Gallions Reach and Belvedere River CrossingsBridge and tunnel technical drawingsDate: November 2015Version: 1.0

2

CONTENTS1.Introduction . 42.Gallions Reach bridge . 53.Gallions Reach tunnel . 74.Belvedere bridge . 105.Belvedere tunnel . 123

1. Introduction1.1.Transport for London (TfL) has commissioned some preliminary design work for bridgesand tunnels at Gallions Reach and Belvedere.1.2.The purpose of these designs is to provide TfL with an understanding of whether thereare feasible solutions to the physical constraints at these locations, and to provide anindication of the likely costs. The key constraints include the navigational parametersnecessary to protect shipping on the Thames, which makes a 6.5 billion contribution tothe UK economy.1.3.TfL has assessed the feasibility of both bored and immersed tunnel crossings. Animmersed tunnel is constructed from individual tunnel segments that are prepared in acasting basin and floated to the tunnel site to be sunk into place on the river bed. Abored tunnel is typically circular in cross-section and excavated below the river bed,without removal of the ground above. Based on the work undertaken so far, theimmersed tunnel appears to be preferable to the bored tunnel because theenvironmental impacts of construction are manageable in these locations, and theimmersed tunnel can be delivered at a significantly lower cost than the bored tunneloption. This would be subject to more detailed assessments and discussions with keystakeholders including the Port of London Authority and Environment Agency.1.4.Different forms of bridge construction have been considered. Due to the need to respectthe clearances required for City Airport, it is expected that a bridge at Gallions Reachwould be a concrete box structure. With a need for a longer span at Belvedere, and thelack of an airport height restriction, it would more likely be a cable-stayed bridge at thatlocation. However these are only working assumptions for now and these conclusionscould change should the constraints change in future or more structurally efficientoptions are identified.1.5.These concept designs are included within this report. However, it is important to notethat : 1.6.Detailed alignments may change as the design progresses to a further stage, tointegrate into current or future development plans and to take account of theviews of key stakeholders (including land owners, boroughs and the Port ofLondon Authority);Incorporation of the final public transport solution may require further work tothe alignment to tie these links into the network at either end, particularly if railbased options are selected;Traffic layouts will need to be refined subject to local area traffic modelling; andConnections at either end for pedestrians and cyclists will need to beincorporated, and will be influenced by emerging development plans for theareas at either ends of the crossings.Therefore while these drawings are presented here for transparency, it must be notedthat these are not final designs, and close working with land owners and other keystakeholders will be necessary in due course on the preferred option(s) selected, torefine and optimise the design, alignment, and connections, and to minimise the impactson adjoining residents, businesses, land owners and developers.4

2. Gallions Reach bridge2.1.A concept design for a bridge at Gallions Reach can be seen on the next page.2.2.The bridge would link the A1020 Royal Docks Road in Beckton with the A2016 WesternWay in Thamesmead. The alignment and junctions, particularly on the southern side, willneed more detailed work to ensure that the impacts on residents are minimised, andconnections to the existing transport networks are optimised.5

130

3. Gallions Reach tunnel3.1.A concept design for a tunnel at Gallions Reach can be seen on the next pages.3.2.The tunnel would link the A1020 Royal Docks Road in Beckton with the A2016 WesternWay in Thamesmead. The alignment and junctions, particularly on the southern side, willneed more detailed work to ensure that the impacts on residents are minimised, andconnections to the existing transport networks are optimised.7

4. Belvedere bridge4.1.A concept design for a bridge at Belvedere can be seen on the next page.4.2.The bridge would link the A13 Marsh Way junction in Rainham with the A2016 EasternWay/Bronze Age Way in Belvedere. The alignment and junctions will need more detailedwork to ensure that the impacts on businesses are minimised, and connections to theexisting transport networks are optimised.10

5. Belvedere tunnel5.1.A concept design for a tunnel at Belvedere can be seen on the next pages.5.2.The tunnel would link the A13 Marsh Way junction in Rainham with the A2016 EasternWay/Bronze Age Way in Belvedere. The alignment and junctions will need more detailedwork to ensure that the impacts on businesses are minimised, and connections to theexisting transport networks are optimised.12

The bridge would link the A1020 Royal Docks Road in Beckton with the A2016 Western Way in Thamesmead. The alignment and junctions, particularly on the southern side, will need more detailed work to ensure that the impacts on residents are minimised, and connections to the existing transport networks are optimised. 130. 7 3. Gallions Reach tunnel 3.1. A concept design for a tunnel at Gallions .

Related Documents:

The Chesapeake Bay Bridge Tunnel, shown in a 2000 file photo. (Steve Earley Virginian-Pilot file photo) View full-size photo Buy Pilot photos RELATED Meetings set on Bay Bridge-Tunnel toll increase - Jul. 18 Bay Bridge-Tunnel moves toward higher toll, expansion - May. 31 Chesapeake Bay Bridge-Tunnel to offer big discount - Feb. 13

Feb 21, 2018 · Downtown Tunnel #1 Hampton Roads #1 Midtown Tunnel #1 Thimble Shoal #1 & Chesapeake #1 Hampton Roads #2 Downtown Tunnel #2 Monitor-Merrimac Midtown Tunnel #2 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 65 Years of Tunneling in

the bridge types under considerationthe evaluation criteria used to , differentiate between potential bridge types, and illustrates strengths and weaknesses of each type. The Bridge and Tunnel Concept Report focused on four distinct conceptual bridge types illustrated in igures 1 F - 4 and different tunnel options discussed in section 4.5.

Future tunnel #11 at Thimble Shoal will be bored tunnel Settlers Landing in Hampton to I-564 Norfolk (9.5 Miles) I-64 improvements include 6 lanes of highway and construction of 4 lane bridge/tunnel New 4 lane HRBT tunnel will s

Virginia Tunnel Inspections June 27, 2016 RESTRICTED – CRITICAL INFRASTRUCTURE INFORMATION; This document and all information contained therein is considered as . Thimble Shoal Tunnel. 9. Chesapeake Channel Tunnel. Roanoke Airport Tunnel . I-564 Runway Tunnel. 10. 11. 8. 9. 11. 10. RES

12.2 ENGINEERING DRAWINGS Successful bridge fabrication and construction depend on the accuracy and completeness of the engineering drawings. Two types of drawings are normally used: design drawings and shop drawings. Design drawings show the structure configuration and provide information necessary for field assembly.

Downtown Tunnel #1 Hampton Roads #1 Midtown Tunnel #1 Thimble Shoal #1 & Chesapeake #1 Hampton Roads #2 Downtown Tunnel #2 Monitor-Merrimac Midtown Tunnel #2 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 9 tunnels are steel-shell immersed tubes

Aluminum bridge crane isometric 11 Steel bridge crane plan view 12 Aluminum bridge crane plan view 13 Bridge Crane Systems & Dimensional Charts Installation Parameters 14 250 lb. capacity bridge cranes 15 - 17 500 lb. capacity bridge cranes 18 - 21 1000 lb. capacity bridge cranes 22 - 25 2000 lb. capacity bridge cranes 26 - 29 4000 lb. capacity .