CooperativeENERG ) 268-2083-FILEDAugust 19, 2019Via U.S. Mail and E-mailAU6 2 0 2019Ms. Katherine CollierExecutive SecretaryMississippi Public Service Commission501 North West Street, Suite 201AJackson, MS 39201MISS. PUBLIC SERVICECOMWSSIONIN RE: JOINT PETITION OF COOPERATIVE ENERGY AND DELTA ELECTRICPOWER ASSOCIATION FOR CERTIFICATE OF PUBLIC CONVENIENCEAND NECESSITYAUTHORIZING THEM TO ACQUIRE, CONSTRUCT,OWN AND OPERATE ELECTRICAL TRANSMISSIONLINE, SWITCHINGSTATION AND SUBSTATIONFACILITIES IN LEFLORE ANDSUNFLOWER COUNTIES,MISSISSIPPI(HALF MILE)Dear Katherine,On behalf of Cooperative Energy and Delta Electric Power Association, I haveenclosed herein the original and twelve (12) copies of the Joint Petition for a Certificate ofPublic Convenience and Necessity to authorize the Petitioners to acquire the necessary sitesand rights-of-way to construct, maintain and operate two (2) transmission lines andswitching station in Leflore and Sunflower Counties, as well as for the construction of asubstation facility in Leflore County, Mississippi. Thank you for your assistance in thismatter, and please let me know if you have any questions or concerns.Sincerely yours,Stephen.JacksonDirector of Legal AffairsSBJ:sEnclosuresCc:Frank F. Farmer, Esq. (via e-mail)Chad Reynolds, Esq. (via e-mail)Virden Jones (via e-mail)Jeremy C. Vanderloo, Esq.**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

BEFORE THE PUBLIC SERVICE COMMISSIONOF THE STATE OF MISSISSIPPIsCOOPERATIVE ENERGYEA-123-0750-00.9IÛDOCKET NUMBER:DELTA ELECTRIC POWER ASSOCIATIONEA-103-0048-00IN RE:JOINT PETITION OF COOPERATIVE ENERGY AND DELTAELECTRIC POWER ASSOCIATION FOR CERTIFICATE OF PUBLICCONVENIENCEAND NECESSITY AUTHORIZING THEM TOACQUIRE, CONSTRUCT, OWN AND OPERATE ELECTRICALTRANSMISSIONLINE, SWITCHING STATION AND SUBSTATIONFACILITIES IN LEFLORE AND SUNFLOWER COUNTIES,MISSISSIPPI(HALF MILE)JOINT PETITION OF COOPERATIVE ENERGY AND DELTA ELECTRIC POWERFOR CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITYCOMES NOW Cooperative Energy,aMississippi electric cooperative (hereinafter"Cooperative Energy") and Delta Electric Power Association (hereinafter "Delta"), hereinafterreferred toas"the Petitioners", and files this, their Joint Petition foraCertificate Of PublicConvenience And Necessity authorizing Petitioners to acquire the necessary sites andrights-of-way, for Cooperative Energy to construct, maintain and operate two (2) 115 kV electrictransmission lines and switching station in Leflore and Sunflower Counties, Mississippi, and forDelta to construct, maintain and operateMississippi,as seta115:13.2 kV substationforth herein, together with all necessary switches, buses and related equipmentand facilities, and in support thereof, would show the1.facility in Leflore County,following:Petitioners are electric power associations, duly chartered, organized, existing andoperating under and pursuant to the Electric Power Association Law,1**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **§77-5-201,et.seq., of the

Mississippi Code of 1972, Annotated, and are public utilities under the terms and provisions ofChapter 372, Mississippi Code of 1956 (§ 77-3-1), et. seq., Volume 17, Mississippi Code of 1972,Annotated, hereinafter referred tothe "Act".Petitioner Cooperative Energy2.defined inas§is ageneration and transmission cooperativeas77-5-256 and is engaged in the generation and transmission of electric energy to serveits eleven member electric power associations operating in 55 counties in Mississippi, i.e.,Southern Pine Electric, Coast Electric Power Association, Pearl RiverValley Electric PowerAssociation, Dixie Electric Power Association, Magnolia Electric Power Association, Pearl RiverValley Electric Power Association, Singing River Electric Cooperative, Twin County ElectricPower Association, YazooValley Electric Power Association, Delta Electric Power Association,and Coahoma Electric Power Association. Petitioner Delta is a publicand is engaged in thedistribution of electric energy toutility as defined in the Actserve its memberslocated in the followingMississippi counties: Attala, Bolivar, Carroll, Choctaw, Grenada, Holmes, Humphreys, Leflore,Montgomery, Sunflower, Tallahatchie, Washington and Webster.3.In order for Petitioners to improve reliability and quality of power in the areashereinafter referred to, and to enable them to maintain adequate voltage levels and increaseddemand capabilities on Delta's entire electric distribution system so that it may be able to renderan adequate andreliable supply of energy to all of its members, itacquire the necessary sites andisnecessary that Petitionersrights-of-way,throughappropriate means, including, if necessary,eminent domain, and to construct, own, operate and maintain the electric transmission lines,switching station, and substation facilities allashereinafter more specifically described.2**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

Petitioner Cooperative Energy seeks authority to acquire, construct, own, operate4.and maintain two (2) 115 kV electric transmission lines and a switching station as an addition toCooperative Energy's present system in Leflore and Sunflower Counties, Mississippi. Petitionerauthorityto acquire, construct, own, operate and maintain a 115:13.2 kV substationasaddition to Delta's present system in Leflore County, Mississippi. Petitioners have attachedasDeltaanseeksExhibit "C",aproject location map, identifying the 115 kV electric transmission lines, switchingstation ("Itta Bena Switching Station"), and 115:13.2 kV substation facility ("Half MileSubstation") proposed to be acquired, built, owned, operated and maintained by Petitioners in saidcounty, said Exhibit "C" consisting ofmap of a portion of Leflore and Sunflower Counties,aMississippi. Schematic drawings of the substation and switching station facilities are attachedasExhibits "D-1" and "D-2", respectively.5.The facilities for which Petitioners seek a Certificate of Public Convenience andNecessity to acquire, construct, own, operate and maintain in Leflore and Sunflower Counties,Mississippi, are more particularly describeda.COOPERATIVEasfollows:ENERGY115kV TRANSMISSION LINE(L621EVANS TO HALF MILE 115KV LINE): Approximately6.5 miles of 115 kV transmissionline and two (2) 3-way GOAB switches will be required between Delta's existing EvansSubstation and Delta's proposed115:13.2kV Half Mile Substation.The proposedtransmission line begins in the Southwest ¼ of the Southwest ¼ of Section 14, Township20North, Range3West in Sunflower County, Mississippi at Delta's existing EvansSubstation, then runs generally South approximately 0.25 miles, then runs generally Eastfor approximately 1.0 mile, then runs generally South approximately 2.0 miles, then3**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

meanders generally East approximately 3.1 miles to Delta's proposed Half Mile Substationin the Southeast ¼ of the Southwest ¼ of Section 28, Township 20 North, Range2West,in Leflore County, Mississippi.Said 3-way GOAB switch facilities are to be constructed with three (3) 3-way fullload break switches, mounted onasingle concrete or steel pole with three (3) motoroperators and all necessary communication and related equipment, one (1) at the existingDelta Evans Substation and one (1) at the proposed Delta Half Mile 115:13.2 kVSubstation.isThe estimate cost of the 115kV transmission line and 3-way GOAB switchesapproximately 3,380,000.Said transmission line facilities are to be constructed of three (3) 795 kemil ACSRconductors per circuit with 0.583" optical ground wire (OPGW),pole construction onautilizingconcreteorsteelright-of-way one hundred (100) feet in width, together with the rightto remove all danger trees on lands adjacent to said one hundred (100) foot wideright-of-way, any part of which would, in falling toward said electric transmission line strike anystructure, or any conductor of said line, or comestructure thereof: together with theright to construct any necessary switches, buses, andrelated equipment and facilities on the existingb.within five (5) feet of any conductor ororproposed transmission right-of-way.COOPERATIVE ENERGY 115 kV TRANSMISSION LINE (L620 HALFMILE TO ITTA BENA 115KV LINE): Approximately 10.5 miles of 115 kV transmissionline will be required between Cooperative Energy's proposed 115 kV 3-way GOAB switchto be located at Delta's proposed Half Mile 115:13.2 kV Substation and CooperativeEnergy's proposed new Itta Bena 115 kV Switching Station. The proposed transmission4**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

line begins in the Southeast ¼ of the Southwest ¼ of Section 28, Township 20 North, Range2West, in Leflore County, Mississippi at Delta's proposed Half Mile 115:13.2 kVsubstation, then runs generally South approximately 1.25 miles, then runs generally Eastfor approximately 2.0 miles, then runs generally South approximately 3.1 miles, thengenerally East approximately 0.5 miles, then generally South approximately 1.2 miles, thengenerally East approximately 2.3 miles to Cooperative Energy's proposed new Itta Bena115kV Switching Station located in the Northeast ¼ of the Northwest ¼ of Section 29,Township19North, Range1West, in Leflore County, Mississippi. The estimate cost ofthe 115kV transmission line is approximately 5,460,000.Said transmission line facilities are to be constructed of three (3) 795 kemil ACSRconductors per circuit with 0.583" optical ground wire (OPGW),pole construction onautilizingconcreteorsteelright-of-way one hundred (100) feet in width, together with the rightto remove all danger trees on lands adjacent to said one hundred (100) foot wideright-of-way, any part of which would, in falling toward said electric transmission line strike anystructure, or any conductor of said line, or come within five (5) feet of any conductor orstructure thereof: together with theright to construct any necessary switches, buses, andrelated equipment and facilities on the existing or proposed transmission 5kVSWITCHINGTo accommodate Delta's proposed 115:13.2 kV Half Mile Substation, it isnecessary for Cooperative Energy to rebuild its existing 115 kV Itta Bena switchingstation.The proposed new115kV switching station will consist of four (4) lineterminations. The station will be constructed usinga5**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **lattice steel structures and have four

circuit breakers with protective relay systems and communications(4) 115 kV gassystems. This proposed new Itta Bena Switching Station will be located adjacent to theexisting Itta Bena 115 kV switching station on MS HWYthe south side of the town7 onof Itta Bena and located in the Northeast ¼ of the Northwest ¼ of Section 29, Township19North, Range1West, in Leflore County, Mississippi.The existing switching stationwill be retired and demolished when the proposed facilityisplaced in service.Theestimated cost of the switching station is approximately 2,290,000.DELTA ELECTRIC POWER ASSOCIATION HALF MILE 115:13.2 KVd.SUBSTATION: The Half Mile Substation will beutilize one (1) 18/24/30 MVA transformer.with aluminum tube busonproposed substation will bea115:13.2 kV substation designed toThe substation will be a lattice steel structurethe high-side and aluminum angle bus on the low-side. Thebuilton anapproximately 4.0-acre site. The siteislocated onCounty Road 538 near the Half Mile communityin the Southeast ¼ of the Southwest ¼ ofSection 28, Township 20North, Range2West, in Leflore County, Mississippi. Theestimated cost of the Half Mile Substation is 3,100,000.The design of said facilities described in Paragraphs a., b., c., and d. above shall commenceimmediately, and itisanticipated that construction shall commencefrom the date of granting of6.awithin twelve (12) monthsCertificate by the Commission for said purpose.The purpose of the above described electric transmission line, switching station,and substation facilities is to provide sufficient capacity and improvereliability and quality ofservice in the Leflore and Sunflower County areas. The substation allows Delta to providesufficient capacity that will relieve load growth, and improve reliabilityand quality of service to6**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

existing residential, industrial, and agriculturalconsumers in and around the West Leflore Countyarea.7.Petitioners aver that said electric transmissionline, switching station, andsubstation facilities above referred to shall be located substantially as set forth in the applicationand as shown on Exhibit "C" hereto, the final location thereof being dependent upon terrain,accessibility, right-of-way acquisition, and engineering feasibility.8.Attached to the PetitionasExhibit "A-1"isthe prefiled Direct Testimony ofChristopher Roberts, P.E. of Cooperative Energy. Mr. Roberts describes the electric transmissionlines and switching station additions and describes the overall benefits derived from thetransmission facilities and 115kV switching station additions. Attached to the Petition as Exhibit"A-2"isthe prefiled Direct Testimony of Harold Pittman, P.E.of Delta Electric PowerAssociation. Mr. Pittman describes the 115:13.2 kV substation facility and describes the overallbenefits derived from the substation.9.Pursuant to the requirements of Appendix"A",Schedule 3, of the PublicUtilityRules of Practice and Procedure ("Procedural Rules"), Petitioners attach, incorporate by reference,or seek particularly-specifieda.Commission disposition with respect to the followingitems:(Appendix "A", Schedule 3, Item 1). A copy of the Charter of Incorporationof Cooperative Energyreference.isonfile with the Commissionand incorporated herein byA copy of the Charter of Incorporation of Delta,Certificate of Amendment of the Certificate of Incorporation,hereto as Exhibit "I".7**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **wellasisas acopy of thecollectively attached

b.(Appendix "A", Schedule 3, Item 2).and addresses ofThe namesCooperative Energy's Board of Directors and officers are attached here toasExhibit "B-1". The names and addresses of Delta's Board of Directors and officers are attached heretoasExhibit "B-2".c.(Appendix "A", Schedule 3, Item 3). A project location map of Leflore andSunflower Counties, Mississippi, showing the general location of the electric transmissionlines, switching station, and substation facilities is attached hereto as Exhibit "C".schematic drawing of the proposed electric substationisAfacility and switching station facilityattached as Exhibit "Dl" and "D2".d.(Appendix "A", Schedule 3, Item 4).Forageneral description of theelectric transmission line, switching station and substation facilities,seeParagraph5above, and the Direct Testimony of Christopher Roberts and Harold Pittman, attached asExhibits "A-1" and "A-2".e.(Appendix "A", Schedule 3, Item 5). None.f.(Appendix "A" Schedule 3, Item 6). The estimated cost of the proposedelectric transmissioli, switching station, and substation facilitiesis setout in Paragraph5above. Petitioners will each fund their respective portion ofthe project using a combinationof general funds, unsecured short-term lines of credit and/or long-term borrowing obtainedfrom the private debt capital markets, the National Rural Utilities Cooperative FinanceCorporation, CoBank and/or the Rural Utilities Service.g.(Appendix "A", Schedule 3, Item 7). With respect to filing a complete setof plans and specifications, see Paragraph10below. The Direct Testimony of Christopher8**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

Roberts and Harold Pittman contain general equipment specifications. See also Paragraph5and Exhibits "Dl"and "D2".h.(Appendix "A", Schedule 3, Item 8). Not applicable.i.(Appendix "A", Schedule 3, Item 9). An Exhibit listing the names andaddresses of all "interested persons" as defined in RP 2.115, together with a Certificate thatPetitioners have servedanotice of the filing upon each are attached heretoasExhibits "E"and "F".j.(Appendix "A", Schedule 3, Item 10). A copy of the testimony to be reliedupon at the hearing is attachedk.asExhibit "A-1" and "A-2".(Appendix "A", Schedule 3, Item 11). A copy of the current balance sheetand income statement of Cooperative Energy are attachedcollectively as Exhibit "G". Acopy of the balance sheet and income statement of Delta is attachedcollectively as Exhibit"H".10.Pursuant to RP 1.102, Petitioners hereby move for and request a waiver of therequirement of Appendix "A", Schedule 3, Item 7, of the Procedural Rules to allow Petitioners tonot file with this Joint Petition a complete set of engineering plans and specifications for theelectric transmission line, switching station, and substation facilities proposed herein. Uponrequest, Petitioners will make such complete set of engineering plans and specification availableto the MPUS for its review when such plans and specifications are completed and therebyavailable. Complete engineering plans and specifications do not exist; therefore, requiring such tobe filed with this Joint Petition would be unreasonably burdensome and impractical.9**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

To the extent,11.if any, that this Joint Petition does not meet all of the technicalrequirements of the Commission's Procedural Rules, petitioners herebyrespectfully move andrequest, pursuant to RP 1.102, that noncompliance be waived by the Commission as not material.Petitioners therefore aver that the transmission12.line, switching station, andsubstation facilities above described are needed and required in order for Delta to have the requiredsupply of power to serve the present and immediately foreseeable requirements of its memberswithin its certificatedprovideaareain Leflore and Sunflower Counties and for Cooperative Energy toreliable source of power from its transmission system to the new Delta delivery point.That in order for the Petitioners to be able to adequately serve the electric requirements of itsmembers, it is necessary and urgent that Petitioners be granted a certificate of public convenienceand necessity, authorizing them to acquire the electric transmission line, switching station, andsubstation facilities sitesincluding any necessary rights of way, to construct, own, operate andmaintain the electrical transmissionappurtenant equipment, allasline, switching station, and substation facilities, andhereinabove more specifically described, all of the same beingnecessary in order that Petitioners shall be able to provide efficient and reliable electric service toits members.13.CommissionThe public convenienceand necessityrequiresand willrequire that thegrant and issue unto Petitioners a certificate of public convenience and necessityauthorizing them to do and perform the things hereinabove fully set forth, because of the need ofPetitioner's members ofa moresubstantial, reliable and adequate supply of power.10**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

None of the facilities for the construction and operation of which14.sought herein will duplicate any similar facilities of any other publicautility. Nor willcertificateisthe operationthereof duplicate or interfere with the operation or services of any other public utility.Petitioners15.areready,willingand able to own, construct,install, operate, andmaintain the electric transmission line, line adjustments, bay and breaker addition and substationfacilities that are the subject of this Joint Petition. The public convenience and necessity requireand will require the issuance by the Commission of a certificate of public convenience andnecessity authorizing the acquisition of the necessary sites andrights-of-way for the ownership,construction, installation, operation, and maintenance of said electric transmission line, switchingstation and substation facilities allasfully setout in this Joint Petition.WHEREFORE, PREMISES CONSIDERED, Cooperative Energy and Delta ElectricPower Association pray that the Commission will set the matter for hearing at the earliest dateavailable; and Petitioners further pray that the Commission shall grantrequirements described in Paragraph 10 above and any otherawaiver from the filingfiling requirementsdescribed inParagraph 11 above and that process be issued by this Commission in the manner provided by lawandby Procedural Rules giving reasonable notice of the hearing hereof to all interested and otherpersons as in the Commission'sjudgmentmay be necessary, including the time and place of suchhearing and the purpose thereof.Petitioners further pray that, uponPetitionersaahearing hereof, the Commission shall grant unto thecertificate that the public convenience and necessity require and will require theownership, construction, installation, operation and maintenance of the electric transmission line,11**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **

sites, orswitching station, and substation facilities including the right to acquire any necessaryrights of way all as particularly described, set out, and petitioned for herein.The Petitioners pray for such other,further, and general reliefbeneficial, or needed.COOPERATIVE ENERGYDELTA El ECTRIC POWER ASSOCIATIONBY:STENJA KSTEPHEN B. JACKSON (MB # 10693)Cooperative EnergyPost Office Box 15849Hattiesburg, Mississippi 39404-5849Telephone: (601) 261-2334Facsimile: (601) 261-2374sjackson@cooperativeenergy.com12**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **asmay be required,

AFFIDAVITSTATE OF MISSISSIPPICOUNTY OF FORRESTjurisdictionPERSONALLY appeared before me, the undersigned authority in and for theaforesaid, Stephen B. Jackson, who, being by me firstduly sworn, deposed and said that he is thePetitioners in the aboveAttorney for Cooperative Energy and Delta Electric Power Association,thisand foregoing Joint Petition, and as such is authorized to makeand things setforth in the foregoing Motion are true and correctasAffidavit; and that themattertherein stated to the best of hisknowledge, information and belief.B. JACKSON, Attorney forSTEPHCooperative Energy and Delta Electric Power AssociationSWORN TO AND SUßSim.·:My commissionexpireb:iiNOTARY PUBUCONo.47400commission 6BEFORE ME on this theg)TARY PUBLIC,¡jj.!13**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **day of August, 2019.

CERTIFICATE OF SERVICEDelta Electric Power in theI, Stephen B. Jackson, counsel for Cooperative Energy andPublicand Delta Electric Power Association for Certificate ofJoint Petition of Cooperative EneravPublic Service CommissionConvenience and Necessity (the "Petition") filed with the Mississippithat in compliance with RP 6 of the(the "Commission") of even date herewith do hereby certify"Rules"):Commission's Public Utilities Rules of Practice and Procedure (theAn original and twelve (12) copies of the Petition(1)same to:have been filed with the Commission by delivery of thewith all exhibits attached heretoMs. Katherine Collier, Executive SecretaryMississippi Public Service Commission501 North West Street, Suite 201AJackson, MS 39201(2)theCommission via e-mail toAn electronic copy of the filing has been filed with thefollowingaddress:Efile.psc@psc.state.ms.uswith all otherCooperative Energy and Delta Electric Power has complied(3)Procedure of Mississippi Public Servicerequirements of the Public Utilities Rules of Practice andCommission and Public Utilities Staff.THIS, theday of August, 2019.STEPH.STEPHEN B. JACKSON (MB # 10693)Cooperative EnergyPost Office Box 15849Hattiesburg, Mississippi 39404-5849Telephone: (601) 261-2334Facsimile: (601) 261-2374sjackson@cooperativeenergy.com14**MSPSC Electronic Copy ** 2019-UA-129 Filed on 08/20/2019 **JACKSON

Valley Electric Power Association, Singing River Electric Cooperative, Twin County Electric Power Association, Yazoo ValleyElectric Power Association, Delta Electric Power Association, and Coahoma Electric Power Association. P

Related Documents:

This newsletter is sponsored by Cooperative Network and the Senior Cooperative Foundation. SCF SENIOR COOPERATIVE FOUNDATION Prepared quarterly by Cooperative Network's Senior Cooperative Housing Council and distributed via U.S. mail and email as a service to member housing cooperatives. Cooperative Network 145 University Ave. W., Suite 450

cooperative. On January 21, 1999, the PCC and HSCC completed an inter-cooperative agreement to facilitate efficient management and accurate accounting between the two cooperatives. The agreement, “Cooperative Agreement Between Offshore Pollock Catchers’ Cooperative and Pollock Conservation Cooperative” remains

B. Susie Craig, Washington State University Cooperative Extension Karen Dickrell, University of Wisconsin Cooperative Extension Caitlin Huth, University of Illinois Cooperative Extension Lila Karki, Tuskegee University Cooperative Extension Service Phyllis Lewis, university of Wyoming Cooperative Extension Service

The Cooperative State-County-Landowner Lymantria dispar Suppression Program . Upshur, Webster, Wetzel, Wirt, Wood and Wyoming Counties. WHAT IS THE . Lymantria dispar . COOPERATIVE SUPPRESSION PROGRAM? It is a cooperative regional suppression program between landowners, the West Virginia Department . University (WVU) Cooperative Extension .

Peak Steam Electric Station,) Units 1 and 2]) REPORT OF SOUTH TEXAS ELECTRIC COOPERATIVE, INC. AND MEDINA ELECTRIC COOPERATIVE, INC. ON THE STATUS OF SETTLEMENT DISCUSSIONS In accordance with the Board's order of May 13, 1980, South Texas Electric Cooperative, Inc. and Medina Electric Cooperative

gass, and water6 public utilities (Utilities) in the State of Arkansas shall suspend :i Ark. Code Ann. § 23-2-3oi. 4 Arkansas Electric Cooperative Corporation, Arkansas Valley Electric Cooperative Corporation, Ashley Chicot Electric Cooperative, Inc., C & L Electric Cooperative Corporation, Carroll Electric Cooperative

gass, and water6 public utilities (Utilities) in the State of Arkansas shall suspend :i Ark. Code Ann. § 23-2-3oi. 4 Arkansas Electric Cooperative Corporation, Arkansas Valley Electric Cooperative Corporation, Ashley Chicot Electric Cooperative, Inc., C & L Electric Cooperative Corporation, Carroll Electric Cooperative

cooperative learning has been established as a promising strategy in classroom pedagogy (Johnson & Johnson, 1999; Dotson, 2001; Kagan & Kagan, 2009; Farmer, 2017). There are various types of cooperative learning strategies practiced over the decades. Kagan Cooperative learning structures (KCLS) are one of many cooperative learning