M-001

3y ago
42 Views
3 Downloads
2.03 MB
9 Pages
Last View : 1d ago
Last Download : 2m ago
Upload by : Julius Prosser
Transcription

AIR DEVICE LEGENDVALVE LEGENDDOUBLE CHECK VALVE ASSEMBLY700RPZ, 3" AND LARGER20 x 20RG70018 x 18EG600PIPE DROPCEILING EXHAUST GRILLE WITH SIZE, TYPE & CFMRIGID DUCT & CEILING SUPPLY DIFFUSER WITHSIZE, TYPE & CFM12 x 12CD-PIPE DROP @ 45 FLEX. DUCT & CEILING SUPPLY DIFFUSER WITHSIZE, TYPE & CFM12 x 12CD700FLEXIBLE DUCT & LINEAR DIFFUSER WITHLENGTH, TYPE & CFM (TYPE SUFFIX DENOTES NO.OF SLOTS)4"-0"CD700EXHAUST GRILLETGTRANSFER GRILLERRETURN, EXHAUST, OR OUTSIDE AIR DUCTSECTIONA.PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TOINSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THEDRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.INCLINE RISE (R) OR DROP (D); ARROW INDIRECTION OF AIR FLOWB.CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC ANDARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. THECONTRACTOR SHALL VISIT THE SITE PRIOR TO BID IN ORDER TO VERIFY EXISTINGCONDITIONS THAT MAY IMPEDE THE WORK TO BE PERFORMED IN THIS CONTRACT. NOTALL EXISTING CONDITIONS ARE SHOWN ON THESE PLANS, AND CONTRACT CHANGEORDERS WILL NOT BE ALLOWED TO RESOLVE CONFLICTS WITH EXISTING PIPING, DUCTS,CONDUIT, LIGHTING, EQUIPMENT, ETC.C.INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLECODES AND STANDARDS.D.NOT ALL EXISTING EQUIPMENT OR CONDITIONS ARE INDICATED ON THESE PLANS. THECONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING EQUIPMENT,DUCTWORK, CONDUIT, LIGHTING, AND PIPING BEFORE BIDDING THIS WORK.E.COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ELECTRICAL WORKSHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.F.WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THEPRODUCT OF ONE MANUFACTURER SHALL BE USED.G.CLOSELY FOLLOW MANUFACTURER RECOMMENDATIONS FOR EQUIPMENT AND SYSTEMINSTALLATION. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'SCERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONSREQUIRED FOR FINAL EQUIPMENT CONNECTIONS. FIELD VERIFY AND COORDINATE ALLDUCT AND PIPING DIMENSIONS BEFORE FABRICATION.DIELECTRIC UNIONTRANSITIONCONCENTRIC REDUCERECCENTRIC REDUCERCIRCUIT SETTER2FT²2 SQUARE FOOT OPENING IN WALL ABOVECEILINGORIFICE VALVE45 BRANCHWYE STRAINER WITH VALVED BLOWOFFPIPE BREAKSUPERVISED VALVEFLEXIBLE DUCTMOTOR OPERATED VALVE15DUAL DUCT MIXING BOX (15, SEE BOX SCHEDULE)MODULATING CONTROL VALVE1645 BRANCH TAKEOFF WITH EXTRACTORVALVE IN RISE OR DROPSOLENOID OPERATED VALVE (ELECTRIC)PPRESSURE GAUGEPPRESSURE GAUGE WITH GAUGE COCKTTHERMOMETER WITH WELL45 BRANCH TAKEOFF WITH SPLITTERSINGLE DUCT BOX (16, SEE BOX SCHEDULE)RADIUS BRANCHTHERMOMETER WELLTWO POSITION CONTROL VALVETEMPERATURE / PRESSURE RELIEF VALVEAQUASTATSINGLE DUCT BOX WITH REHEAT (17, SEE BOXSCHEDULE)17ANGLE VALVEMOA6000METER (NATURAL GAS, CITY WATER)H.LOUVER WITH SIZE, SECTION & CFMAIR FLOW MEASURING STATION IN DUCTWORKFLEXIBLE CONNECTOR - BELLOWS TYPE3-WAY MIXING VALVESTEAM TRAPHHRADIUS BRANCH TAKEOFF WITH SPLITTERFLEXIBLE CONNECTOR - NEOPRENE TYPE48 x 48 LVRDUCT MOUNTED STEAM OR HOT WATER HEATINGCOILHUMIDISTATDTDUCT HUMIDISTATDUCT MOUNTED STEAM HUMIDIFIERMISCELLANEOUS SYMBOLS#THERMOSTATKEYED DRAWING NOTES36 x 12FLAT OVAL DUCTWORK WITH CONICAL TAP ANDFLAT OVAL OR ROUND BRANCH DUCTAUTOMATIC AIR VENT AND SHUTOFF VALVEAELEVATION MARKERTHERMOSTAT - ASPIRATING36 x 12FLAT OVAL DUCTWORK WITH CONICAL TAP ANDCAPPED FLAT OVAL OR ROUND BRANCH DUCT#TSHEETNTHERMOSTAT - NIGHTMANUAL AIR VENT12x12#TR or DDETAIL INDICATORTHERMOSTAT - RECESSED OR DIFFUSERMOUNTED12"TRANSITION FROM RECTANGULAR TO ROUNDDUCTWORKSECTION INDICATORSHEETALL MISCELLANEOUS HARDWARE AND SUPPORTS REQUIRED TO ENSURE PROPERINSTALLATION AND AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT(UNLESS NOTED OTHERWISE) SHALL BE FURNISHED AND INSTALLED BY THEMECHANICAL CONTRACTOR.J.ALL EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL BE SUPPORTED AS DETAILED,SPECIFIED, AND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION.K.CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUMEDAMPERS, ETC. ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITYFOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THEEXTENT OF THE REQUIREMENTS FOR THESE ITEMS. ALL DUCTWORK SHALL BECOORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDEDDUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NOADDITIONAL COST TO THE OWNER.L.ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEARDIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LININGTHICKNESS.M.PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH SINGLE THICKNESS TURNING VANESPER SMACNA GUIDELINES UNLESS INDICATED OTHERWISE. PROVIDE ACCESS DOORSUPSTREAM OF ALL ELBOWS WITH TURNING VANES.N.ALL WALL-MOUNTED THERMOSTATS SHALL BE AT 48" AFF UNLESS NOTED OTHERWISE.DUCTWORK TEE WITH ADJUSTABLE SPLITTERDAMPER AND VANED ELBOWSCHAIN OPERATED VALVETTHERMOMETER2FT²DOOR LOUVER WITH 2 SQUARE FEET FREE AREATHE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THESPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATEONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS ANDRESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVETHE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALEDRAWINGS.I.POINT OF CONNECTION / REMOVALTGwin EngineeringConsultants, LLCMECHANICAL GENERAL NOTES:FLANGED UNIONDBALANCING VALVESAFETY VALVE WITH DRIP PAN ELBOWCONSULTANTSUNIONEGArchitectural & Engineering ServicesThe University of OklahomaHealth Sciences Center865 Research Parkway, Suite 500Oklahoma City Oklahoma 73104(405) 271-2305; cell (405)740-2862SUPPLY DUCT SECTIONPLUGGED TEEGAS PRESSURE REGULATOR3-WAY DIVERTING VALVECONTRACTOR MUST AVOID SEVERANCE OR DAMAGE TO BURIED SERVICE LINES.SHOULD DAMAGE OCCUR, REPAIRS SHALL BE MADE WITHOUT ADDITIONAL COST TO THEOWNER.CAP ON END OF PIPEPRESSURE REDUCING VALVESAFETY RELIEF VALVED.SOUND ATTENUATING DUCTWORKBRANCH TEE, BOTTOM CONNECTIONVACUUM BREAKERAUTOMATIC VALVECOORDINATE WITH WORK OF OTHER TRADES AND CONSTRUCTION MANAGER TO AVOIDINTERFERENCES BEFORE BEGINNING WORK.BRANCH TEE, TOP CONNECTIONCHECK VALVE - SWING TYPEMC.DUCT (FIRST DIMENSION IS SIDE SHOWN)20 x 2GAUGE COCKSALL WORK TO BE PERFORMED AND INSTALLED PER THE REQUIREMENTS OF ALLFEDERAL, STATE AND LOCAL CODES, LAWS, REGULATIONS, INSPECTION AGENCIES,UTILITY COMPANIES, AND ANY OTHER AUTHORITIES HAVING JURISDICTION. REFER TOARCHITECTURAL DRAWINGS FOR FEDERAL ADA FIXTURE REQUIREMENTS (IF ANY).FLAT OVAL DUCTWORKPIPE RISE700VBB.PIPE ANCHORSIDEWALL RETURN GRILLE WITH SIZE, TYPE &CFMBUTTERFLY VALVECHECK VALVE - BUTTERFLY TYPE"GENERAL NOTES" APPLY TO ALL DRAWINGS ISSUED FOR THIS PROJECT. "DRAWINGNOTES" APPLY ONLY TO THE SHEETS ON WHICH THEY APPEAR. THE WORD "PROVIDE" ISDEFINED "FURNISH AND INSTALL".PIPE GUIDEGATE VALVEPLUG VALVEA.ROUND DUCTWORKDIRECTION OF SLOPEGLOBE VALVEBALL VALVEPROJECT GENERAL NOTES:DUCT LEGENDDIRECTION OF FLOWSIDEWALL SUPPLY GRILLE WITH SIZE, TYPE &CFM24 x 12SG-RPZ, 2" AND SMALLERPIPING LEGEND1306 Commerce Drive, Norman, OK 73071Phone: (405) 850-0205Email: ogwin@gwin-engineering.comOklahoma CA # 7649; Expires 6/30/2022OUHSCCOLLEGE OF PUBLIC HEALTHAHU REPLACEMENTS801 NE 13th StreetOklahoma City, Ok 73104-5042ISSUED FOR CONSTRUCTION11/27/2020MVDMANUAL VOLUME DAMPERM MODMOTOR OPERATED DAMPERF:\PC Move\Documents\BMSB-Pdfs\BMSB FLOORS lab remodels2019.plnFDFIRE DAMPERMARKSMOKE DAMPERPROJECT NO:MODEL FILE:DRAWN BY:ARCHK'D BY:OGCOPYRIGHTDATEDESCRIPTIONSDTURNING VANESFLEXIBLE CONNECTION - DUCTWORKDUCT CAPSHEET TITLEHVAC LEGENDS & NOTESATTACHMENT BM-001SHEETOF

EXISTING CHWS & CHWRUNDERGROUND TOAUDITORIUMEXISTING ELECTRICAL PANELSUPPLYING EXISTING AHUEXISTING HHWS &HHWR OVERHEADArchitectural & Engineering ServicesThe University of OklahomaHealth Sciences Center865 Research Parkway, Suite 500Oklahoma City Oklahoma 73104(405) 271-2305; cell (405)740-2862CONSULTANTSEXISTING ELECTRICAL PANELSUPPLYING EXISTING AHUGwin EngineeringConsultants, LLCDEMOLISH WIRE AND RACEWAY (WHERE NOT EMBEDDEDIN THE STRUCTURE) FROM THE EXISTING AHU BACK TOSOURCE. REMOVE ANY REDUNDANT CONTROLS,DISCONNECTS ETC. ASSOCIATED WITH THE EXISTINGAHU. PRESERVE CIRCUIT BREAKER FOR REUSE.EXISTING CHWS &CHWR OVERHEAD1306 Commerce Drive, Norman, OK 73071Phone: (405) 850-0205Email: ogwin@gwin-engineering.comOklahoma CA # 7649; Expires 6/30/2022EXISTING HEATING HOTWATER SUPPLY & RETURN(HHWS & HHWR)EXISTING CONDENSATERETURN PUMP TO REMAINEXISTING 70 PSI STEAMPIPING OVERHEADEXISTING PRVREMOVE CHILLED WATER ANDSTEAM COILS AS INDICATED.EXISTING STEAM TO HOTWATER GENERATOR TOREMAINREMOVE EXISTING BRANCHSTEAM, CHILLED WATER, ANDCONDENSATE PIPING SERVINGCOILS BEING REMOVED.REMOVE FAN ANDASSOCIATED DUCTWORK INMECH ROOM AS INDICATEDEXISTING LOW PRESSURESTEAM TO REMAINRELOCATE PIPING AS REQUIREDTO ACCOMMODATE NEW AIRHANDLER AND VAV TERMINALUNITS IN MECH ROOM. SEE 1/M201.OUHSCCOLLEGE OF PUBLIC HEALTH(E)15x22 SA(E)18x22 SAEXISTING FAN TO BEREMOVED. SEE 1/M101.(E)15x22 SAEXISTING OUTDOORAIR INTAKE LOUVERTO REMAINAHU REPLACEMENTSEXISTING RETURNDUCT TO REMAIN801 NE 13th StreetOklahoma City, Ok 73104-5042F:\PC Move\Documents\BMSB-Pdfs\BMSB FLOORS lab remodels2019.plnISSUED FOR CONSTRUCTION11/27/2020MARKDATEDESCRIPTIONPROJECT NO:MODEL FILE:DRAWN BY:ARCHK'D BY:OGCOPYRIGHT2HVAC PIPING DEMO PLAN - BASEMENT AHU1SCALE: 1/4" 1'-0"NORTHHVAC DEMO PLAN - BASEMENT AHUSCALE: 1/4" 1'-0"NORTHSHEET TITLEHVAC DEMOLITIONBASEMENT AHUM-101SHEETOF

Architectural & Engineering ServicesThe University of OklahomaHealth Sciences Center865 Research Parkway, Suite 500Oklahoma City Oklahoma 73104(405) 271-2305; cell (405)740-2862EXISTING CHWS &CHWR OVEREADEXISTING ELECTRICALPANEL TO REMAINCONSULTANTSREMOVE EXISTING BASKETSTRAINER AND PUMPSUCTION AND DISCHARGEPIPING AS INDICATED.REMOVE EXISTINGPUMP CONTROLSGwin EngineeringConsultants, LLCREMOVE EXISTING 30-HPPUMP, ACCESSORIES, ANDPIPING AS INDICATED.1306 Commerce Drive, Norman, OK 73071Phone: (405) 850-0205Email: ogwin@gwin-engineering.comOklahoma CA # 7649; Expires 6/30/2022DEMO RACEWAY, WIRING,CIRCUIT BREAKER, AND VFDFOR EXISTING CHW PUMPREMOVE EXISTING30-HP VFDOUHSCCOLLEGE OF PUBLIC HEALTHAHU REPLACEMENTSEXISTING CHWS &CHWR OVEREAD801 NE 13th StreetOklahoma City, Ok 73104-5042EXISTING DELTA-TVALVE OVERHEADISSUED FOR CONSTRUCTION11/27/2020F:\PC Move\Documents\BMSB-Pdfs\BMSB FLOORS lab remodels2019.plnEXISTING CHWS &CHWR FROM CAMPUSCHILLED WATER LOOPMARK1DATEDESCRIPTIONPROJECT NO:MODEL FILE:DRAWN BY:ARCHK'D BY:OGCOPYRIGHTHVAC DEMO PLAN - BASEMENT CHW PUMPSSCALE: 1/4" 1'-0"NORTHSHEET TITLEADDITIVE ALTERNATE #1ALL WORK INDICATED ON THIS SHEET SHALL BE BID ASHVAC DEMOLITIONBASEMENT CHW PUMPS(ALT #1)MANDATORY ADDITIVE ALTERNATE #1. ALTERNATE #1 INCLUDESREPLACEMENT OF THE BUILDING TERTIARY CHILLED WATERPUMP WITH TWO NEW REDUNDANT PUMPS AS INDICATED.M-102SHEETOF

Architectural & Engineering ServicesThe University of OklahomaHealth Sciences Center865 Research Parkway, Suite 500Oklahoma City Oklahoma 73104(405) 271-2305; cell (405)740-2862EXISTING RETURNFAN ON ROOFCONSULTANTSGwin EngineeringConsultants, LLCEXISTING RETURNFAN ON ROOF1306 Commerce Drive, Norman, OK 73071Phone: (405) 850-0205Email: ogwin@gwin-engineering.comOklahoma CA # 7649; Expires 6/30/2022REMOVE EXISTINGRETURN AIR DUCTABOVE UNITREMOVE EXISTING32x16 SUPPLY AIRDUCT OVERHEADOUHSCCOLLEGE OF PUBLIC HEALTHAHU REPLACEMENTSREMOVE EXISTING AHU-5801 NE 13th StreetOklahoma City, Ok 73104-5042REMOVE EXISTING STEELSTRUCTURE BELOW UNIT(E) 3" CHW DOWNTHRU ROOFREMOVE EXISTINGSUPPLY AIR DUCTOVERHEADISSUED FOR CONSTRUCTION11/27/20201HVAC DEMO PLAN - ROOFTOP AHUSCALE: 1/4" 1'-0"NORTHF:\PC Move\Documents\BMSB-Pdfs\BMSB FLOORS lab remodels2019.plnDRAWING NOTES:1.REMOVE EXISTING AIR HANDLING UNIT AS INDICATED.2.REMOVE EXISTING SUPPORT STRUCTURE BELOW AIR HANDLING UNIT (AHU)DOWN TO EXISTING ROOF DECK. PREPARE ROOF AREA TO RECEIVE NEW ROOFCURB TO SUPPORT REPLACEMENT AHU.3.REMOVE EXISTING 3" CHILLED WATER PIPING DOWN TO ROOF PENETRATION.4.REMOVE EXISTING 2" HEATING HOT WATER SUPPLY AND RETURN PIPING FROMAHU TO THE BUILDING EXTERIOR WALL.5.DEMO DISCONNECTS AND WIRING FOR AHU FAN MOTOR AND HEAT TRACEBACK TO SOURCE, PRESERVE RACEWAY FOR REUSE IF IN GOOD ORDER, ANDSIZED FOR NEW WIRING. DRAWINGS SHOW SOURCE AS PANEL “5L2”; FIELDVERIFY TO CONFIRM.MARKDATEDESCRIPTIONPROJECT NO:MODEL FILE:DRAWN BY:ARCHK'D BY:OGCOPYRIGHTSHEET TITLEHVAC DEMOLITIONROOFTOP AHUM-103SHEETOF

DRAWING NOTES:EXISTING ELECTRICAL PANELSUPPLYING EXISTING AHUEXISTING HHWS &HHWR OVERHEADEXISTING CHWS &CHWR OVERHEADEXISTING CHWS & CHWRUNDERGROUND TOAUDITORIUM2" HHWS &HHWRVAV-B384" AFFNEW CUSTOM AIR HANDLING UNIT ON 3" CONCRETE HOUSEKEEPING PAD. SEESCHEDULE ON SHEET M601 AND DETAIL 1/M601. PAD SHALL BE 6" WIDER THANUNIT ON ALL FOUR SIDES.2.NEW SINGLE DUCT VAV TERMINAL UNIT WITH HOT WATER REHEAT COIL. SEESCHEDULE ON M601 AND DETAIL 1/M501.3.INSTALL NEW SHUT-OFF VALVES IN BRANCH CHILLED WATER PIPING SERVINGNEW AHU-B.4.TAP NEW HHWS & HHWR AT TOP OF EXISTING HHWS & HHWR PIPING ANDPROVIDE NEW SHUT-OFF VALVES TO ISOLATE NEW PIPING TO VAV TERMINALUNITS.5.NEW STEAM CONDENSATE RETURN PUMP AT FLOOR. BELL & GOSSETT MODEL23CB9-15 OR EQUIVALENT, 31 HP, 9 GPM.6.INSTALL NEW CIRCUIT BREAKER AND FEEDER FROM PANEL TO NEWCONDENSATE RECEIVER UNIT ( 1 HP). COORDINATE PHASES AND WIRE SIZESWITH FINAL UNIT SUBMITTED7.INSTALL 3, #10AWG, #12G, 3 PHASE 208V FOR FAN DRIVE, AND 2, #12 AWG 120VFOR UV LIGHT & EP3/MSP AIRFLOW MONITOR, IN ¾” EMT FROM EXISTING PANELTO NEW AHU-B. AT PANEL, REUSE EXISTING 3 POLE CIRCUIT BREAKER FOR FANDRIVE, AND INSTALL NEW 20A 1 POLE BREAKER FOR ADDITIONAL 120V CIRCUIT.8.EXISTING FLOOR DRAIN. ROUTE 1" COPPER CONDENSATE FROM NEW AHU-BWITH 81" PER FT MINIMUM SLOPE TO FLOOR DRAIN. PROVIDE CONDENSATETRAP AT UNIT DRAIN CONNECTION AND TERMINATE PIPING WITH 1" AIR GAP.Architectural & Engineering ServicesThe University of OklahomaHealth Sciences Center865 Research Parkway, Suite 500Oklahoma City Oklahoma 73104(405) 271-2305; cell (405)740-2862EXISTING ELECTRICAL PANELSUPPLYING EXISTING AHUCONSULTANTSGwin EngineeringConsultants, LLCVAV-B384" AFF1306 Commerce Drive, Norman, OK 73071Phone: (405) 850-0205Email: ogwin@gwin-engineering.comOklahoma CA # 7649; Expires 6/30/2022EXISTING HEATING HOTWATER SUPPLY & RETURN(HHWS & HHWR)EXISTING CONDENSATERETURN PUMP TO REMAIN18x22 SAEXISTING 70 PSI STEAMPIPING OVERHEAD1" COND DRAINFROM AHU-B1.EXISTING PRV2VAV-B284" AFFEXISTING STEAM TO HOTWATER GENERATOR TOREMAIN1-1/2" HHWS& HHWRAHU-BEXISTING LOW PRESSURESTEAM TO REMAIN2" CHWS &CHWR TOAHU-B3" LPS TOAHU-BM201VAV-B160" AFF54x18 SA UP15x22 SAEXISTING OUTDOORAIR INTAKE LOUVERTO REMAIN50x24 RA36VAV-B160" AFF4x2RAVAV-B284" AFF(E)15x22 SANEW CP-1(E)15x22 SA1-1/2" PUMPED CONDENSATE TOEXISTING 1-1/2" CONDENSATERETURN PIPING FROM MECH ROOM(E)18x22 SAM15x22 SA44x24 OAOUHSC16x24 OACOLLEGE OF PUBLIC HEALTHNEW AHU-BAHU REPLACEMENTS(E)50x24 RAEXISTING RETURNDUCT TO REMAIN3HVAC PIPING NEW WORK PLAN - BASEMENT AHU1SCALE: 1/4" 1'-0"801 NE 13th StreetOklahoma City, Ok 73104-5042HVAC NEW WORK PLAN - BASEMENT AHUISSUED FOR CONSTRUCTION11/27/2020SCALE: 1/4" 1'-0"NORTHNORTH24x48 OA14"Ø SA TO VAV-B350x24 RA24x16 OAVAV-B160" AFFVAV-B284" AFF22x15 SA22x18 SAOA INTAKEMMOTORIZED OACONTROL DAMPERHHW IN/OUTF:\PC Move\Documents\BMSB-Pdfs\BMSB FLOORS lab remodels2019.pln54x18 SA79x14 RAHHW IN/OUTMARK15x22 SAAHU-BCHW OUT3" CONCRETE HOUSEKEEPINGPAD, 6" WIDER THAN UNIT ONALL SIDES.DATEDESCRIPTIONSTEAM INLETCHW INDRAIN2EXISTING SADUCTS ABV. CLG.STEAM OUTLETDRAINHVAC SECTION - BASEMENT AHUBASEMENTFLOORPROJECT NO:MODEL FILE:DRAWN BY:ARCHK'D BY:OGCOPYRIGHTSHEET TITLEHVAC NEW WORKBASEMENT AHUSCALE: 1/4" 1'-0"M-201SHEETOF

DRAWING NOTES:EXISTING CHWS &CHWR OVEREADEXISTING ELECTRICALPANEL TO REMAIN1.NEW BASE-MOUNTED END-SUCTION PUMP ON CONCRETE PAD. SEE DETAIL3/M501 AND CHILLED WATER PUMP PIPING SCHEMATIC 4/M501. BELL &GOSSETT MODEL e-1510 MODEL 5EB, 40-HP MOTOR, 208V/3PH, 1000 GPM, 90 FT.HEAD, 11-INCH IMPELLER, 1672 RPM. PROVIDE YASKAWA MODEL HV600VARIABLE FREQUENCY DRIVE WITH MOTOR OVERLOAD PROTECTION.2.6" CHWS DOWN TO SUCTION DIFFUSER AT PUMP INLET. SUCTION DIFFUSERSHALL BE BELL & GOSSETT MODEL GG-3X OR EQUIVALENT WITH INTEGRALBLOW-DOWN AND ADJUSTABLE SUPPORT FOOT. 2.1 FT PRESSURE DROP AT1000 GPM.3.RELOCATED DELTA-T CONTROL VALVE.4.INSTALL TWO NEW 3 POLE 125A BREAKERS IN EXISTING PANEL, MATCH PANELKAIC RATING. ADJUST BREAKER RATING IF REQUIRED TO SUIT THE SUBMITTEDVF DRIVE.5.INSTALL NEW 3, #1AWG, #6G IN 1-1/2” EMT FEEDERS FROM EXISTING PANEL, ONETO EACH OF THE TWO NEW VFDS,. INSTALL 3, #1AWG, #6G IN FLEXIBLENON-METALLIC CONDUIT FROM THE VFDS TO THEIR RESPECTIVE MOTORS.Architectural & Engineering ServicesThe University of OklahomaHealth Sciences Center865 Research Parkway, Suite 500Oklahoma City Oklahoma 73104(405) 271-2305; cell (405)740-2862CONSULTANTSGwin EngineeringConsultants, LLCCHWP-1 VFD1306 Commerce Drive, Norman, OK 73071Phone: (405) 850-0205Email: ogwin@gwin-engineering.comOklahoma CA # 7649; Expires 6/30/2022CHWP-1CHWS HEADERNOTE:SEE 4/M501 CHILLED WATERPUMP PIPING SCHEMATIC FORPIPE ROUTING IN THIS AREA.CHWP-2OUHSCCOLLEGE OF PUBLIC HEALTHCHWP-2 VFDAHU REPLACEMENTSEXISTING CHWS &CHWR OVEREAD801 NE 13th StreetOklahoma City, Ok 73104-5042EXISTING DELTA-TVALVE OVERHEADISSUED FOR CONSTRUCTION11/27/2020F:\PC Move\Documents\BMSB-Pdfs\BMSB FLOORS lab remodels2019.plnEXISTING CHWS &CHWR FROM CAMPUSCHILLED WATER LOOPMARK1DATEDESCRIPTIONPROJECT NO:MODEL FILE:DRAWN BY:ARCHK'D BY:OGCOPYRIGHTHVAC NEW WORK PLAN - BASEMENT CHW PUMPSSCALE: 1/4" 1'-0"NORTHSHEET TITLEADDITIVE ALTERNATE #1ALL WORK INDICATED ON THIS SHEET SHALL BE BID ASHVAC NEW WORK PLANBASEMENT CHW PUMPS(ALT #1)MANDATORY ADDITIVE ALTERNATE #1. ALTERNATE #1 INCLUDESREPLACEMENT OF THE BUILDING TERTIARY CHILLED WATERPUMP WITH TWO NEW REDUNDANT PUMPS AS INDICATED.M-202SHEETOF

Architectural & Engineering ServicesThe University of OklahomaHealth Sciences Center865 Research Parkway, Suite 500Oklahoma City Oklahoma 73104(405) 271-2305; cell (405)740-2862EXISTING RETURNFAN ON ROOFCONSULTANTSGwin EngineeringConsultants, LLCEXISTING RETURNFAN ON ROOF1306 Commerce Drive, Norman, OK 73071Phone: (405) 850-0205Email: ogwin@gwin-engineering.comOklahoma CA # 7649; Expires 6/30/2022EXISTING RETURN DUCTWORK ABOVE ROOF(E) 38x10(E) 26x1012"Ø SA14"Ø SA28x28 RA DUCTABOVE AHU24x14 SAMVD14x28 SA DUCTABOVE AHUMVDMVDOUHSCMVDCOLLEGE OF PUBLIC HEALTH22x20 SAPROPOSED AHU-5AHU REPLACEMENTS14x28 SA DUCTABOVE AHU801 NE 13th StreetOklahoma City, Ok 73104-5042CDCDEXISTING 22x20 SUPPLYAIR DUCT OVERHEADISSUED FOR CONSTRUCTION11/27/20201HVAC NEW WORK PLAN - ROOFTOP AHUDRAWING NOTES:SCALE: 1/4" 1'-0"F:\PC Move\Documents\BMSB-Pdfs\BMSB FLOORS lab remodels2019.plnNORTH1.NEW ROOF-MOUNTED AIR HANDLING UNIT (AHU-5) ON NEW 18" TALL ROOFCURB.2.TRANSITION DUCTWORK FROM SIZES INDICATED TO INLET OR OUTLET SIZE OFEQUIPMENT CONNECTION AT UNIT.3.3" CHILLED WATER PIPING INSIDE AHU PIPING VESTIBULE. SEE X/M501 FORPIPING DIAGRAM CONNECTION AT COIL.4.2" HEATING HOT WATER (GLYCOL) PIPING ROUTED THRU ROOF CURB OF AHUAND INTO PIPING VESTIBULE. LOCATE HHW CONTROL VALVE INSIDE AHUVESTIBULE FOR ACCESSIBILITY. SEE 1/M501 FOR PIPING DIAGRAMCONNECTION AT COIL.5.ROUTE 1" COPPER CONDENSATE PIPING FROM NEW DRAIN CONNECTION TOEXISTING ROOF DRAIN. PROVIDE CONDENSATE TRAP PER AHUMANUFACTURER RECOMMENDATIONS AT UNIT CONNECTION. ROUTE PIPINGABOVE ROOF WITH PILLOW BLOCK SUPPORTS AT 5' MAXIMUM SPACING.6.APPROXIMATE LOCATION OF EXISTING ROOF DRAIN (FIELD VERIFY).7.INSTALL 3, #10AWG, #12G, 3 PHASE 208V FOR FAN DRIVE, AND 2, #12 AWG 120VFOR UV LIGHT & EP3/MSP AIRFLOW MONITOR, IN EXISTING RACEWAY (IFREUSABLE, OTHERWISE, NEW ¾” CONDUIT) FROM EXISTING PANEL “5L2” TONEW AHU 5. AT 5L2, REUSE EXISTING 3 POLE CIRCUIT/FUSE, AND INSTALL NEW20A 1 POLE DEVICE FOR ADDITIONAL 120V CIRCUIT.MARKDATEDESCRIPTIONPROJECT NO:MODEL FILE:DRAWN BY:ARCHK'D BY:OGCOPYRIGHTSHEET TITLEHVAC NEW WORKROOFTOP AHUM-203SHEETOF

MArchitectural & Engineering ServicesThe University of OklahomaHealth Sciences Cen

two position control valve temperature / pressure relief valve angle valve safety relief valve 3-way mixing valve 3-way diverting valve safety valve with drip pan elbow automatic air vent and shutoff valve manual air vent chain operated valve s m vb m-001 hvac legends & notes gwin engineering consultants, llc 1306 commerce drive, norman, ok 73071

Related Documents:

holux hxe-w01 hp 290483-b21 310798-b21 311314-001 311314-002 311315-b21 311340-001 311349-003 311949-001 343110-001 343117-001 350579-001 359498-001 35h00013-00 35h00014-00 35h00063-00m 377358-001 382877-001 382878-001 383745-001 383858-001 395780-001 398687-001 399858

001 10 001 055 dyson andrew pass 001 10 001 056 gomani only pass 001 10 001 057 jasten wonderful pass 001 10 001 058 jobo yona pass . 001 10 003 083 wanda kastom l pass 001 10 003 084 y

Abe, Genki 064 31798 001 039 230 86/05/05 Abendroth, Walter 100 325769 001 001 230 86/11/03 Aberg, Einar 105 009428 001 155 230 86/16/05 Abetz, Otto 100 004219 001 022 230 86/11/06 Abjanic, Theodore 105 253577 001 132 230 86/16/01 Abrey, Richard See Sovloot (100-382419) Abs, Hermann J. 105 056532 001 167 230 86/16/06 Abualy, Aldina 105 007801 001 183 230 86/17/02 Abwehr 065 37193 001 122 230 .

02 1 Waterslager/Kleur 02.005.001 2 002 02.005 02 1 Timbrado's/Kleur 02.006.001 2 002 02.006 02 1 Harzers/Postuur 02.007.001 2 002 02.007 02 1 Waterslagers/Postuur 02.008.002 2 002 02.008 02 1 Timbrado's/Postuur 02.009

BY ABDULLAH YUSUF ALI THE OPENING, CHAPTER NO. 001 001.001 In the name of God, Most Gracious, Most Merciful. 001.002 Praise be to God, the Cherisher and Sustainer of the world; 001.003 Most Gracious, Most Merciful; 001.004 Master of the Day of Judgment. 001.005 Thee do we worship, and Thine aid we seek. 001.006 Show us the straight way,

Weight kg Ways 1P 3P Ordering details Type Code Type No. GDMS312 MXFC GDMS318 MXFC GDMS324 MXFC GDMS330 MXFC GDMS336 MXFC GDMS348 MXFC GDMS360 MXFC GDMS372 MXFC 2CVB 106 001 M0001 2CVB 206 001 M0001 2CVB 306 001 M0001 2CVB 406 001 M0001 2CVB 506 001 M0001 2CVB 606 001 M0001 2CVB 706 001 M0001 2CVB 806 001 M0001 7 9 11 13 15 17 19 21 12 18 24 30 .

Materiał: stal nierdzewna szlifowana na matowo Artykuł DN/OD Klasa filtra Jednostka dostawcza PLN/szt. 170448-001 250 G4 pojedynczo 60,00 170458-001 250 F6/G2 pojedynczo 70,00 170468-001 315 G4 pojedynczo 74,00 170528-001 315 F6/G2 pojedynczo 84,00 170538-001 400 G4 pojedynczo 82,00 170548-001 400 F6/G2 pojedynczo 92,00 170558-001 500 G4 .

Fall 2013 ELEC 5200-001/6200-001 Pipelining 1 ELEC 5200-001/6200-001 Computer Architecture and Design Fall 2013 Pipelining (Chapter 4.5, 4.6)