Electromagnetic Interference/Compatibility (EMI/EMC)Control Test and Measurement FacilityUser Test Planning GuideNational Aeronautics and Space AdministrationLyndon B. Johnson Space CenterHouston, Texas 77058

Table of Contents1.0Electromagnetic Interference/Compatibility Test Facility .32.0Facility Layout .43.0Safety and Health .64.0Test Process Flow .64.1.Proprietary Information .74.2Test Initiation Phase .84.2.1Test Request . 84.2.2Schedule and Cost Estimate . 94.3Test Preparation Phase .94.3.1Test Requirements . 104.3.2Test Article Documentation . 104.3.3Test Plan . 114.3.4Test Schedule . 114.3.5Test Article Delivery . 114.3.6Test Readiness Review . 114.4Test Execution Phase .124.4.1Test Authority . 124.4.2Test Deviations . 124.5Test Closeout Phase .134.5.1Customer Feedback . 135.0Facility Access .146.0Roles and Responsibilities .15Acronyms .17Appendices .18Appendix AFacility Interfaces.19Appendix BTest Request Worksheet .23Appendix CFacility Specifications .28Appendix DFacility Equipment .29Appendix ESample Test Configurations .322

1.0 Electromagnetic Interference/Compatibility Test FacilityThe Electromagnetic Interference/Electromagnetic Compatibility (EMI/EMC) Control Test andMeasurement Facility supports engineering development and EMI/EMC measurements andprovides EMI/EMC evaluation and certification testing of crew, flight, and ground supportequipment including, but not limited to, Communication, Instrumentation, Biomedical, Guidanceand Navigation, Computation, and Robotics.Services Provided Testing - developmental, engineeringsupport, performance and precertificationevaluation, and certification testingConducted and radiated emissions andsusceptibility testing (e.g., MIL-STD-461,all revisions; RTCA/DO-160, sections 16through 21)Lightning indirect effects and ElectrostaticDischarge (ESD) assessment(e.g., RTCA/DO-160, sections 22 and 25)Cable transfer impedance and equipmentshielding effectiveness assessmentEMC design consultationDetailed test planning support and testdata collection/reportingCapabilitiesShielded room enclosuresMeet military standard MIL-STD-285Synthesized signal generatorsCapable of covering a frequency range of 10 Hz to 26 GHzRadio frequency (RF) power amplifiersProvide up to 500 W of output power in the frequency range of 10 kHz to18 GHzLightning transient generator andsupport probesProvide test waveforms 1, 3A, 3B, 4, and 5A for lightning indirect effectstesting up to Level 3ESD test equipmentProvides standard ESD test waveforms up to a 30 kV peak pulse voltageComplete line of general purposeancillary test equipmentPower supplies, oscilloscopes, power meters, and voltmetersHigh-fidelity EMC modeling softwareGeneral purpose three-dimensional electromagnetic modelingPoint of ContactLab Manager, Richard DeppischJohnson Space Center2101 NASA Parkway, Houston, TX 77058(281) 483-0475richard.m.deppisch@nasa.gov3

2.0 Facility LayoutThe facility has two shielded enclosures, or chambers, as shown in the accompanying figures.The primary chamber is designed to accommodate larger pieces of equipment. The wall,ceiling, and floor are constructed of panels of 24-gauge galvanized steel sheets laminated toboth sides of a ¾-inch structural core. The floors are covered with tile and are designed tohandle a loading capacity of 1,000 lb. per square foot. Each chamber is equipped with a 9′ W x3′ D ground plane bench, covered with a copper sheet that is electrically bonded to the adjacentwall. The test benches stand 30 inches above the floor.KEY1000A3’x5’tableTest Rm.18’X23’X10’Absorber 0BPC&PrinterControl Rm.10’X12’X10’23’10RMAIP BIP A1000BASupport Rm.10’X11’X10’CIP C57’2’6”x5’tableTest benchIP DDoorsA - Sgl., 3’6” w X 7’6” h, 4.5” lipB – Dbl., 8’ w X 10’ h, 3.5” lipC – Sgl., 3’6” w X 7’6” h, 4.5” lipHB – 13’ w X 20’ hIP A, IP B & IP C – 2” IDIP D – 4” ID2’6”x5’table3’6” 3’4”To 102028’OH DoorLadder upto 2P2100010RW9’4”35’ 8”NOTE: The walls and ceiling of the test room are treated with ferrite tiles and absorber material out to the dotted line and acrossthe back wall. Test Bench can be removed or another may be added as needed to accommodate hardware.Physical Layout of EMI/EMC Primary Facility in B14A/R1000 High Bay4

Large Equipment Under Test (EUT) can be accommodated in the primary chamber via the13′-wide rollup High Bay door in Johnson Space Center (JSC) Building 14A, Room 1000.Heavy EUT can be handled with a forklift or crane, operated by local riggers. EUT too large tofit on the ground plane table may be accommodated by removal of the ground plane bench.Ramps are available so that EUT can be easily moved inside over the 3.5″ chamber doorwaythreshold. Handling of fixtures, test item placement, and service connections should beresolved during pretest coordination and planning.8’4” L X 6’ W20º downward rampDKEYDoorsA - 3’6” w X 7’ h, 3” lipB – Dbl., 6 w X 7’6” h , 3” lipC – 3’6” w X 7’ h , 3” lipD – Dbl., 6 w X 7’ hIP E & IP G – 2” IDIP F – 4” IDR133D4’4”8’ W �4’6”IP GA10’Test Rm.16’X10’X8’6”Control Rm.8’X10’X8’6”PC& PrinterEMI Rcvr.3’10”CBWork BenchIP E4’ X 8’Test BenchStairway2’ X 2’EUTTableEUT GSESupport Rm.11’6”X10’X8’6”IP F3’ X 3’Table35’6”Physical Layout of EMI/EMC Secondary Chamber in B14/R133D* See Appendix A for facility interface information and Appendix E for sample test configurations.5

3.0 Safety and HealthSafety is an integral part of the culture at the National Aeronautics and Space Administration(NASA). Management, leadership, and employee involvement from all organizations are criticalto the success of NASA’s safety program. In order to ensure personal safety and a safe testenvironment throughout the process, the requester shall furnish the facility with the informationnecessary to perform a hazard assessment of the test article. Additionally, while visiting JSC,the requester shall follow all facility-specific safety and health requirements. A facility safetybriefing shall be provided to all personnel prior to the start of the test. The safety briefing willinclude a review of the laboratory safety rules, potential hazards, and emergency procedures.4.0 Test Process FlowThe flowchart presented below outlines the basic roadmap and significant milestones betweenthe initial test request and delivery of test data. The flow is separated between Test Requesteractions and Facility actions, highlighting interactions and inputs between the Test Requesterand the facility Test Director.6

The test schedule is highly dependent on the complexity of the test, facility availability, andsequence of runs. For time-critical testing, it may be possible to accelerate the schedule, givenconstraints associated with previous customer commitments. A detailed schedule shall bedeveloped as part of the test planning process following a review of the test objectives andrequirements. Typical major milestones are presented below:Note: The schedule is subject to the complexity of test requirements.4.1. Proprietary InformationThe EMI/EMC Test Facility provides for protection of proprietary information and hardwarethroughout the test process. The Test Requester shall clearly mark all export controlled orproprietary hardware items and data provided with a notice of restriction on disclosure or usage.The Test Director shall safeguard export controlled or proprietary items from unauthorized useand disclosure and ensure that test articles remain secure within the facility and are properlysequestered. Hardware items shall be returned to the Test Requester or disposed of inaccordance with the Test Requester’s instructions at the completion of the test activity.7

4.2Test Initiation PhaseThe test initiation phase establishes the relationship between the Test Requester and the TestDirector. The Test Requester shall provide a test request to the Test Director. The test requestwill be used to determine test feasibility and to develop an estimated cost and a preliminary testschedule. An initial requirements review meeting may be necessary in order to discuss thecharacteristics of the test article, the test approach, or any special considerations for the test.An onsite tour of the facility is highly recommended for familiarization and to provide anopportunity for an exchange of technical information.Inputs:Test Requester provides test request, identifies Test Article ExpertActivities:Facility Test Director reviews test request to determine test feasibilityOutputs:Facility delivers preliminary test plan, estimated cost and schedule to TestRequester4.2.1 Test RequestThe test request outlines the EUT requirements, test objectives, test article description, andpreferred schedule. A Test Request Worksheet is provided in Appendix B. This worksheetaddresses the basic requirements for testing in the EMI/EMC Test Facility. It is suggested thatthe Test Requester complete this worksheet to facilitate the development of a preliminary testplan. At a minimum, the test request should include the following information:Test Requirements and ObjectivesA brief description of the test requirements including, but not limited to, the following: Applicable EMI/EMC requirements/limits/specification (e.g., customer specification,MIL-STD-461, DO-160) Desired test environment and modes of operation Proposed test approach Test data requirements8

Test Article DescriptionA brief description of the test article including, but not limited to, the following: Size/dimensions (provide drawings, sketches, photos) Weight Test article interface (electrical, mechanical, fluids, gases, pressure, temperature,other) Special considerations [hazards, cleanliness, compatibility, Material Safety DataSheets (MSDS)] Handling, storage, and security requirementsScheduleIdentify the desired start date and the required date for delivery of the data/test report.4.2.2 Schedule and Cost EstimateA preliminary cost and schedule estimate, including major milestones, will be delivered followingreview of the Test Request Worksheet. Additional details and refinement of the cost andschedule estimate will be worked out with the Test Requester as test planning proceeds, with afinal version to be agreed upon prior to the Test Readiness Review (TRR).4.3Test Preparation PhaseThe detailed test plan and test schedule are finalized during the test preparation phase. TheTest Requester shall provide detailed test requirements and test article documentation to theTest Director. A TRR will be held following approval of the test plan.Inputs:Test Requester provides test requirements and objectives, and test articledocumentationActivities:Facility and Test Requester develop test planFacility begins assembly of facility-unique interface/support structure(s) (if needed)Test Requester ships/transports test article and associated support/peripheralequipment to JSCOutputs:Test Requester approves test plan, schedule, and final cost estimateFacility hosts TRR9

4.3.1 Test RequirementsA complete understanding of test requirements and facility capabilities is mandatory for asuccessful test. Test requirements must be carefully defined and reviewed so that the test teamunderstands the effect of the requirements on test facility preparation and test performance.The Test Requester shall provide a detailed list of test requirements including, but not limited to,the following: Applicable EMI/EMC requirements/limits/specifications(e.g., customer specification, MIL-STD-461, DO-160) Desired test conditions (frequency)and modes of operation Proposed test approach Test data requirements Test article interface Orientation, load points, method of suspension or test article support Electrical, mechanical, fluids, gases, pressure, temperature, other Data/instrumentation requirements (provided by Test Requester and facility)4.3.2 Test Article DocumentationTest Article DrawingsThe Test Requester shall provide detailed test article drawings as requested by the facility.Test article drawings are used to prepare the facility interfaces, test article supportstructures, and instrumentation connection points.Material Safety Data SheetsNASA must ensure that all materials exposed to test environments do not present a hazardto personnel or the test facility. The Test Requester shall deliver to the facility MSDS formaterials used in the construction or operation of the test article and any associated supportequipment. The Test Director will review the materials list for compatibility with the testenvironment.Test Article Hazard IdentificationThe safety of facility personnel, facility equipment, and the test article is imperative to NASA.Potential hazards, material compatibility, and facility interfaces will be reviewed with thefacility prior to testing. In certain instances, special precautions must be taken due to theseverity level of these potential hazards. The Test Requester may be asked to providefurther information to clarify or mitigate a potential hazard. A Test Article Hazard Checklist isprovided in Appendix B.10

4.3.3 Test PlanA test plan will be prepared through collaboration between the Test Director and the TestRequester. The final test plan shall be jointly approved by the Test Requester and the TestDirector prior to the TRR. The test plan will be the controlling document, with respect to scopeand approach for the test program. The test plan will include, at a minimum, the scope, testarticle description, test objectives, test requirements/limits, safety considerations, datarequirements, and detailed test procedures. Changes to the test plan that occur after the TRRthat result in a major change to the scope of the test or that present new hazards will require adelta TRR.4.3.4 Test ScheduleA detailed schedule shall be developed jointly by the Test Director and the Test Requester. Theschedule shall allow adequate time for creation, review, and approval of test plans, assembly offacility interfaces/structures, test article delivery, performance of the test, and creation of the testreport. The schedule of other tests and maintenance activities will be reviewed for potentialconflicts. Any identified conflicts shall be resolved prior to the TRR.4.3.5 Test Article DeliveryThe test article delivery date will be determined on a case-by-case basis. An agreed-upondelivery date shall be captured as a milestone in the test schedule. The Test Requester isexpected to provide personnel to handle and set up hardware prior to the start of the test. Thetest article shall be secured within the test facility, unless directed to provide another means ofstorage. A physical inspection of the test article shall be performed by the Test Director and afunctional test of the test article shall be performed by the Test Article Expert prior to the start oftesting. Test Article Expert participation is mandatory throughout all test phases in order toprovide immediate feedback on test article handling and any integration issues that arise.4.3.6 Test Readiness ReviewA TRR will be held to ensure the completion of all necessary facility and test article activitiesprior to test execution. The TRR will include the following: Review of the test plan, test procedures, and other required test documentation Confirmation of facility and test article readiness Review of configuration records, including facility interface control documents, pressuresystem certification, instrumentation calibration, and materials compatibility Assurance that controls are in place to mitigate risks or hazards identified in the TestArticle Hazard Analysis11

Verification that data acquisition and processing functions are in place to adequatelycapture all critical data Confirmation that multimedia coverage is adequate to provide recognition andassessment of potential test anomaliesApproval to proceed with test operations is granted by the Test Readiness Review Board(TRRB). The Test Director shall ensure that all TRR actions have been accomplished prior tothe start of the test. The TRRB shall convene 1 to 5 business days prior to the start of the test.TRRB participants shall include the following:NASA TRRB ChairmanTest DirectorTest Safety OfficerTest Article ExpertSafety EngineerQuality Engineer – if required by facilityOther expertise (e.g., pressure safety, radiation control, crew office, medical) may be requiredfor support, depending on the nature of the EUT.4.4Test Execution PhaseNASA encourages Test Requester participation in the testing activity. The Test Requester shallprovide a Test Article Expert to verify that test setup and execution meet the statedrequirements and objectives. The Test Article Expert also shall verify test article performanceand approve requested test deviations during test operations.Inputs:Approval to begin testing received from TRRBActivities:Facility conducts testing activityOutputs:Test data package and/or detailed test report4.4.1 Test AuthorityThe Test Director has the authority and responsibility to direct the test in accordance with theapproved test plan and to te

Measurement Facility supports engineering development and EMI/EMC measurements and provides EMI/EMC evaluation and certification testing of crew, flight, and ground support equipment including, but not limited to, Communication, Instrumentation, Biomedical, Guidance

Related Documents:

Automotive EMC testing with Keysight Jon Kinney RF/uW Applications Engineer 11/7/2018. Page How to evaluate EMI emissions with a spectrum/signal analyzer ? Keysight EMI Solutions 2 . Page Getting started –Basic terms Keysight EMI Solutions EMI, EMS, EMC 3 EMI EMS EMC Today, We focus here ! Page Why bother? EMC evaluation is along with your product NPI cycle 4 EMI Troubleshooting EMI Pre .

EN 50270 Electromagnetic compatibility - Electrical apparatus for the detection and measurement of combustible gases, toxic gases or oxygen EN 50370-1 Electromagnetic compatibility (EMC) - Product family standard for machine tools - Part 1 Emissions. EN 50370-2 Electromagnetic compatibility (EMC

have standardized electromagnetic compatibility (EMC) regulations.11 Electromagnetic compatibility refers to the ABILITY OF AN EQUIPMENT or an EMI shielding material that does not affect itself or any other equipment due to EM radiation.12,13 The usage of traditional metal and metallic composites as an EMI shielding materials is

EMI FILTER There are several types of filters, for example, passive EMI filter, active EMI filter and hybrid EMI filter. However, the passive EMI filter is simpler than others. A typical procedure used in [4, 5] is considered to design power line EMI filter. A basic network topology is used, C-L-C for DM filter and L-C

automotive EMC/EMI requirements Introduction The automotive industry and individual automobile manu-facturers must meet a variety of electromagnetic compati-bility (EMC) requirements. For example, two requirements are to ensure that electronic systems do not emit exces-sive electromagnetic interference (EMI) or noise, and to be immune to the noise emitted by other systems. This article .

Road traffic signal systems - Electromagnetic compatibility : 31. EN 50370-1:2005 Electromagnetic compatibility (EMC) - Product family standard for machine tools - Part 1: Emission . 32. EN 50370 -2:2003 Electromagnetic compatibility (EMC) - Product family standard for machine

A rt emi s Fowl B ook 2 : Th e A rc t i c I n c i d en t A rt emi s Fowl B ook 3 : E t ern i t y C od e A rt emi s Fowl B ook 4 : O p al Dec ep t i on A rt emi s Fowl B ook 5 : Lost C ol on y A rt emi s Fowl B ook 6 : Ti me Parad ox A rt emi s Fowl B ook 7 : At l an t i s C omp l ex. For Betty. A rt e

Keywords --- algae, o pen ponds, CNG, renewable, methane, anaerobic digestion. I. INTRODUCTION Algae are a diverse group of autotrophic organisms that are naturally growing and renewable. Algae are a good source of energy from which bio -fuel can be profitably extracted [1].Owing to the energy crisis and the fuel prices, we are in an urge to find an alternative fuel that is environmentally .