SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORKPART 11.1GENERALSUMMARYA.B.Section Includes:1.The Auxiliary Boilers Relocation Project consists of the relocationof an existing Cleaver-Brooks package boiler from their current indoor location owned by Hackman Capital (Campbells Soup) to two(2) outdoor locations within Sacramento County, California. Theboiler is being uprated to 90 kpph at 190 psig and retrofitted with aSelective Catalytic Reduction (SCR) System. A limited amount ofancillary equipment, piping, instrumentation and controls will berelocated with the balance being replaced with new equipment. Fordesign data refer to Section 000101-Project Information and SiteData.2.The scope of this Section includes earthwork and construction ofnew foundations.Related Sections:1.C.Attachments:1.Attachment A – Design Drawing List2.Attachment B – SMUD Requirements3.1.2Section 000101 – Project Information and Site Dataa.SMUD Section 01300 – Submittalsb.SMUD Section 02200 – EarthworkAttachment C – SCA Geotechnical Report (P001399-SRWSZ001)SCOPE OF WORKA.General Scope of Work:1.B.The Contractor shall receive, protect, store, haul, assemble, erect,install, test and place into service foundations and associatedmaterials defined by this document and associated specificationsand drawings.Structural Scope of Work:1.Subsoil preparation.2.Excavation and backfilling.Zachry Engineering CorporationAll Rights ReservedPage 2 of 12

SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORKC.3.Replacement of unsuitable material with engineered fill as directedby geotechnical engineer on site.4.Supply and installation of form work, concrete, and reinforcingbars.5.Supply and installation of anchor bolts, rods and concreteembedments (i.e., plates, angles, channels, welding studs, pipesleeves, manway covers, etc.).6.Supply and installation of grout.7.Supply and installation of water stops, joint sealants, and jointfillers.8.Foundations to be installed include:Deaerator/Boiler Feed Areac.PEC Buildingd.Transformere.Pipe Rackf.Any other work assigned by task ownerNOT USEDNOT USEDInstrumentation and Controls Scope of Work:1.1.3b.Electrical Scope of Work:1.E.Boiler Area, includes Packaged Boiler, SCR, Economizerand StackMechanical Scope of Work:1.D.a.NOT USEDREFERENCESA.The work performed under these specifications shall be done inaccordance with the following codes and standards. Unless otherwisespecified, the applicable governing edition and addenda to be used for allreferences to codes or standards specified herein shall be interpreted to bethe jurisdictionally approved edition and addenda. If a code or standard isnot jurisdictionally mandated, then the current edition and addenda ineffect at the date of the document shall apply.Zachry Engineering CorporationAll Rights ReservedPage 3 of 12

SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORKB.1.4Refer to SMUD requirements (Attachment B).NOT USEDNOT USEDSee Secton 02200 (Attachment B) and Drawing D001399-PSAS0Y001(Attachment A)GUARANTEESA.PART 22.1Seller shall comply with all applicable codes and standards, whether or notidentified in this listing. This specification refers to these publications bythe basic designation only. These references shall govern the work exceptwhere they conflict with the Engineer’s specifications. In case of conflict,the more stringent requirement, as interpreted by the Engineer, shallgovern.TESTINGA.1.8California Building standards Code (CBSC)NOISEA.1.72.QUALITY ASSURANCEA.1.6American Society of Civil Engineers (ASCE)SUBMITTALSA.1.51.NOT USEDPRODUCTSSTRUCTURAL CONSTRUCTIONA.The Contractor shall furnish the labor, supervision, materials, incidentalsand equipment as required for the completed installation of the following:1.Excavation, backfilling, and dewatering as required forfoundations, duct banks, underground piping, and concretestructures installation.2.Forming, placing, and finishing of all concrete foundations, floorslabs, slabs-on-grade, door stoops, door aprons and concretestructures including reinforcement and installation of anchor bolts,post installed anchors, gaskets, special fasteners and connections,and all other embedded materials.Zachry Engineering CorporationAll Rights ReservedPage 4 of 12

SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORK3.2.22.7c.Outlet protectionsd.Hay balesNOT USEDNOT USEDNOT USEDOwner will provide temporary construction power. Contractor shall beresponsible for bringing power to work area and providing appropriateelectrical connections including compliance with OSHA Power CordRequirements.WORK NOT INCLUDED IN THIS CONTRACTA.Installation of structural and miscellaneous steelB.GradingC.Installation of equipmentPERMITSA.PART 33.1Inlet protectionsCONSTRUCTION POWERA.2.6b.INSTRUMENTATION AND CONTROLS CONSTRUCTIONA.2.5Silt fencingELECTRICAL CONSTRUCTIONA.2.4a.MECHANICAL CONSTRUCTION1.2.3Installation and maintenance of all construction storm waterpollution prevention measures including, but not limited to:Owner will provide all permitsEXECUTIONLABOR, EQUIPMENT AND MATERIALSA.The Seller shall provide competent, suitably qualified personnel to survey,lay out the work, and perform construction as required by the contractdocuments. The Seller shall maintain good discipline and order at the Siteat all times. Unless otherwise specified, the Seller shall furnish andassume full responsibility for all equipment and materials, labor,transportation, construction equipment and machinery, tools, appliances,Zachry Engineering CorporationAll Rights ReservedPage 5 of 12

SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORKfuel, power, light, heat, telephone, water, sanitary facilities, temporaryfacilities and all other facilities and incidentals necessary for thefurnishing, performance, testing, start-up and completion of the work.B.3.23.3All equipment and materials incorporated in the work shall be designed tomeet the applicable safety standards of federal, state and local laws andregulations.LAWS AND REGULATIONSA.Seller shall give all notices and comply with all laws and regulationsapplicable to furnishing and performance of the work. Except whereotherwise expressly required by applicable laws and regulations, neitherthe Owner nor the Owner’s Engineer shall be responsible for monitoringthe Seller's compliance with any laws or regulations.B.If the Seller observes that the sections or drawings are at variance with anylaws or regulations, the Seller shall make necessary changes authorized bythe Owner or the Owner’s Engineer. If Seller performs any work knowing,or having reason to know, it is contrary to such laws or regulations, theSeller shall bear all governmental fines, penalties and legal costsassociated therewith; however, it shall be the Seller's primaryresponsibility to make certain the sections and drawings are in accordancewith such laws and regulations.TEMPORARY BARRIERS AND CONTROLSA.B.For protection of existing finish work, the Seller shall:1.Provide design, materials and installation of interior and exteriorshoring, bracing or other supports as determined by the Seller’sEngineer to prevent movement, settlement or collapse of structuresor elements to be demolished, including adjacent facilities orequipment, which will remain in place. Design shall be preparedby technically competent and qualified professionals and shall besubmitted to the Owner for approval prior to the commencement ofinstallation.2.Protect from damage existing finish work that is to remain in place,which becomes exposed during construction and demolition.Protect floors with suitable coverings as necessary. All damageshall be repaired at the Seller’s expense.For environmental protection control, the Seller shall:Zachry Engineering CorporationAll Rights ReservedPage 6 of 12

SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORK3.41.Provide methods, means and facilities required to preventcontamination of soil, water or atmosphere by the discharge ofhazardous or toxic substances from the Seller’s constructionoperations.2.Provide equipment and personnel, perform emergency measuresrequired to contain any spillages by the Seller. Remove the soils orliquids contaminated by the Seller. Excavate and dispose of anycontaminated earth offsite in approved locations and replace withsuitable compacted fill and topsoil.3.Take special measures to prevent harmful substances generated bythe Seller from entering public waters, sanitary or storm sewers.4.Concrete, rubble and other materials shall not be disposed of in theriver, except where approved for use as riprap.DRAWINGSA.The drawings listed in Attachment A – Drawing List, are enclosed as partof this section. The Seller shall furnish and install all work in accordancewith this section and as shown on the drawings and other drawings thatmay subsequently be furnished or approved by the Owner to providegreater detail. The Seller shall furnish or install all work in accordancewith this section and as shown on the drawings and other drawings thatmay subsequently be furnished or approved by the Owner to providegreater detail.B.Drawings and sections are intended to be descriptive only and any errorsor omissions of details in either shall not relieve the Seller from anobligation to install, in correct detail, all materials necessary for completeand operable systems to the extent shown on the drawings and describedin this section.C.In the event the Seller finds any discrepancies, errors, omissions orconflicts between the Contract, other documents and the drawings, theSeller shall refer the matter to the Owner immediately for clarification.D.Changes, additions, or deletions shall be made only with written approvalor instruction from the Owner. A separate, complete and accurate as-builtfile of Seller’s drawings shall be maintained by the Seller at all times,using the latest issues of drawings marked to show all subsequent data,approved deviations, and critical locations determined during the course ofconstruction. Seller’s as-built file shall be kept up-to-date throughout theZachry Engineering CorporationAll Rights ReservedPage 7 of 12

SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORKProject on a daily basis, and all changes shall reference the appropriatechange requested and approval. The as-built file shall be turned over to theOwner and the as-built drawing shall be turned over to the Engineer within30 days of the completion of construction.3.53.6E.Seller shall be aware that the sections and drawings describe the minimumrequirements. Components and modifications which are not specificallyreferenced herein, but are obviously required to complete the work andprovide the Owner with a finished, complete and operable project shall bethe responsibility of the Seller. It shall also be the responsibility of theSeller to obtain from the Owner or Owner’s Engineer, in a timely manner,any additional drawings or other information deemed necessary to preparethe bid package and complete the work after contract award.F.After contract award, the Seller shall be responsible for gathering andverifying all necessary as-built field information for completing the workas described herein and as shown on the drawings.CODES AND STANDARDSA.All work shall be performed in accordance with all applicable local, stateand federal codes, regulations, laws and standards.B.Codes and standards applicable to the work described in each division arelisted separately within each section. The latest edition of the document ineffect as of the date of the Request for Bid shall be used.C.Section sections refer to codes, standards and other documents whichestablish product, installation and quality standards of industry-recognizedassociations and institutes. If there is, or seems to be, a conflict betweenthis section and a referenced document, the matter shall be referred to theEngineer.HOLD POINTSA.The Owner and the Owner’s Engineer shall have the right to establish holdpoints for which the Seller shall give prior notification. Hold pointsrequire the Seller to give prior notification at least 48 hours in advance ofthe scheduled time of performance. The Owner and Owner’s Engineermay require that activities performed without prior notification and workcovered prior to inspection is repeated for the Owner or the Owner’sEngineer’s observation at the Seller’s expense.Zachry Engineering CorporationAll Rights ReservedPage 8 of 12

SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORKB.The Owner or Owner’s Engineer shall inform the Seller of its desire towitness the event or authorize the Seller to proceed without witnessing theevent. The above may be performed by telephone communication.C.Written waiver will be issued if requested by the Seller and agreed to bythe Owner or Owner’s Engineer.END OF SECTIONZachry Engineering CorporationAll Rights ReservedPage 9 of 12

SPECIFICATIONSECTION 011101FOUNDATION CONSTRUCTION SCOPE OF WORKAttachment ADesign Drawing ListD001399-SRWL1Y001 S01 RC Site Related Work SCA Site General ArrangementD001399-PSAS0Y001 S01 RB SCA Site Concrete General Structural NotesD001399-PSAS1Y101 S01 RD SCA Site Overall Foundation PlanD001399-PSAS1Y102 S01 RD SCA Site Englarged Boiler Foundation PlanD001399-PSAS1Y103 S01 RB SCA Site Foundation Sections & DetailsD001399-PSAS1Y104 S01 RB SCA Site Foundation Sections & DetailsD001399-PSAS1Y105 S01 RB SCA Site Foundation Sections & DetailsD001399-PSAS1Y106 S01 RA SCA Site Foundation Sections & DetailsZachry Engineering CorporationAll Rights ReservedPage 10 of 12

1.2 SCOPE OF WORK A. General Scope of Work: 1. The Contractor shall receive, protect, store, haul, assemble, erect, install, test and place into service and associated foundations materials defined by this document and associated specifications and drawings. B. Structural Scope of Work: 1. Subsoil preparation. 2. Excavation and backfilling.File Size: 716KB

Related Documents:

Chapter 5 Project Scope Management Chapter 5 Project Scope Management 5.1 Plan Scope Management 5.1 Colect Requirements 5.2 Collect Requirements 5.2 Define Scope 5.3 Define Scope 5.3 Create WBS 5.4 Create WBS 5.4 Verify Scope 5.5 Validate Scope 5.5 Control Scope 5.6 Control Scope PMBOK 5th Edition

Scope 2 market-based. 1. Scope 2 location-based. 1. Scope 3 Purchased goods and services. 2. Capital goods. 2. Fuel and energy-related activities Employee commuting Waste generated in operations Total Scope 1, Scope 2 market-based, Scope 3 GHG intensity (Scope 1 and Scope 2 mtCO2e/sq ft) 3. 1,560 10,523 11,171 121,817 89,963 3,522 3,677 15,388 .

camera. The main imaging scope can be virtually any scope suitable for your CCD or DSLR camera. Guide Scope You will need an additional telescope for guiding, referred to as a guide scope. The guide scope is mounted on top of, or beside the main imag-ing scope. Adjustable guide scope tube rings (available from Orion) are

Metacafe General Medio General MediaFLO General Martha Stewart Living Omnimedia General Lexico General Internet Broadcasting (IBSYS) General Hearst-Argyle General Harvard Business Review General Greystripe General Friendster General Facebook General Enpocket General Emmis Interactive General Cellfish Media General Company Member Type .

c. General contractor/construction manager d. Other specialty subcontractors e. Vendors/suppliers 4. Review the general scope of work. a. Provide an overview of the project scope of work and the electrical scope. b. Review major work performed by others. 5. Review the contract cost. a. Review direct costs and the contract cost. b.

There are two types of scope that are Product Scope and Project Scope Product scope: The features & functions that characterize the product, service, or result documented usually by the Business Analyst in consultation with the stakeholders. Project Scope: The work that needs to be accomplished to deliver a product, service, or

Scope Template App User Guide and Administrative Manual 4 CHAPTER 1. CREATE A TEMPLATE FOR A SCOPE OF WORK 1. Create a New Scope of Work Document 1.1. Start New Document Select the “Create Scope of Work Document” button to start creating a new document. 1.2. Add Details Input the Proje

ASTM D 5132 BSS 7230 MODEL 701-S MODEL 701-S-X (export) MODEL VC-1 MODEL VC-1-X (export) MODEL VC-2 MODEL VC-2-X (export) MODEL HC-1 MODEL HC-1-X (export) MODEL HC-2 MODEL HC-2-X (export) FAA Listed TM. FAA MULTI-PURPOSE SMALL SCALE FLAMMABILITY TESTER SPECIFICATIONS: FAR Part 25 Appendix F Part I (Vertical, Horizontal, 45 and 60 ) DRAPERY FLAMMABILITY The most widely cited .