Installation Guide - Sub-Zero

3y ago
19 Views
2 Downloads
1.94 MB
56 Pages
Last View : 2m ago
Last Download : 2m ago
Upload by : Harley Spears
Transcription

Designer Series RefrigerationInstallation GuideSPECIFICATIONS, INSTALLATION,AND MORE

Designer Series RefrigerationContents3Designer Series Refrigeration4Opening p Bracket10Placement10Alignment11Water Line12Panels14Panel Installation16CompletionFeatures and specifications are subject to change at anytime without notice. Visit subzero.com/specs for the mostup-to-date information.2 Sub-Zero Customer Care 800.222.7820Important NoteTo ensure this product is installed and operated as safelyand efficiently as possible, take note of the following typesof highlighted information throughout this guide:IMPORTANT NOTE highlights information that is especiallyimportant.CAUTION indicates a situation where minor injury or product damage may occur if instructions are not followed.WARNING states a hazard that may cause serious injury ordeath if precautions are not followed.IMPORTANT NOTE: Throughout this guide, dimensions inparentheses are millimeters unless otherwise specified.IMPORTANT NOTE: Save these instructions for the localelectrical inspector.

Designer Series RefrigerationProduct InformationImportant product information, including the model andserial number, are listed on the product rating plate. Forcolumn models, the rating plate is located inside themiddle drawer near the drawer guide opposite the hinge.For tall and drawer models, the rating plate is locatedinside the cabinet, to the left of the upper drawer. Refer tothe illustrations below.If service is necessary, contact Sub-Zero Factory CertifiedService with the model and serial number. For the name ofthe nearest Sub-Zero Factory Certified Service or for questions regarding the installation, visit the Product Supportsection of our website, subzero.com, or call Sub‑ZeroCustomer Care at 800-222-7820.RATING PLATERATING PLATEColumn modelsTall and drawer modelssubzero.com 3

Site PreparationOpening DimensionsDESIGNER MODELSOPENING DIMENSIONSCOLUMN / TALL18" Column24" Column30" Column / Tall36" Column / Tall25" (635)OPENINGDEPTH25 3/4" (654)FOR OUTDOORMODELDRAWERTOP VIEW24" Drawer27" Drawer30" Drawer36" DrawerW*H18" (457)24" (610)30" (762)36" (914)84" (2134)84" (2134)84" (2134)84" (2134)W*H24" (610)27" (686)30" (762)36" (914)341/2" (876)341/2" (876)341/2" (876)341/2" (876)The depth of each designer model is 24" (610). Allow forpanel thickness when planning the finished opening depth.A minimum 31/2" (89) finished return is required on all sidesof the opening—41/2" (114) for the outdoor model. Framedcabinets require additional finished filler material behindthe face frame for a proper installation. Refer to the illustration.HWOPENINGHEIGHTOPENING WIDTHDUAL INSTALLATIONWhen installing two units side by side in a dual installation, the opening width is the width of the two units addedtogether. A dual installation kit is required for this installation. If a dual installation kit is not specified, a minimum2" (51) filler strip is required between the units.SIDE VIEWFRONT VIEWNOTE: 3 1/2" (89) finished returns will be visible and should be finished to match cabinetry—4 1/2" (114) for outdoor model.3/4" (19)3/4" (19)TYPICAL3 1/2" RY4 TYPICAL3 1/2" (89)FRAMEDCABINETRYSub-Zero Customer Care 800.222.7820FILLERDual installation kits are available through an authorizedSub-Zero dealer. For local dealer information, visit thefind a showroom section of our website, subzero.com.For questions regarding the installation, call Sub‑ZeroCustomer Care at 800-222-7820.

Site PreparationElectrical RequirementsInstallation must comply with all applicable electrical codes.The electrical supply must be located within the shadedarea shown in the illustration and chart below. A separatecircuit servicing only this appliance is required.IMPORTANT NOTE: For indoor models, a ground fault circuit interrupter (GFCI) is not recommended and may causeinterruption of operation.For the outdoor model, a ground fault circuit interrupter(GFCI) is required to reduce the risk of electrical shock.The electrical outlet must be positioned with the grounding prong to the right of the thinner blades.CAUTIONThe outlet must be checked by a qualified electricianto be sure it is wired with the correct polarity. Verifythe outlet is properly grounded.WARNINGDo not use an extension cord, two-prong adapter, orremove the power cord ground prong.ELECTRICAL REQUIREMENTSElectrical SupplyELECTRICAL SUPPLY LOCATIONA18" Model6" (152)24" Model91/2" (241)27" Model11" (279)30" Model121/2" (318)36" Model151/2" (394)115 VAC, 60 HzService15 amp dedicated circuitReceptacle3-prong grounding-typeLEFT SIDEOF OPENING41/2"(114)A4 1/4"(108)1/4" (6)FLOORElectrical supply locationsubzero.com 5

Site PreparationPlumbing RequirementsInstallation must comply with all applicable plumbing codes.PLUMBING REQUIREMENTSLocate the water supply line within the shaded area shownin the illustration below. Connect the water supply line tothe house supply with an easily accessible shut-off valve.Do not use self‑piercing valves. The water supply line mustbe flush with the floor and cannot interfere with the installation of the anti-tip bracket.Water Supply LineColumn and tall models with an ice maker or water dispenser feature a water filtration system. An in-line filter isrequired for drawer models with an ice maker when waterconditions have a high sediment content.A reverse osmosis system can be used provided there isconstant water pressure of 35–120 psi (2.4–8.3 bar) supplied to the unit at all times. In this application, the waterfiltration system must be bypassed. Refer to Water FilterBypass on page 18. A copper line is not recommended forthis application.WATER SUPPLY LOCATIONA18" Model3" (76)24" Model51/2" (140)30" Model6" (152)36" Model9" (229)RIGHT SIDEOF OPENINGA6" (152)3" (76)AREA EXTENDS 1/2" (13)FORWARD ON FLOORWater supply location6 Sub-Zero Customer Care 800.222.7820Water PressureExcess Water Line for Connection1/4" OD copper, braidedstainless steel, or PEX tubing35–120 psi (2.4–8.3 bar)36" (914)

Site PreparationPreparationUncrate the unit and inspect for damage. Remove thewood base and discard the shipping bolts and brackets.Remove and recycle packing materials. Do not discard thekickplate, anti-tip bracket, and hardware.Remove the kickplate by extracting the two mountingscrews. Refer to the illustration below.SCREWKickplate removalsubzero.com 7

Site PreparationAnti-Tip BracketWARNINGTo prevent the unit from tipping forward, the anti-tipbracket must be installed.The back of the anti-tip bracket must be installed 24" (610)from the front of the unit (without panels). Use all the antitip bracket hardware as instructed for wood or concretefloors.IMPORTANT NOTE: For wood or concrete floor applications, if the #12 screws do not hit a wall stud or wall plate,use the #8 screws and #12 washers with the wall anchors.IMPORTANT NOTE: In some installations, the subflooringor finished floor may necessitate angling the screws usedto fasten the anti-tip bracket to the back wall.ANTI-TIP HARDWAREWOOD FLOOR APPLICATIONAfter properly locating the anti-tip bracket in the opening,drill pilot holes 3/16" (5) diameter maximum in the wall studsor wall plate. Use the #12 screws and washers to securethe brackets. Verify the screws penetrate through the flooring material and into the wall studs or wall plate a minimumof 3/4" (19). Refer to the illustration and chart below.CONCRETE FLOOR APPLICATIONAfter properly locating the anti-tip bracket in the opening,drill pilot holes 3/16" (5) diameter maximum in the wall studsor wall plate. Drill 3/8" (10) diameter holes into the concretea minimum of 11/2" (38) deep. Use the #12 screws andwashers to secure the brackets to the wall, and use the 3/8"wedge anchors to secure the brackets to the floor. Verifythe screws penetrate the wall studs or wall plate a minimum of 3/4" (19). Refer to the illustration and chart below.1Anti-tip bracket12#12 x 21/2" pan head screwsANTI-TIP BRACKET PLACEMENT43/8"–16 x 33/4" wedge anchors18" Model9" (229)12#12 flat washers24" Model12" (305)4#8–18 x 11/4" truss head screws27" Model131/2" (343)4Nylon Zip-it wall anchors30" Model15" (381)36" Model18" (457)AAAAFINISHEDFLOORINGFINISHEDFLOORINGWALL PLATESUBFLOORINGWOOD FLOORWood floor8 Sub-Zero Customer Care 800.222.7820AWALL PLATESUBFLOORINGCONCRETEFLOORConcrete floor11/2"(38)min

Site PreparationAnti-Tip BracketCONCRETE WEDGE ANCHOR INSTALLATIONCAUTION1Drill a 3/8" (10) diameter hole any depth exceeding theminimum embedment. Clean the hole or drill additionaldepth to accommodate the drill fines.Always wear safety glasses and use other necessary protective devices or apparel when installing orworking with anchors.2Assemble the washer and nut flush with the end ofanchor to protect threads. Drive the anchor throughthe material to be fastened until the washer is flush withthe surface material.Anchors are not recommended for use in lightweightmasonry material such as block or brick, or for usein new concrete which has not had sufficient time tocure. The use of core drills is not recommended todrill holes for the anchors.3Expand the anchor by tightening the nut 3–5 turns pasthand-tight position or to 25 foot-pounds of torque.WARNINGVerify there are no electrical wires or plumbing in thearea which the screws could penetrate.subzero.com 9

InstallationPlacementCAUTIONBefore moving the unit into position, secure the door/drawers closed and protect any finished flooring.Use an appliance dolly to move the unit near the opening.The front leveling legs are extended below the front rollersto improve stability during placement. Once the unit isplaced in front of the opening, completely retract the frontleveling legs to allow the unit to be rolled into position.The front and rear leveling legs can be adjusted from thefront once the unit is positioned.If the unit has been on its back or side, it must standupright for a minimum of 24 hours before connectingpower.Plug the power cord into the grounded outlet and roll theunit into position. Verify the anti-tip bracket is properlyengaged.AlignmentLEVELINGOnce the unit is in position, the height adjustment can bemade from the front. Using a Phillips drive, turn clockwiseto raise the unit or counterclockwise to lower. Use thelowest torque setting when using a power drill. Do not turnthe leveling legs by hand. Refer to the illustration below.When the unit is properly leveled, door/drawer adjustments are less likely to be necessary.IMPORTANT NOTE: Level the unit to the floor, not the surrounding cabinetry. This could affect the operation of theunit, such as door closing.WARNINGTo reduce the possibility of the unit tipping forward,the front leveling legs must be in contact with thefloor.FRONTADJUSTMENTREARADJUSTMENTLeveling10 Sub-Zero Customer Care 800.222.7820

InstallationAlignmentWater LineANCHORINGApproximately 3' (.9 m) of 1/4" plastic tubing is connectedto the unit with a preassembled 1/4" compression connection under the unit. The water line fitting connection kit,provided with the unit, contains a 1/4" compression unionfitting for connection to the household water line.Adjust the depth of the unit to fit flush with the surrounding cabinetry. Once aligned, verify the door/drawers openproperly, then install screws in each side trim.Purge the water line prior to final connection to the unit.This will remove any debris that may be present in thetubing from installing the new water line. Connect theplastic tubing from the unit to the house water supply linewith the fitting connection kit provided. Check all waterline fittings for leaks.SCREWSIDE e the water line in the notch as shown in the illustration below.FRONT OFUNITIMPORTANT NOTE: If a reverse osmosis system is used, itis recommended the water filtration system be bypassedby removing the filter.IMPORTANT NOTE: Water lines cannot be exposed tofreezing temperatures.NOTCHWATER LINECONNECTIONWater linesubzero.com 11

PanelsStainless Steel PanelsThe outdoor model requires the use of Sub-Zero stainlesssteel outdoor accessory panels.Stainless steel panels are available through an authorizedSub‑Zero dealer. For local dealer information, visit the finda showroom section of our website, subzero.com.The thickness of indoor stainless steel panels is 3/4" (19) andoutdoor stainless steel panels is 11/2" (38). The depth of eachdesigner model is 24" (610). Allow for panel thickness whenplanning the finished opening depth.Reveals of 1/8" (3) are typical, however, the reveal betweenthe upper and lower outdoor stainless steel panels is 1/4" (6)to accommodate the lock.For designer models, custom door/drawer panels andhandle hardware must be installed.The thickness of the custom panel can vary. A minimum5/8" (16) thick panel is required, but the thickness can beincreased provided it does not exceed the maximum panelweight indicated in the chart below. The depth of eachdesigner model is 24" (610). Allow for panel thickness whenplanning the finished opening depth.PANEL REQUIREMENTS18" Column24" Column30" Column36" ColumnWEIGHT PER PANEL30" Tall (door)36" Tall (door)DrawerPANEL THICKNESSAll Panels12 Sub-Zero Customer Care 800.222.7820CAUTIONWhen installing a panel thicker than 1" (25), the 90 door stop may be required to prevent damage to theunit and adjacent cabinetry.CAUTIONAs reveals between cabinetry and the unit decrease,severe finger pinching can occur while the door isclosing.Finish all sides of the custom panels. They will be visiblewhen the door/drawer is open.Custom PanelsWEIGHT PER PANELReveals between panels can vary, 1/8" (3) reveals are typical.MAX45 lb (20 kg)60 lb (27 kg)75 lb (34 kg)75 lb (34 kg)MAX50 lb (22 kg)60 lb (27 kg)15 lb (7 kg)MIN5/8" (16)D-style handles are recommended. Locate the doorhandle near the edge of the panel opposite the hinge andcentered top to bottom. Locate the drawer handles nearthe top edge of each panel. Stainless steel tubular andpro handles are avail able through an authorized Sub-Zerodealer. For local dealer information, visit the find a showroom section of our website, subzero.com.

PanelsCustom PanelsDOOR PANEL HEIGHTTOE KICK CLEARANCE (EXCLUDES OUTDOOR MODEL)The height of the custom door panel can extend beyondthe typical panel height, provided it does not exceed theweight limit. Refer to the illustration below.The height of the toe kick area can extend beyond thetypical toe kick height, provided it does not exceed thedimensions in the illustration below. Toe kick heights from2" (51) to 37/8" (98) require a reduced toe kick accessoryavailable through an authorized Sub-Zero dealer. For localdealer information, visit the find a showroom section ofour website, subzero.com. For questions regarding theinstallation, call Sub‑Zero Customer Care at 800-222-7820.1 3/4"(45)A DECORATIVE VALANCECANNOT EXTENDBEYOND THIS PLANE1/8" (3)DOORPANEL84"24" (610)(2134)TO BACK OF UNITHINGE**VENTEDLOUVERS24" (610)TO BACK OF UNITHINGEDOORPANEL1 1/8" (29)MAXTOE KICKADJUSTMENT2" (51)*TO6" (152)FROMFLOORA DECORATIVE TOE KICKCANNOT EXTENDBEYOND THIS PLANEUpper valance (side view)*2" (51) to 3 7/8" (98) requires sales accessory.**Column models only.Toe kick (side view)subzero.com 13

Panel InstallationPanel InstallationDOOR PANEL INSTALLATIONTypical panel dimensions are based on an 84" (2134) finished height with 1/8" (3) reveals. Placement of the templatemust be adjusted for panels exceeding the typical dimensions.For tall models, the door panel should be installed first,followed by the upper, then lower drawer panel.Place the panel face down on a protected work surface.Position the template flush with the top and sides of thepanel. Verify the correct side of the template is being used,then mark and drill holes. Refer to the illustration below.EDGE OF DOOR PANELEDGE OF DOOR PANELFor tall models, align the notch in the template with thebottom of the door panel, then mark and drill holes. Referto the illustration below.Use a Torx drive to partially insert a #8 x 1/2" screw into thesecond hole from the top on each side of the panel. Thescrews should be approximately 3/16" (4) proud of the paneland will support the weight of the panel during installation.Align the support screws on the back of the panel with theslotted holes on both door mounting brackets. Refer tothe illustration below. Opening the door slightly may helpwith alignment. Once the panel is supported by the screws,partially insert a #8 x 1/2" screw into the second hole fromthe bottom on each side of the panel, but do not tighten.CAUTIONAs reveals between cabinetry and the unit decrease,severe finger pinching can occur while the door isclosing.TOP OF DOOR PANELTOP OFDOOR PANEL84" APPLICATION83 7/8" ACTUALUSE TABS FOR HINGESIDE PANEL EDGE ONDUAL INSTALLATIONBACK OFDOOR PANELBOTTOM OFDOOR PANELBOTTOM OFDOOR PANELUSE TABS FOR HINGESIDE PANEL EDGE ONDUAL INSTALLATIONBOTTOM OFDOOR PANELTOP OFDOOR PANEL84" APPLICATION83 7/8" ACTUAL14 Door panel template—bottom(tall models only)EDGE OF DOOR PANELEDGE OF DOOR PANELDoor panel template—topSub-Zero Customer Care 800.222.7820Door panel mounting

Panel InstallationPanel InstallationDRAWER PANEL INSTALLATIONPANEL ADJUSTMENTPlace the panel face down on a protected work surface.Position the template flush with the top and sides of thepanel. Verify the correct side of the template is being used,then mark and drill holes. Refer to the illustration below.Close the door/drawers, now adjustments can be made toalign the panels and reveals.Use a Torx drive to partially insert a #8 x 1/2" screw into thesecond hole from the top on each side of the panel. Thescrews should be approximately 3/16" (4) proud of the paneland will support the weight of the panel during installation.Align the support screws on the back of the panel with theslotted holes on both drawer mounting brackets. Referto the illustration below. Opening the drawer slightly mayhelp with alignment. Once the panel is supported by thescrews, partially insert a #8 x 1/2" screw into the secondhole from the bottom on each side of the panel, but donot tighten.TOP OF DRAWER PANELBACK OFDRAWER PANELFor side-to-side adjustment, move the panel side to side,then install and tighten all mounting screws.For up-and-down and in-and-out adjustments, slightlyloosen the bracket screws. Depending on the level ofadjustment required, it may be helpful to loosen all of thebracket screws which will allow for maximum adjustment.Once the bracket screws are loosened, use a wrench torotate the cams to make adjustments. After the adjustments have been made, tighten all bracket screws. Refer tothe illustrations below.IN-AND-OUTCAMTOP OFDRAWER PANELBRACKETSCREWSLEFT EDGE OF DRAWER PANELRIGHT EDGE OF DRAWER PANELTOP HOLESFOR UPPERAND LOWERDRAWERSDrawer panel template—topBOTTOMHOLES FORLOWERDRAWERIn-and-out adjustmentBRACKETSCREWSUP-AND-DOWNCAMUp-and-down adjustmentDrawer panel mountingBOTTOMHOLES FORUPPERDRAWER7021340subzero.com 15

InstallationCompletionDOOR TRIM INSTALLATIONSIDE TRIM INSTALLATIONAfter the panels have been adjusted, install the decorativeside trim to the door/drawers. To install, start at the topand align the trim with the front and rear flanges on thebracket, then snap into place by pushing the trim towardthe back of the panel. Once the top is secure, continue theinstallation downward until the remaining trim is completely secure. Refer to the illustrations below.Install the decorative trim strip to the handle side of talland column models. The side trim snaps over the bracketattached to the handle side of the unit. Refer to the illustration below.SIDE TRIMFRONTFLANGEREARFLANGESide trimDoor side trim16 Bracket flangesSub-Zero Customer Care 800.222.7820

InstallationCompletionTOP TRIM INSTALLATIONKICKPLATE INSTALLATIONIdentify the top trim strips by the notch on one end at thebottom; this trim strip fits on the hinge side of the u

If service is necessary, contact Sub-Zero Factory Certified Service with the model and serial number. For the name of the nearest Sub-Zero Factory Certified Service or for ques-tions regarding the installation, visit the Product Support section of our website, subzero.com, or call Sub-Zero Customer Care at 800-222-7820.

Related Documents:

Sub-Zero, Sub-Zero & Design, Sub-Zero & Snowflake Design, Dual Refrigeration, The Living Kitchen, Great American Kitchens The Fine Art of Kitchen Design, Wolf, Wolf & Design, Wolf Gourmet, W & Design, red colored knobs, Cove, and Cove & Design are registered trademarks and service marks of Sub-Zero Group, Inc. and its subsidiaries.

Throughout this guide, dimensions may vary by 3 mm. seool.o. 3 PRO 48 Refrigeration Freshness finds unmistakable expression in the Sub-Zero . Sub-Zero, Sub-Zero & Design, Sub-Zero & Snowflake Design, Dual Refrigeration, The Living Kitchen, Great American Kitchens The Fine Art of Kitchen Design, Wolf, Wolf &

If service is necessary, contact Sub-Zero Factory Certified Service with the model and serial number. For the name of the nearest Sub-Zero Factory Certified Service or for questions regarding the installation, visit the Support & Service section of our website, subzero.com, or call Sub-Zero Customer Care at 800-222-7820. Rating plate location .

2017 ZERO S / SR / DS / DSR 2017 ZERO S ZERO SR ZERO DS ZERO DSR TORCYCLES.COM YCLES.COM 88-08708.06 OWNER’S MANUAL OWNER’S MANUAL Zero Owner's Manual (S and

If service is necessary, contact Sub-Zero factory certified service with the model and serial number. For the name of the nearest Sub-Zero factory certified service or for questions regarding the installation, visit the contact & sup-port section of our website, subzero.com or call Sub-Zero customer care at 800-222-7820. BUILT-IN REFRIGERATION

If service is necessary, contact Sub-Zero factory certified service with the model and serial number. For the name of the nearest Sub-Zero factory certified service or for questions regarding the installation, visit the contact & sup-port section of our website, subzero.com or call Sub-Zero customer care at 800-222-7820. INTEGRATED REFRIGERATION

ZERO S ZERO SR ZERO DS ZERO DSR ZERO S / SR / DS / DSR TORCYCLES.COM 2016 2016 YCLES.COM 88-08461.04 OWNER’S MANUAL OWNER’S MANUAL Zero Owner's Manual (S and DS).book Page 1 Thursday, March 15, 2018 4:13 PM

Health and care staff and the teams they form are the fundamental component of how the nation delivers healthcare. Over the last six months, colleagues across all parts of the health system have mobilised resources, deployed creativity, worked at pace and applied learning to ensure the immediate challenges presented by the pandemic were managed. In responding to the pandemic, we have seen the .