Fyi: City Of Austin Bid Notices Are Posted On The City Of .

2y ago
9 Views
2 Downloads
1.00 MB
7 Pages
Last View : 11d ago
Last Download : 2m ago
Upload by : Philip Renner
Transcription

a publication for the City of AustinSmall & Minority Business Resources DepartmentEvery Week Construction Contractors, Subcontractors & Suppliers Will Receive————Notices About City Construction ProjectsNews About Other Upcoming Projects & EventsInformation About Bid Results & Awards (when available)Plus Free Use Of The Plans & Computer CenterInvitations For Bids For The Week Of August 22-26, 2016fyi: City of Austin Bid Notices Are Posted On The City of Austin Purchasing Office Website: http://www.austintexas.gov/department/purchasing CITY OF AUSTINBIDDING ON CITY OF AUSTIN SOLICITATIONS? BIDDERS MUST ATTEND MANDATORY PRE-BID CONFERENCES AND ARE ENCOURAGED TOATTEND ANY NON-MANDATORY PRE-BID CONFERENCES TO ENSUSRE THEIR UNDERSTANDING OF OWNER’S BIDDING AND CONTRACTING REQUIREMENTS,PARTICULARY MBE/WBE PROCUREMENT PROGRAM REQUIREMENTS. IF THE PRE-BID CONFERENCE IS MANADATORY THE BIDDER MUST ARRIVE AND SIGN-INWITHIN FIFTEEN 15) MINUTES OF THE SCHEDULED START TIME OF THE MEETING. OTHERWISE THE BIDDER WILL NOT BE ALLOWED TO SUBMIT A BID FORTHE PROJECT. The City of Austin Online Vendor Registration and Solicitation Advertising website has changed. On October 1, 2011, the City installed the VendorConnection, a replacement for the existing registration and solicitation advertising websites. This new site may be accessed at ndex.cfm and select Vendor Connection. Solicitation details and document packages are available at this website. Bidders / Proposers arerequired to document efforts to solicit MBE/WBE or DBEs in the Compliance Plan. The Goals for each project and the instructions and forms for the Compliance Planare included in the MBE/WBE or DBE Program Packet included in the solicitation. For construction contracts, the MBE/WBE or DBE Program Packet is a separatelybound volume of the Project Manual.UPCOMING CITY OF AUSTINCONSTRUCTION PROJECTSProject Name:MONTOPOLIS RECLAIMED WATER RESERVOIRAND PUMP STATIONSolicitation No.:IFB 6100 CLMC601Estimated Value: 10,400,000.00MANDATORY Vendor Conf.: July 28, 2016 at 9:00 am, Waller Creek Ctr, 625 E 10th St.,Ste 104, Austin, TX. Site Visit after the Mandatory Vendor ConferenceOffers Due:September 1, 2016 prior to 9:30 amFor Info:John Wepryk, 512-974-7010MBE/WBE GOALS: African American3.21%Hispanic 2.75%Native/Asian American0.39WBE1.21%PROJECT TRADE SUMMARY:Doors, Frames, and Jambs, SteelHandrails, All TypesOverhead Doors: Garage, Etc. (See Class 450 For HaConduit, PVC, Schedule 80Lighting Fixtures, Indoor: All Kinds ,Parts (InMasonryLighting Fixtures, Outdoor: Floodlights, SpotlightTransformer Parts And AccessoriesFencing, Temporary (For Construction And Other IndMetal WorkHydrants, Fire (Including Accessories And Parts)PaintingBarricades, Traffic, PortableDecking, SteelSteel, Fabricated: Beams, Gabions, Gratings, WalkwGratings, Walkway, Fabricated SteelPipe, Ductile Iron, Centrifugally Cast, Mech. JoinPipe, Pvc (Polyvinyl Chloride)Valves, Brass And CopperValves Iron Body: Angle/Check/Gate/ .Signs, Construction Project ID SignsConveying Systems: Elevators, Lifts, Etc.Shoring and Reinforcement ServicesSite WorkConstruction, Irrigation SystemExcavation ServicesConstruction Curb/Gutter (Maintenance, Repair, Remv) Toilets, Portable, Rental Or LeaseBack Fill, Porous Granular Material For Back FillConcreteBack Fill, Trench.(Furnish, Transport Fine Aggregate)Traffic Ctrl Device Placement /Rem SvcConstruction, Sidewalk And Driveway (Incl Hand Ramps) Construction, PipelineDriveway Pavement, Portland Cement ConcreteBase Course, Aggregate.Pavement Marking Lines, Letters And SymbolsPhotography, ConstructionConstruction, Water System, Main and Service LineHauling ServicesManholes, Construction Of. This Work Shall ConsistErosion Control ServicesPaving/Resurfacing, Street (Major And Residential)Fence Installation And RepairElectrical, Industrial (Warehouse, Utility Plants)Htng., Ventilating/ Air Conditioning (HVAC)Plumbing, Industrial (Warehouse, Utility Plants,Inspection Services, Construction TypeSurvey (Not Aerial Or ResearchTree And Shrub Removal ServicesLandscaping (Including Design, Fertilizing, PlantingLandscaping, Tree And Plant Protection During ConsPOTENTIAL PRIME BIDDERES:PSC-CCI, John Taylor, 972-854-0063 Zachry, Adam Lopez, 210-315-1142Prota Construction, Inc., Prota Inc, JV, Becky Clark, 512-535-2553MGC Contractors, Inc., Kirby Anderson, 210-694-0565CSA Construction, Inc., George Craig, 713-686-8868Matous Construction, DonSchnch, 254-534-8020Jay-Reese Contractors, Inc., Ron Albee, 512-844-9968Oscar Renda Contracting, Sam Michael, 515-306-8922Excel Construction Services, Matt Cannors, 512-974-7012MAC, Inc., Brad Bechto, 512-326-3920 CRU, Ltd., Cody Andrews, 512-989-2602Pepper Lawson Waterwork, Chad Mitchell, 7134-5232-0174Flintco, Kevin Bromenshenk, 512-623-0934PROJECT NAME:SAR THICKENER IMPROVEMENTSSolicitation No.:IFB 6100 CLMC558Estimated Value: 6.612,000.00MANDATORY Vendor Conf. August 4, 2016 at 9:30 am at 1017 Fallwell Lane, Del Valle,Site Visit will occur after the Mandatory Vendor Conf.Offers Due:September 8, 2016 prior to 9:30 amFor Info:John Wepryk, 512-974-7010MBE/WBE Goals:African American1.32%Hispanic 1.80%Native/Asian American0.73%WBE1.61%PROJECT TRADE SUMMARY:Lighting Fixtures, Outdoor: Floodlights, SpotlightFencing, Temporary (For Construction And Other IndSteel, Fabricated: Beams, Gabions, Gratings, WalkwPipe, Ductile Iron, Centrifugally Cast, Mech. JoinValves, Iron Body: Angle, Check, Gate, Globe, Etc.Signs, Construction Project Identification SignsSite WorkDemolition ServicesBack Fill, Trench.(Furnish, Transport Fine Aggregate)Constru, Sidewalk/Driveway Incl HandicappedConstruction, Water System, Main And Service LineElec/Indust (Warehouse/Utility Plants)Metal WorkPaintingPhotography, ConstructionInspection Services, Construction TypeTraffic Control Device Placement And Removal ServiceErosion Control ServicesLandscaping, Tree And Plant Protection During ConsTransformer Parts And AccessoriesHydrants, Fire Inclu Access/PartsGratings/Walkway/Fab SteelPipe, Pvc (Polyvinyl Chloride)Pumps, Sump, SubmersibleConveying Sys: Elevators, Lifts, Etc.Shoring/Reinforcement ServicesExcavation ServicesConstruction, PipelineDrwy Pav/ Portland Cmt ConcreteManholes/Construction OfHeating, Ventilating/ AC (HVAC)Plumbing/Indus Warehouse Utility Plants,Hauling ServicesSurvey (Not Aerial Or ResearchToilets, Portable, Rental Or LeaseFence Installation And RepairPOTENTIAL PRIME BIDDERS:EXCEL Construction Services, Kevin Wenske, 512-259-5005Matous Construction, Andrew Roberts and Don Schnch, 254-780-1400PSC-Cardinal Contractors, John Taylor, 972-854-0063LASCO Electrical / CLO2 Services, Robert Lemay, 512-289-3089Prota Inc., Prota Construction, Inc., JV, Rafael Soto, 512-535-2555T. Morales Co, Farrell Prewitt, 254-793-4344Project Name:AUSTIN ENERGY DOMAIN ADA IMPROVEMENTSolicitation No:IFB 6100 CLMC602Estimated Value: 400,000.00MANDATORY Vendor Conf.: August 3, 2016, at 1:30 pm, Austin Energy, 2526 Kramer Lane,MANDATORY site visit will immediately follow the meetingOffers Due:August 18, 2016 prior to 10:30 amFor Info:Paul Sanchez, 512-322-6323MBE/WBE Goals:African American2.44%Hispanic1.65%Asian/Native American0.58%WBE1.82%PROJECT TRADE SUMMARY:Doors, Metal, Fireproof W/FrameTile, VinylLockers, Storage (For Coats, Hats And Baggage) Steel, Reinforcing, MeshBathroom Accessories: Fans/Mirrors/Medicine Cab Plumbing Fixtures/Parts: Lavatories, Sinks, ToShower Stalls, Doors, And Tub EnclosuresToilet Partitions And DoorsWater Heaters, CommercialSod, GrassPlumbingSigns, Construction Project Identification SignsConveying Systems: Elevators, Lifts, Etc.Finishes: Flooring, Wall And Ceiling, Etc.Site WorkPaintingMasonry/Concrete/Stucco, Maint, Finishing/Repair Wall/ Ceiling Repair/Replac (Incl Drywall)Demolition ServicesExcavation ServicesConstruction, Parking Lot And AlleyBack Fill/Porous Granular Mat For Back FilliConstruction, Sidewalk And Driveway (Incl Handicapped Ramps)Heating, Ventilating And Air Conditioning (Hvac)Structural And Reinforcement SteelWeldingPhotography, ConstructionDust Control WateringTraffic Ctrl Device Placement/Remv SvcGarbage/Refuse Equip (Dumpsters) RentalToilets, Portable, Rental or LeaseErosion Control ServicesProject Name:ONION CREEK WASTEWATER TREATMENT PLANT(Demo)Solicitation No.:IFB 6100 CLMC614Estimated Value: 1,118,049.00MANDATORY Vendor Conf. August 3, 2016 at 10:00 am,10600 River Plantation Drive, Austin,Offers Due:August 18, 2016 prior to 9:30 amFor Info:Brenda Baker, 512-974-1175MBE/WBE Goals:African American1.16%Hispanic3.61%Native/Asian American0.44%WBE1.50%PROJECT TRADE SUMMARY:Fencing, Chain Link (Inclu Fabric, Gates, Pane)Fencing, Temporary (For Construction, OtherBarricades, Traffic, PortablePatching Mix, Asphalt ConcreteBlack Base, Rock AsphaltSealant, Asphalt, Crack And JointSlurry SealBorrow And Soil (See Class 790 For Top Soil)Ready-Mix ConcreteSite WorkGarbage/Trash Removal/DisposalConstru Backfill/Digging/Ditching/Rd GradingDemolition ServicesConstruction, PipelineConstruction, Sidewlk/Drwy (Incl Handicapped)Constru, Water System, Main/Service LineManholes, Construction OfMeter Vaults, ReconstructionValve Vaults And Boxes, Reconstruction OfMetal WorkStructural And Reinforcement SteelPhotography, ConstructionHauling ServicesPavement Marking Svcs (Includ RemovalSurvey (Not Aerial Or ResearchErosion Control ServicesTraffic Control Device Placement\Removal SvcWell Pointing Services (Dewatering)Garbage/Refuse Equip (Dumpsters, Etc.) RentalToilets, Portable, Rental Or LeaseLandscaping (Including Design, Fertilizing, PlantingLandscaping, Tree And Plant Protection During ConsProject Name:ELEVATOR REFURBISHMENT REBIDSolicitation No:CLMC578AEstimated Value: 3,312,800.00For Info:Rohini Kumarage (512) 530-7547MANDATORY Vendor Conf: August 17, 2016 at 2:00 pm, 2716 Spirit of Texas Dr., Rm174A, Mandatory Site Visit immediately follow the Pre-Bid Mtg.Offers Due:September 15, 2016 prior to 9:00 amMBE/WBE Goals:MBE 0.61%WBE 0.25%PROJECT TRADE SUMMARY:Stone, Building (Except Marble)Elevator Installation, Maintenance And RepairHeating, Ventilating And Air Conditioning (HVAC)Finishes: Flooring, Wall And Ceiling, Etc.ElectricalConstru Equip Maintenance/ RepairProject Name:4TH / RIO GRANDE CHILLED WTR TRANS MAINSolicitation #:CLMC611Estimated Value: 1,800,000.00For Info:John Routh (512) 505-7820.MANDATORY Vendor Conf. September 1, 2016 at 1:30 pm, Town Lake Center, 721Barton Springs Rd., Rm 130, Austin, TX 78704Offers Due:September 15, 2016 prior to 10:00 amMBE/WBE Goals:African 31%PROJECT TRADE SUMMARY:Pipe Fittings, Misc. (Not Otherwise Classified)Boring, Drilling, Testing, And SoundingsConstru, (Backfill/Digging/Ditching/Road Grading Excavation ServicesConstruction, Curb/Gutter (Maint/Repair/Removal) Construction, Highway And RoadConstruction, Chilled Water Pipe InstallationConstruction, PipelineConstru, Sidewalk /Drwy (Incl Handicapped Ramps) Driveway Pavement, Bituminous.Construction, Street (Major And Residential)Mudjacking/Repairing Concr Pav SlabsChemical Treatment Of Boiler And Tower WaterHauling ServicesVideo Scanning Of Sewers, Waterwells, Etc.Pavement Marking ServicesCable, ElectricConduit, Pvc.Erosion Control ServicesPOTENTIAL PRIME BIDDERS:Traco Elevator, Jared Schmidt, 512-538-8321STR Constructors, Ltd, Tom Stanfield, 512-515-0254Workman Commercial, Travis Thrift, 512-326-9293G Corp, Dustin Gadberry, 214-325-5628Thyssen Krupp Elevator, Billy Lund, 512-486-1011

City of Austin Upcoming Construction ProjectsContinuedPROJECT NAME:PARMER LANE INTERCEPTORSolicitation No.:IFB 6100 CLMC552Estimate Value: 29,600,000.00MANDATORY Vendor Conf.: August 22, 2016 at 9:00 am, t Webberville Service Center,2600 Webberville Rd., Austin, TX 78702Offers Due:September 15, 2016 prior to 9:30 amFor Info:Eric Bailey, 512-974-7713PROJECT TRADE SUMMARY:Curing Mixtures, all typesFuel Oil, DieselSteel, Fabricated: Beams/Gabions/GratingsStructural Shapes, Steel/Angles/ChannelsPipe, PVC (polyvinyl chloride)Flexible BaseStabilized BaseTop Soil/Fill Dirt (Class 335 Mulch)Manholes/Manhole Covers/Frames/Grates/RSite WorkShoring/Reinforcement ServicesDemolition ServicesExcavation, BorrowManagement ConstructionConstruction, PipelineConstruction, TunnelManholes, Construction OfWeldingLaboratory /Field Testing ServicesHauling ServicesSurvey (not aerial or research)Tree and Shrub Removal ServicesBuilding, Fabricated, Rental or LeaseMachinery/Heavy Hardware Rental or LeaseToilets Portable, Rental or LeaseFence Installation and RepairLandscaping Tree Plant Protec During ConstrFencing, TemporaryBarricades, Traffic, PortableSteel, Reinforcing, Bars and RodsGrates, Guards and other protective devicesBorrow/Soil (Class 790 for top soil)Ready/Mix ConcreteGrass SeedSigns, Construction Project IdentificationSewer Lift Stations, PartsGarbage/Trash hing/RGExcavation ServicesExcavation, Rock 1/2 Cubic YardBack fill, Trench (Furnish/Transport)Embankments, Construction OfConstruction, Utility Underground ProjectsStructural and Reinforcement SteelPhotography, ConstructionBoring For Road CrossingDust Control WateringTraffic Sign InstallationWater and Wastewater Treatment ServicesCrane Rental or LeaseRoad/Highway Equipment (not otherwise) RErosion Control ServicesHydromulching ServicesLitter Remov Svcs (inclu Beach Clng)CHILLED WATER PIPING CONSTRUCTION IN THERIGHT OF WAY IDIQProject Name:Solicitation No:CLMC606Estimated Value: 6,000,000.00MANDATORY Vendor Conf: August 16, 2016, at 1:30 pm, Town Lake Center, 721 BartonSprings Rd., Room 130, Austin, TX 78704Offers Due:September 15, 2016 prior to 9:30 amFor Info:James Matlock , 512-322-6273MBE/WBE Goals:MBE4.81%WBE0.86%PROJECT TRADE SUMMARY:Excavation ServicesConstruction, TunnelHauling ServicesLandscaping/Tree/Plant Protec During ConsConstruction, Chilled Water Pipe InstallationBeamsConstruction, PipelineWeldingTraffic Ctrl Device Placement/Removal SvcBack Fill/Trench Furnish/Transport Fine AggJacking/Cribbing/Shoring Existing DeckPOTENTIAL PRIME BIDDERS:Bilfinger Weston, Alex Perez, 832-795-7008Muniz Concrete & Contracting, Manny Trinidad, 512-385-2334CENTRAL PURCHASING ADVERTISEMENTSSolicitations will be issued, and sealed bids or proposals may be received at the Purchasing Office, Municipal Building, 124 W. 8th St.,3rd floor, Room 308/310, telephone number (512) 974-2500, Austin,TX until the dates and times specified in the solicitation documents forthe following items:UNIVERSITY OF TEXAS AT AUSTINProject Name:(GEB) Dorothy L. Gebauer Building Project A andProject B: Design & Replace Fire Alarm/Signaling SystemSolicitation #:16CSP031/16CSP032Pre-Proposal Conf.: August 23, 2016 at 9:30 a.m. at 1301 E. Dean Keeton Road,FC1, Rm 1.118C Training Room C, Austin, TexasGeneral Construction Budget: Project A: 300,000.00 to 330,000.00Project B: 405,000.00 to 445,000.00Envelopes No. 1 is due September 21, 2016 at 11:00 a.m.Project Summary: Cutting, patching, ceiling removal, painting and fire alarmsystem.16030 Montopolis WRI Storage Reservoir & PumpStation ProjectProject Description:Scope Sheets are Due: Wednesday, August 24, 2016 @ 2:00 PM CDTTuesday, August 30, 2015 @2:00 PM CDTProposals are Due:Bid Day Telephone: 210-871-3601Bid Day Fax: 210-871-6979Bid Day Email: bldgbids@zachrycorp.comGeneral Project Description:Pump Station building, including pumps, disinfection system, associated electrical & controls,piping systems and values, overhead crane, plumbing systems, and HVAC; Hydro-pneumatictank & control system; reclaimed water storage reservoir, nominal 4 million gallon capacity;storm water detention pond; approx. 1,200 LF of 2” potable water main & appurtenances;approx. 2,500 LF of 36” reclaimed water main & appurtenances; approx. 750 LF of 2” sanitary sewer force main & appurtenances; site grading & other site work to accommodate thefacilities, including driveway, sidewalk, fencing & other site work; site electrical work &service connections; connections to existing water and sewer systems; security system.Pump station is a PEMB & masonry structure on cast-in-place concrete foundations foundedon drilled shafts.Note: This project has a required Wage Determination (see other documents on iSqFt and Dropbox).If registered as MWBE with the City of Austin, ZCC needs the following information: (Please fill outthe Mandatory Form on the second page and email it to ZCC at bldgbids@zachrycorp.com by August24, 2016) Vendor Code / Certification No. Type of Certification: (MBE MWB MWDB WBE WMB WMDB) Gender/ Ethnicity: (African American, Hispanic, Asian/Native American)All Bidders: Please provide the above requested information for any registered Second TierSubs or Material Suppliers Bid documents can be found via ISQFT Invitation, or via ZachryDropbox Link AAtBvysYl1856czxtUjyWi7a?dl 0For information pertaining to plans and contract documents contact:Zachry Building Estimating Department: phone 210-871-3601Please forward all questions concerning the project to: Adam.Lopez@zachrycorp.comAll proposals must be submitted via email or fax to the Estimating Dept., bldgbids@zachrycorp.com or (210)871-6979, on Tuesday, August 30, 2016 at 2:00 p.m. and conform to Owner's specifications. All Subcontractors / Suppliers will be bound by the Prime Contract provisions and must execute the applicable ZachryConstruction Corporation Subcontract Agreement without modifications and comply with Zachry Construction Corporation insurance and bonding requirements. Please include all applicable premiums forinsurance and bonds in your written proposal.CLEANING AND TELEVISING SANITARY SEWERProject Name:PIPESSolicitation No.:Offers Due:MBE/WBE:Local Plan Room SitesIFB 2200 EAD0254September 15, 2016 prior to 2:00 pm6.26%To View & Check-out Plans & SpecificationsCity of Austin Construction & Technology Center4201 Ed Bluestein Blvd., Suite 2103, Austin, TX 78721website: www.austintexas,gov/smbr512-974-7799Austin Area Black Contractors Association (ABCA)REQUEST FOR PROPOSAL:JON Second Floor Lobby DesignPROJECT SUMMARY:SCOPE OF WORK:LOCATION:DRAWINGS:BID DATE:Renovation of the lobby and auditoriumcorridor floors and architecturalelements of the surrounding areas.Daily and final cleaning.Jesse H. Jones Hall (JON)Second Floor LobbyElectronic Files available from AlphaBuilding Corporation upon request.8/29/16 @ 12:00 PM6448 Highway 290 East, Suite E-107, Austin, Texas 78723website: www.abcatx.com512-467-6894Asian Contractor Association (ACA)4201 Ed Bluestein Blvd., Suite 2104, Austin, Texas 78721website: d General Contractors (AGC)of America, Building Branch609 South Lamar Blvd., Austin, Texas 78704website: www.agcaustin.org512-442-7887INSURANCE AND BONDING REQUIREMENTS:Associated Builders and Contractors (ABC)1. Workers’ Compensation:2. Employer’s Liability3. Comprehensive General Liability:3006 Longhorn Blvd., Suite 104, Austin, Texas 78758website: www.abccentraltexas.org512-719-5263Statutory 500,000.00 1,000,000.00 each occurrence 1,000,000.00 in the aggregate4. Comprehensive Automobile Liability (Any auto, hired auto, Non-owned auto)a) Bodily Injury: 1,000,000.00 each person 1,000,000.00 each occurrenceb) Property Damage: 1,000,000.00 each occurrence5. Builder’s Risk:full value of construction portion of contractUnited Hispanic Contractors Associationde Austin (USHCA)9205 Dean Keeton St., Austin, Texas 78705website: www.uscha-austin.com512-922-0507 (cell)City of AustinSmall and Minority Business ResourcesDepartment (SMBR) 512-974-7600MANAGEMENT TEAM Veronica Briseño Lara, Director Tamela Saldana, Acting Assistant Director Thomas Owens, Resource Services Division Manager Elton Price, Certification Division Manager Kristi Samilpa, Business Process Consultant Angela Hill, Executive AssistantPROCUREMENT OPPORTUNITIESOpening9/6/161:00 PMSolicitation No.B1608-003-LD8/25/16DescriptionBuyer290 East Landfill Operation &9:00 AM An Optional Pre-Bid Conference will beheld at the 290 East Landfill, 9500 US Hwy. 290East, Austin, Texas 78744Loren Breland(512) 854-4854

City of AustinPencil Bid TabulationsSource: City of Austin Public Works DepartmentProposed Construction ProjectsBidding between 08-01-2016 and 07-30-2017FirstAdvertisementDateSubproject NameConstructionCostEstimate1,100,000TRAFFIC SIGNAL & PHB INSTALLATION—IDIQ 2016Solicitation No. CLMC593 Bid Opening August 4, 2016Estimated Value: 450,000.00Bid AmountAug-16Onion Creek WWTP DemolitionAug-16Wastewater Collection System Rehabilitation of Lines Group AAug-16Aug-16Parmer Lane InterceptorWilliamson Creek - Bitter Creek Tributary Channel Rehab27,077,1002,324,000Aug-16Walnut Creek WWTP Tertiary Filter Rehabilitation18,727,966Aug-16InVision Studios1,171,000Aug-16South Austin Regional WWTP Thickener Improvements8,630,000Aug-16Gus Garcia District Park - Phase 3 Improvements962,500Aug-16Public Safety Training Academy - Tenant Finish Out Building I795,358Aug-16Gonzales Lift Station Abandonment819,500Sep-16Little Stacy Neighborhood Park - General Park ImprovementsSep-162nd Street Garage New ElevatorsSep-16Downtown Wayfinding Master Plan & Imple (Downtown Austin Plan)Sep-16St. Johns Pocket Park - General Park ImprovementsSep-16Waller Creek District - Sabine St. Promenade2,520,000Sep-16Violet Crown Trail - North1,130,000Oct-16Zilker Metro Park - Maintenance Barn Replacement1,878,750Oct-16Blocks 2 & 4 Odor AbatementOct-16Exposition Blvd (W. 35th to Enfield) WW Line Renewal2,500,691Oct-16Oct-16Town Lake Metro Park - Alliance Childrens GardenBurleson Road Reclaimed Water Pressure Conversion2,877,0005,090,000Oct-16Bowie Underpass6,001,301Oct-16Oct-16Plaza Saltillo Water Rehabilitation Phase 2Walnut Creek WWTP Lab Admin Bldg HVAC Rehab Phase 12,223,0001,940,000Oct-16SLA Sendera South Wetpond RepairNov-16Springdale/290 Water Line Improvements6,500,000BidderNov-16Upper Boggy Creek Trail Phase 11,065,000Nov-16Fire Station - Onion Creek3,555,000Nov-16East Bouldin - One Texas Center Water Quality retrofitsNov-16Park Patrol / Rangers Joint Use Facility3,262,949Dec-16East Austin Wastewater Line Improvements2,518,350Jay-Reese Contractors, Inc.M.A. Smith Contracting Co., Inc.Muniz Concrete & Contracting, Inc.MAC, Inc.Austin Filter Systems, Inc.Santa Clara Construction, LTD.Dec-16Landside Roadway and Pedestrian Improvements Phase 21,198,925Dec-16Walnut Creek WWTP Secondary Process Improvements9,125,000Dec-16Women's Locker Room Additions Ph 5 - #5,7,22,24,26,271,338,078Dec-16Govalle Neighborhood Park - Pool RenovationJan-17So. Austin Regional WWTP Electrical Substation No.1 ReplaceJan-17Mary StreetJan-17Hornsby Bend Thickener Complex Rehab5,450,000Jan-17BOG - MLK-TOD Storm Drain Improvements Phase 16,500,000Jan-17Bull Creek District Park - General Park Improvements573,750Feb-17Campus HVAC Improvements4,880,700Feb-17Hornsby Bend Side Stream Treatment Plant (SSTP) Relief6,700,000BidderFeb-17Zilker Metro Park - Barton Springs Bathhouse Renovation1,366,102Feb-17West Allandale and Trailridge Drive Line Renewal2,200,000Santa Clara Construction, Ltd.Muniz Concrete and ContractingFeb-17Dove Springs District Park - Recreation Center Expansion1,630,350Feb-17Shipe Neighborhood Park - Pool Renovation2,700,250Feb-17Feb-17FM 812 Additional Closure Work and Letdown RepairTown Lake Metro Park - Holly-Festival Master Plan Phase 1997,5001,946,125Feb-17Feb-17Govalle Wastewater Flow DiversionZilker Metro Park - Preliminary Design and Phase 1 Imple3,670,0001,607,500Mar-17Walnut Creek WWTP Stormwater Improvements1,237,500Mar-17Austin to Manor Phase 24,628,753Mar-17Wastewater Collection System Replacement Lines Group AMar-17Colony District Park - General Park Improvements1,160,000Mar-17Wastewater Collection System Replacement Lines Group B2,260,000Mar-17Reznicek Field Water Quality RetrofitApr-17Morrow and Gault Water & Wastewater Line RenewalApr-17Pedestrian Bridge McNeil Dr and Jekel Circle - 1/4 FundApr-17Montopolis Recreation and Community CenterMay-17May-17Elisabet Ney Museum - Building Restoration and Site ImpvE. 51st St. Improvements520,000524,855BidderMuniz Concrete & Contracting, Inc.DEMOLISH BUILDIINGS AND FENCE REBIDSolicitation No. CLMC582A Bid Opening August 4, 2016Estimated Value: 118,017.00Bid AmountBidderTotal DemolitionR.S. Ellis dba Southwest CorporationTS EnvironmentalSolicitation No. CLMC596 Bid Opening August 4, 2016Estimated Value: 3,177,003.00Bid Amount892,336672,841BidderAaron Concrete Contractors, LPMA Smith Contracting Co., Inc.JKB Construction Co., LLCFacilities Rehabilitation, Inc.S.J. Louis Construction of TX. LTDD. Guerra ConstructionSanta Clara Construction, LTDCentral Road & Utility, LTDWPM ConstructionSolicitation No. CLMC591 Bid Opening July 14, 2016Estimated Value: 890,895.00Bid Amount750,000 833,642.00CITY-WIDE TRFFIC SIGNAL MODIFICATIONS ANDUPGRADES-BICYCLESolicitation No.CLMC589 Bid Opening July 7, 2016Estimated Value: 250,000.00Bid Amount2,700,00014,900,000 3,562,533.00 3,075,903.10 2,883,683.20 4,405,306.00 2,840,005.70 3,341,007.86 2,864,725.00 3,471,243.09 3,667,956.80LOWER BUTTERMILK CREEK BANK STABILIZATION450,000403,000 97,000.00 171,300.00 71,427.00INDIAN HILLS 48-INCH LINE EXT. 1PHASE 1B & 1C—CRC4,734,000155,000 2,080,428.10BidderSiemens ITS 297,679.00ABIA STORMWATER MAINTENANCE PROJECTSSolicitation No.CLMC603 Bid Opening July 7, 2016Estimated Value: 581,950.00Base Bid Plus AllowancesBid Amount 829,578.00 711,413.00Source: City of Austin, Capital Contracting 6221,676,508SponsorsCESCO, IncICON Information Consultants Talent 101 978,171.00 1,041,573.09

CONGRATULATIONS!!Award Approved on City Council Consent:Bid Proposal InvitationTexas Facilities CommissionTexas School for the Deaf& Texas School for the Blind and Visually ImpairedDeferred MaintenanceBid Package #1 TSD - Early Release PackageTFC Project No. 16-001-8801BID DATE: Thursday, September 8, 2016 TIME: 02:00 PM CTPROJECT CONTACT: Jeremy Morford, jmorford@flintco.comAuthorize award and execution of a 24-month contract withELK ELECTRIC, INC., JM ENGINEERING, LLC (WBE),and TRINI CONSTRUCTION BUILDER, LLC (MBE), toprovide electrical, general building, and heating, ventilating,and air conditioning installation, maintenance and repairservices, in an amount not to exceed 5,200,000 each andcombined, with four 12-month extension options in anamount not to exceed 2,600,000 per extension optioneach and combined, for a total contract amount not to exceed 15,600,000 each and combined.DESCRIPTIONFlintco, LLC (CM @ Risk) is soliciting proposals from Subcontractors and MaterialSuppliers for Bid Package No. #1 – Texas School for the Deaf Deferred Maintenance Early Release, TFC Project No. 16-001-8801.Scope includes: general requirements, demolition, concrete, structural steel, wooddecking, waterproofing, roofing, glazing, drywall, plaster, painting, fire protection,plumbing, mechanical, electrical / fire alarm, fencing, landscaping and utilities.A HUB Mixer / Pre-Proposal meeting and site walk to be held at 4:15 pm on August 23, 2016 at TSD, CTE Ford Building, MPR Room, 1102 South Congress Ave.,Austin, TX 78704. Enter the project through gate on West Elizabeth Street. Parking is limited and proposers are encouraged to carpool if possible.Proposals are due Thursday, 9/8/16 @ 2:00 pm at Flintco’s office 8100 Cross ParkDrive, Austin, TX 78754.Contact Jeremy Morford, jmorford@flintco.com, Phone: (512) 822-7392 for package information available via SmartBidNet.com, AGC, Austin Area Black Contractors, Builder’s Exchange, City of Austin Plan Room, Dodge and CMD.Come Joinus to learn about Procurement opportunities for an upcoming UT – High Density Storage Addition project in Austin. The approximate 10,000 S.F. HighDensity Storage building will be used for remote storage of library materials.The new addition will be a warehouse style building with pre-cast insulatedconcrete wall panels, Ff-60 concrete floor slab and the roof framing will consist of steel bar joists and metal deck. The high-density area has no windows,and as few penetrations of walls and roof as possible. The building will haveseparate HVAC and dehumidification system with particulate and gas filters tomaintain a constant temperature at 50 F /- 5 F and relative humidity levelsat 30% RH /- 5%. During these subcontractor outreach sessions you canlearn more about the project, meet the project team, discuss scope of workpackages, learn about UT requirements and how to pre-qualify with Turner.We are also hosting a pre-proposal conference on August 4th for the earlyproposal packages (precast panels, steel and shelving) that will pertain to theproject shown in the second attachment. In addition, we will hold a sec-ond pre-proposal meeting on September 7for the remainingscopes in which I will send out once the date arrives closer. Thank you forbeing interested in working with us. We look forward in meeting you!Sean Mokhtari Field Engineer Turner Construction CompanySMBR’s PLAN ROOMCity of AustinSmall & Minority Business Resources Plan Roomis open for businessweekdays from 8:30 a.m. – 4:30 p.m.CLARIFICATION: Material SupplierDBE Goal CreditThe following is guidance and clarification provided to TxDOT byFHWA pertaining to material supplier DBE goal credit:Concerning Regulation 49 CFR 26.55: (B)A person may be a regular dealer in such bulk items as petroleumproducts, steel, cement, gravel, stone, or asphalt without owning, operating, or maintaining a place of business if the person both owns andoperates distribution equipment for the products. Any supplementingof regular dealers' own distribution equipment shall be by a long-termlease agreement and not on an ad hoc or contract-by-contract basis.Example: The supplementing of a regular dealer’s own distribution equipm

9/6/16 B1608-003-LD 290 East Landfill Operation & Loren Breland 1:00 PM (512) 854-4854 held at the 290 East Landfill, 9500 US Hwy. 290 East, Austin, Texas 78744 UNIVERSITY OF TEXAS AT AUSTIN Project Name: (GEB) Dorothy L. Gebauer Building Project A and Project B: Design & Replace Fire Alarm/Signaling System

Related Documents:

Austin, TX Covert Cadillac . Austin, TX Covert Chrysler Dodge Jeep Ram . Austin, TX Covert Ford Lincoln . Austin, TX David McDavid Acura of Austin . Austin, TX Fiat Alfa Romeo of Austin . Austin, TX First Texas Honda . Austin, TX Henna Chevrolet . Austin, TX Howdy Honda . Austin, TX Kia of South Austin . Austin, TX Land Rover of San Antonio .

FYI translates individual development into business results. FYI is an easy-to-use guide for coaching and development. Use FYI to build a skill that is mission critical or to reduce noise and avoid derailment. FYI is intended for individual learners, managers, coaches, and executives. The 67 Competencies, 19 Stallers and .

Aug 27, 2019 · SUBMISSION OF BID: a. Bids must be sealed in an envelope, and the outside of the envelope should be marked with the following information: 1. Marked with the words “Sealed Bid”. 2. Name of the firm submitting the Bid. 3. Title of the Bid. 4. Bid Number. 5. Bid Due Date. 6. Contact e-mail and telephone number. b. The bid must be submitted as .

3.3 A bid that contains any escalation clause is considered invalid. 3.4 Bidders shall include a Bid Bond or other approved bid security with the bid form submitted to the Owner when the bid form indicates such bid security is required. The bond value shall be 5% of the bid amount. The form of bond is shown in section 00 43 13.

Bid/Proposal Title: Bid/Proposal Number: Indicate what part of the bid this form package is being submitted for: 1. Base Bid/Proposal Only: 2. Base Bid/Proposal with Alternates*: (List Alternate #s ) 3. Only Bid/Proposal Items*: (List Item #s ) *If you are only bidding on certain items or alternates on a bid/proposal, indicate the alternates

Bid security in the form of a bid bond, payable to the Town of Manchester, is required in the sum of 5 percent (5%) of the total bid. Bid security shall be subject to the conditions set forth in the Standard Instructions to Bidders. No bidder may withdraw their bid for a period of sixty (60) days after the date of bid opening.

to Bid form (SBD1) and requisite bid forms attached as (Part 4) with its bid. Bidders must take careful note of the special conditions. 2.2 All bids submitted in reply to this invitation to bid should incorporate all the forms, parts, certificates and other documentation forming part of this invitation to bid, duly completed and

Bid security in the form of a bid bond, payable to the Town of Manchester, is required in the sum of 5 percent (5%) of the total bid. Bid security shall be subject to the conditions set forth in the Standard Instructions to Bidders. No bidder may withdraw his bid for a period of sixty (60) days after the date of bid opening.