PERFORMANCE EVALUATIONREPORTPUBLIC SECTOR GENERATIONCOMPANIESJamshoro Power Company Limited (JPCL, GENCO-I)Central Power Generation Company Limited (CPGCL, GENCO-II)Northern Power Generation Company Limited (NPGCL, GENCO-III)Lakhra Power Generation Company Limited (LPGCL, GENCO-IV)NATIONAL ELECTRIC POWER REGULATORY AUTHORITYISLAMIC REPUBLIC OF PAKISTAN2016-172017-18

Table of ContentsS.No.DescriptionExecutive e No.1Performance Standards (Generation) Rules, 2009IntroductionJamshoro Power Company Limited (GENCO I)Thermal Power Station Jamshoro (Units 1 to 4)Thermal Power Station Jamshoro (Units 5 & 6)Gas Turbine Power Station KotriCentral Power Generation Company Limited (GENCO II)Thermal Power Station GudduGuddu 747 Combined Cycle Power PlantNorthern Power Generation Company Limited (GENCO III)Thermal Power Station MuzaffargarhGas Turbine Power Station FaisalabadSteam Power Station FaisalabadCombined Cycle Power Plant NandipurLakhra Power Generation Company Limited (GENCO IV)578910111213131314AnalysisReduction in Net CapacityAvailing Higher Outage HoursLonger Duration of Standby ModeReduction in Availability FactorNet Capacity FactorNet Output FactorEnergy Availability FactorAnnexuresEnergy Loss and Financial Impact of Reduction in Net CapacityUnused Energy Potential and Subsequent Energy Cost due to Availing HigherOutage HoursEnergy Loss and Financial Impact of Auxiliary Consumption during Standby ModeUnit wise data pertaining to Net Capacity Factor, Net Output Factor, EnergyAvailability Factor16202325282930

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)EXECUTIVE SUMMARYNational Electric Power Regulatory Authority (NEPRA) regulates the power sector in Pakistan andprotects the interests of consumers and companies providing electric power services. As such,apart from monitoring the performance of transmission and distribution licensees, NEPRA alsomonitors the performance of generation licensees.NEPRA framed Performance Standards Generation Rules (PSGR) back in 2009. Under PSGR, eachoperational generation licensee is required to submit a quarterly report to NEPRA on regularbasis, particularly with respect to parameters such as Reference Capacity/Net Capacity,Planned/Unplanned Outage Hours, Availability Factor, Net Capacity Factor, Net Output Factorand Energy Availability Factor. The main purpose/objective of these parameters is to ascertainwhether;i.The net capacity of power plant remained equal/higher to that approved byNEPRA in its tariff determination or otherwise.ii.The power plant availed outages in accordance with the Power PurchaseAgreement signed with CPPA-G or otherwise.iii.The CPPA-G imposed Liquidated Damages on non-performance of power plant orotherwise.iv.The power plant remained under-utilized or otherwise.Accordingly, the quarterly reports submitted by public sector GENCOs for the FY 2016-17 and2017-18 were reviewed and a comprehensive Performance Evaluation Report has beenprepared. The report mainly highlights the following key findings;i.Reduction in Net Capacity: The data submitted by GENCOs for the FY 2016-17 and2017-18 reflects that a number of units/machines of different power stations ofGENCOs have failed to ensure the Net Capacity as approved by NEPRA in theirrespective tariff determinations (upon which they are receiving capacitypayments). This resulted into a cumulative energy loss of about 479.573 MillionkWh, translating into a financial impact of Rs.4.025 Billion, as per the followingdetails;GENCOIIIIIIIVTotalEnergy Loss(Million kWh)66.270195.554204.64913.100479.573Performance Evaluation Report of Public Sector GENCOsFinancial Impact(Rs. Billion)0.6351.2192.1180.0534.025Page 1

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)These units include Units 1 to 4 of TPS Jamshoro (GENCO-I), Units 3, 5, 6, 11 & 12of TPS Guddu & Unit 15 of Guddu 747 CCPP (GENCO-II), Units 1, 4 & 5 of TPSMuzaffargarh, Unit 9 of GTPS Faisalabad, Unit 2 of SPS Faisalabad & NandipurPower Plant (GENCO-III) and Units 1 & 2 of Lakhra Power Station (GENCO-IV).ii.Availing Higher Outages/Reduction in Availability Factor: The data submitted byGENCOs for the FY 2016-17 and 2017-18 indicates that a number ofunits/machines of different power stations of GENCO-I, II & III availed higheroutage hours than allowed limit as specified in their respective Power PurchaseAgreements, resulting in reduction of their Availability Factor. Had these units notavailed higher outage hours, a huge amount of energy - around 9373.003 MillionkWh could have been contributed by them to the national grid (subject to dispatchby the system operator), amounting to Rs. 64.629 Billion as per the followingdetails;GENCOIIIIIITotalEnergy Loss(Million kWh)21.9467542.4481808.6099373.003Financial Impact(Rs. Billion)0.19048.50215.93764.629These units include Unit 2 of TPS Jamshoro & Units 3 & 5 of GTPS Kotri (GENCO-I),Units 1, 2, 4, 7, 8, 9, 11 & 13 of TPS Guddu & Units 14, 15 & 16 of Guddu 747 CCPP(GENCO-II) and Units 4, 5 & 6 of TPS Muzaffargarh, Unit 1 of SPS Faisalabad &Nandipur Power Plant (GENCO-III).It is pertinent to mention that CPPA-G has imposed liquidated damages amountingto Rs. 2.093 Billion on GENCO-I, II & III, on account of availing higher outages thatallowed limit as specified in their respective Power Purchase Agreements duringthe FY 2016-17. However, the same is still in process for the FY 2017-18.iii.Longer Duration of Standy Mode: The data submitted by GENCOs for the FY 201617 and 2017-18 shows that a number of units/machines of different powerstations of GENCO-I, II & III remained on standy mode for an alarming longerduration, which resulted in the consumption of auxiliary power and a subsequentfinancial loss of around Rs. 1.031 Billion to the national exchequer.On enquiry from GENCOs in this regard, it was revealed that instructions from thesystem operator (NPCC) due to no demand and fuel constraints were the majorreasons of such longer duration of standby mode.Performance Evaluation Report of Public Sector GENCOsPage 2

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)iv.Net Capacity Factor: The Net Capacity Factor is the ratio of net actual generationto the product of net capacity and period hours.The data pertaining to Net Capacity Factor, as submitted by public sector GENCOsfor the FY 2016-17 and 2017-18, reveals that the Net Capacity Factor of all theGENCOs remained low (less than 68%) during the said period, owing to increasedduration of outages and underutilization of power plants. Particularly, the NetCapacity Factor of GTPS Kotri (GENCO-I), GTPS & SPS Faisalabad (GENCO-III) andLakhra PS (GENCO-IV) remained only 10%, 6%, 1% and 2% respectively during theFY 2017-18, which raises serious question marks on the performance of thesepower stations.v.Net Output Factor: The Net Output Factor is the ratio of net actual generation tothe product of net capacity and service hours. Its value should be nearly equal to100%.The data pertaining to Net Output Factor as submitted by public sector GENCOsfor the FY 2016-17 and 2017-18, depicts that the Net Output Factor of TPS Guddu& Guddu 747 (GENCO-II) and TPS Muzaffargarh & Nandipur Power Plant (GENCOIII) remained low (less than 80%) during the FY 2016-17 and 2017-18. Similarly,the Net Output Factor of TPS Jamshoro & GTPS Kotri (GENCO-I) remained only71% and 76% respectively during the FY 2017-18 and that of Lakhra Power Station(GENCO-IV) remained only 66% during the FY 2016-17, which clearly speaks of theunderutilization of these power plants during the said period.Concluding, it can be said that as a result of successive legal actions taken by NEPRA on nonperformance of GENCO-I, II & III during the calendar years 2012 to 2014 (resulting in impositionof Rs. 5 Million each on GENCO-I, II & III) and during the fiscal years 2015 and 2016 {(resulting inimposition of Rs. 2 Million fine each on GENCO-I & II (legal proceedings against GENCO-III arecurrently under process)}, the performance of abovementioned GENCOs has considerably beenimproved during the FY 2016-17 and 2017-18. However, the same is still beyond the targets asapproved by NEPRA in their respective tariff determinations with respect to reduction in netcapacity and as specified in their respective Power Purchase Agreements signed with CPPA-Gwith respect to availing higher outages.Performance Evaluation Report of Public Sector GENCOsPage 3

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)PERFORMANCE STANDARDS(GENERATION) RULES, 2009Performance Evaluation Report of Public Sector GENCOsPage 4

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)1.Performance Standards (Generation) Rules (PSGR) 2009In exercise of the Powers conferred by and clause (k) of section 46 of the Regulation ofGeneration, Transmission and Distribution of Electric Power Act, 1997 (XL of 1997), read withclause (c) of sub section (2) of section 7 and section 34 thereof, the National Electric PowerRegulatory Authority (NEPRA), with the prior approval of the Federal Government, is pleased tomake the following Rules to ensure that the electric generation facilities and power plants areefficiently operated to further ensure electrical service reliability and adequacy to thetransmission and distribution service provider within prescribed parameters of PerformanceStandards (Generation) Rules (PSGR) 2009.Quality of Supply - Rule 3 of PSGR 2009 states that "In order to maintain Performance Standards,the generation facilities are required to ensure that the voltage and frequency of electricitysupplied to recipients shall be within normal operation limits contained in the 'applicabledocuments' as defined in clause (iv) of sub rule 1 of rule 2 NEPRA Licensing (Generation) Rules,2000, rules 7 & 8 of NEPRA Performance Standards (Transmission) Rules 2005 and NEPRA clauses(d) & (e) of the rule 4 of Performance Standards (Distribution) Rules 2005".Data Requirement - Rule 4 of PSGR 2009 states that "As part of Generator Performance DataSystem, the licensee shall calculate the following key indicators and others as indicated in FormsI and II to these rules for its generating facilities and submit on regular basis, a report to theAuthority under sub-rule (2) of rule 5, namely:(a)(b)(c)Energy Loss Rate (ELR)Energy Availability Factor (EAF)Equivalent Planned Outage Factor (EPOF)"Reporting Requirement - Rule 5 (2) of PSGR 2009 states that "Reports required for the keyindicators under rule 4 shall be submitted on quarterly basis and the first report thereof shall bedue after the publication of these rules in the official Gazette.Performance Evaluation Report of Public Sector GENCOsPage 5

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)INTRODUCTIONPerformance Evaluation Report of Public Sector GENCOsPage 6

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)2.INTRODUCTION:2.1Jamshoro Power Company Limited (JPCL, GENCO-I)2.1.1 Thermal Power Station Jamshoro (Units 1 to 4):S.No.1.2.3.4.5.6.7.8.9.10.Details of Generation FacilityLicense Issuance DateJuly 01, 2002License Expiry DateJune 30, 2021License NumberGL/01/2002Location of PlantJamshoro, SindhType of FacilityThermal Power PlantInstalled Capacity880 MWNet Capacity649.02 MW3*210 MWNumber of Units4 Steam Turbines1*250 MWPrimary FuelFurnace OilUnit 1NilAlternate FuelUnits 2 to 4Natural GasTable 1Figure 1Performance Evaluation Report of Public Sector GENCOsPage 7

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)2.1.2 Thermal Power Station Jamshoro (Units 5 & 6):S.No.1.2.3.4.5.6.7.8.9.10.11.Details of Generation FacilityLicense Issuance DateAugust 11, 2014License Expiry DateDecember 30, 2049License NumberGL/01/2002Location of PlantJamshoro, SindhType of FacilityThermal Power PlantInstalled Capacity1320 MWNet Capacity1200 MWNumber of UnitsSteam Turbine2*660 MWPrimary FuelImported/Local CoalAlternate FuelNilUnit 5December 31, 2018Expected CODUnit 6December 31, 2019Table 2Figure 2Performance Evaluation Report of Public Sector GENCOsPage 8

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)2.1.3 Gas Turbine Power Station Kotri:S.No.1.2.3.4.5.6.7.8.9.10.Details of Generation FacilityLicense Issuance DateJuly 01, 2002License Expiry DateJune 30, 2021License NumberGL/01/2002Location of PlantKotri, SindhType of FacilityCombined CycleInstalled Capacity144 MWNet Capacity106.5 MWGas Turbines4*25 MWNumber of Units5Steam Turbine1*44 MWPrimary FuelNatural GasAlternate FuelHigh Speed DieselTable 3Figure 3Performance Evaluation Report of Public Sector GENCOsPage 9

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)2.2Central Power Generation Company Limited (CPGCL, GENCO-II)2.2.1 Thermal Power Station Guddu:S.No.1.2.3.4.5.6.7.License Issuance DateLicense Expiry DateLicense NumberLocation of PlantType of FacilityInstalled CapacityNet Capacity8.Number of Units9.Primary Fuel10.Alternate FuelDetails of Generation FacilityJuly 01, 2002June 30, 2017GL/02/2002Jacobabad, SindhThermal1655 MW1400 MWGas Turbines2*110 2*210 4*100 2*136 MW13Steam Turbines2*100 1*143 MWNatural GasUnits 3 & 4Furnace OilOther UnitsNilTable 4Figure 4Performance Evaluation Report of Public Sector GENCOsPage 10

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)2.2.2 Guddu 747 Combined Cycle Power Plant:S.No.1.2.3.4.5.6.7.8.9.10.Details of Generation FacilityLicense Issuance DateApril 26, 2013License Expiry DateJune 30, 2017License NumberGL/02/2002Location of PlantJacobabad, SindhType of TechnologyCombined CycleInstalled Capacity776.7 MWNet Capacity720.79 MWGas Turbines2*255.6 MWNumber of Units3Steam Turbine1*265.5 MWPrimary FuelNatural GasAlternate FuelHigh Speed Diesel OilTable 5Figure 5Performance Evaluation Report of Public Sector GENCOsPage 11

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)2.3Northern Power Generation Company Limited (NPGCL, GENCO-III)2.3.1 Thermal Power Station Muzaffargarh:S.No.1.2.3.4.5.6.7.8.9.10.License Issuance DateLicense Expiry DateLicense NumberLocation of PlantType of FacilityInstalled CapacityNet CapacityNumber of UnitsPrimary FuelAlternate FuelDetails of Generation FacilityJuly 01, 2002June 30, 2027GL/03/2002Muzaffargarh, PunjabThermal1350 MW1183.52 MW6Steam Turbines3*210 1*320 2*200 MWFurnace OilNatural GasTable 6Figure 6Performance Evaluation Report of Public Sector GENCOsPage 12

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)2.3.2 Gas Turbine Power Station Faisalabad:S.No.1.2.3.4.5.6.7.8.9.10.Details of Generation FacilityLicense Issuance DateJuly 01, 2002License Expiry DateJune 30, 2027License NumberGL/03/2002Location of PlantFaisalabad, PunjabType of FacilityCombined CycleInstalled Capacity144 MWNet Capacity132 MWGas Turbines4*25 MWNumber of Units5Steam Turbine1*44 MWPrimary FuelNatural GasAlternate FuelHigh Speed DieselTable 72.3.3 Steam Power Station Faisalabad:S.No.1.2.3.4.5.6.7.8.9.10.Details of Generation FacilityLicense Issuance DateJuly 01, 2002License Expiry DateJune 30, 2027License NumberGL/03/2002Location of PlantFaisalabad, PunjabType of FacilityThermalInstalled Capacity132 MWNet Capacity97 MWNumber of Units2Steam Turbines2*66 MWPrimary FuelNatural GasAlternate FuelFurnace OilTable 82.3.4 Combined Cycle Power Plant Nandipur:S.No.1.2.3.4.5.6.7.8.9.10.Details of Generation FacilityLicense Issuance DateOctober 31, 2014License Expiry DateJune 30, 2027License NumberGL/03/2002Location of PlantGujranwala, PunjabType of FacilityCombined CycleInstalled Capacity565.65 MWNet Capacity510 MWGas Turbines3*122.1 MWNumber of Units4Steam Turbine1*199.35 MWPrimary FuelFurnace OilAlternate FuelNatural GasTable 9Performance Evaluation Report of Public Sector GENCOsPage 13

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)Figure 72.4S.No.1.2.3.4.5.6.7.8.9.Lakhra Power Generation Company Limited (LPGCL, GENCO-IV):Details of Generation FacilityLicense Issuance DateFebruary 18, 2005License Expiry DateFebruary 17, 2020License NumberGL/06/2005Location of PlantDadu, SindhType of FacilityThermalInstalled Capacity150 MWNet Capacity93 MWNumber of Units3Steam Turbines3*50 MWFuel TypeLignite CoalTable 10Figure 8Performance Evaluation Report of Public Sector GENCOsPage 14

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)ANALYSISPerformance Evaluation Report of Public Sector GENCOsPage 15

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)3.1Reduction in Net Capacity:According to Performance Standards (Generation) Rules, 2009;Net Capacity is the unit’s maximum generating capacity based on IDC (Initial DependableCapacity) or AIDC (Annual Initial Dependable Capacity) less any station service or auxiliarypower requirements in MW utilized for that unit.Net Capacity is determined when there are no short term equipment problems causing atemporary derating of the unit and all major equipment is operating at full load underdesigned temperatures and pressures.While reviewing the quarterly reports submitted by public sector GENCOs for the FY 201617 and 2017-18, it has been observed that the Net Capacity of a number of units/machinesof different power stations of GENCOs remained lower than that approved by NEPRA intheir respective tariff determinations. This resulted into a cumulative energy loss of about479.573 Million kWh, translating into a financial impact of Rs. 4.025 Billion. The detail isas under;Table 11CapacityUnitYearInstalledActual1Energy Loss(Million kWh)Financial Impact(Rs. .635000000000000000000NetApprovedReduction23 2-1GENCO ITPS 50182.45154.73155.36156.48649.02Sub TotalGTPS nce Evaluation Report of Public Sector GENCOsPage 16

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY -172017-182016-172017-18Installed44Financial Impact(Rs. 4780.4710.948NetApprovedReduction123 2-121.7721.7638.2835.0925Energy Loss(Million kWh)Actual1441835107Sub TotalTotalGENCO IITPS 090901301301301400Sub TotalPerformance Evaluation Report of Public Sector GENCOsPage 17

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)CapacityUnitYearGuddu 747 rgy Loss(Million kWh)Financial Impact(Rs. 0.00600.00600.006ActualNetApprovedReduction123 79Sub TotalTotalGENCO IIITPS .52Sub TotalGTPS 337.0225252525441252020202037117Sub TotalPerformance Evaluation Report of Public Sector GENCOsPage 18

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)CapacityUnitYearSPS rall2017-18Installed66Financial Impact(Rs. .1610.8070.0030.0020.0450.004ActualReduction123 2-1505043.9543.5066Energy Loss(Million kWh)NetApproved13248.548.597Sub TotalCCPP Nandipur2016-1712017-18425401.83410.03Sub TotalTotal411.34GENCO IVLakhra 31.231.293.6TotalGrand TotalREQUIRES 0534.025Note: ‘Actual Net Capacity’ has been worked out by deducting the auxiliary power (MW) consumed bythe units/machines of GENCO-I, II, III & IV during service mode from the ‘De-rated Capacity’ asmentioned in their respective generation licenses. ‘Approved Net Capacity’ is the net capacity approved by NEPRA in the respective tariffdeterminations of abovementioned GENCOs. Energy Loss has been worked out by multiplying the reduction in net capacity to the service hoursavailed by the units/machines of GENCO-I, II, III, & IV. Similarly, the financial impact has been calculated by multiplying the energy loss to the selling rateof the units/machines of abovementioned GENCOs as worked out from the Energy ProcurementReports submitted by CPPA-G. The details are attached at Annex I.Performance Evaluation Report of Public Sector GENCOsPage 19

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)3.2Availing Higher Outage Hours:According to Performance Standards (Generation) Rules 2009;Outage Hours are the sum of Planned Outage Hours and Unplanned Outage Hours.Where;Planned Outage Hours are the sum of all hours the unit was offline due to planned orscheduled outages (outages planned well in advance such as annual overhauls); andUnplanned Outage Hours are the sum of all hours the unit was offline due to sudden,delayed, postponed, startup failure outages.While reviewing the quarterly reports submitted by public sector GENCOs for the FY 201617 and 2017-18, it has been observed that a number of units/machines of different powerstations of GENCO-I, II & III availed higher outage hours than allowed limit as specified intheir respective Power Purchase Agreement. Had these units not availed higher outagehours, they could have contributed around 9373.003 Million kWh to the national grid(subject to dispatch by system operator) amounting to Rs. 64.629 Billion. The detail is asunder;UnitPeriodPlanned1Table 12Outage Hours (% of Period Hours)ActualAllowedForcedTotal23 1 2ExtraUnused EnergyPotential(Million kWh)EnergyCost(Rs. Billion)45 .0116.16521.9460.0310.190GENCO ITPS thin RangeSub TotalGTPS 7-180020.418.320.418.3Within Range17.4317.40.9Within RangeWithin RangeSub TotalTotalPerformance Evaluation Report of Public Sector GENCOsPage 20

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)UnitPeriodPlanned1Outage Hours (% of Period Hours)ActualAllowedForcedTotal23 1 24Extra5 3-4Unused EnergyPotential(Million kWh)EnergyCost(Rs. 440.276GENCO IITPS 482.617.482.617.482.617.47.4Within Range17.43.4Within Range33.813.4Within Range00055.610010055.610010014.61616418484Within RangeSub TotalGuddu 83.815.919.61.516.117.66.731.4Sub TotalTotal38.1Within Range17.42.2Within Range17.40.2Within Range17.420.7GENCO IIITPS 2017-182016-171,2,32017-188.212.520.717.43.3Within Range8.513.421.9018.818.817.44.5Within Range17.41.4Within RangePerformance Evaluation Report of Public Sector GENCOsPage 21

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)UnitPeriodPlanned1Outage Hours (% of Period Hours)ActualAllowedForcedTotalUnused EnergyPotential(Million kWh)EnergyCost(Rs. 5.9906.167969.5537.756Sub TotalTotal969.5531808.6097.75615.937Grand Total9373.00364.62923 1 24Extra5 3-4Sub TotalGTPS Faisalabad5,6,7,2016-178,92017-18Within RangeSub TotalSPS 1.510017.417.474.182.6Within RangeSub TotalCCPP Nandipur2016-1712017-1844.90.445.318.426.9Within RangeNote: ‘Actual Outage Hours’ are the outage hours availed by the units/machines of GENCO-I, II & III, assubmitted by them in their quarterly performance reports. ‘Allowed Outage Hours’ are the outage hours allowed to the units/machines of GENCO-I, II & III,as specified in their respective Power Purchase Agreements signed with CPPA-G. Unused Energy Potential has been worked out by multiplying the extra outage hours availed bythe units/machines of GENCO-I, II & III to the net capacity approved by NEPRA in their respectivetariff determinations. Similarly, the Energy Cost has been calculated by multiplying the unused energy potential to theselling rate of the units/machines of abovementioned GENCOs as worked out from the EnergyProcurement Reports submitted by CPPA-G. The details are attached at Annex II.Performance Evaluation Report of Public Sector GENCOsPage 22

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)3.3Longer Duration of Standby Mode:While reviewing the quarterly reports submitted by public sector GENCOs for the FY 201617 and 2017-18, it has been observed that a number of units/machines of different powerstations of GENCO-I, II & III remained on standby mode for an alarming longer duration,which resulted in the consumption of auxiliary power and a subsequent financial loss ofaround Rs. 1.031 Billion to the national exchequer (Annex III).In view of above, GENCO-I, II & III were asked to submit the reasons of such longerduration of standby mode. In response, following reasons were submitted byabovementioned GENCOs;i.ii.iii.Instructions from the system operator (NPCC) due to no demand.Fuel Constraints.River Water Conductivity.The details are as under;Unit No.TPS Jamshoro1234GTPS Kotri34567TPS Guddu356789101112FY 2016-17Table 13Total Duration of Standby Mode (Hours)FY 2017-18ReasonsGENCO I802557133010103930445939821918Instructions of the System Operator(NPCC), River Water Conductivityand Shortage of Fuel4104447236304939408858127022733373877095GENCO IINon-availability of indigenous gasfuel from 91577579Non-availability of indigenous gassupply, which is supplied from twodifferent gas fields i.e. Kandhkotand Mari gas fieldPerformance Evaluation Report of Public Sector GENCOsPage 23

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)Unit No.FY 2016-17Total Duration of Standby Mode (Hours)FY 2017-18ReasonsGENCO IIGuddu 747 CCPP15142-Non-availability of indigenous gassupply, which is supplied from twodifferent gas fields i.e. Kandhkotand Mari gas fieldGENCO IIITPS Muzaffargarh123456GTPS Faisalabad56789SPS Faisalabad12CCPP 5641834237No demand from System 7407No demand from System Operator(NPCC)74446447778No demand from System Operator(NPCC)55917No demand from System Operator(NPCC) and Non-availability ofGas FuelPerformance Evaluation Report of Public Sector GENCOsPage 24

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)3.4Reduction in Availability Factor:According to Performance Standards (Generation) Rules 2009;𝐴𝑣𝑎𝑖𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝐹𝑎𝑐𝑡𝑜𝑟 𝐴𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 𝐻𝑜𝑢𝑟𝑠𝑃𝑒𝑟𝑖𝑜𝑑 𝐻𝑜𝑢𝑟𝑠Where;Available Hours are the sum of Unit Service Hours, Reserve Shutdown Hours andSynchronous Condensing Hours (if applicable); andPeriod Hours are the sum of Available Hours and Unavailable Hours (total of PlannedOutage Hours and Unplanned Outage Hours).While reviewing the quarterly reports submitted by public sector GENCOs for the FY 201617 and 2017-18, it has been observed that the Availability Factor of a number ofunits/machines of different power stations of GENCO-I, II & III remained lower than thatas worked out from their respective Power Purchase Agreements. The same arehighlighted in the tables given below;UnitPeriodTPS -182016-1742017-18GTPS 2016-1762017-182016-1772017-18Table 14.1 (GENCO I)Availability Factor (%)ActualAs per Performance Evaluation Report of Public Sector GENCOs1.2-30.9Page 25

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)UnitPeriodTable 14.2 (GENCO II)Availability Factor (%)ActualAs per PPAReduction123 7TPS

3.4 Reduction in Availability Factor 25 3.5 Net Capacity Factor 28 3.6 Net Output Factor 29 3.7 Energy Availability Factor 30 4 Annexures I Energy Loss and Financial Impact of Reduction in Net Capacity II Unused Energy Potential and Subsequent Energy Cost due to Availing Higher Outage Hours

Related Documents:

NEPRA Annual Educational Symposium 2017 November 8 – 10, 2017 Mohegan Sun Resort & Casino Uncasville, CT NEPRA.org Valet parking is free at the hotel entrance.

8. Brand Finance US 500 March 2017 Brand Finance US 500 March 2017 9. Rank 2017: 1 2016: 2 BV 2017: 109.5bn BV 2016: 88.2bn Brand Rating: AAA Rank 2017: 2 2016: 1 BV 2017: 107.1bn BV 2017: BV 2016: 145.9bn Brand Rating: AAA Rank 2017: 3 2016: 3 BV 2017: 106.4bn BV 2017: BV 2016: 69.6bn Brand Rating: AAA-Rank 2017: 4 2016: 6

8. Brand Finance Global 500 February 2017 Brand Finance Global 500 February 2017 9. Rank 2017: 1 2016: 2 BV 2017: 109,470m BV 2017: BV 2016: 88,173m Brand Rating: AAA Rank 2017: 2 2016: 1 BV 2017: 107,141m BV 2016: 145,918m Brand Rating: AAA Rank 2017: 3 2016: 3 BV 2017: 106,369m BV 2016: 69,642m Brand Rating: AAA-

uate the quality of grain damaged by rodents with respect to nutritional value, infection by moulds and aflatoxin contamination. 2 Materials and methods 2.1 Study area The study was conducted in Mwarakaya ward (03 49.17́'S; 039 41.498′E) located in Kilifi-south sub-county, in the low landtropical(LLT)zoneofKenya.Thisstudy site wasselect-

Nov 26, 2017 · Chemtrails, HAARP and The Full Spectrum Dominance of Planet Earth – Hosted By Bye Bye Blue Sky and Conspiracy Culture Bookstore Archives November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2

CAM cumul annuel mobile, soit une année complète (13 dernières périodes) CAD cumul à date, soit le cumul de l'année civile allant de P1 à la dernière période - 0.5 1.4 - 1.3 1.1 0.1 0.1 - 2.4 5.7 0.9 3.0 1.6 0.3 0.7 1.4 P10 2016 P11 2016 P12 2016 P13 2016 P01 2017 P02 2017 P03 2017 P04 2017 P05 2017 P06 2017 P07 2017 P08 2017 P09 .

Crédits reportés non-automatiquement de 2017 à 2018 en % des crédits finaux 0% L K/B Appropriations carried over from 2016 to 2017 Crédits reportés de 2016 à 2017 M Automatic carryovers from 2016 to 2017 Crédits reportés automatiquement de 2016 à 2017 680.987,59 N Payments against automatic carryovers from 2016 to 2017

Automotive EMC Introduction and Overview. 14. Automotive System RF Emissions Vehicle systems can be responsible for onboard noise generation as a byproduct of vehicle operation. In the automotive industry, this noise has been classified into two categories: – Broadband (typically due to electrical arcing) » Referred to as “Arc and Spark” noise. – Narrowband (typically due to .