Truck Manufacturing Advanced Ship Notice -- EDI-856 .

1y ago
22 Views
1 Downloads
224.08 KB
24 Pages
Last View : 5d ago
Last Download : 1m ago
Upload by : Francisco Tran
Transcription

International Truck and Engine CorporationTruck ManufacturingAdvanced Ship Notice -- EDI-856**Production Sequenced Parts**BUSINESS PROCESS GUIDEVersion 003050June 5, 2002Document Number:PUR-2049Revision:1.2Revision Date:Truck Business Process Guide for ASN-Production Sequenced PartsWritten by:Reviewed/ Approved by:Charlene McGill/Dan Walker/ Tim BentzJames BentzNovember 12, 2003This Document Applies to:X TruckEngineService PartsThis document is restricted and may not be sent outside International Truck and Engine Corporation or reproduced without permissionfrom International Truck and Engine Corporation. Suppliers are required to assume all patent liability. This document is controlledelectronically and all printed copies or copies otherwise saved from this location are considered uncontrolled.Copyright 2001 International Truck and Engine Corporation.

International Truck and Engine CorporationBusiness Process Guide – EDI 856 Ship NoticeSequence, ABR, Modules/KitsTable of Contents1.Transaction Definition.22.Business Procedure Overview.32.1.Frequency and Responsiveness.32.2.Availability.42.3.Off Hours .42.4.INTERNATIONAL Expectations of Supplier .42.5.Impact on INTERNATIONAL’s Receiving Process.42.6.Special Considerations for Sequenced Material .52.7.Special Identification for Returnable Containers and Repair Parts.62.8.Special Notes relative to Release 3050 .63.2.8.1. BSN Segment .62.8.2. DTM Header Segment.72.8.3. FOB Segment .72.8.4. N1 Header Segment .72.8.5. REF Header Segment .72.8.6. LIN Detail Segment.72.8.7. REF Detail Segment .82.8.8. General Notes.8EDI Transaction and Business Examples.94.Definition of Terms .235.INTERNATIONAL Specific Codes .236.Conformance Testing Procedures.23Advanced Ship Notice -- EDI-856Page i

International Truck and Engine CorporationBusiness Process Guide – EDI 856 Ship NoticeSequence, ABR, Modules/Kits3.Transaction DefinitionType:Regenerative with each messageFrequency:Variable -- Parameter ControlledEDI Transaction:ANSI-X12 / AIAG-856Application:The Advanced Ship Notice -- EDI-856 Transaction Set (Version 003050) must be sent by all suppliers toINTERNATIONAL prior to the physical receipt of the material at the manufacturing/assembly facility. The shipnotice must be representative of the supplier’s shipment, containing shipping information and materialcontents. This information must be communicated as soon as a shipment leaves the supplier’s location, or atan agreed upon time relative to close-proximity suppliers, as it will be used to facilitate the receiving process atINTERNATIONAL facilities as well as the subsequent generation of ERS Payment Process data submitted toKnoxville Accounting Center.Advanced Ship Notice -- EDI-856Page 2

International Truck and Engine CorporationBusiness Process Guide – EDI 856 Ship NoticeSequence, ABR, Modules/Kits4.Business Procedure OverviewThe Advanced Ship Notice -- EDI-856 (SN) will be used by the supplier to transmit Electronic Bill of Ladingand/or Packing Slip information pertaining to the Supplier’s shipment to INTERNATIONAL.There are three formats for the Ship Notices. The primary format is used for non-sequenced material or "simple" parts. The second format is an extension of the primary format, which contains Job related information forsequenced material. INTERNATIONAL has published an 856 Sequence Material Business ProcessGuide specifically addressing this process.It is available for download onwww.internationalsupplier.com. Only selected Suppliers will utilize this process upon notificationfrom INTERNATIONAL personnel. The third format addresses the business process for Remote Receiving, coined Circular ASN. ordownloadonwww.internationalsupplier.com. Only selected Suppliers will utilize this process upon notificationfrom INTERNATIONAL personnel. The use of the N1*PN segment is peculiar to the Remote Receivingprocess. Transmitting Remote Receiving ASN's for either the simple or sequenced processes couldresult in Invalid data populating INTERNATIONAL'S database that can neither be used in the Receivingprocess nor purged from our applications in a timely manner. The consequence could be 500 fornon-compliance of available ASN data at time of physical receipt of material.INTERNATIONAL utilizes three EDI transactions within our Receiving Process. These are termed theReceiving Suite and include the 824 Applications Advice, the 856 Ship Notice and the 861 Receipt Advice. Allthree transactions are mandatory and their guides are located on our website.INTERNATIONAL will also deliver theEDI-997 Acknowledgment Response to the supplier’s mailbox, usually within ½ hour, indicating thatINTERNATIONAL has received the supplier’s EDI transmission.INTERNATIONAL will communicate to the supplier via the EDI-824 Application Advice rejection and/oracceptance of the supplier’s Ship Notice. It is the responsibility of the supplier to receive the EDI-824 ApplicationAdvice in a timely manner which allows the supplier to identify, correct and resubmit any incorrect Ship Noticesprior to the physical receipt of the material at the INTERNATIONAL Facility.INTERNATIONAL personnel will validate the content of the load against the content of the Supplier's EDI-856 atthe time of physical receipt of material. If any discrepancies are noted, they will be posted during the ReceivingProcess and an 861 will be generated. The EDI-861 Receipt Advice will be transmitted in nightly batch.4.1.Frequency and ResponsivenessAn SN is to be sent by the supplier for each shipment of material to an INTERNATIONAL Assembly Plant. TheSN must be received and accepted without errors prior to the arrival of the shipment at INTERNATIONAL’s facility.Failure to comply may result in a penalty of 500 for each occurrence of non-compliance. It is imperative tounderstand that the ASN, while it facilitates INTERNATIONAL'S Receiving Process, will also provide the foundationfor generation of ERS Payment Records submitted to our Knoxville Accounting Center.Advanced Ship Notice -- EDI-856Page 3

International Truck and Engine CorporationBusiness Process Guide – EDI 856 Ship NoticeSequence, ABR, Modules/Kits4.2.AvailabilityINTERNATIONAL will process the Advanced Ship Notice -- EDI-856 transactions within 15 minutes of thesupplier placing the EDI transaction into his mailbox. INTERNATIONAL will generate and deliver theAcknowledgment response (EDI-997) and/or the Application Advice (EDI-824) during any of the following processwindows. These EDI transactions are usually delivered to the Supplier’s mailbox within 45 minutes of beingprocessed by INTERNATIONAL. INTERNATIONAL delivers the EDI messages every 30 minutes on the ½ hour andhour during the system window listed below.INTERNATIONAL EDI Transaction Processing WindowFromToMonday - All Times are for the Central Time Zone.Any EDI transactions submitted to INTERNATIONAL during a downtime will remain in INTERNATIONAL’s mailboxuntil the process is resumed. Any EDI-856 status messages generated outside of the processing windows will besuspended and delivered at the next available window.4.3.Off HoursFor Off Hours Support, INTERNATIONAL provides a voice mail system on the EDI Hot Line number and thesupplier’s Plant EDI Coordinator. Suppliers should leave a message indicating the problem and any relatedinformation available about the problem along with a contact and telephone number. The Supplier will becontacted during normal business hours, the morning following receipt of the message.Any EDI transactions that are sent to INTERNATIONAL by the supplier will be retained in INTERNATIONAL’smailbox until INTERNATIONAL’s system becomes available. Any EDI transactions that INTERNATIONAL has to deliverto the supplier will be retained and distributed as soon as INTERNATIONAL’s system becomes available.4.4.INTERNATIONAL Expectations of SupplierINTERNATIONAL expects the Supplier to provide an accurate Advanced Ship Notice -- EDI-856 with eachshipment prior to the material arriving at INTERNATIONAL’s location. For those instances where the Supplier’s SNis rejected by INTERNATIONAL, an 824 Applications Advice will be generated. It is expected that the Supplier willretrieve and process this transaction and submit a corrected SN, using the original unique shipment identificationnumbers as a complete replacement, prior to the material arriving at INTERNATIONAL’s location.If the Module Reference Number transmitted in the 856 does not pass the audits within INTERNATIONAL'Sreceiving process, an 824 will be generated. It is our expectation that the Supplier will retrieve this EDI message,correct the information and re-transmit the entire ASN using the same Bill of Lading.4.5.Impact on INTERNATIONAL’s Receiving ProcessFailure to submit an accurate Advanced Ship Notice -- EDI-856 prior to the material arriving atINTERNATIONAL’s location may result in a penalty of 500 for each occurrence of non-compliance. It is imperativeto understand that the ASN, while it facilitates the Receiving Process, will also provide the foundation forgeneration of ERS Payment Records submitted to our Knoxville Accounting Center. Additionally, the potentialexists for discrepancies between what was manually input vs. what should have been transmitted in the ShipNotice and could result in delayed payments or debit memos.Advanced Ship Notice -- EDI-856Page 4

International Truck and Engine CorporationBusiness Process Guide – EDI 856 Ship NoticeSequence, ABR, Modules/Kits4.6.Special Considerations for Sequenced MaterialMaterial that is shipped to an INTERNATIONAL Assembly Plant in Assembly Line Sequence must berepresented in the ASN with the associated Job of the component. Each sequenced component may consist ofone or more part numbers. Each sequenced part number must be associated with a valid Job Number as statedon the EDI-866 provided by INTERNATIONAL. Parts which have no Job Number associated with them will beconsidered non-sequenced production part numbers. Parts that are identified as Returnable Containers (RC) orRepair/Replacement Parts (RP) will not require Job Number associations.All sequenced part level detail contained in a Sequenced Ship Notice is evaluated against the EDI-866 thatINTERNATIONAL furnished the supplier to determine if all part numbers for the specific Job is being provided. Forinstance, if the EDI-866 indicated that Job Number 101010 needed 1 piece of part 1R1 and 1 piece of part 1R2,then both part numbers must be associated with Job Number 101010 on the Ship Notice.ABR (Attribute Based Release) Components must be managed in a sequence environment. ABR is aModule Assembly Process (expressed by a grouping of Feature Part Numbers) enabling INTERNATIONAL and oursuppliers to build, ship, receive, invoice, and control inventory at a specific job number level without theassignment of a top-level identifier within the Bill of Material. A feature could be a tangible component, or it could represent installations or a reference to a parts list. Features are grouped into categories where each category has one or more features (attributes/options)associated with it. Combining one feature from each category will create a compatible valid configuration. A unique identifier - such as the job number - is required and transmitted to facilitate control of theconfiguration for a given vehicle.o This unique identifier must be maintained in the system to be referenced for the life of thevehicle. A Module Reference Number, which can be treated as a unique identifier, will also be transmitted tofacilitate control of the configuration. This MRN must be transmitted to INTERNATIONAL in the EDI-856using the PU qualifier. Please see the examples below.ABR 866 PRODUCTION SEQUENCE DATA NOTES:1) Attribute Part Numbers are typically suffixed by "F91", "F92", "F93" and so on.2) Attribute Parts cannot stand alone as purchased finished commodities.3) ABR Commodities are not defined by top-level part numbers, but are grouped as a configuration specificto a job number.4) The Module Reference Number is not maintained in INTERNATIONAL's Bill of Material.5) The Module Reference Number is a system-generated number, unique to the grouping of attributes thatform a configuration specific to a Job Number.a) Any change to the attribute content of the specified job number will cause a new Module ReferenceNumber to be generated.b) Any change to the requirement quantity of a particular attribute, of a specified job number, will cause anew Module Reference Number to be generated.6) Suppliers shipping ABR commodities must transmit "Job Level" 856 ASN's.7) The Module Reference Number must be transmitted with applicable quantities referencing the specific JobNumber.a) INTERNATIONAL will explode the content of the Module Reference Number contained in the 856 data toascertain the attribute content specific to the job number.b) The attribute content will be aggregated and the Receipt Record will be used to create the ERSRecord forwarded to INTERNATIONAL FINANCE for the payment process.Advanced Ship Notice -- EDI-856Page 5

International Truck and Engine CorporationBusiness Process Guide – EDI 856 Ship NoticeSequence, ABR, Modules/Kits8) Suppliers shipping ABR commodities to the Escobedo Assembly Plant will be expected to utilize theModule Reference Number in their Customs Invoices to facilitate border-crossing processes.a) These Suppliers will be expected to transmit "Job Level" 856 ASN's.b) Suppliers must explode the content of the Module Reference Number to aggregate the attributeswithin their own applications to generate their Invoices.9) The human readable verbiage "ABR Assembly" contained on the ABR Part Label must be replaced withthe Module Reference Number.Modules or Kits are considered a configuration of an assembly comprised of discrete parts and/or subassemblies to reduce complexity on the assembly line. INTERNATIONAL will assign a Module Reference Numberfor each Job comprised of two or more discrete parts. This MRN must be transmitted to INTERNATIONAL in theEDI-856 using the PU qualifier. Please see the examples below.4.7.Special Identification for Returnable Containers and Repair PartsReturnable Container(s) must be included within a Ship Notice. Although a returnable container is not aproduction part it requires identification in order to properly account for the containers. In order to segregate areturnable container from production parts the RC qualifier must be used in association with the returnablecontainer part number. This is reflected within the example section of this document. 4.8.Repair/Replacement Parts must be included within a Ship Notice. Although these types of parts are notnormal production parts they require identification in order to properly account for them. In order tosegregate a Repair/Replacement Part from regular production part numbers the RP qualifier must beused in association with the respective part number.If the Repair/Replacement Part is a “NO CHARGE” item, the part number used to identify the part neednot be a INTERNATIONAL Part Number and there MUST NOT be a Purchase Order Number specificallyassociated with that part number. The PRF segment must not be transmitted; otherwise our applicationwill treat the part as regular production and reject the ASN.If the Repair/Replacement Part is a “SPECIAL ORDER” and “BILLABLE” then the part number used toidentify the part MUST be a INTERNATIONAL Part Number and there MUST be a valid INTERNATIONALPurchase Order Number specifically associated with that part number.Special Notes relative to Release 3050The following sections provide a short review of some items pertaining to INTERNATIONAL TRUCKMANUFACTURING'S use of Version 3050 of the EDI-8564.8.1. BSN SegmentWhile INTERNATIONAL'S Engine Divisions require the use of the BSN segment for shipmentidentification using the Bill of Lading number, Truck Manufacturing does NOT require it. For Truck,within the BSN segment, the Shipment Identification Number will not be required to be the Bill ofLading Number. However, this number must be a unique number that is not repeated within thecalendar year.The Bill of Lading Number is required as a REF Header Segment.Advanced Ship Notice -- EDI-856Page 6

International Truck and Engine CorporationBusiness Process Guide – EDI 856 Ship NoticeSequence, ABR, Modules/Kits4.8.2. DTM Header SegmentThe DTM*003 segment required for the Invoice Date and Time is not required.The DTM*011 segment for the Shipment Date and Time has been expanded to include a Time ZoneQualifier and a Century Number.4.8.3. FOB SegmentThe FOB Segment is required,indicating the type of shipment; CC -- Collect; PP -- Prepaid.4.8.4. N1 Header SegmentThe N1*RE segment indicating the "Remit To International Assigned Supplier Code forInvoice Submission" is not required.4.8.5. REF Header SegmentINTERNATIONAL'S Truck Manufacturing Divison use of the REF Header segments include moredata related to the identification of the shipment. The REF*BM segment which indicates the Bill of Lading Number of the shipment is aMANDATORY segment. Failure to submit this segment with the 3050 Release will result in therejection of the transaction and notification of the condition via the 824 Applications Advicetransaction from INTERNATIONAL. In that 824, a temporary BOL number will be identified that willbe derived from the Shipment Identification Number in the BSN segment.The additional new REF Header segments, although optional, are highly recommended (seeexamples provided).The REF*JA and REF*JE are specific reference segments to be used by suppliers providingsequenced material.4.8.6. LIN Detail Segment The Qualifier on the LIN Detail Segment has been expanded to includeRP as a Replacement/Repair Part.o If the Replacement/Repair Part is a Billable part then the associated part number MUSTbe a International Part and an associated PRF segment must be present contain

INTERNATIONAL will process the Advanced Ship Notice -- EDI-856 transactions within 15 minutes of the supplier placing the EDI transaction into his mailbox. INTERNATIONAL will generate and deliver the Acknowledgment response (EDI-997) and/or the Application Advice (EDI-824) during any of the following process windows.

Related Documents:

bike tractor school bus boat train car digger dump truck van fire truck police car sailboat scooter city bus tow truck road roller crane. Vehicle Bingo Free theautismhelper.com pickup truck cruise ship mail truck jeep taxi bike motorcycle spaceship school bus boat train ambulance garbage truck car airplane dump truck van fire truck sailboat scooter

Car Carrier with Hydraulic Winch 10% Ready Mix Concrete Truck 30% Spray Truck 15% Carpet Cleaning Van 15% Refrigeration Truck 15% Super Sucker Truck 90% Digger-Derrick Truck 20% Salt Spreader/Dump Truck with Spreader 15% Sweeper Truck 20% Dump Truck 23% Sanitation Dump Trailer 15% Tank Transport 15% Fire Truck

For example, a dump truck, a roll off truck, a flatbed truck or a box truck. Another term used to describe this type of vehicle is “straight truck.” What is a “truck”? A truck is generally defined as any self-propelled commercial motor vehicle. However, a truck tractor is designed and/or

MAN Truck & Bus MAN 324 Typ Si-OAT Dec-11 Mercedes Benz Truck & Bus MB-Approval 325.0 Sep-11 Mercedes Benz Truck & Bus MB-Approval 325.3 Mercedes Benz Truck & Bus MB-Approval 326.3 Mercedes Benz Truck & Bus MB-Approval 325.5 Oct-11 RENAULT Truck SCANIA SETRA MB-Approval 325.0 SETRA MB-Approval 325.5 VOLVO Truck 2005 Volvo Truck 2006 On Highway

1The data reflect the total commercial truck fleet including trucks with 5-axles or more, but excludes personal trucks. ES-4 Tank truck, liquids or gas Other (includes platforms with devices permanently mounted, beverage truck, utility truck, winch or crane truck, wrecker, service truck, yard tractor, oil

Apr 01, 2008 · Ship Notice/Manifest - 856 856 Ship Notice/Manifest Functional Group SH This Draft Standard for Trial Use contains the format and establishes the data contents of the Ship Notice/Manifest Transaction Set (856) for use within the context of an Electronic Data Int

EDI 856 Advanced Ship Notice/Manifest Electronic Data Interchange Guidelines EDI Contact Information: E-mail: [email protected] Fax: (417) 873-5299 EDI Technical Information: Current Documents: 810 Invoice 850 Purchase Order 856 Ship Notice/Manifest 997 Functional Ac

Structural design of a container ship approximately 3100 TEU according to the concept of general ship design B-178 By Wafaa Souadji The initial design stage is crucial for the ship design, including the ship structural design, as the decisions are here taken fundamental to reach design objectives by establishing basic ship characteristics.Author: Wafaa SouadjiPublish Year: 2012

Design-to-Build – A vessel acquisition program in which the vessel design is developed by the shipbuilder for construction in its facilities . Design & Build 1 Design & Build 2 Build to Print Ship 1 . Ship 2 . Ship 1 . Ship 2 . Ship 1 . More design and planning achieved by SOC Fewer changes during construction

SERVICE MANUAL SERVICE MANUAL SECTION 3200, 4200, 4300, 4400, 7300, 7400, 7500, 7600, 8500, 8600 SERIES Built After September 15, 2003 — ELECTRICAL CIRCUIT DIAGRAMS Truck Model: 3200 Start Date: 03/01/2002 Truck Model: 4200 Start Date: 10/01/2002 Truck Mode l: 4300 Start Date: 10/01/2002 Truck Model: 4400 Start Date: 10/01/2002 Truck Model: 7300

Pickup truck --ton Pickup truck -- 6-passenger Dump truck -- 25,000 GVW Dump truck -- 32,000 GVW Farm tractor -- with sickle bar Farm tractor with 15' rotary Utility backhoe--buckets Service truck --ton 1 3 3 1 3 1 2 09 Truck tractor diesel 10 Farm tractor -- with power broom 1 11 Gradall 1

ndCommand requested a 2 ndAlarm at 1944 hours. Truck 2 responded on the 2 Alarm at 1945 hours. Truck 2 arrived on-scene at 1945 hours. A fire fighter from Truck 2 went to the roof of the fire building with Truck 10 to ventilate the roof. After the roof was vented, the fire fighters from Truck 2 and Truck 10 came off the roof.

Advanced Manufacturing is the combination of information, technology and people, to add value to a manufacturing business or sector.Closely related to ideas such as Smart Manufacturing, Industry 4.0, and Industrial Digitalisation, Advanced Manufacturing builds on the agile, flexible and computer integrated manufacturing of the last 20 years.

EDI 856 Implementation Guide, version 4010 Document Status Document Number KB toys 856 4010 IG 2_4 Version 2.4 File Name Advance Ship Notice 856 – EDI Implementation Guide Issue Date May 21, 2003 Owner Cathy Covell Description An EDI Implementation Guide for KB toys Advance Ship Notice. Document Revision History

Case Pack UPC’s – Please note that if Nordstrom sends your company a case pack UPC (unit of measure of ‘CA’ in PO103), we require the 856 back at the individual component level (an individual UPC for each item). ASN Requirements – Advance Ship Notice Compliance Non-compliance of the ASN guidelines here may result in expense offset fees.

EDI 856 Advance Ship Notice Best Practices and Common Errors 1 October/2020 856 Advance Ship Notice Best Practices and Common Errors The 856 ASN tells us: when the order will be shipped, which items are being shipped, how much of each item

Nov 18, 2015 · 856 Ship Notice/Manifest 4010 Segment: BSN Beginning Segment for Ship Notice Position: 020 Loop: Level: Heading X12 Usage: Mandatory Sanmina Usage: Mandatory Max Use: 1 Purpose: To transmit identifying numbers, dates and other basic data relating to the transaction set. Syntax Notes: Semantic Not

Manning and Automation Model for Naval Ship Analysis and Optimization ABSTRACT The manning of a ship is a major driver of total ownership cost. The Government Accounting Office (GAO) states that “the cost of the ship’s crew is the largest expense incurred over the ship’s lifetime” [1]. This cost is largely

Each ship acts in initiative order, with the check applying to all turns of the combat. The Basics of Ship Movement The number of hexes per turn a ship can move works as pool of points—termed move action points—which are spent to move hexes on the combat map. Table 6: “Boats and Ships” lists the speed for each type of ship.

ASTM D2996 or ASTM D2997 ASTM D2996 or ASTM D2997 (1) No hydrostatic test required (2) Dimensional tolerances only Unless otherwise tested and approved by the Department, only use encasement pipe or uncased carrier pipe material that is new and has smooth interior and exterior walls. When the Plans show that the casing is to be used as a drainage carrier pipe, extend the casing the entire .