MP0-0

2y ago
17 Views
3 Downloads
3.38 MB
18 Pages
Last View : 2m ago
Last Download : 2m ago
Upload by : Amalia Wilborn
Transcription

MECHANICAL/PLUMBING SYMBOL LISTMECHANICAL/PLUMBING ABBREVIATIONSNOTE: THIS IS A MASTER SCHEDULE. NOT ALL SYMBOLS CONTAINED HEREIN MAY APPEAR ON THE DRAWINGS.370 E Windmill Lane, Suite 100Las Vegas, NV 89123702.896.1100msa-ec.comNOTE: THIS IS A MASTER SCHEDULE. NOT ALL ABBREVIATIONS CONTAINED HEREIN MAY APPEAR ON THE DRAWINGS.ITEM TO BE REMOVEDHWRHEATING WATER RETURN PIPINGPOINT OF CONNECTION/DISCONNECTIONHWSHEATING WATER SUPPLY PIPINGAABCAMERICAN AIR BALANCE COUNCILGIGREASE INTERCEPTORPRVPRESSURE REDUCING VALVEACDAUTOMATIC CONTROL DAMPERGPFGALLONS PER FLUSHPSIPOUNDS PER SQUARE INCHAFFABOVE FINISHED FLOORGPMGALLONS PER MINUTEPSIAPOUNDS PER SQUARE INCH ABSOLUTEPSIDPOUNDS PER SQUARE INCHDIFFERENTIAL#SHEET NOTERLREFRIGERANT LIQUID PIPINGAPACCESS PANELGRGLYCOL RETURN#REVISION NUMBERRSREFRIGERANT SUCTION PIPINGASHRAEGSGLYCOL SUPPLYGWGREASE WASTEPSIGPOUNDS PER SQUARE INCH GAUGETAGUNITAMERICAN SOCIETY OF HEATING,REFRIGERATION, AND AIRCONDITIONING ENGINEERSHDHEAD(R)EXISTING TO BE RELOCATEDEQUIPMENT MARKHPHORSEPOWERRARETURN AIRACID VENTHPGHIGH PRESSURE GASRHRELATIVE HUMIDITYAWACID WASTEHRHOURRL/SREFRIGERANT LIQUID/SUCTIONDRAIN PIPINGBFDBACKFLOW PREVENTION DEVICEHSPFRPMREVOLUTIONS PER MINUTEBRAKE HORSE POWERRPPACOLD WATER PIPINGBHPHEATING SEASONAL PERFORMANCEFACTORREDUCED PRESSURE PRINCIPALASSEMBLYBTUHBRITISH THERMAL UNIT PER HOURCDCONDENSATE DRAINCFMCUBIC FEET PER MINUTECHARCHARACTERISTICSCHRCHILLED WATER RETURNFIRE PROTECTION PIPINGCHSCHILLED WATER SUPPLYHIGH PRESSURE GAS PIPINGCOCLEANOUTCRCONDENSER WATER RETURNCSCONDENSER WATER SUPPLYCWCOLD WATERDDRAINDBDRY BULB TEMPERATUREDDCDIRECT DIGITAL CONTROLDIADIAMETERCONDENSATE DRAIN PIPINGPCPUMPED CONDENSATE DRAIN PIPINGDICWISCWSCWINDUSTRIAL COLD WATER PIPINGINDUSTRIAL SOFTENED COLD WATER PIPINGSOFTENED COLD WATER PIPINGRETURN GRILLEFMPGGV1-WAY BLOW SUPPLY DIFFUSER--" --"X--"ROUND FLEXIBLE DUCT140 TWORDSDSMOKE DAMPERIEINVERT ELEVATIONSEERSEASONAL ENERGY EFFICIENCY RATIOIMCINTERNATIONAL MECHANICAL CODESOISAND OIL INTERCEPTORIPCINTERNATIONAL PLUMBING CODE"SPSTATIC PRESSURE (INCHES OF)KWKILOWATTSPECSSPECIFICATIONSLATLEAVING AIR TEMPERATURESQSQUARELBSPOUNDSSQFTSQUARE FEETLWTLEAVING WATER TEMPERATURESSSTAINLESS STEELMAXMAXIMUMTTEMPERATUREMBHONE THOUSAND BTUHTABMCAMINIMUM CIRCUIT AMPSTEST AND BALANCE WORK ANDREPORTMINMINIMUMTSPTOTAL STATIC PRESSUREMOCPMAXIMUM OVER CURRENTPROTECTIONTWTEMPERED WATERTYPTYPICAL(E)EXISTING TO REMAINMPGMEDIUM PRESSURE GASUBCUNIFORM BUILDING CODEEAEXHAUST AIRMVDMANUAL VOLUME DAMPERUMCUNIFORM MECHANICAL CODEEATENTERING AIR TEMPERATUREN/ANOT APPLICABLEUONUNLESS OTHERWISE NOTEDECELECTRICAL CONTRACTORNCNORMALLY CLOSEDUPCUNIFORM PLUMBING CODEEERENERGY EFFICIENCY RATIONEBBVVENTEFFEFFICIENCYNATIONAL ENVIRONMENTALBALANCING ATIONAL ELECTRIC CODEVFDVARIABLE FREQUENCY DRIVEESPEXTERNAL STATIC PRESSURENFPAVTRVENT THROUGH ROOFEWTENTERING WATER TEMPERATURENATIONAL FIRE PROTECTIONASSOCIATIONWBWET BULB TEMPERATUREFAHRENHEITNICNOT IN CONTRACTWCOWALL CLEANOUTFLOOR CLEANOUTNONORMALLY OPENWGWATER GAUGEFIRE DAMPERNTSNOT TO SCALEWMSWIRE MESH SCREENFEET PER MINUTEOAOUTSIDE AIR(X)EXISTING TO BE REMOVEDFSDFIRE/SMOKE DAMPEROATOUTSIDE AIR TEMPERATUREGGASOBDOPPOSED BLADE DAMPERGAGAGE OR GAUGEOEDOPEN END DUCTOFCIOWNER FURNISHED, CONTRACTORINSTALLEDPDPRESSURE DROPOVERFLOW ROOF DRAIN PIPINGAWABOVE GROUND ACID WASTE PIPINGDOUBLE LINE RIGID DUCTAWUNDERGROUND ACID WASTE PIPINGVENT PIPINGABOVE GROUND WASTE PIPINGUNDERGROUND WASTE PIPINGGWABOVE GROUND GREASE WASTE PIPINGGWUNDERGROUND GREASE WASTE PIPING FFCOFDFPMGWABOVE GROUND GREASE WASTE PIPING W/HEAT TRACEGALGALLONSGWUNDERGROUND GREASE WASTE PIPING W/HEAT TRACEGCOGRADE CLEANOUTCIRCUIT SETTERBACKDRAFT DAMPER2-WAY ELECTRONIC CONTROL VALVEMANUAL VOLUME DAMPERDRAWING INDEX3-WAY ELECTRONIC CONTROL VALVEREMOTE VOLUME DAMPERRVDINTERNATIONAL BUILDING CODETEMPERED WATER PIPINGSINGLE LINE RIGID DUCT (ACOUSTICALLY LINED)MOTORIZED DAMPER (PARALLEL BLADE TYPE)IBCDIRECT EXPANSIONACID VENT PIPINGMOTORIZED DAMPER (OPPOSED BLADE TYPE)SUPPLY AIRDXAVFIRE/SMOKE DAMPERFSDSADOWNSINGLE LINE RIGID DUCTSMOKE DAMPERHEATING HOT WATER SUPPLYDNROOF DRAIN PIPINGFIRE DAMPERHWSHOT WATER RETURN PIPINGRDEXISTING DUCTWORKSD140 HOT WATER PIPINGSQUARE TO ROUND TRANSITIONDOUBLE LINE RIGID DUCT (ACOUSTICALLY LINED)FDGAS VENT PIPINGHOT WATER PIPINGROUND DUCTWORKRECTANGULAR DUCTWORKMEDIUM PRESSURE GAS PIPINGREMOTE VOLUME DAMPERSSMOKE DETECTORSDTTHERMOSTATHHUMIDISTATSSENSORCCARBON DIOXIDE SENSORCCARBON MONOXIDE SENSORDOOR UNDERCUTUCLEAN OUTWALL CLEAN OUTFLOOR CLEAN OUTGRADE CLEAN OUTFLOOR DRAINFLOOR SINKFLOOR SINK W/ GRATECHRCHILLED WATER RETURN PIPINGCHSCHILLED WATER SUPPLY PIPINGSOLENOID VALVEBUTTERFLY VALVEPLUG VALVEGAS COCKBALL VALVECHECK VALVEGATE VALVESYMBOL LIST AND 3SCHEDULESTEMPERATURE PRESSURE RELIEF VALVEMP0.4PIPING DIAGRAMSTHERMOMETERMP0.5PIPING DIAGRAMSMP0.6PIPING DIAGRAMSMP0.7PIPING DIAGRAMSMP0.8CONTROLSPRESSURE TEMPERATURE PORTMP0.9CONTROLSY-STRAINER WITH BLOWDOWNMP0.10CONTROLSMP0.11SEQUENCE OF OPERATIONPRESSURE REDUCING VALVERELIEF VALVEPRESSURE GAUGE WITH GAUGE COCKMANUAL AIR VENTCONDENSER WATER RETURN PIPINGMP1.0UNIONCSMCONDENSER WATER SUPPLY PIPINGWATER METERSHEET TITLEMP0-0HOSE END DRAIN VALVEPIPE GUIDECRSHEETNUMBERMPD5.1MECHANICAL AND PLUMBING OVERVIEW PLANMECHANICAL AND PLUMBING ROOF DEMOLITION PLANPIPE ANCHORM4.1ENLARGED MECHANICAL PLANFLEXIBLE CONNECTORP4.1ENLARGED PLUMBING PLANPIPE CAP/STUB-OUTMP4.2ENLARGED MECHANICAL AND PLUMBING PLANSMP5.1MECHANICAL AND PLUMBING ROOF PLANISSUE DATE:#DIRECTION OF FLOWPIPE DOWN****AIRFLOW DIRECTIONLOW PRESSURE GAS PIPINGRVD*2-WAY BLOW SUPPLY DIFFUSERGHEATING HOT WATER RETURN****3-WAY BLOW SUPPLY DIFFUSERHPGHWR*4-WAY BLOW SUPPLY DIFFUSERHOT WATER****EXHAUST GRILLEHW*EXHAUST AIR DUCT UP/DOWNAVCDSUPPLY AIR DUCT UP/DOWNRETURN AIR DUCT UP/DOWNAMERICAN SOCIETY OF PLUMBINGENGINEERS****ACCESS PANELASPE*CFMDIFFUSER TAGCOMPRESSED AIR LINESPERMIT ISSUEDATE:02-14-2018TAGA777 WEST CHEROKEE STREETCATOOSA, OK 74015(X) (X) (X)HARD ROCK CASINO 4 - EXPANSIONCENTRAL PLANT DATE18PIPE UPPIPE TEE UPPIPE TEE DOWNDRAWINGS AND SPECIFICATIONS REMAINTHE PROPERTY OF THE DESIGNPROFESSIONAL. COPIES OF THE DRAWINGSAND SPECIFICATIONS RETAINED BY THECLIENT MAY BE UTILIZED ONLY FOR HIS ORHER USE AND FOR OCCUPYING THE PROJECTFOR WHICH THEY WERE PREPARED, ANDNOT FOR THE CONSTRUCTION OF ANYOTHER PROJECTS. USE OR REPRODUCTIONSOF THIS DRAWING(S) BY ANY MEANS ISSTRICTLY PROHIBITED WITHOUT WRITTENPERMISSION FROM MSA ENGINEERINGCONSULTANTS, INC. COPYRIGHT 2017STAMP:SHEET TITLE:SYMBOL LIST ANDABBREVIATIONSSHEETMP0-0

MECHANICAL/PLUMBING SPECIFICATIONS370 E Windmill Lane, Suite 100Las Vegas, NV 89123702.896.1100msa-ec.comTHE OWNER HAS CONTRACT LANGUAGE THAT NEEDS TO BE READ PRIOR TO BIDSUBMISSION AS THERE ARE ITEMS THAT MAY SUPPLEMENT OR SUPERSEDE ITEMSNOTED HEREIN. THE OWNER'S CONTRACT DOCUMENTS HAS INFORMATION ON HOWWORK IS TO BE PERFORMED, HOW DOCUMENT SUBMITTALS ARE PROVIDED, RECORDDOCUMENTS ARE SUBMITTED, ETC. SEE THE ARCHITECTURAL DOCUMENTS FORADDITIONAL DIVISION 1 INFORMATION.18.3.CODE USED IN DESIGN: IBC 2015, IMC 2015, IPC-2015, IECC-2006, IFGC 2015.19. ALL WORK SHOWN IS NEW UNLESS NOTED OTHERWISE.3.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST ADOPTED EDITIONSOF THE APPLICABLE INTERNATIONAL BUILDING CODE (IBC), LOCAL MECHANICALCODE (UMC, IMC, ETC.), LOCAL PLUMBING CODE (UPC, IPC, ETC.), NATIONALELECTRIC CODES (NEC) AND ALL OTHER APPLICABLE FEDERAL, STATE, AND LOCALREGULATIONS.20. MAINTAIN OCCUPANCY AND FIRE WALL SEPARATION INTEGRITY AS REQUIRED.REFER TO ARCHITECTURAL PLANS FOR LOCATIONS OF ALL OCCUPANCY/FIREWALLSEPARATIONS AND SPECIFIC DETAILS FOR CONSTRUCTION.PROVIDE ALLNECESSARY FIRE AND SMOKE FIRE DAMPERS, ACCESS DOORS, CAULKING, ETC. FORAPPROVED INSTALLATION.THE CONTRACTOR MUST ARRANGE A VISIT TO THE WORK SITE PRIOR TO BIDSUBMISSION TO FULLY UNDERSTAND THE EXISTING CONDITIONS. THE DRAWINGSARE DIAGRAMMATIC AND SHOW THE WORK INTENT BUT NOT NECESSARILY ALLEXISTING OBSTRUCTIONS, PIPE OR DUCT BENDS. DETERMINING SITE CONDITIONSAND ADJUSTING THE INSTALLATION IS THE RESPONSIBILITY OF THE CONTRACTOR21. IECC COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ANDPERFORMING ALL REQUIREMENTS AND WORK SET FORTH IN THE IECC COMPLIANCECERTIFICATE THAT IS INCLUDED IN THESE DOCUMENTS.5.THE CONTRACTOR SHALL PROVIDE THE WORK SHOWN ON THE DRAWINGS ANDSPECIFIED FOR THEIR INDIVIDUAL SECTIONS OF WORK. THE WORD "WORK" SHALLMEAN ALL LABOR, TRANSPORTATION, MATERIAL, EQUIPMENT, TOOLS, INSTALLATION,SUPERVISION AND ANY OTHER INCIDENTAL ITEMS OR SERVICES NECESSARY FORTHE PROPER INSTALLATION AND OPERATION OF THE COMPLETE SYSTEMS, WHICHSHALL BE PROVIDED WHETHER OR NOT SPECIFICALLY INDICATED OR NOTED.6.ALL GENERAL CONDITIONS, SPECIAL REQUIREMENTS OR GENERAL REQUIREMENTSOF THE CONSTRUCTION SPECIFICATIONS ARE MADE PART OF THIS SPECIFICATIONAND HAVE THE SAME FORCE AND AFFECT AS IF COMPLETELY REPRODUCED.7.THE WORD "PROVIDE" SHALL MEAN FURNISH AND INSTALL, MAKE ALL FINALCONNECTIONS AND LEAVE IN AN APPROVED COMPLETE OPERATING CONDITION.8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYING ALL FEES AND OBTAININGALL PERMITS AND INSPECTIONS REQUIRED FOR THE WORK.9.1.1.13. ALL SUBSTITUTIONS SHALL BE SUBMITTED TO THE ENGINEER FOR CONSIDERATIONPRIOR TO BIDDING.THE OWNER'S REPRESENTATIVE SHALL PREAPPROVE ANYPROPOSED SUBSTITUTION IN WRITING. THE CONTRACTOR SHALL BE RESPONSIBLEFOR COORDINATING ALL REQUIREMENTS ASSOCIATED WITH SUBSTITUTEDEQUIPMENT OR MATERIALS WITH OTHER BUILDING TRADES, INCLUDING ALLELECTRICAL, STRUCTURAL, OR ARCHITECTURAL ELEMENTS. (SHOP DRAWING IPMENTCOORDINATION REQUIREMENTS.) SUBSTITUTED EQUIPMENT, ANYTHING DIFFERENTFROM SPECIFIED ON THE DOCUMENTS, MUST BE IDENTIFIED AS SUCH DURING THESUBMITTAL PROCESS. THE CONTRACTOR SHALL IDENTIFY AND ANNOTATE ALLREVISED REQUIREMENTS PER BUILDING TRADE ON THE SHOP DRAWINGS. THECONTRACTOR SHALL ALSO IDENTIFY ALL COST DEBITS OR CREDITS IN WRITING FORTHE PROPOSED CHANGES PER BUILDING TRADE.2.16. CONTRACTOR SHALL CHECK AND VERIFY ALL SIZES, DIMENSIONS, ANDCONDITIONS BEFORE STARTING ANY WORK. ANY DEVIATIONS OR PROBLEMS SHALLBE TRANSMITTED TO THE ENGINEER FOR REVIEW.17. PROVIDE BASE AND COUNTER FLASHING FOR ITEMS PENETRATING THE ROOF OREXTERIOR WALLS.18. STARTERS, VFDs DISCONNECT SWITCHES AND CONTROLS FOR MOTORS IF NOT UNITMOUNTED AND/OR SUPPLIED BY THE EQUIPMENT MANUFACTURER, UNLESS NOTEDSPECIFICALLY OTHERWISE SHALL FOLLOW:18.1.18.2.VFDs TO BE SUPPLIED BY THE MECHANICAL CONTRACTOR AND INSTALLED BYTHE ELECTRICAL CONTRACTOR. FINAL LOCATIONS COORDINATED WITH THEENGINEER. WIRING BETWEEN THE VFD AND THE MOTOR SHALL BE SHIELDEDPOWER CABLE DESIGNED FOR VFD APPLICATIONS, GROUNDED AT OMBINATION1.3.PLUMBING FIXTURES: PROVIDE CHROME PLATED ANGLE STOPS WITH ESCUTCHEONPLATES AT PLUMBING FIXTURES. ALL PLUMBING FIXTURES SHALL COMPLY WITHLOCAL REGULATIONS AND ADOPTED WATER CONSERVATION CODES.4.DISINFECT ALL POTABLE WATER SYSTEMS IN ACCORDANCE WITH PLUMBING CODEAND/OR, AWWA STANDARD.PROVIDE WRITTEN CONFIRMATION TO OWNERSREPRESENTATIVE THAT THIS WORK HAS BEEN COMPLETED.5.GAUGES: TEMPERATURE: INTERIOR - WEISS VARI-ANGLE DIGITAL WITH 316 SSTHERMOWELL, EXTERIOR WITH DCV-4 OUTDOOR WATERPROOF COVER. PRESSURE:WEISS DIGITAL DUGY3-xxx-2L (PG - RFI FOR RANGE PER APPLICATION)6.GAS REGULATORS SUPPLIED SHALL BE OF THE "LOCK UP" TYPE AND SHALL HAVE ASTRAINER INSTALLED BEFORE THE REGULATOR.7.ALL EQUIPMENT SHALL BE RATED IN EXCESS OF THE AVAILABLE FAULT CURRENT ATTHE POINT OF CONNECTION.NON-RIGID INSULATION0.0160.0160.0160.020 11"-24"0.0160.024 24"-36"0.0200.032 36"0.0240.040AUTOMATIC TEMPERATURE CONTROLSTHE MECHANICAL CONTRACTOR SHALL PROVIDE A COMPLETE SYSTEM OFAUTOMATIC TEMPERATURE CONTROLS INTEGRATED INTO THE EXISTING BUILDINGAUTOMATION SYSTEM (BAS, BMS, ATC, DDC). THIS SYSTEM SHALL INCLUDE BUTNOT BE LIMITED TO: TEMPERATURE SENSORS, CONTROLLERS, TRANSFORMERS,EQUIPMENT INTERFACE DEVICES AND ALL REQUIRED RELAYS, WIRING AND CONDUIT- REGARDLESS OF VOLTAGE.2.THE MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL, IN ACCORDANCEWITH THE NEC AND THIS PROJECT ELECTRICAL SPECIFICATIONS, ALL CONDUIT,WIRE, JUNCTION BOXES, THERMOSTAT BACK BOXES AND CIRCUIT BREAKERSREQUIRED FOR A FULLY OPERATIONAL ATC SYSTEM.120V POWER, IF NOTPROVIDED, SHALL BE OBTAINED FROM LOCATIONS PROVIDED ON THE ELECTRICALDESIGN DOCUMENTS - IF NO INFORMATION IS PROVIDED THE CONTRACTOR MUSTISSUE AN RFI DURING THE BID PROCESS TO CLARIFY.3.WHERE AN EXISTING OR NEW BAS SYSTEM IS UTILIZED THE CONTRACTOR SHALLPROVIDE A GUI PAGE FOR EACH SYSTEM. GRAPHICS MUST MATCH OR EXCEED THEEXISTING FOR DETAIL AND INFORMATION PROVIDED.4.SUBMIT SHOP DRAWINGS OF TEMPERATURE CONTROL WIRING, LOCATION OFDEVICES AND INSTALLATION DATA FOR REVIEW PRIOR TO INSTALLATION.1.PROVIDE PLUMBING EQUIPMENT AS SPECIFIED AND/OR SCHEDULED HEREIN AND INACCORDANCE WITH MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS.EQUIPMENT SHALL OPERATE ACCORDING TO THE MANUFACTURER'S "OWNER'SOPERATING AND MAINTENANCE MANUAL" TROUBLE FREE AND CONFORMING TO THEONE-YEAR WARRANTEE.1.THE CONTRACTOR SHALL PROVIDE ALL SLEEVES, OPENINGS, CUTTING ANDPATCHING NECESSARY FOR THE INSTALLATION OF THE WORK.CUTTING ANDPATCHING SHALL BE DONE BY WORKMEN SKILLED IN THE TRADES REQUIRED ANDPAID BY THE CONTRACTOR REQUIRING THE WORK COMPLETED. SYSTEMS PASSINGTHROUGH WATER PROOFING OR DAMP PROOFING SHALL BE WATER TIGHT. SYSTEMSPASSING THROUGH FIRE RATED CONSTRUCTION SHALL BE FIRE PROOFED WITHERMATERIAL APPROVED FOR THE FIRE AND TEMPERATURE RATING OF THE ASSEMBLYAND U.L. LISTED. (IF THE ARCHITECT HAS NOT PROVIDED A STANDARDDRAWING/ASSEMBLY FOR AN APPLICATION AND ONE IS NOT AVALIABLE, THECONTRACTOR IS RESPONSIBLE TO OBTAIN AN "ENGINEERING JUDGEMENT" ANDASSOCIATED DRAWING FOR THE APPLICATION.)2.THE CONTRACTOR SHALL PROVIDE ALL RIGGING, HANDLING OF MATERIALS ANDEQUIPMENT, AND THE NECESSARY PROTECTION FOR MATERIALS AND EQUIPMENT.3.THE CONTRACTOR WILL PROTECT THE WORK AND MATERIAL AGAINST DIRT, THEFT,INJURY OR DAMAGE UNTIL ACCEPTED BY OWNER. ALL WORK SHALL BE TURNEDOVER TO OWNER CLEAN AND IN NEW CONDITION.4.WHERE FLOOR DRAINS OR FLOOR SINKS OR SIMILAR FIXTURES ARE INSTALLED INFLOORS THAT ARE NOT SLAB-ON-GRADE, OR PIPE PASS THROUGH SAID FLOORS ANDTHE FLOOR IS A FIRE RATED ASSEMBLY, PER CODE, THE OPENING CREATED TOACCEPT THE DRAIN AND THE DRAIN FITTING OR PIPING ASSEMBLY THROUGH THEFLOOR MUST USE A LISTED SYSTEM TO BE TEMPERATURE AND FIRE RATED TOMATCH THE RATING OF THE FLOOR (MIN 2 HOUR).5.PROVIDE TRAP PRIMERS (OR TRAP GUARDS WHERE APPROVED) FOR FLOOR DRAINS,FLOOR SINKS AND OTHER DEVICES WHERE TRAP SEALS EXIST.6.EACH CONTRACTOR SHALL PROVIDE ALL FOUNDATIONS, HANGERS, AND SUPPORTSFOR ALL EQUIPMENT SUPPLIED AND/OR INSTALLED UNDER THEIR WORK. ANYEQUIPMENT WITH MOVING PARTS SHALL BE PROVIDED WITH VIBRATION ISOLATIONAND FLEXIBLE CONNECTIONS TO PIPING AND OR DUCTWORK IF APPLICABLE.MISCELLANEOUS STEEL AND ANCHORS REQUIRED FOR THE INSTALLATION OF THECONTRACTORS EQUIPMENT IS THE RESPONSIBILITY OF THE CONTRACTOR AND THERETENTION OF A STRUCTURAL ENGINEER OR OTHER DESIGN DISCIPLINE TOCOMPLETE THE WORK IS THE RESPONSIBILITY OF THE CONTRACTOR. EG: THE USEOF CONCRETE ANCHORS WILL REQUIRE DOCUMENTATION APPROVAL FROM ASTRUCTURAL ENGINEER RETAINED BY THE CONTRACTOR.7.WHERE PIPES OR CONDUITS PASS THROUGH WALLS, FLOORS, OR CEILINGS INFINISHED AREAS, THEY SHALL BE FURNISHED WITH ESCUTCHEON PLATES (COLORPER ARCHITECT AND/OR INTERIOR DESIGNER).4.PIPES AND/OR CONDUITS PASSING THROUGH WALL, FLOORS AND PARTITIONSSHALL BE PROVIDED WITH SLEEVES. SLEEVES PASSING THROUGH WATER PROOFINGOR DAMP PROOFING SHALL BE WATER TIGHT. SLEEVES/PIPES PASSING THROUGHFIRE RATED CONSTRUCTION SHALL BE FIRE PROOFED WITH MATERIAL APPROVEDFOR THE FIRE AND TEMPERATURE RATING OF THE ASSEMBLY AND U.L. LISTED. (IFTHE ARCHITECT HAS NOT PROVIDED A STANDARD DRAWING/ASSEMBLY FOR ANAPPLICATION AND ONE IS NOT AVAILABLE, THE CONTRACTOR IS RESPONSIBLE TOOBTAIN AN "ENGINEERING JUDGEMENT" AND ASSOCIATED DRAWING FOR THEAPPLICATION.)5.AT THE CONCLUSION OF THE JOB, EACH PIECE OF EQUIPMENT, VALVE, SWITCH,STARTER, PANEL, PIPE LINE, CONDUIT, DUCT, ETC., SHALL BE CLEARLY IDENTIFIEDWHETHER EXPOSED OR CONCEALED, COVERED OR UNCOVERED, IN ACCORDANCEWITH OSHA AND ANSI REGULATIONS. IDENTIFY PIPES NEAR EACH VALVE WITH"BRANDY-PERMA' CODE PIPE TAPE" OR T. & B. WESTLINE "TEL-A-PIPE" INDICATINGDIRECTION OF FLOW, SERVICE, ZONE, AND SIZE. TAPE SHALL BE APPLIED TO PIPE,CONDUIT, OR COVERING. VALVES, CONTROLS, AND DAMPERS SHALL BE IDENTIFIEDBY 2-INCH LACQUERED BRASS TAGS WITH STAMPED LETTERS FASTENED WITH "S"HOOKS OR CHAINS. EQUIPMENT IS TO BE IDENTIFIED AS TO FUNCTION ANDPURPOSE BY MEANS OF PERMANENTLY ATTACHED LAMINATED ENGRAVED PHENOLICNAMEPLATES WITH BEVELED EDGES, AND WHITE LETTERS ON BLACK BACKGROUND.(NO ADHESIVE LABELS ALLOWED).6.AT THE CONCLUSION OF THE WORK, ALL EQUIPMENT AND SYSTEMS SHALL BEBALANCED, ADJUSTED, AND TESTED TO PROVIDE A QUIET-OPERATING, STABLE, ANDSAFELY OPERATING SYSTEM(S). DEMONSTRATE OPERATION OF ALL SYSTEMS TOTHE OWNER'S DESIGNATED REPRESENTATIVE. THE TEST AND BALANCE WORK SHALLBE PERFORMED IN ACCORDANCE WITH NEBB OR AABC STANDARDS, BYINDEPENDENT, APPROVED, AND CERTIFIED TEST AND BALANCE NTSEXIST,THEMECHANICAL/PLUMBING CONTRACTOR IS RESPONSIBLE FOR RETAINING AND PAYINGFOR THE DESIGN SERVICES OF A STRUCTURAL ENGINEER TO CREATE THE DESIGNAND INSTALLATION DRAWINGS FOR MECHANICAL/PLUMBING SYSTEMS SEISMICRESTRAINT SUPPORT, PER THE PROJECT BUILDING CODE.PRIOR TOCONSTRUCTION, THE CONTRACTOR SHALL SUBMIT MECHANICAL SYSTEMS SHOPDRAWINGS BASED UPON MULTI DISCIPLINE COORDINATION. INCLUDED WITH THESHOP DRAWING SUBMISSION SHALL BE SEISMIC RESTRAINT DRAWINGS NOTINGWHERE SEISMIC SUPPORT IS REQUIRED. FOR EACH AREA NOTED NEEDING SEISMICSUPPORT FOR THE MECHANICAL SYSTEMS, THERE SHALL BE A SEISMIC DRAWINGDETAILING THE REQUIRED SUPPORT. THE SEISMIC SUPPORT DRAWINGS SHALL BESIGNED AND SEALED BY A REGISTERED STRUCTURAL ENGINEER IN THE SAME STATEAS THE PROJECT. IN ADDITION TO THE PROJECT DESIGN TEAM REVIEW, THESEISMIC SUPPORT DRAWINGS WILL BE ISSUED TO THE LOCAL BUILDINGDEPARTMENT FOR REVIEW AS PART OF A DEFERRED SUBMITTAL FOR THE BUILDINGDOCUMENTS.COMMENCEMENT OF CONSTRUCTION PRIOR TO BUILDINGDEPARTMENT REVIEW IS AT THE CONTRACTOR'S RISK.8.CONTRACTOR SHALL REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN FOREXACT LOCATION OF GRILLES, REGISTERS AND DIFFUSERS.9.PIPE HANGERS: PIPE SIZES 1/2" TO 1 1/2" - 5'-0" MAX SPACING, 3/8" MIN. RODDIAMETER; PIPE SIZES 2" TO 3" - 8'-0" MAX SPACING, 1/2" MIN. ROD DIAMETER;PIPE SIZES 4 TO 6"-10'-0" MAX SPACING, 5/8" MIN. ROD DIAMETER.PLUMBING PRODUCTS1.DOMESTIC WATER PIPING:1.1.ABOVE GROUND: TYPE "L" COPPER (ASTM B-88), WROUGHT FITTINGS (ASMEB16.22), JOINTS: ANSI/ASTM B32, SOLDER: 95/5 TIN/ANTIMONY, 0.2% MAXLEAD. (SADDLE TAPS, SHARKBITE, PROPRESS, EXTRUDED OUTLETS ("PULLEDTEES") OR SIMILAR FITTINGS NOT PERMITTED UNLESS TREMECIRCUMSTANCES TO BE POWERSTOP SADDLE BY POWERSEAL PIPELINEPRODUCTS CORP., MODEL 3425)1.2.UNDER GROUND/BELOW GRADE: PROTECTED FROM SOIL, TYPE "K" COPPER(ASTM B-88), HARD DRAWN, WROUGHT FITTINGS (ASME B16.22) JOINTS:AWS A5.8, BCuP SILVER BRAZE.2.DOMESTIC WASTE & VENT PIPING MATERIALS:2.1.THIS PROJECT:CASTBASE PROPOSAL ON MANUFACTURER NAMES LISTED UNLESS "OR EQUAL" ISINDICATED. PROVIDE SUBSTITUTION REQUESTS A MINIMUM OF FIVE (5) BUSINESSDAYS PRIOR TO BID DATE CLOSING TO ALLOW TIME FOR DUE CONSIDERATION OFPROPOSED ALTERNATE. DETERMINATION OF SUBSTITUTION OF EQUALITY RESTSSOLELY WITH THE ENGINEER.IRONWASTESTAINLESSSTEELXWASTE BELOW GRADEVENTXGW ABOVE GRADEXGW BELOW GRADEHVAC EQUIPMENT1.PROVIDE HVAC EQUIPMENT AS SPECIFIED AND/OR SCHEDULED HEREIN AND INACCORDANCE WITH MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS.EQUIPMENT SHALL OPERATE ACCORDING TO THE MANUFACTURER'S "OWNER'SOPERATING AND MAINTENANCE MANUAL" TROUBLE-FREE PRIOR TO STARTING TESTAND BALANCE (TAB) WORK.2.2.CONTROL DAMPERS:WET LOCATIONS)LEAKAGE CLASS 1A/1.2.PIPE HANGERS: PIPE SIZES 1/2" TO 1 1/2": MALLEABLE IRON, CARBON STEEL,ADJUSTABLE SWIVEL, SPLIT RING.PIPE SIZES OVER 2" (UNLESS NOTEDOTHERWISE): CARBON STEEL, ADJUSTABLE, CLEVIS. PIPE SIZES CHILLED WATER 8"AND OVER, HEATING WATER 6" AND OVER, STEAM (SUPPLY & CONDENSATE) 4" ANDOVER: ADJUSTABLE STEEL YOKE, CAST IRON ROLL, DOUBLE HANGER.3.PIPING: HYDRONIC WATER PIPING (ABOVE GROUND) - SCHEDULE 40 STEEL (ASTMA53), MALLEABLE IRON OR FORGED STEEL WELDED TYPE FITTINGS, SCREWED ORWELDED JOINTS; OR TYPE L HARD DRAWN COPPER TUBING (ASTM B88), CAST BRASSOR SOLDER WROUGHT COPPER FITTINGS, SOLDER GRADE 95TA JOINTS. PIPINGOVER 2" SHALL BE STEEL WITH WELDED JOINTS. EQUIPMENT DRAIN OVERFLOWSSHALL BE TYPE M HARD DRAWN COPPER.VALVES: PROVIDE THE NAME OF MANUFACTURER AND GUARANTEED WORKINGPRESSURE CAST OR STAMPED ON VALVE BODIES AND BE BY SINGLE MANUFACTURERFOR SIMILAR TYPE. ACCEPTABLE MANUFACTURERS: BRAY, MILWAUKEE, STOCKHAM,NIBCO, APOLLO.5.PIPE INSULATION: GLASS FIBER INSULATION WITH A MAXIMUM K VALUE NOTEDBELOW AT 75 DEGREES F. OUTDOOR INSULATION THICKNESS SHALL BE DOUBLEINDOOR THICKNESS WITH A MAXIMUM THICKNESS OF 3". INTERIOR APPLICATIONSSHALL HAVE KRAFT REINFORCED FOIL VAPOR BARRIER WITH ONE PIECE PREMOLDEDPVC JACKETS FOR FITTINGS.EXTERIOR APPLICATIONS SHALL HAVE STUCCOEMBOSSED ALUMINUM JACKETS. ACCEPTABLE MANUFACTURERS: OWENS CORNING,CERTAINTEED, JOHNS MANVILLE, KNAUF.FLUID TEMPINSUL. CONDUCTIVITYRANGE FBTU-IN/(HR-SQ.FT.- F)NOMINAL PIPE SIZE (IN) 1.55ACCEPTABLESOILGAS PIPING: ABOVE GRADE SCHEDULE 40 BLACK IRON(ASME A-53), THREADEDMALLEABLE FITTINGS INSIDE AND GALVANIZED FITTINGS AND PIPE WHEREEXPOSED, JOINT COMPOUND. PROVIDE ISOLATION VALVES AT ALL EQUIPMENT.BELOW GRADE GAS PIPING SHALL BE POLYETHYLENE (PE) GAS PIPING WITH BUTTFUSION JOINTS. PIPING SHALL BE LABELED GAS. GAS VALVE SHALL BE BRONZEBODY, BRONZE TAPERED PLUG, NON-LUBRICATED, TEFLON PACKING, THREADEDENDS.4.PIPE INSULATION:ALL DOMESTIC COLD WATER PIPING (IN UNCONDITIONEDSPACES ONLY) AND ALL DOMESTIC HOT WATER PIPING ABOVE GROUND SHALL BEINSULATED WITH 1" THICK FIBERGLASS PIPE INSULATION WITH ALL-SERVICEJACKET AND MAXIMUM K VALUE OF 0.27 AT 75 F. WHERE CLEARANCE LIMITATIONSPREVENT THE USE OF FIBERGLASS INSULATION, A MINIMUM 3/4" THICK CLOSEDCELL NEOPRENE PIPE INSULATION MAY BE USED. WHERE THE CLIMATE DICTATES,COLD WATER PIPING, CONDENSATE DRAIN AND ROOF DRAIN PIPING TO BEINSULATED. PROVIDE METAL SADDLES AND RIGID INSULATION AT HANGERS WHERESYSTEM WEIGHT COMPRESSES INSULATION. PROVIDE ADA COMPLIANT INSULATIONON EXPOSED UNDER SINK PIPING.EQUAL TO RUSKIN CD-60 (CD-50 IN4.WHERE3.MECHANICAL PRODUCTS1.PVC MAY ONLY BE USED BELOW GRADECONDITIONS ARE CONFIRMED TO EXIST.5.PIPE HANGERS: PIPE SIZES 1/2" TO 1 1/2": MALLEABLE IRON, CARBON STEEL,ADJUSTABLE SWIVEL, SPLIT RING.PIPE SIZES 2" TO 4":CARBON STEEL,ADJUSTABLE, CLEVIS. PIPE SIZES 6" AND OVER THAT ARE SUBJECT TO EXPANSION& CONTRACTION: ADJUSTABLE STEEL YOKE, CAST IRON ROLL, DOUBLE HANGER.SYSTEM LOAD (PIPE FULL OF DESIGN LIQUID OR GAS) ON HANGER MUST NOTEXCEED MORE THAN 85% OF HANGER CAPACITY.TEST AND BALANCE (TAB)1.THE CONTRACTOR IS RESPONSIBLE FOR ADJUSTING THE GPM FOR THE CHILLED ANDHOT WATER - SEE DWGS FOR DIRECTION ARROW. IF NO DIRECTION ARROW ISILLUSTRATED THE CONTRACTOR MUST DIRECT AN RFI TO THE ENGINEER TO OBTAINPROPER THROW DIRECTIONS.2.THE TEST AND AIR BALANCE (TAB) REPORT SHALL INCLUDE DESIGN AIRQUANTITIES AND AIR QUANTITIES AFTER ADJUSTMENTS.FURNISH OWNER'SREPRESENTATIVE WITH THREE (3) COPIES OF THE FINAL TAB REPORT.1.5 & 3500.325251-3500.2944.5201-2500.272.531.DIELECTRIC FITTINGS SHALL BE USED WHEREVER DISSIMILAR METALS ARE JOINED.141-2000.251.522. 1400.2211.5PROVIDE ACCESS PANELS IN CEILINGS & WALLS TO ACCESS MECHANICAL/PLUMBINGEQUIPMENT AND APPURTENANCES WHERE REQUIRED. IN HARD CEILINGS PROVIDEGFRG OR BAUCO PLUS II ACESS PANELS.M&P NOTESL17268PART THREE - EXECUTIONPLUMBING EQUIPMENTPART TWO - PRODUCTS14. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL SUPPLY THEENGINEER WITH AN ELECTRONIC CAD AND PDF SET OF AS-BUILT DOCUMENTSACCURATELY SHOWING THE MATERIALS AND EQUIPMENT AS INSTALLED.15. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A MINIMUM OF ONE(1) YEAR FROM DATE OF ACCEPTANCE BY OWNER. REFRIGERATION COMPRESSORSSHALL BE GUARANTEED FOR A MINIMUM OF FIVE (5) YEARS FROM DATE OF OWNER'SACCEPTANCE.IN ADDITION, THE CONTRACTOR SHALL GUARANTEE THAT THEINSTALLATION WHEN OPERATED IN ACCORDANCE WITH THE CONTRACTOR'SINSTRUCTIONS WILL DEVELOP CAPACITY AND CHARACTERISTICS AS SPECIFIED ANDWILL FULFILL EACH AND EVERY REQUIREMENT OF THE DRAWINGS ANDSPECIFICATIONS. SHOULD THE INSTALLATION IN ANY WAY FAIL TO DO SO, THECONTRACTOR WILL, WITHOUT DELAY OR WITHOUT COST TO THE OWNER, PROVIDEWHATEVER ADDITIONAL EQUIPMENT, MATERIAL, AND LABOR REQUIRED TO CORRECTTHE DEFICIENCY AND COMPLY WITH THE REQUIREMENTS OF THE DRAWINGS ANDSPECIFICATIONS.THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID TO BECOMEFAMILIAR WITH THE EXISTING CONDITIONS. THE CONTRACTOR SHALL COMPARETHE WORK SPECIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTINGCONDITIONS. THE CONTRACTOR SHALL IDENTIFY AND NOTATE ALL WORK ORCONDITIONS THAT ARE DIFFERENT FROM THE CONTRACT DOCUMENTS OR THEIRINTENT. THE CONTRACTOR SHALL, UPON DISCOVERY, IMMEDIATELY NOTIFY ANDREPORT, IN WRITING, ANY DISCREPANCIES TO THE ENGINEER. NO EXTRAS ORCHANGE ORDERS WILL BE ALLOWED FOR FAILURE TO PERFORM THE PRE-BID SITEVISIT.RIGID INSULATION 8"-11"BIDDING11. ALL WORK REQUIRED FOR IDENTICAL/SIMILAR ITEMS SHOWN ON THE DRAWINGSSHALL BE PROVIDED, ALTHOUGH EACH SPECIFIC IDENTICAL/SIMILAR ITEM MAY NOTBE SHOWN IN DETAIL.12. THE CONTRACTOR SHALL SUBMIT ELECTRONIC PDF SHOP DRAWINGS ANDTECHNICAL DATA SHEETS FOR ALL EQUIPMENT AND MATERIALS SPECIFIED HEREINTO THE ENGINEER. THE ENGINEER SHALL REVIEW SHOP DRAWINGS AND TECHNICALDATA SHEETS FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS AND ISSUE AWRITTEN ASSESSMENT TO THE OWNER PRIOR TO COMMENCEMENT OF WORK. THECONTRACTOR SHALL BE RESPONSIBLE FOR ALL ENGINEERING FEES NECESSARY CKAGES/EQUIPMENT SUBSTITUTIONS.THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CREATING "ALLTRADES" COORDINATION DRAWINGS. THIS WORK APPLIES TO ABOVE CEILINGS, INSHAFTS AND ON THE ROOF. THESE DRAWINGS ARE TO BE PREPARED IN 3D ORREVIT. 2D AUTOCAD DRAWINGS WILL BE AVAILABLE FROM THE DESIGN TEAM ANDCAN BE UTILIZED TO ASSIST IN THE PREPARATION OF THE COORDINATIONDRAWINGS. THESE DRAWINGS SHALL BE COMPLETED PRIOR TO WORK BEINGINSTALLED IN THE FIELD FOR THE LOCATIONS NOTED ABOVE.AS-BUILTDOCUMENTS ARE NOT AVAILABLE FOR THE WORK LOCATION. THE CONTRACTORWILL NEED TO PERFORM FIELD WORK TO LOCATE STRUCTURAL CONSTRAINTS ANDEXISTING SERVICES THAT ARE REQUIRED TO REMAIN SO THAT ACCURATEDOCUMENTS CAN BE CREATED. THE ENGINEER WILL ASSIST WHERE NEEDED TOHELP IDENTIFY EQUIPMENT THAT NEEDS TO STAY WITHIN THE CEILING SPACE TOSERVICE OTHER SPACES.EACH TRADE INVOLVED IS TO PROVIDE THEIRDOCUMENTS, IN AUTOCAD FORMAT, TO THE MECHANICAL CONTRACTOR FORINSERTION TO THE COMMON FILE. (DURING THE BID PROCESS THE MECHANICALCONTRACTOR IS TO ENSURE THE GC IS AWARE OF THIS WORK WHERE THEY HAVERESPONSIBLE CHARGE.) THE OWNER MAY PRE-PURCHASE THE SERVICES OF A FIRESPRINKLER AGENCY, BUT THE INSTALLATION OF THE SPRINKLER PIPING WITHREGARD TO SCHEDULE, LOCATION AND INSTALLATION WILL FALL UNDER THEDIRECTION OF THE GC AND SPRINKLER PIPING MUST BE INCLUDED IN THECOORDINATION DOCUMENTS. AT A MINIMUM THE FOLLOWING TRADES ARE TO BEINVOLVED IN THE COORDINATION DRAWINGS:MECHANICAL, PLUMBING,ELECTRICAL, LOW VOLTAGE, BAS, SPRINKLER, CARPENTRY, ANY OTHER TRADE THATWILL WORK IN THE AFFECTED AREAS.MINIMUM ALUMINUM JACKET THICKNESS (INCHES) 8"COORDINATION DRAWINGSTHE CONTRACTOR SHALL CAREFULLY EXAMINE ALL CONTRACT DOCUMENTS. THECONTRACTOR SHALL COORDINATE THE WORK WITH ALL OTHER TRADES INCLUDING,BUT NOT LIMITED TO, THE CONTRACT DOCUMENTS, SHOP DRAWINGS, ETC. FOR ALLGENERAL CONSTRUCTION, STRUCTURAL, MECHANICAL, ELECTRICAL AND SPECIALTYCONTRACTOR WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPERFITTING OF MATERIAL INTO THE BUILDING AS PLANNED, WITHOUT INTERFERENCEWITH OTHER WORK, AND SHALL MAKE REASONABLE MODIFICATIONS IN THELAYOUTS NEEDED TO PREVENT CONFLICT WITH OTHER TRADES, TO PROVIDEACCESS AND FOR THE PROPER EXECUTION OF THE WORK.10. DRAWINGS ARE DIAGRAMMATIC AND SCHEMATIC IN NATURE, AND INDICATE THETYPE, SIZE, ARRANGEMENT AND LOCATION OF MATERIALS AND EQUIPMENT. WORKINCLUDES CERTAIN COMPONENTS, APPURTENANCES AND RELATED SPECIALTIESTHAT MAY NOT BE SHOWN. CONTRACTOR SHALL PROVIDE ALL NECESSARY ITEMS TOCOMPLETE THE WORK ACCORDING TO INDUSTRY STANDARDS. IT IS THE INTENT OFTHE DRAWINGS AND SPECIFICATIONS TO CALL OUT FOR FINISHED WORK, TESTEDAND READY FOR OPERATION. DO NOT SCALE DRAWINGS. ARRANGEMENT OFEQUIPMENT AND ROUTING OF PIPES AND DUCTWORK, ETC. INDICATED ONDRAWINGS SHALL BE ROUTED PLUMB AND AT RIGHT ANGLES TO BUILDINGCONSTRUCTION AND MAY REQUIRE MODIFICATION DUE TO UNFORESEENCONDITIONS AND REQUIRE ON SITE REVISIONS DURING CONSTRUCTION. (SEE ALSO"BIDDING").DIAMETERCONTROL AND INTERLOCKING WIRING SHALL BE FURNISHED AND INSTALLEDBY CONTRACTOR PERFORMING CONTROLS WORK.(SEE AUTOMATICTEMPERATURE CONTROLS SECTION FOR ADDITIONAL INFORMATION WITHREGARD TO THIS WIRING RULE.)2.4.OUTER INSUL.777 WEST CHEROKEE STREETCATOOSA, OK 740151.HARD ROCK CASINO 4 - EXPANSIONCENTRAL PLANT ADDITIONSTARTERS, DISCONNECT SWITCHES, MOTOR RATED SWITCHES, TOGGLESWITCHES, ETC. TO BE SUPPLIED AND INSTALLED BY THE ELECTRICALCONTRACTOR.PART ONE - GENERAL10. PROVIDE CLEAN OUTS IN SANITARY, WASTE AND DRAIN LINES AS SHOWN AND ASREQUIRED BY LOCAL CODE. ALL CLEANOUTS SHALL BE READILY ACCESSIBLE.ISSUE DATE:#02-14-2018REVISIONS:DESCRIPTIONDATEDRAWINGS AND SPECIFICATIONS REMAINTHE PROPERTY OF THE DESIGNPROFESSIONAL. COPIES OF THE DRAWINGSAND SPECIFICATIONS RETAINED BY THECLIENT MAY BE UTILIZED ONLY FOR HIS ORHER USE AND FOR OCCUPYING THE PROJECTFOR WHICH THEY WERE PREPARED, ANDNOT FOR THE CONSTRUCTION OF ANYOTHER PROJECTS. USE OR REPRODUCTIONSOF

Feb 14, 2018 · circuit setter 2-way electronic control valve (x)(x)(x) item to be removed point of connection/disconnection access panel sheet note # revision number equipment mark wall clean out cd hpg g mpg 140 icw iscw condensate drain piping high pressure gas piping low pressure gas piping medium pressure gas piping 140 hot water piping industrial .

Related Documents:

CS 423: Operating Systems Design 2 Learning Objectives: Conduct a quick review of systems programming Announcements: C4 readings for Week 2 are out!Due Jan 25 (UTC-11) HW0 is available on Compass!Due Jan 25 (UTC-11) MP0 is available for review on Compass! Due Jan 28 (UTC-11) Goals for Today Reminder: Please put away devices at the start of class

EMC standards generally cover the range from 0 Hz to 400 GHz. Currently, however, not all frequency ranges are completely regu-lated. The first important frequency range is the range around the power network frequency, which in Europe is 50 Hz. Most loads connected to the power network are non-linear loads, i.e., they draw a current that does not follow the sinusoidal voltage. Non-linear loads .

Chapter 3: Basic Counseling Skills and Techniques 33 Attending 33 Attire 33 Preparation of the room 34 Body language and voice tone 34 Interest shown to the client 35 Maintaining focus in the client’s world 36 Active listening 37 Benefits of active listening 37 Good active listening 39 Starting and ending a session 44 Beginning the session 45 Bringing the session to close 46 The last session .

Modules which are part of Biology (Human) specifications only. * Only part of this chapter is required in the module: the sections needed are indicated in the te xt. The content you need for your AS exam. MICROSCOPES AND CELLS (1) 1 Cells are the basic units of organisms. In many organisms, cells are organised into tissues and tissues into organs. Several organs often link into an organ system .

The Cambridge English approach to teacher professional development, described in Section II, is based on key features which Cambridge English believes characterise successful professional development programmes: 1. Localised and context-specific 2. Growth mind-set 3. Relevant, differentiated and supported 4. Bottom-up/top-down synergy 5. Reflection and critical engagement 6. Collaboration and .

B Glossary of key financial terms, equations and ratios 75 C List of abbreviations 76 D Our profile 77 E Our leadership team 82 Contents PwC 2017 Ghana Banking Survey 2 Vish Ashiagbor Country Senior Partner T hat we chose for this year’s banking survey a theme that focuses on bank capital – in particular, risk-based minimum regulatory capital – is, itself, not surprising. For .

Anger in Children and Teens Books to read to children A volcano in my tummy- by Whitehouse and Pudney What to do when your temper flares- By Dawn Huebner and Bonnie Matthews Starving the anger gremlin for children aged 5-9 years by - Kate Collins-Donnelly The red Beast, controlling anger in children with Asperger’s syndrome – By K.I. Al- Ghani and Haitham Al-Ghani Your emotions, I feel .

Cold War 2001: China joins the World Trade Organization 2010: China overtakes Japan as world’s 2nd largest economy 2013: Belt and Road Initiative* announced 2015: Made in China (MIC) 2025 program** announced 2018: Seminal U.S. vice-presidential speech on China 2005: First U.S.-China Strategic Dialogue Key historical events in the U.S.-China strategic rivalry * Belt and Road Initiative (BRI .