BACK TO BASICS: DUCT DESIGNMatthew Low, M.AIRAH, CPEng15 MAY 2013

Back to Basics: Duct Design Quick Introduction Duct Sizing Tools and Methods Recommended Duct Velocities and Noise Effects Duct Fitting Pressure Losses Do and Don’ts of Duct Design Duct Applications AS 4254

Quick IntroductionA “Good” Duct Design is a Balance between Application (Design Intent) Reliability (Maintenance Cost) Manufacturing Costs (Capital Cost) Pressure Loss (Operational and Energy Cost) Acoustics (Environmental Cost) Air Balancing (Commissioning Cost)

Duct Sizing ToolsORDuct Sizing ChartAIRAH DA3 Duct Design ManualDuctulator (Manual/Digital)Manufacturers/Programs

Duct Sizing MethodsMethodsDescription SummaryVelocityReduction Base on ExperienceQ VA (Continuity equation) Simplest Not standardNot completely balancedConstantPressureGradient Also called Equal FrictionIn Pa/m Straight ductHigher Pa/m used Very Simple Considerable dampeningrequiredStatic Regain Supply air onlyDecrease in velocity pressurebranch or fittingOffsets friction loss insucceeding section of ductFixing 1st Segment withmethods above Lower systempressure lossLower EnergyconsumptionLess Noise issues intake offs Larger duct sizesIncreased capital costIncreased spatial requirementsAny method above initiallyDetermine the index runResize to ensure pressureloss similar to index Better pressurebalanced systemSmall duct sizesReduced capital andspatial costs Tedious CalculationsHigher velocities at take offsmay be noisyDampering of Larger ducts maybe as or more noisyASHRAE FundamentalsOperation and Capital Costoptimisation focused SimpleBest EconomicalSizing Method BalancedPressure DropT-Optimisation Pros Cons Very tedious calculations withsimulationsSpatial costs neglected

Recommended Duct Velocities and NoiseEffects Table above shows the duct velocities based on AES projectexperience HOWEVER, Project/Design Engineer must always check andselect appropriate sizes to suit the project’s complexity andapplication

Duct Fitting Pressure Loss Various duct fitting pressure lossesAIRAH DA3 or the AIRAH Technical HandbookMore available in the ASHRAE Handbook or SMACNAObtain other duct fittings pressure losses from manufacturerssuch as duct heaters, dampers, filters, grilles, coils, etc Calculated by the following formula (derived from Bernoulli’s) PTOTAL KT X PV KT X ½ X ρV2 PTOTAL the total pressure loss across the duct fittingKT the pressure loss coefficient of duct fittingPv velocity pressure (dynamic pressure)ρ density of airV velocity of fluid

Example of Duct Fitting LossVu Upstream velocity offittingH Height of the ductW Width of the ductR Radius of the bendΘ Angle of the radiusCalculate the pressure loss of the duct fitting in a 600mm W x200mm H duct with a radius of 600mm and a 90 Bend angle. SayReynolds number as 4500. Therefore the pressure loss is 0.2149

Example of an AES Static Calculation Sheet Can be summarised in aspreadsheet Remember to include othermanufacturer’s type ancillary ductfittings like duct heaters, VAVs,coils, etc Total static pressure safetyvarious on application

Installation Do’s and Don’ts Good resource - “Fans by Fantech Book”

Installation Do’s and Don’ts by Fantech

Duct Applications Kitchen Exhaust Ductwork Smoke Exhaust Ductwork Seismic Restraining Winds Restraining (not covered in this presentation) Acoustics and Attenuation (refer to Back to Basics: Acousticsheld last Technical Meeting) Etc

Kitchen Exhaust Ductwork Construction of 1.2mm or 0.9 stainless as perAS1668 standard with Seams sealed to preventgrease leakage. Spigot connections at 5 to 7m/s. Duct to slopeup in direction of flow for grease flow back tohood. Duct access panels every 3 metres of straightduct and change of direction. Builder/Architectmust provide access panels. Lower edge of canopy type must not be lessthan 2m above floor level at the operator side ofcooking equipment.

Smoke Exhaust Ductwork Internal insulated smoke exhaust ductworkmust have perforated metal lining Coated with fire rated spraying/wrapping,cladding and etc must applied where smokeexhaust ductwork in a different firecompartment it serves Construction of 1.2mm galvanised steel or0.9mm stainless steel thick ductwork.Subducts are 2mm ductwork and fullywelded at each level to prevent smokemigration between non fire affected floors.Riser shafts adequately sized to allow forrestrictions.

Seismic Restraints Requirements determined by AS 1170.4-2007and not clear in design documents. Building Structural Engineer and BuildingCertifier to classify the following:– Earthquake Design Category– Building Importance– Probability of Exceedance of design eventsand Probability factor– Hazard Factor– Site Sub Soil Classification Duct installed to be reviewed initially and finallyby structural engineer (project or independent)prior to completion

AS4254: Duct Classification Standard Duct pressure classification tables found in the AS 4254 such as low,medium or high pressure AS4254 explains duct thicknesses, sealing, reinforcement andfunctional requirements. Refer to table 2.3 for duct thicknesses andreinforcement methods Changes to 2012 edition as follows: Fire rated duct must be constructed to the same standard as the testedsolution for that particular product. Detail must be obtained from therelevant supplier at the start of the project and may be differentdepending on the proposed fire rating method. Any duct system over 3000 L/s must be tested at minimum 10% ofeach system at 1.25 times operating pressure.

Thank You

Duct Sizing Tools OR Duct Sizing Chart Ductulator (Manual/Digital) AIRAH DA3 Duct Design Manual Manufacturers/Programs . Duct Sizing Methods . More available in the ASHRAE Handbook or SMACNA Obtain other duct fittings pressure losses from manufacturers such as duct heaters, dampers, filters, grilles, coils, etc

Related Documents:

installed as described in the TDC or TDF addendum to the SMACNA Duct Construction Standards except the corners may not be bolted. Standard 5" metal clips may be used with spacing as shown in diagram. SLEEVE DUCT TYPICAL TDC/TDF JOINT DUCT 60" Duct 3 REQ'D. 48" Duct 3 REQ'D. 36" Duct 3 REQ'D. 24" Duct 2 REQ'D. 18" DUCT and .

Air Duct Design & Sizing Duct sizing methods Static regain method Normally used with a computer package for high velocity systems (e.g. in main duct) Size air duct so that static pressure nearly offset the pressure loss of succeeding duct section along main duct T me

Under Floor Duct 1.5 OFFSET FOR #6 DUCT PU6-OFS15 Duct / Under Floor Duct. L 4 International Drive Rye Brook, NY 10573 Toll Free: 1 888.764.7681 Phone: 914.934.2075 Fax: 914.934.2190 MonoSystems.com 03/2016 DOCUMENT REF. NO. PU6FFL45-PU6WE Manufactured by MonoSystems, Inc. Under Floor Duct

lsc bus duct system 1. introduction 3 1.1 general specifications 1.2 outstanding feature of lsc bus duct 1.3 cataloging 2. high power distribution (600a 6000a) 9 2.1 general specifications 2.1.1 i-series bus duct 2.1.2 8-series bus duct 2.1.3 f-series bus duct 2.1.4 y-series bus duct 2.2 grounding & ip degree 2.2.1 grounding 2.2.2 ip degree 2.3 .

and oval duct is easy to install, looks great, saves time and reduces costs. 3 DUCT SYSTEM DESIGN MATERIALS AVAILABLE Aluminum Galvanized steel Stainless steel SIZES AVAILABLE Round spiral duct up to 120" in diameter Round longitudinal seam duct to 100 " in diameter Oval spiral duct in over 350 sizes with minors 4 .

notes: 1. tdc duct constructed per smacna standards-first edition 1995 2. duct fabricated using pittsburg seams. 3. all duct stiffened by machine formed beads spaced at 12” o.c. 4. duct work to be sealed per smacna hvac table 1-2 5. tdc cnt-jnt-co

duct board can provide an alternative to wrapped or liner insulation. Duct board is more rigid than duct liner or duct wrap and can be easily cut, taped together and made into a rectangular duct section. When properly assembled into a system, duct board offers low leakage and can be a cost effective option to du

runout inspection according to DIN 3960/62 or AGMA 2000 (or other standards), the exact measurement and determination of the APEX point of herringbone gears, with a comprehensive evaluation software package, en-sures a final quality certification. KAPP NILES Callenberger Str. 52 96450 Coburg, Germany Phone: 49 9561 866-0 Fax: 49 9561 866-1003 E-Mail: info@kapp-niles.com Internet: www.kapp .