EAST LONDON MULTI-PURPOSE TERMINAL Document Title: SCOPE .

3y ago
19 Views
3 Downloads
591.84 KB
5 Pages
Last View : 1m ago
Last Download : 3m ago
Upload by : Vicente Bone
Transcription

EAST LONDON MULTI-PURPOSE TERMINALDocument Title:SCOPE OF WORKScope Of Work Title:The Repair of the Mobile Harbour Crane leaking Luffing CylinderTPT MHC luffing cylinder repair 1

1. BACKGROUNDEast London Transnet Port Terminals (TPT) has the Liebherr-550 Mobile HarbourCrane (MHC) that is used in handling various. The MHC has a hydraulic oil leakon the Luffing cylinder.The lifting capacity of the machine will be affected should we not attend to this.Secondly this poses an environmental impact with oil dropping uncontrollable.2. PURPOSERepair MHC leaking luffing cylinder.3. SCOPE OF WORK3.1. The scope will be in two options: Option 1 – repair of cylinder option 2 – replace cylinder with new.3.2. Removal and refitting of hydraulic cylinderThe appointed contractor will be responsible for: Safely removing the cylinder from the machine. Contractor must take in toconsideration OEM specifications of the machine so that the removal does notnegatively affect the machine.All tools and lifting equipment for the job.Removal of cylinder valve block.Containing oils to prevent environmental contamination.Once all the repairs are concluded on the cylinder the contractor will refit thecylinder to OEM specifications.All pins, bearings for the works must be catered for.3.3. Cylinder RepairsContractor will be responsible for the following: The contractor will be responsible for transporting the cylinder from TPT tocontractor’s premises.Drain hydraulic fluid and completely inspect the rod for more scarring whichare causing the seals failure.Remove all the nuts, snap-ring or other devices that holds the rod end inplace.TPT MHC luffing cylinder repair 2

Pull the rod completely out of the cylinder barrel to expose the piston and anyother attached components to remove all the seals and replacing them andany other components to be replaced.Repair the damages on the rod. Clean and inspect the inside of the cylinderbarrel, re-inspect the rod, piston and any other attaching parts.Install new seals on every applicable part to OEM specifications.Tighten the piston nut to its specified torque with a calibrated torque wrench.Reinstall all the parts back to the cylinder barrel and the cylinder.Carry out the Pressure test to OEM Specifications to ensure the safety,reliability, and leak tightness of the cylinder. Provide test certificate.OPTION 2 – REPLACEMENT Contractor will be responsible for removal and refitting cylinder as per item3.2.Supply new hydraulic cylinder as per OEM requirements.Carry out the Pressure test to OEM Specifications to ensure the safety,reliability, and leak tightness of the cylinder. Provide test certificateNOTE: For purposes of engaging the OEM for machine specific details usethe following:Name: LHM 550SERIAL Number: 1411844. SHE File RequirementsBelow are some of the documents that make up a SHE file:a) Risk Assessment and Control measures for the specific activities to beperformedb) Fall Protection Planc) Signed section 37(2) form (from TPT)-Contractor Appointmentd) Letter of Good Standing with Compensation Commissionere) List of PPE to be usedf) Registers – vehicles/machinery/tools/Safety Talksg) Team members’ medical certificates for the current financial year.h) Copies of Contractor SOP’s / Work Instructionsi) If Hot work to be done: Competence certificates for persons performingHot Workj) List of equipment / tools with valid log sheets.Before awarding a service provider is expected to submit a full SHE file to SHEQdepartment for approval.TPT MHC luffing cylinder repair 3

5. GENERAL Working hours will be allowed from 07h00 to 15h00 (Monday to Friday),the successful contractor based on the amount of work and resourcesmust determine own working hours needed to ensure all work iscompleted.All sandblasting should be done by suitably qualified artisans.All Scaffolding shall be erected by qualified, certified erecters andinspection certificate to be provided.Contractor shall practice good “housekeeping” and leave the site clean andtidy.When vacating the area the contractor will remove equipment and debrisfrom site. Anything damaged by the contractor will be the responsibility ofthe contractor to repair that area at their own cost.Electrical power point will be provided.Toilet facilities will be provided by East London MPT.All work to be carried out must adhere to OHS Act6. SAFETY RELATED ITEMS Safety of all electrical tools shall be checked and certified as per statutoryrequirement and certificates must be presented to TPT.Tenderer to provide inspection certificates of all lifting gear, equipment,scaffolding and rigging equipment as per statutory requirement andcertificates must be submitted with the Tender Document.Prior to start of work a comprehensive safety file needs to be submitted tothe TPT Safety, Health, Environmental and Quality (SHEQ) Department forapproval.As part of the safety file a comprehensive risk assessment and methodstatement must be included for approval.All workers must be qualified for their specific work- proof of qualificationmust be included in safety fileThe contractor must adhere to Transnet Lockout Procedure and otherrelevant safety rules.The contractor must ensure that all its personnel have all the necessaryprotective clothing whilst within and working in TPT premises.All personnel working in the TPT premises must undergo a completeinduction course with the SHEQ department before commencing with theproject on site.The contractor must ensure that they apply for a permit to work from TPTprior to commencement of works and for a hot work permit from TransnetNational Port Authority (TNPA) prior to commencing with any work thatmight institute a hazard or an explosion through SHEQ department.TPT MHC luffing cylinder repair 4

The contractor must ensure that all the necessary fire protection and aqualified fire fighter will be on site whilst carrying out such work. Onlyafter receiving permission in writing from TNPA can work commence.7. SCHEDULING OF THE WORKS: The Tenderer with his first-hand knowledge of contracts of this nature, hisown capabilities and the current activity in the engineering environment is togive a schedule time for execution of the works; Tenderers must note that other parts of the terminal will be operationalduring the execution of the works; and The successful contractor would be required to schedule his site work suchthat it does not interfere with the terminal’s operations or there is minimaldisturbance to operation.Signed:Name: Linamandla BusakweTitle: Technical Manager ELMPT2018-09-26Date:Sign:TPT MHC luffing cylinder repair 5

East London Transnet Port Terminals (TPT) has the Liebherr-550 Mobile Harbour Crane (MHC) that is used in handling various. The MHC has a hydraulic oil leak on the Luffing cylinder. The lifting capacity of the machine will be affected should we not attend to this. Secondly this poses an environmental impact with oil dropping uncontrollable. 2 .

Related Documents:

Table 2. Wiring terminal references for non-Excel 10/12 devices signal T7460A terminal T7460B terminal T7460C terminal Excel 800 XF82x terminal (example) Excel 500 XF52xB terminal (example) Excel 500 XFL52x terminal (example) Excel 100 terminal (example) Excel 50 terminal (example) Excel 20 terminal (example) CPO-FB22344R terminal (example)

APEX Virtual Terminal 3 Viewing Your Virtual Terminal in the Apex Portal To view your virtual terminal, select the Virtual Terminal menu option and select the My Terminal submenu. From the My Terminal page, you can process credit card and eCheck transactions for your customers. NOTE: My Terminal is a standard terminal that currently .

point terminal dundalk marine terminal fairfield auto terminal masonville marine terminal motiva terminal csxt coal pier seagirt marine terminal south locust point terminal tradepoint atlantic 10.4 milliion tons of general cargo were processed in 2020 1st among the nation’s ports for vo

Greater London is one of the nine regions of England; it comprises of the City of London and 32 London boroughs, of which 12 are Inner London and 20 Outer London. The 2011 census showed that the population of London was 8,174,000. Sample size The adult sample size for Taking Part 2016/17 in London region was 992 (national sample size 9,352).

the public schools of seekonk massachusetts classroom supply bid 2017-2018 description unit counts item# unit price total price 1 multi-purpose 8 1/2 x 11 paper white cs 1000 2 multi-purpose 11 x 17 paper white rm 30 3 multi-purpose 8 1/2 x 14 paper white rm 10 4 multi-purpose 8 1/2 x 11 paper yellow rm 50 5 multi-purpose 8 1/2 x 11 paper pink rm 40 6 multi-purpose 8 1/2 x 11

through terminal block. There is one terminal block per wire, resulting in two terminal blocks per signal loop. Three terminal blocks may be needed if the shield wire is also connected to a separate PE ground block. Other configurations use two or more circuits in one multi-level terminal block, and provide options that

janus et cie waterworks safavieh l e xin g t on a venu e t h ir d a venu e s e c on d a v e nu e east 55th street east 5th street east 5th street east 5th street east 59th street east th street east d street east d street east s t street tutenkian artisan carpets the catholic center of an a sa tvern

University of Cambridge International Examinations London GCE AS/A-Level / IGCSE / GCSE Edexcel International. 6 Examination Date in 2011 Cambridge IGCSE Oct/Nov X 9 Cambridge GCE / May/Jun 9 9 London GCE London GCSE May/Jun 9 X Chinese London IGCSE Jan X 9 Cambridge IGCSE / May/Jun 9 9 London IGCSE London GCE Jan 9 9 Cambridge GCE Oct/Nov X 9 Private Candidates School Candidates Exam Date. 7 .