Splicing InstructionsCore Dependent DoubleBraid Eye SpliceType 2 Double Braid Ropes

IntroductionCore Dependent Double Braid Eye SpliceThis document describes the steps required to perform a CoreDependent Double Braid Eye Splice in Type 2 double braid.Type 2 double braid ropes contain high modulus fibers such asPlasma , Spectra , Technora , Vectran , etc. in the core.Type 1 double braid ropes consist of ropes that are made entirelyof polyester, nylon, polyolefins or some combination of thesematerials. Type 1 double braid ropes require a different typeof splice.The following tools are required to perform the splice: Large ruler or measuring tape Knife Large needle Splicing fid Marker pen Adhesive tape (plastic or paper) ScissorsAll splicing should be performed on a clean, flat surface.Fid ChartRope Dia.in.mmin.mmRope id /4"6107113"in.Fid Lengthmm483660Rope "mmRope 4"Copyright 2021 by Cortland Company, Inc., all rights reserved.4"8884"5"6"7"8"9"11"13"

Step 1bitter endMeasurement and Markings1.1 Lay out the section of the rope being splicedon a flat surface. Secure the rope to a sturdy postor anchor point by tying a hitch type knot 7 – 10fid lengths down from the free end of the rope (thebitter end). If possible, insert a large sewing needleor pin through the rope just in front of the knot toassist in holding the cover and core together.Mark 1 2.5 fidlengths frombitter end of ropeMeasure a distance of 2-1/2 fid lengths from thebitter end down the length of the rope toward theknot. Make a mark on the cover of the rope at thispoint (Mark 1). Carefully open up the cover braidand make a mark on the core as well (Core Mark 1).core Mark 11.2 Using Mark 1 as a reference point, form aneye in the bitter end of the rope. The eye shouldbe sized about 2 inches (51mm) larger than therequired size of the finished eye when measuredfrom the base of the eye to the top. When theproper size of eye has been determined make amark on the rope directly opposite Mark 1. Thisis Mark 2. Carefully open up the cover braid andmake a mark on the core as well (Core Mark 2).Mark 1eye lengthMark 2core Mark 2extractionpoint 11.3 From both Mark 1 and 2, measure a distanceequal to 3/4 of a fid length towards the bitter endof the rope and mark the cover at each point.These will be Extraction Points 1 and 2.extractionpoint 2Copyright 2021 by Cortland Company, Inc., all rights reserved.3

Step 2Extracting the Corecover tailextractionpoint 12.1 Open the cover braid at Extraction Point 1using a large needle, fid or similar tool and pullout the core.core tail2.2 At Extraction Point 2 pull out a loop of thecore. The core will need to be pulled from thedirection of Mark 2.extractionpoint 2pull core in this directionat both extraction pointsMark 2core Mark 1core Mark 24Copyright 2021 by Cortland Company, Inc., all rights reserved.2.3 Pull out the exposed sections of the core untilthe marks made on the core at Marks 1 & 2 areexposed at the Extraction Points.

Step 3Splicing the Core and Cover Together1/2 fid lengthcut cover tailNOTE: For sizes 1/4" – 9/16" dia.(6 mm–14 mm) skip to Step 3.4. Forlarger diameters, continue with step 3.1.3.1 Starting at Extraction Point 1, measure 1/2 fidlength towards the bitter end of the cover. Cut theend of the cover off at this point. Attach a fid to theend of the cut cover tail.core Mark 13.2 Insert the fid at Mark 1 on the core and pushthe fid through toward the bitter end, exiting thecore at a point approximately 2/3 of a fid lengthdown from the insertion point. Pull the fid outof the core exposing the entire fid and as muchof the cover tail as possible. This will requirebunching up the core back toward Extraction Point1.bunchedup coreCopyright 2021 by Cortland Company, Inc., all rights reserved.5

tapered endof cover3.3 Remove the fid from the cover and taper theend of the cover strands. When tapering the coverit is best to divide the strands into four groups andcut the ends of each group at different lengths.Once the cover strands are tapered, smooth outthe bunched up section of core to bury the taperedend of the cover back inside the core.smooth out bunchedup core to burytapered coverextractionpoint 2core Mark 26Copyright 2021 by Cortland Company, Inc., all rights reserved.3.4 At Extraction Point 2, increase the size ofthe exposed core loop by pulling out additionalcore from the section of rope leading back to theanchor point. Attach the fid to the bitter end of thecore. Once attached, insert the fid at Mark 2 onthe core and push the fid toward the anchor point.

3.5 Continue to insert the fid for a distance ofapproximately 3 fid lengths toward the anchorpoint until Core Mark 1 and Core Mark 2 meet.When the core marks are together the fid must bepulled through the cover braid until the entire fidand a one fid length of core are exposed.core Mark 1 & 2cut and remove twostrands at the 1-fid,3/4-fid and 1/2-fit point3.6 Cut and remove a left and right pair of strandsat a point 1 fid length from the end of the core.Repeat this process at the 3/4-fid point and the1/2-fid point. A total of six strands will be cut andremoved to taper the core tail.one fid lengthcore tail3.7 Fan out the remaining strands at the end ofthe core tail and cut them at an angle to completethe taper.tapered core tailwith angle cutstrands at endof tailCopyright 2021 by Cortland Company, Inc., all rights reserved.7

Step 4Finishing the Splice4.1 Smooth the exposed core from the pointwhere the two core marks coincide toward theanchor point until the tapered end of the core iscompletely buried.core Mark 1 & 2buried core tail4.2 Working from the anchor point, smooth thecover of the rope toward Core Marks 1 & 2 untilthe entire exposed core is buried inside the coverand the eye is completely formed. A winch orcome-along may be used to tension the splice toassist in burying the core.slide cover up fromanchor point to buryexposed core8Copyright 2021 by Cortland Company, Inc., all rights reserved.

NOTE: For sizes 1/4" dia.–9/16" dia.(6 mm–14 mm), skip to Step 5. For ropes withburied cover tails (5/8" or 16mm dia. and larger)finish the splice as per Step 4.3.cross-stitching4.3 After the eye slice is complete, cross-stitching thesplice below the base of the eye is recommended.Copyright 2021 by Cortland Company, Inc., all rights reserved.9

WhippingDouble Braid WhippingThe following steps describe the method used to install a whippingat the base of the completed eye. Whipping with appropriate sizenylon twine prevents the eye splice from potentially coming loosewhen the rope is not under load or when lines are mishandled.The following tools are required to install the whipping: Scissors Tape Nylon twineNote: The twine should be at least the same diameter as oneof the twisted strands of the cover.Whipping should be performed on a clean, flat surface.10Copyright 2021 by Cortland Company, Inc., all rights reserved.

Step 5Install the Whipping5.1 Cut rope cover tail diagonally starting at the coreentry point at the base of the eye. The length of thecover tail after cutting should be at least 3" (76mm)at its longest point.base of eye5.2 Tape over the cover braid tail from the base oftheeye to the end of the cover tail.Copyright 2021 by Cortland Company, Inc., all rights reserved.11

5.3 Lay a loop of twine along the spliced area of therope with the loop facing away from the eye. Thebitter end of the twine should extend past the base ofthe eye.bitter end of twineloop oftwine5.4 Starting at the base of the eye begin to wrapthe standing part of the twine tightly over the tapedand spliced area of the rope. Avoid gaps betweenadjacent wraps of the twine. Continue to wrap thetwine down to a point just before the loop of twineat the end of the splice.5.5 Insert the end of the twine through theexposed loop.loop oftwine12Copyright 2021 by Cortland Company, Inc., all rights reserved.

5.6 Pull the bitter end of the twine until the loopand a length of the standing part of the twine areburied midway through the whipped area. If thewhipping needs to be tightened further, both endsof the twine can then be pulled simultaneously.pull bitter endof twine5.7 Trim both ends of the twine.5.8 Completed whipping.Copyright 2021 by Cortland Company, Inc., all rights reserved.13

GlossaryBitter End – End of the rope closest to the working area.Core – Inner braid of a double braid rope. The core is contained within the cover braid.Core Dependent Rope – A double-braid rope in which the core carries the entire load and the cover is primarilyfor protection from abrasion and external damage.Cover/Sleeve/Jacket – Outer braid of a double braid rope that covers the core braid.Cross Stitching – A series of sewing stitches using twine that locks a splice into place to prevent it from slippingor being pulled apart. Reference Cortland’s Cross Stitching Instructions, CT TL 060 document.Crossover – The point in a splice where the core enters the cover and the cover enters the core.Eye Allowance – Length of the rope that determines the final eye size.Eye Splice – The splice that is necessary to form an eye at the end of a rope.Fid – A metal, wood or plastic tool used as an aid in splicing. Fids typically are tapered at one end and have amethod to allow attaching the cover or core of the rope being spliced at the other end. Some fids are also intendedto be used as a measuring tool when laying out the splicing marks on the rope.Fid Length – A fid length is a unit of measurement originally based on the design of tubular fids used for splicingdouble braids. A fid length is now generally defined as 7 x the rope circumference or 21 x the rope diameter.Grommet – (or Endless Grommet or Endless Loop) – A line that is spliced into a loop rather than having eyes.Milk – The act of removing slack in the cover or core by sliding the loose braid back over the rope element thathas been buried inside the loose section.Pick – A point on either the core or cover braid in which one strand in the left or “S” direction crosses over orunder a strand in the right or “Z” direction.Splice – The process used to make an eye or join two ends of rope together.Standing End – The end of the rope not in use.Standing Part – The central section of rope away from the end being used or spliced.Strands – A twisted (S twist or Z twist) bundle of yarn comprising one of the discrete components used to make abraided rope.S-Twist – A strand in which the fibers are twisted in a left-hand direction.Taper – Trimming or cutting a strand or braid so that it gradually becomes thinner toward one end.Thimble – A ring or tear-drop shaped form, often of metal or plastic, that fits on the rope on the inside of an eyesplice. It is used to prevent sharp bending of the rope at the top of the eye & to protect the inside of the eye fromchafing or cutting.Unlay (Unbraid) – To take apart and separate the strands of a rope into individual components.Whipping – Securing rope ends or sections of a rope or splice by wrapping twine tightly around the objectto be whipped.Z-Twist – A strand in which the fibers are twisted in a right-hand direction.14Copyright 2021 by Cortland Company, Inc., all rights reserved.

NotesCopyright 2021 by Cortland Company, Inc., all rights reserved.15

Cortland is a global designer, manufacturer, and supplier of technologically advanced ropes,slings, and strength members. Collaborating with customers, our team uses its experience inhigh performance materials and market knowledge to transform ideas into proven products.For more than 35 years, our custom-built solutions have been developed for work in thetoughest environments and to overcome some of the world’s greatest challenges. Theyconsistently enable our customers to meet the demands of the aerospace, defense, medical,research, subsea, marine, and energy industries.Cortland is a part of the Enerpac Tool Group (NYSE: EPAC), a diversified industrial companywith operations in more than 30 countries. cortlandcompany.comCT TL 058 0921 US

proper size of eye has been determined make a mark on the rope directly opposite Mark 1. This is Mark 2. Carefully open up the cover braid and make a mark on the core as well (Core Mark 2). 1.3 From both Mark 1 and 2, measure a distance equal to 3/4 of a fid length towards the

Related Documents:

important invariants; the Braid index and Braid Word. We de ne the Braid index of a knot Kto be the smallest nsuch that the closure of a braid from B n is K. We then de ne the Braid Word to be a braid of shortest length (meaning having the least number of symbols) whose closure is K. Problem 5.1. Is the Braid Index a good invariant? In .

Plaited Ropes: Eight strand plaited rope formed by intertwining four pairs of strands in a maypole . braided core is over-braided with a cover braid, hence the terms braid on braid and 2 in 1 braid. Hollow & Diamond Braids: A hollow, tubular structure braided in a maypole fashion to produce a plain braid pattern with and without a core

Order #_ Page 3 FLOWER HEAD/BORDER Qty PRICETOTAL BRAIDS - not included, each at cost Total Tie Neckstrap 3.00 Military Braid 2.00 Chandelle Boa (1 side) each Bling Military Braid 3.00 blue / white / white with gold Diamondback Braid -flat 2.00 Maribou Boa - wrap around border 4.00 Bling Diamondback Braid -flat 3.00 "Senior Spirit" Retro Ribbon 3.00 Foil Box Braid

called strands, have disjoint images. These nstrands are called a braid. The braid group B n on n strands is the group of isotopy classes of braids. The product of a braid (f . Our second mode of defining the braid group is by an explicit presentation due to Artin. 1.2 The (pur

De nition 4.2. (geometric) The n-strand braid group consists of equivalence classes of braids as de ned above with the operation that connects the bottom of the rst braid to the top of the second, and rescales so that the new braid is still unit length. The trivial braid has nparallel strands, and the inverse of a braid is its mirror image.

Braid Tape Tube Cut 2.5m/8’ approx. length of nylon braid, slide braid onto the fiber braid tube, and tape braid at both ends of tubing to secure. Fit cover using M6 screws and cross-head 8 screwdriver. 7 Assemble M25 split gland onto conduits. Slide over fiber and tighten nuts. 5 Cut conduit as per table above. 6 Installation Process Conduit .

Step 4 Step 3 Holding the end of the braid with your left hand, loop one strand of yarn around the braid and knot it. Repeat the knot with the other strand, so that there are two knots around the end of the braid. You can now let go of the braid. Braid all the w

Sisal, Cotton Braided Rope: Double Braid Polyester Double Braid Nylon Euro-Braid Polyester Hollow Braid Polypropylene Multifilament Polypropylene Braided Cotton Rope Characteristics TWISTED ROPE Nylon Twisted Rope (Professional Duty) SIZE Dia. SIZE Cir. Linear Density lbs./100' New Rope Tensile Strength* (Lbs.) Working Load Limit** (Lbs.) 3/16 .