenceSeattle, March 02-05, 2020

Outline Motivation IEC 61850 SCL Engineering Process Test Method for Substation Automation System Engineering Requirements for Optimal Testing Test Case Examples ConclusionPage 2

PAC Testing Protection Testing: Tools for Automated Testing Standardized Test Plans reduced effortsdramatically But what happened in the.? Testing Automation and Control: Functional drawings and interfaces Logics, Interlockings SCADA, Gateways, RTUs (signal lists) Manual procedures so far. How to test itefficiently?Page 3

IEC 61850 Substations Data Models Client/Server (Reports), GOOSE, Sampled Values System Configuration Language (SCL)Page 4

Engineering of IEC 61850 with SCL IEC 61850-6 Configuration of overall communication system Interoperability between Engineering ToolsSystem Specification DescriptionIED Capability DescriptionSystemConfiguration onfigured IED DescriptionPage 5

SCL Scope SCL uses XML-based files An SCL file contains following information: IEDs: Data Models and Configuration of Reports, GOOSE, SV Correlation between Switchgear and Functions to IED Logical Nodes Communication links between IEDsPage 6

New Test Approach Based on SCL Information Visualize and Test entire Substation Automation SystemSCLFilePage 7

New Test Approach#1 Monitor and TestCommunication#2 Identify errors#3 Test Logic#4 Simulation (e.g. FAT)Page 8

New Test Approach#5 Testing the SAS during its entire Lifecycle#6 Test PlansIEDFeaturesQualitySCL FilePage 9EfficientTesting

Test Mode and Simulation Flag Test Mode: what are the DUTIEDGOOSE dataq.test FALSEOutput to processBeh ONprocessedBeh TESTnot processed Simulating Messages with Test SetGoID 1Simulation TRUEGoID 1Simulation FALSESubscribe GoID 1LPHD.Sim FALSELPHD.Sim TRUEIEDPage 10Test Set

SCD Substation Section Substation Topology in SCDSubstationVoltage LevelBayIEDBreakerPage 11Testing Tool

SCD Substation Section Association between Switchgear and LNsAssociatedSignalsBreakerandIEDPage 12

SCD: Signal Descriptions “desc” attribute of Data Objects should be present in SCD file IEC 61850 allows to hide 61850 Instead of Complex Addresses, use signal names from Engineering If unavailable, use smart names from StandardPage 13

Describing GOOSE connections 2 ways to define subscriptions in SCD: Subscribers in GOOSE Control Block of Publisher ExtRef in Subscribers Use of LGOS Logical Node for GOOSE Subscription One per Subscription Enable Monitoring of Receive Status Benefit Check of GOOSE links: Verify Publisher Verify mismatches by comparing traffic with SCD Verify Reception with Subscribers LGOSPage 14

Report Configuration Reports used for SCADA Communication One-to-one connections between IED and Clients Reports can be reserved “Owner” attribute Described in SCD Benefit Check Report links: Verify “Owner” is the Client defined in the SCDPage 15

Network Design Considerations Testing Requirements should be considered for Network Design Clear Access Points for Testing considering: Topology: Station Bus and Process Bus Traffic Control: VLAN and Multicast Filtering Redundancy: RedBoxPage 16

Example: Testing Interlocking Logics CILO LN shows interlocking logic resultfor each switchPage 17

Example: Troubleshooting Tracing Signals through the SASPage 18

Example: Re-testing after Security UpdatesPage 19

Conclusion SCL is a very powerful aspect of IEC 61850 Challenges: Some features are Optional Lack of Tools Requirements to be considered during System Design and Engineering Benefits go beyond engineering: Testing / Monitoring Cybersecurity Documentation Save Time and Increase Efficiency Using what SCL OffersPage 20

e 21

Mar 04, 2020 · Substation Automation Systems: from Engineering to Automated Testing Power & Energy Automation Conference . Visualize and Test entire Substation Automation System. Page 7. SCL File. New Test Approach. Page 8 #1 Monitor and Test Communication . Cybersecurity Documentation Save Tim

Related Documents:

Electrical Substation Configuration Effect on Substation Reliability . Courtney Otania and Kurt Vedros a. a Idaho National Laboratory, Idaho Falls, ID, USA . . Substation Level, Generic 4.931E-05 Busbar, Substation [7] 132 kV Busbars 1.507E-05 Control Panel Switchgear [2] C4-300 2.845E-06 .

- NJT01113, ROC Unit Substation: This project includes construction of a replacement Substation to be built above Design Flood Elevation and integration of emergency power equipment to service the Rail Operations Center (ROC). 8. Contract/Program Location Henderson Street Substation, Bay Head Yard Substation, Depot Substation, Rail Operations .

The new substation will sit on the footprint of the oldest structure and extend a little beyond. The second substation will be demolished. At completion of the project there will be only one substation. In answer to the survey posted on the internet concerning the project we have prepared a sheet answering those questions they are as follows:

system paradigm, which establishes the substation . cybersecurity.” The smart substation as a climate change catalyst Nearly every industry group and authority, including the . Substation & Edge-of-the-Grid Automation is a new, r

when used in substation system communications that have stringent response time requirements and . Substation automation requires 3ms latency at most, and even high-end . the problems of a highly connected substation are the

Sep 12, 2008 · The IEC 61850 standard includes a model of a substation communications interface system, as shown in Fig. 1 [2]. It separates the substation communications into process level, bay level, and substation level. Fig. 1. Interface model of a substation automation system as depicted in IEC 61850-1 One

Aug 23, 2019 · IEEE C37.240 ―Standard for Cyber Security Requirements for Substation Automation, Protection and Control Systems‖ (under development) . Cybersecurity Requirements for Substation Automation, Protection, and Control Systems. . The physical power system (a substation PC co-model is sh

A - provider is used by AngularJS internally to create services, factory etc. B - provider is used during config phase. C - provider is a special factory method. D - All of the above. Q 10 - config phase is the phase during which AngularJS bootstraps itself. A - true B - false Q 11 - constants are used to pass values at config phase. A - true B .