Issue No. 01 Quality Manual - Indian Cotton Solutions

3y ago
156 Views
18 Downloads
595.44 KB
59 Pages
Last View : 1m ago
Last Download : 3m ago
Upload by : Melina Bettis
Transcription

Quality Indian Cotton Solutions.comPvt. Ltd.ManualDocument No. QM/01Issue No.01Date01–08–2018Quality ManualReference Standard ISO/IEC 17025:2017Issue Number 01Issue Date 01–08–2018Copy NumberTotal PagesIssued ToAddressD No. 4–5–60/2/A, Main lane, Sai baba road, Guntur–522007, Andhra Pradesh, IndiaTel. No. 91–863–2243599,Cell No. 91–91778 28282,E mail ceo.ics.com@gmail.comNameDesignationPrepared ByApproved ByIssued ByMs. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerPrepared ByApproved ByIssued ByPage 1 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.ManualDocument No. QM/01Issue No.01Date01–08–2018This Quality Manual is released underthe authority ofMr. G. Kameswara Rao,and is the property ofIndian Cotton Solutions.com Pvt. Ltd.having its address as follows:D No. 4–5–60/2/A, Main lane, Sai baba road, Guntur–522007,Andhra Pradesh, IndiaTel. No. 91–863–2243599, Cell No. 91–9177828282, E mail ceo.ics.com@gmail.comPrepared ByApproved ByIssued ByPage 2 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.ManualChapter1.1 1.0Document No. QM/01Issue No.01Date01–08–2018General InformationTable of contentsAmendISO/IEC 17025ment Page No.Clause Ref.No.ChapterNo.Subject1Cover page, table of contents, amendment record sheetand glossary of terms (abbreviation)001–6 2Authorization statement and laboratory profile andcontext of organization007–9 3Control and distribution0010 – 11 General requirements4.05.04.1Impartiality0012 – 134.2Confidentiality00140015 – 20Structural requirements4.05.0Resource requirements6.06.1General00216.2Personnel0021 – 226.3Facilities and environmental conditions00236.4Equipment0024 – 266.5Metrological traceability00276.6Externally provided products and services0028 – 296.0Process requirements7.07.1Review of requests, tenders and contracts0030 – 317.2Selection, verification and validation of methods0032 – 347.3Sampling00357.4Handling of test or calibration items00367.5Technical records00377.6Evaluation of measurement uncertainty00387.7Ensuring the validity of results0039 – 407.8Reporting of results0041 – 437.9Complaints00447.10Nonconforming work00457.11Control of data – Information management0046Prepared ByApproved By7.0Issued ByPage 3 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.Manual1.1Document No. QM/01Issue No.01Date01–08–2018Table of contentsChapterNo.AmendISO/IEC 17025ment Page No.Clause Ref.No.SubjectManagement system requirements8.08.1Options00478.2Management system documentation (Option A)0047 – 488.3Control of management system(Option A)0049 – 518.4Control of records (Option A)00528.5Actions to address risks and opportunities(Option A)00538.6Improvement (Option A)00548.7Corrective action (Option A)00558.8Internal audits (Option A)00568.9Management reviews (Option A)00570058 – 59documents8.0AnnexureANX–1 List of documents Note The amendment number given above is at the time of issue of this manual. If any page isamended then latest amendment number of such pages is recorded in amendment recordsheet and on the table of content given above.Prepared ByApproved ByIssued ByPage 4 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.Manual1.2Amd.No.Document No. QM/01Issue No.01Date01–08–2018Amendment record sheetAmd. Issue IssueDateno.datePageNo.ChapterAmendment madeno.Reasons ofamendmentSign. ofauthorizedpersonNote :–(I.) All the pages of this Quality Manual are currently as per Issue no. 01 and Amendment no. 00,except pages listed in the above table. The pages addressed above are amended with theidentification of amendment no. and date of amendment in this table as well as in the footer.(II.) To check the validity of the complete manual, confirm current revision and amendment statusof this page with Quality Manager and cross–check with sheets changed.Prepared ByApproved ByIssued ByPage 5 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.Manual1.3Document No. QM/01Issue No.01Date01–08–2018Glossary Of Terms gement3.CEOChief Executive Officer4.QMQuality Manual5.QPQuality Procedure6.NCR7.IANCRInternal Audit Non–Conformity Report8.AEPLApproved External Provider List9.CARCorrective Action Report10.WWork Instruction11.EExhibit12.FFormats13.QMS / SYS14.LMSLaboratory Management 18.QCDQuality Control19.TRGTraining20.INTIntermediateForIndian Cotton Solutions.com Pvt. Ltd.Non–Conformity ReportPrepared ByQuality Management SystemApproved ByIssued ByPage 6 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.ManualChapter2.1 2.0Document No. QM/01Issue No.01Date01–08–2018Authorization Statement and ICSCPL ProfileAuthorization StatementICSCPL is committed to the establishment and maintenance of management system given in thismanual and implemented by the ICSCPL, to meet the requirements of ISO/IEC 17025:2017.The members of the ICSCPL strictly adhere to the various quality procedures and work instructions /standard operating procedures, as supported by the policies outlined in this manual.Ms. G. Kastury has been appointed as Quality Manager and Mr. G. Kameswara Rao himself hasbeen appointed as Technical Manager of ICSCPL. The Quality Manager is responsible for ensuringcompliance with the quality requirements stipulated in this manual. Quality Manager is authorized toensure that the management system is established, implemented, and maintained by the ICSCPL,CEO, Technical Manager, and ICSCPL employees give full support and co–operation to QualityManager. Technical Manager assumes responsibility of Quality Manager and Quality Managerassumes the responsibility of Technical Manager in their absence. Technical Manager is responsiblefor ensuring compliance with the technical requirements in the testing activities.Mr. G. Kameswara RaoCEOIndian Cotton Solutions.com Pvt. Ltd.Prepared ByApproved ByIssued ByPage 7 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.Manual2.2Document No. QM/01Issue No.01Date01–08–2018Company ProfileThis is an innovation, a concept designed mainly with a "cotton farmer" orientation andbalancing the thoughts of the entire Textile industry chain from Farmer to Weaver. InIndia cotton farmers are not being encouraged and are also not getting the benefitscomparatively in the Textile chain. The capital-intensive spinning sector of cotton industryis also not happy with lot of cotton price fluctuation because there is one negative year inevery 3 years in the market; due to this all cash-rich companies are affected heavily. Inthe supporting process, ginning mills are also not happy due to heavy fluctuations ofindustry. Here in this design, cotton farmer has great importance because they are cottonproducers with their maximum efforts. India takes pride in being number one in cottonproduction in the world. This position is continuing from 2014. As new generationengineers we have developed this concept mainly by keeping in mind that Indian cottonfarmer should get maximum advantage because their efforts are high and they are thekey for India being in the 1st position of cotton producing. Indian government support isenormous by adopting the MSP (minimum support price) system for raw cotton andpurchasing through CCI (cotton corporation of India). It is a great incentive but as perour observation so far, no special initiative from Indian Textile Industry to support cottonfarmers directly. Considering all of this we developed this innovative concept focusing onthe support to cotton farmers as our obligation. The farmers have put in a lot of effort andbrought up India to 1st position among the cotton producing countries. So, now it is theduty and responsibility of every promoter of Indian textile industry to sustain the growth ofcotton production and in turn develop the whole industry rather than the personaldevelopment and personal growth. As a helping hand to the cotton sector from cotton toyarn we came up with this solution of “Indian Cotton Solutions.”We have mobile facilities for the testing of cotton, which gives proper rate of cotton tofarmer. The laboratory is having state of art technology equipments for testing of qualityof cotton.Prepared ByApproved ByIssued ByPage 8 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.Manual2.3Document No. QM/01Issue No.01Date01–08–2018Context of organizationInternal issues1. Impartiality to the laboratory activities2. Reporting statement of conformity against defined risk3. Nonconforming testing work4. Maintaining competence of testing personnel as well as employees’ turnoverExternal issues1. Confidentiality of customer’s information2. Customer dissatisfaction3. Market reputation4. Legal issues2.4Testing facilities covered in ISO/IEC 17025:2017 Scope1.CottonScope of AccreditationThe detailed scope of accreditation with the details of the products / materials, specifictests or types of test performed, specification, standard (method) or techniques used andrange of testing / limit of detection is given in E/SYS/07.Prepared ByApproved ByIssued ByPage 9 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.Manual3.0Controls And Distribution3.1Structure Of Quality ManualDocument No. QM/01Issue No.01Date01–08–20183.2This manual is prepared according to the table of contents. Cover page begins with pageno. 1 and the numbering continues throughout the manual.The manual is supported by documented management system covering QualityProcedures (QP) and work instructions or test methods. The procedure is referred in therelevant chapters of this manual. In addition, a separate list of chapter–wise proceduresreferred in this manual is given in Annexure–1 and a glossary of terms is given in clauseno. 1.3.The manual is issued in loose paper sheets and is accessible to the staff and customers.The implementation of this manual and related quality procedure is mandatory for alldepartments. Any changes made in this manual shall be effected through the documentcontrol procedures and must be approved by the CEO.Responsibility3.3CEO approves all the pages of the Quality Manual. The control and maintenance of thismanual is the responsibility of Quality Manager, who is maintaining master list ofdocuments for quality manual.ReferenceISO/IEC17025:2017Quality Procedure3.4General requirements for the competence of Testing andCalibration LaboratoriesQP/01 to QP/21DistributionQuality Manuals are distributed to various departments on a "controlled" basis. Controlledcopies are the one, which are subject to incorporation of "revisions"."Controlled" copies of the quality manual are stamped “Controlled Copy” on all pagesand are given a unique copy number for maintenance purpose.Distribution list of Quality Manual is given on the next page.Quality Manager, through a “change note” issues amendments and revised pages ofquality manual to holders of controlled copies of the manual. Upon receipt of suchrevisions, the recipient will replace the pages by the revised ones."Uncontrolled" copies may be issued by the Quality Manager to the customers onrequest of the Technical Manager, or Functional Head to all employees but the recipientshall not be issued the amendments / revisions.Quality Manager is responsible to fill–up amendment sheet in line with any amendmentand put “Controlled Copy” Stamp on the amendment sheet as well as table of contents.All the information regarding revisions is distributed to Copy Holders. If any amendmentdue to change in page number is done then the table of contents is amendedaccordingly.Prepared ByApproved ByIssued ByPage 10 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.Manual3.53.6Document No. QM/01Issue No.01Date01–08–2018Distribution list of Quality ManualCopy No.Type of documentDistributed to1Controlled Copy2Master Copy3Controlled copyTechnical Manager4Controlled copyMobile Lab copy Uncontrolled copyCEOQuality ManagerAccreditation bodyNumbering and document control for Quality Manual(1.)The number for Quality Manual is given as QM/01, where QM stands for Quality Manualand 01 stands for 1st level document.(2.)When any amendment becomes necessary, it is the affected page that is replaced andnot the whole chapter. The revised page is given amendment no. and amendment date inthe footer as well as in the amendment record sheet of Chapter –1.(3.)Revised pages of the Quality Manual are subject to the same approvals and controls asper the original one. In case of amendments to the particular page the amendment no.and amendment date for the particular page is identified on the footer of the amendedpage. After more than nine amendments in a single page the whole issue number ofQuality Manual is revised with new issue number with amendment no. as 00.3.71.Reference to related documentsAmendment record sheet (Clause No. 1.2)Prepared ByApproved By–Chapter – 1.Issued ByPage 11 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.ManualDocument No. QM/01Issue No.01Date01–08–20184General requirements4.1Impartiality4.1.1Laboratory activities are undertaken impartially and they are structured and managed, soas to safeguard impartiality. To ensure impartiality, the testing personnel and administrationpersonnel are separate. The organization structure is given on the next page, whichensures that impartiality related to work is carried–out by the laboratory. The QualityManager ensures impartiality by the laboratory during the laboratory subcontractors’ andemployees’ relation with customers during execution of the work.ICSCPL management is committed to impartiality and impartiality policy (E/SYS/05) isprepared and communicated to all. Procedure (QP/01) is prepared for maintainingimpartiality of laboratory activities and is followed to maintain impartiality.ICSCPL is independent laboratory, dealing in the cotton testing. ICSCPL is responsible forthe impartiality of its activities and the matter related to commercial, financial or otherpressures to compromise impartiality is handled by the personnel other than the testingpersonnel. Testing person is not in the direct contact with the customer. Receipt of sample,billing, payment collection, etc. activities is undertaken by administration personnel.Employees are not given more work which can create pressure on them to ensure nocompromise in the testing activities.ICSCPL has identified risks to its impartiality on an on–going basis from customer,employees and suppliers. This includes those risks that arise from its activities, or from itsrelationships, or from the relationships of its personnel. However, such relationships are notnecessarily present at ICSCPL with a risk to impartiality. A relationship that threatens theimpartiality of ICSCPL, is on ownership (as the Head of ICSCPL does not have any otherbusiness, he is engaged in the testing activities only), governance, management, personnel(technical and administration personnel are separate), shared resources (all resources forthe testing are owned by laboratory; as a policy, it is decided that the resource of customerwill not be used in any case for undertaking the customer’s testing job), finances (separateand dedicated finance is allotted for testing laboratory), contracts, marketing (includingbranding etc. not applicable). The other activities like, payment of a sales commission orother inducement for the referral of new customers etc. are not done as a part of policy.Impartiality policy, its requirements and its norms are communicated to all laboratorypersonnel by:4.1.24.1.34.1.4 To all employees By providing training related to requirements of impartiality,To all sub–contractors / external service providers By signing the confidentiality andimpartiality agreement (F/PUR/07).4.1.5If a risk to impartiality is identified, ICSCPL will take appropriate action to eliminate orminimize such risk by deploying separate personnel, by providing separate or dedicatedresources etc. CEO initiates the immediate actions to overcome and take action to maintainimpartiality.Reference documentsQP/01Procedure for Maintaining impartiality of laboratory activitiesE/SYS/05Impartiality policyF/PUR/07Sub–contractor’s / External service provider’s agreementF/SYS/17Impartiality check reportPrepared ByApproved ByIssued ByPage 12 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.ManualDocument No. QM/01Issue No.01Date01–08–2018Organization ChartDirectorsCEO and Technical ManagerGeneral Manager and Quality ManagerMobile Laboratory InchargesMobile Laboratory OperatorsRemarks Technical Manager is nominated as Deputy Quality Manager. Quality Manager is nominated as Deputy Technical Manager.Prepared ByApproved ByIssued ByPage 13 of 59Ms. G. KasturyMr. G. Kameswara RaoMs. G. KasturyQuality ManagerCEOQuality ManagerAmendment No. 00Amendment Date Copy No.

Quality Indian Cotton Solutions.comPvt. Ltd.ManualDocument No. QM/01Issue No.01Date01–08–20184.2Confidentiality4.2.1The confidentiality agreement is made with the employees and other parties to ensureprotection of its customers' confidential information, proprietary rights as well as testresults. All care is taken to ensure files are transmitted in non–edited form to the customerand all care for confidentiality is taken in electronic storage and transmission of results.ICSCPL is responsible, through legally enforceable commitments (based on the contractmade with the customer, either in customer order or in the Sample test request slip –F/QCD/02), for the management of all information obtained or created during theperformance of Laboratory activities. ICSCPL informs the customer in advance, of theinformation it intends to place in the public domain. Except for information that the customermakes publicly available, or when agreed between ICSCPL and the customer (e.g. for thepurpose of responding to complaints), all other information is considered proprietaryinformation and is regarded as confidential. All employees of the laboratory activities havesigned confidentiality agreement (F/TRG/06) to ensure that confidentiality of customer’sinformation is maintained. All sub–contractors / external service providers have signedconfidentiality and impartiality agreement (F/PUR/07).4.2.2When ICSCPL is required by law or authorized by contractual arrangements to releaseconfidential information, ICSCPL will inform the details of information shared to thecustomer or individual concerned. The customer is informed in writing for such incidence.4.2.

Quality Manual Reference Standard ISO/IEC 17025:2017 Issue Number 01 Issue Date 01–08–2018 Copy Number Total Pages Issued To . ANX–1 List of documents 00 58 – 59 Note The amendment number given above is at the time of issue of this manual. If any page is amended then latest amendment number of such pages is recorded in amendment record sheet and on the table of content given .

Related Documents:

Accreditation Programme for Nursing and Midwifery . Date of submission of report to Bangladesh Nursing and Midwifery Council_ 2) The Review Team During the site visit, the review team members validate the self-assessment for each of the criteria. . as per DGNM guideline. Yes ⃝No

The Bubble Map is for describing using adjectives; Identifying the sensory, logical and emotional qualities of any topic or concept. Who Am I, My Story: My Qualities - Bubble Map name quality quality quality quality quality examples influences name quality quality quality quality quality 8 your name name 2

Project Issue Management Process Project Issue Management Process Template, version 1.0 (03.15.12) ii 1 Introduction The Project Issue Management Process is followed during the Execution phase of the Project Management Life Cycle throughout the project; however, issues may be identified at any stage of the project life cycle.File Size: 258KBPage Count: 8People also search forissue management processcontemporary issue management:contemporary issue management: quizletdefine opportunity management processacquisitions the issue management proces asana project management templates

DL06 Micro PLc USER MANUAL Please include the Manual Number and the Manual Issue, both shown below, when communicating with Technical Support regarding this publication. Manual Number: D0-06USER-M Issue: 3rd Edition, Rev. D Issue Date: 6/16 Publication History Issue Dat

Management Systems are managed by the joint UoA – NHSG Quality Assurance Manager (QAM). 5.1 Quality Manual This Quality Manual is the statement by UoA of its documented Quality Management System which conforms with ISO/IEC 17025:2017. Conformance with the requirements stated in the Quality Manual and in the UoA IMS Standard Operating

Quality Manual Third edition Revision 05 02 April 15 Page 9 of 43 3.2 Abbreviations In the text the following abbreviations recur: QMS, QS Quality Management System QMan Quality Manual PRO Quality Procedure ISO 9001 UNI EN ISO 9001: 2008 PEW Pressure Equipment Workshop ATW Assembly Workshop

Feb 11, 2019 · HFSC Quality Manual Quality Division HFSC Quality Manual Document ID: 1105 Issued By: Quality Director Issue Date: February 11, 2019 Uncontrolled When Printed Page 7 of 84 reached based on the results of analysis/examination. contract An agreement between the laboratory

3006 AGMA Toilet Additive 1338 (3006) 19.0% 2914 CERAVON BLUE V10 DC (2914) 0.05% 2922 FORMALDEHYDE REODORANT ALTERNATIVE (2922) 0.6% 3 Water (3) 80.05% Constituent Chemicals 1 Water (3) 80.05% CAS number: 7732-18-5 EC number: 231-791-2 Product number: — EU index number: — Physical hazards Not Classified Health hazards Not Classified Environmental hazards Not Classified 2 Bronopol (INN .