Installation And Operational Qualification Protocol .

3y ago
206 Views
36 Downloads
97.06 KB
5 Pages
Last View : 1m ago
Last Download : 2m ago
Upload by : Troy Oden
Transcription

TEM-270Issue dateInstallation and Operational Qualification Protocol(Reference: SOP )Project NameProject NumberEquipmentSerial NumberManufacturerModel NumberProcess Line/LocationProtocol numberWRITTEN BY:REVIEWED BY:Name:PositionSignature:Date:APPROVAL TO EXECUTE:Name:Position:Signature:Date:PROTOCOL COMPLETION e objective of this protocol is to define the Installation Qualification (IQ) and OperationalQualification (OQ) requirements and acceptance criteria for the [insert system name and plantnumber] which will be located in the [insert area, packaging or manufacturing] at site [insert sitename]. IQ/OQ is required as [insert brief description as to why required, e.g. as it is newequipment.Successful completion of this protocol will provide a high degree of assurance that the equipmenthas been installed and operates in accordance with the site requirements, specifications andmanufacturers recommendations and is in compliance with cGMP and site policies.Page 1 of 18

TEM-270Issue dateInstallation and Operational Qualification Protocol(Reference: SOP )Appendix [Insert Appendix No]Test 001: Verification of Installed Equipment1. ObjectiveThe objective of this test is:1. To verify that equipment is uniquely identified and installed in accordance with site andmanufacturers’ recommendations2. To verify that equipment is scheduled for preventative maintenance3. To ensure that the equipment installed is documented for change control / revalidation purposes2. ProcedureInspect the installed equipment and record details of all major process equipment as required below.Verification of installed components may be achieved by visual inspection or approved documentation/ drawings. If a document or drawing is used it must be referenced.3. Acceptance CriteriaAll equipment must be uniquely identified and installed in accordance with site and manufacturers’recommendations. All major equipment items should be included for preventative maintenanceEquipment Description[Insert EquipmentName. If subsystems includeone row for eachsub system]InstalledInitial & DateManufacturerModelSerial numberPlant NoMaintenance log No[Insert EquipmentName. If subsystems includeone row for eachsub system]ManufacturerModelSerial numberPlant NoMaintenance log NoComments:All Acceptance Criteria Met (yes/no):Report all deviations/further actions in Appendix [insert Deviation appendix no]( Deviation ref )Page 5 of 18Reviewed By:Initial/DateDate:

TEM-270Issue dateInstallation and Operational Qualification Protocol(Reference: SOP )Appendix [Insert Appendix No]Test 005: Verification of Computer System Software1. ObjectiveThe objective of this test is:1. To verify that all computer system Operating Software and Application Software integrated withthe system is uniquely identified and installed in accordance with site and manufacturers’recommendations.2. To ensure that the software components of the installation are documented for changecontrol/re-validation purposes.2. ProcedureInspect the installed software and record details. Verification of installed components may beachieved by visual inspection or approved documentation / drawings. If a document or drawing isused it must be referenced.3. Acceptance Criteria1. All software must be uniquely identified and installed in accordance with site and manufacturers’recommendations.2. A backup copy of the software must be available.Software Description[Insert systemname]InstalledInitial & DateOperating Software nameOperating Software versionApplication Software nameApplication Software versionApplication Software DeveloperLocation of backupComments:All Acceptance Criteria Met (yes/no):Report all deviations/further actions in Appendix [insert Deviation appendix no]( Deviation ref )Page 9 of 18Reviewed By:Initial/DateDate:

TEM-270Issue dateInstallation and Operational Qualification Protocol(Reference: SOP )Appendix [Insert Appendix No]Test Ref: 010: Verification of Safety1. ObjectiveThe objective of this test is to verify that EHS are notified that qualification of the system is beingundertaken and a safety audit if required can be performed.2. ProcedureContact the EHS representative and determine if a safety audit is required prior to performing anyOQ testing If required enter the estimated completion date for the audit. It is the responsibility of EHSto complete this test and to ensure that the equipment is safe for operational qualification and for use.3. Acceptance CriteriaThe need for a safety audit has been established prior to OQ and if required a safety audit has beenconducted by EHS and the equipment is deemed suitable for routine use.Test#Test Procedure1Determine if asafety audit isrequired2Enter theestimatedcompletion datefor the safetyaudit if required3Document if thesystem isconsidered safefor operationalqualificationActualInitial & DateAudit required?Comments:All Acceptance Criteria Met (yes/no):Report all deviations/further actions in Appendix [insert Deviation appendix no]( Deviation ref )Page 14 of 18Reviewed By:Initial/DateDate:

TEM-270Issue dateInstallation and Operational Qualification Protocol(Reference: SOP )APPENDIX [Insert Appendix No] – DEVIATION LOG AND REPORTDEVIATION REPORT NO.:TEST SCRIPT / TEST PROCEDURE #:1.DEVIATION DESCRIPTION:Initial / icalDeviationCircleChangeRequiredYesChange #Deviation #COMMITMENT #RESOLUTION (attach any re-test results to this sheet):Resolution Completed & Deviation Resolved: (yes/no)3.NoInitial / DateJUSTIFICATION FOR ACCEPTANCE OF DEVIATION:Justification Completed & Deviation Accepted: (yes/no)Print/Type NameInitial / DateSignatureDateApproved By: (System Owner)Approved By: (Validation)Approved By: (QualityAssurance)Page 18 of 18

The objective of this protocol is to define the Installation Qualification (IQ) and Operational Qualification (OQ) requirements and acceptance criteria for the [insert system name and plant number] which will be located in the [insert area, packaging or manufacturing] at site [insert site name].

Related Documents:

PERFORMANCE QUALIFICATION PROTOCOL FOR CARTON PACKING MACHINE PROTOCOL No.: Prepares the performance qualification protocol. Ensures that the protocol is in compliance with current policies and procedures on system Qualification. Distributes the finalized protocol for review and approval signatures.

The installation qualification must be completed prior to execution of the operational qualification phase. Operational Qualification Operational qualification demonstrates that the installed equipment is functioning within established limits as specified by Helmer. The operational qualification must be completed prior to the execution of the .

INSTALLATION / OPERATIONAL QUALIFICATION PROTOCOL Rev. 04-05-2020 1/6 The following Installation Qualification (IQ) & Operation Qualification (OQ) is intended to be a guideline. Local IQ & OQ procedures can vary depending on intended use. The IQ & OQ is concluded if all the criteria of acceptance are verified and the possible deviations are .

OPERATIONAL QUALIFICATION PROTOCOL FOR AUTOMATIC HIGH SPEED LINEAR VIAL WASHING MACHINE-300 Protocol cum Report No.: Batch Size: Page No.: 3 of 19 SCHOLARS QUALITY DEPARTMENT Signing of this Operational Qualification Protocol indicates agreement with the Validation Master Plan approach of the equipment.

Operational qualification Operational qualification (OQ) 13. Operational qualification (OQ) should follow Installation qualification. 3.10 OQ normally follows IQ but depending on the complexity of the equipment it maybe performed as a combined Installation/Operation Qualification (IOQ). OQ could include but is not be limited to the following:

The Installation / Operational / Performance Qualification protocol is a comprehensive document, which will be used to guide the executants, in the verification of the proper installation and operation of the Reefer Truck ID located at Xxxx. 4 OBJECTIVE The purpose of this Installation / Operational / Performance Qualification is to:

BOTTLE PHARMA DEVILS INSTALLATION QUALIFICATION PROTOCOL CUM REPORT FOR WASHING MACHINE PROTOCOL No.: PROTOCOL CONTENTS S.No. TITLE PAGE No. 1.0 Protocol Pre-Approval 3 2.0 Objective 4 3.0 Scope 4 4.0 Responsibility 5 5.0 Equipment Details 6 6.0 System Description 7 7.0 Pre-Qualification Requirements 7 8.0 Critical Variables to be Met 8

OPERATIONAL QUALIFICATION PROTOCOL FOR AUTOMATIC VISUAL VIAL INSPECTION MACHINE Protocol cum Report No.: Batch Size: Page No.: 4 of 20 QUALITY DEPARTMENT 2.0 OBJECTIVE The objectives of this Operational Qualification (OQ) are as follows: To verify that the equipment operates in accordance with the design and user requirements as .