Guidelines for FIRE NOC1) Architect Completion Certificate.2) ‘A’ Form from fire license agency.3) List of fire fighting appliances installed by the agency.4) Payments slip of Fire Cess Charges.5) Work Completion letter from Developer / Builder.6) Letter of installation of fire fighting appliances from firelicense agency.7) Provisional fire NOC.8) Provisional drawing sanctioned from fire department.9) Fire resistance door installation certificate.10)Challan of fire pumps (Xerox Copy)11)Lift inspection certificate.12)Challan of D.G. sets.13)Commencement Certificate obtained from BuildingPermission Section.14)Photographs of fire fighting appliances.Undertaking on 200 Rs. Stamp Paper that provision of Firemaintained as per approved plansafety is

CIDCO FIRE SERVICEDetails of Fire Fighting System Check ListName of Society: .Address:Types of Building: Inspection Date:Total Area: Name of Main Person: signature .No.Type of installation1Dry /wet Riser2Landing Valve3Hose Box4Hose5Branch6Hose Reel with shut – up Cock Nozzle7Terrace tank8Underground Static water storage Tank9Courtyard Hydrant10Siamese Connection11Electric Main pump12Booster Pump13Stand by Electric Pump14Jockey Pump15Diesel Pump16D.G. SetAvailableQuantityRemark

17Automatic Fire Alarm System18Auto Sprinkler System19Fire Door20Fire Lift21Refuge Area22Control Room23Entrance & Exit Gate24Staircase25Electric Duct26Fire DuctPortable Fire EquipmentsI)D.C.P Type Fire ExtinguisherII)CO2 Type Fire ExtinguisherIII)A.B.C. Type Fire ExtinguisherIv)Fire Brand type Fire BucketNOTE:Fire Service Fee Structure for Special Planning AuthoritiesSr.No.Type of Building OccupancySpecial Planning AuthoritiesFees inRs. PerSq. Mt.(1)(2)Subject to MinimumofRs.(1)(2)RESIDENTIAL BUILDING (A)(a)(b)Lodging & rooming House (A-1)Less Than 15 m in Height(i) Up to 15 Rooms(ii) More than 15 and up to 30Rooms(iii) More than 30 RoomsApartment House (A-4)5.0030,000.007.0035,000.0010.0050,000.00

1From 15 m to 24 m in Height5.0030,000.00224 m and above but notexceeding 35 m in heightAbove 35 m but not exceeding45 m in heightAbove 45 m in (3)(d)(1)(2)(3)Hotel (A- 5)Less than 15 m in height(i) Covered area not exceeding300 m2 on each floor(ii) Covered area exceeding300m2 but not more 1000m2 neach floor(iii) Covered area exceeding1000m2 on each floor15m and above but notexceeding 30mAbove 30m in heightHotels( starred) (A-6)Less than 15m in height(i) 3 starred Hotels(ii) 5 starred Hotels(iii) 7 starred Deluxe Hotels15m & above but not exceeding30 m in heightAbove 30m in heightEDUCATIONAL BUILDINGS(B)(1)(2)(a)(1)Less than 15m in height(i) Ground plus one storey(ii) Ground plus two story15m and above but notexceeding 30m in heightINSTITUTIONALBUILDINGS ( C)Hospitals, Sanatoria and nursinghomes(C-1)Less than 15m in height

(2)(3)(b)(1)(2)(3)(4)(1)(2)(3)(4)(1)(i) Up to ground plus one storywith plot area less than1000m2, with no beds(ii) Up to ground plus one storeywith plot area greater than1000m2 with beds(iii) Above two storey, with nobeds(iv) Above two storey, withbeds15m and above but notexceeding 24m in heightAbove 24m and not exceeding30m in heightCustodial (c-2) and Penal andPlental (c-3)Less than 10 in 5,000.0010.0075,000.0015.001,00,000.00(i) Up to 300 persons5.0030,000.00(ii) More than 300 persons6.0035,000.0010m and above but notexceeding 15m in height15m and above but notexceeding 24m in height24m and above but notexceeding 30m in heightASSEMBLY BUILDING (D)(D-1 TO D-5)Less than 10m in i)Upto 300 persons5.0030,000.00(ii)More than 300 001,00,000.005.0035,000.00Above 10 m but not exceeding15m in heightAbove 15 m and above but notexceeding 24m in heightAbove 24 m not exceeding 30 min heightBUSINESS BUILDINGS(E)Less than 10 m in height

(2)(3)(4)(a)(1)(2)(3)(b)Above 10m but not exceeding15m in heightAbove 15 m and up to 24 m inheightAbove 24 m in heightMERCANTILE BUILDING (F )F-1 and F-2Less than 15 m in height(i) Ground plus one story, withtotal covered area notexceeding 500m2(ii) Ground plus one story andcovered area exceeding500m2(iii) More than ground plus onestoryAbove 15 m but not exceeding24m in heightAbove 24m but not exceeding30 m in heightUnderground shopping complex(F-3)INDUSTRIAL BUILDINGS (G)(a)(1)(i)(b)(1)Low Hazard (G-1)Up to 18m in heightCovered area up to 50m2(ii) Covered area above 50m2and up to 100m2(iii) Covered area above 100m2and upto 200m2(iv) Covered area above 200m2and up to 400m2(v) Covered area above 400m2Moderate Hazard (G-2)Up to 18m in heightCovered area up to 100m2Covered area above 100m2 andup to 250 m2Covered area above 250m2 07.0030,000.0075,000.0010.001,00,000.00

(c)(1)up to 500m2Covered area above 500 m2High Hazard (G-3)(A) Up to 15m in height(i) Covered area up to 50m2(ii) Covered area above 50m2and up to 150m2(iii) Covered area above 150m2and up to 300m2(iv) Covered area above 300m2and up to 500m2(v) Covered area above 500m2(1)(B)Cross country Pipelinescarrying hazardous gases andpetroleum productsSTORAGE BUILDINGS (H)Up to 15m in .0060,000.0015.001,00,000.0020.002,00,000.0020.00 permts.2,00,000.00(i)Single storey Building10.0030,000.00(ii)Ground Plus one 0050,000.00(2)Above ground plus one floor(1)HAZARDOUS BUILDINGS (J)Up to 15m in height(i)(ii)Single storey BuildingMore than one floorbuilding but not exceeding15mAs Follows Consummation Paper forms for the Fire

Department PROPOSAL NOC.SrNo.123456789101112DocumentsCopy of Architect’sregistration with councilof ArchitectureCopy of Agreement toLeaseCopy of PossessionreceiptCopy of confirmeddemarcation planCopy of all registeredtripartite agreementFinal transfer order fromEstate sectionCopy of power ofattorney (POA)Necessary charges / feesincluding Fire CessAmalgamation NOCfrom Estate sectionApproval of location &size of Elect. Sub stationfrom MSEDCNOC from societyYes / NoRemark

Built up Area statementfor Fire CessNote : After 07 days the above paper consummation paper forms will begiven a letter noc.FIRE OFFICERCIDCO FIRE SERVICE

Example of Stamp paper for Fire NOC

4) Payments slip of Fire Cess Charges. 5) Work Completion letter from Developer / Builder. 6) Letter of installation of fire fighting appliances from fire license agency. 7) Provisional fire NOC. 8) Provisional drawing sanctioned from fire department. 9) Fire resistance door installation certificate

Related Documents:

May 2020 NOC April 2020 NOC March 2020 Modification of Section IV Table 11C.1 (New provision symbols: 30B#6.21N_1, 30B#6.21N_2) February 2020 NOC January 2020 Modification of Section II Chapter 1 and Chapter 2 with new Special Sections: AP30/P and AP/30A/P. December 2019 NOC November 2019 NOC October 2019 NOC September 2019

Bruksanvisning för bilstereo . Bruksanvisning for bilstereo . Instrukcja obsługi samochodowego odtwarzacza stereo . Operating Instructions for Car Stereo . 610-104 . SV . Bruksanvisning i original

Once the design of the basic NOC architecture became established, new techniques evolved to address advanced issues such as dynamic load balancing on to a node of the NOC architecture, the shortest/fastest path for the data flow through NOC, and energy efficient NOC architecture design. Most researchers have focused on the

complex system chip design, especially for NoC-based SoC, which has been increasingly applied to complex system design. This paper proposes a collaborative verification and testing platform for NoC-based SoC. Based on VMM verification methodology, a hierarchical NoC validation platform is constructed and assigned to the function verification of NoC

10 tips och tricks för att lyckas med ert sap-projekt 20 SAPSANYTT 2/2015 De flesta projektledare känner säkert till Cobb’s paradox. Martin Cobb verkade som CIO för sekretariatet för Treasury Board of Canada 1995 då han ställde frågan

service i Norge och Finland drivs inom ramen för ett enskilt företag (NRK. 1 och Yleisradio), fin ns det i Sverige tre: Ett för tv (Sveriges Television , SVT ), ett för radio (Sveriges Radio , SR ) och ett för utbildnings program (Sveriges Utbildningsradio, UR, vilket till följd av sin begränsade storlek inte återfinns bland de 25 största

Hotell För hotell anges de tre klasserna A/B, C och D. Det betyder att den "normala" standarden C är acceptabel men att motiven för en högre standard är starka. Ljudklass C motsvarar de tidigare normkraven för hotell, ljudklass A/B motsvarar kraven för moderna hotell med hög standard och ljudklass D kan användas vid

phases attained more algae for future oil extraction (Day 32 was in growing phase). After ultrasonication, the lipids were extracted by the Folchs method. The lipid content was 8.6% by weight. 0 0.05 0.1 0.15 0.2 0.25 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Algae Mass (grams) Time (days) Haematococcus Growth in Bolds Basal .