3. PUBLIC CONSULTATION

2y ago
7 Views
1 Downloads
2.25 MB
149 Pages
Last View : 1m ago
Last Download : 3m ago
Upload by : Ronan Garica
Transcription

HONOUR INFRAESTATES LIMITEDSY. NO. 169 ‐ 171, 174 ‐ 186, 186(P), 187 ‐ 188, 188(P),189 ‐ 191, 191(P), 192, 194 ‐ 204, 204(P), 205, 206(P), 217(P),221(P), 222, 222(P), 223 ‐ 231, 231(P), 232, 232(P), 233 ‐ 242,242(P),243 ‐ 245, 245(P), 246, 248 ‐ 256,PEDDAMASANPALLY VILLAGE, THOGUTTA MANDAL,MEDAK DISTRICT, TELANGANA3. PUBLIC CONSULTATIONSubmitted ByHonour Infraestates ltd,H.No: 8‐3‐166/7/1,Hetero House, Erragadda,Hyderabad – 5000018Phone: 91‐40‐23710405Fax: 91‐40‐23700405E‐mail: contact@honourlab.inStudies & Documented ByM/s Team Labs and Consultants(MoEF&CC – NABET –OM‐S.No 154)(ISO 9001:2008 certified Organization)B‐115,116, 117 & 509, Annapurna Block,Aditya Enclave, Ameerpet,Hyderabad‐ 500 038Phone: 91‐40‐23748555, 23748616Fax : 91‐40‐23748666E‐mail: teamlabs@gmail.comSUBMITTED TOMINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE,GOVERNMENT OF INDIAINDIRA PARYAVARAN BHAWAN,JOR BAGH ROAD, ALIGANJ, NEW DELHI

Public ConsultationHonour Infraestates Ltd.CHAPTER 1.0 PUBLIC CONSULTATION1.0 IntroductionPublic hearing for the project was conducted on 19.11.2014 from 11.30 A.M. onwardsat the proposed project site, Peddamasanpally Village, Thoguta Mandal, MedakDistrict, Telangana State.1.1 AdvertisementAdvertisement for the public hearing was notified in two prominent news papersnamely, Eenadu, a Telugu daily news paper on 17.10.2014 and Times of India(English), an English newspaper on 18.10.2011.Minutes of the meetingThe minutes of the public hearing along with the attendance sheet is enclosed inannexure.1.2 Concerns Raised By PublicThe concerns expressed by public during the public hearing meeting, and concernsexpressed by public through representations and the responses of proponent arepresented in Table 1.1.1-1Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.Table 1.1 Issues raised in public hearing and responseS.NoIssues1He strongly objected the establishment of proposed projectand stated that all the villagers are against the setting up ofthe proposed project and requested Joint Collector (JC) tostop the public hearing. He also informed that public arenot interested in the pollution generating industries like theproposed Bulk drug unit. He also submitted a writtenrepresentation objecting to the proposed project. Thecontent of the representation is as follows: “He informedthat the EIA report furnished to TSPCB does not includename of the products, formula, the solid, liquid wastesgenerated from each products. He informed that theproposed project is surrounded by lakes, forests and kuntaswithin 3 kms and may cause ecological imbalance”.234Sri. MRaghunadan Rao,Official Spokesperson, BJPSri. MadhusudanReddy,PeddamasanpallyVillageSri. SudarshanReddy,PeddamasanpallyVillageSri. SrinivasReddy,PeddamasanpallyResponseThe proposed project is an industrialestate for Active pharma ingredient(API’s) manufacturing units, 30 MW cogeneration plant (CPP) and securedlandfillwithinappraisedasaninfrstructure project. The details of wastewater, air pollution and solid wastegeneration quantities are presented inchapter 2. The mitigation measures for thesame are presented in Chapter 4. Thedetails of zero liquid discharge systemproposed for effluent treatment arepresented in Chapter 4. The land usepattern is presented in Table 2.1, Chapter2.0. The drainage pattern of the area isextracted and presented in page 5-6.He informed that they do not require any Public hearingand requested the officials not to conduct any furtherproceedings as the total villagers are against the proposedproject.He informed that all the public present in the meeting isagainst the establishment of the proposed project andrequested not to conduct public hearing.He strongly objected the proposed project and informed Zero liquid discharge system is adopted tothat the public already faced bitter experience with the Bulk ensure no discharge of effluent outside thedrug industries as they polluted the ground water and premises. The treated effluents are reused1-2Team Labs and Consultants

Honour Infraestates Ltd.S.NoVillage5Sri. J. Ravinder,Dalitha PorataSamithi, StatePresident6Sri, Radlia KishanReddy, MPTC7Sri. R. Srinivas,Sarpanch,SirsanagandlaVillagePublic ConsultationIssuesResponsecausing health problems. He also requested the Joint for cooling tower makeup. The estate willCollector to stop the public hearing.function in line with the standards ofMoEF&CC, the proponent requested thepeople to clear their apprehensions overagricultural prospects, health hazards,environmentaldegradationetc,aseffective environmental and pollutioncontrol measures based on the guidelinesof MoEF and CPCB are adopted.He informed that they will not allow the proposed publichearing and further informed that the industry has Most of site area was acquired fromprocured the lands belonging to Daliths allotted by the private owners, Govt and about 10.61government and requested the government not to allow acres of TSIIC land is in the process ofthese industry and take action against the unit for Acquisition from Govt of Telangana.procuring the Dalith lands.(Copy of letter issued by TSIIC Enclosed)The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirHe stated that they are opposing the proposed project and apprehensions over agricultural prospects,requested the Chief Minister and Joint Collector to take healthhazards,environmentalaction for establishing pollution free industries.degradationetc,aseffectiveenvironmental and pollution controlmeasures based on the guidelines of MoEFand CPCB are adopted.The estate will function in line with theHe informed that the total public in the surrounding standards of MoEF&CC, the proponentvillagers of the proposed project are against the project and requested the people to clear theirthey unanimously rejecting the proposed project.apprehensions over agricultural prospects,healthhazards,environmental1-3Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.IssuesS.No8Sri. Kista Goud,PeddamasanpallyVillage9Sri. NnrasimhaReddy, LingapurVillage10Sri. Venkat ,aseffectiveenvironmental and pollution controlmeasures based on the guidelines of MoEFand CPCB are adopted.He informed that the total proposed land procured by theproponent is in the catchment area of the lake and said The drainage pattern of the area issome of the general public are disrupting the public hearing extracted and presented in page 5-6. Theprocess.site area falls in various water sheds.The estate proposed “Zero Liquiddischarge” and wastewater will not bedischarged. All the effluents are treated inEffluent treatment system containingHe informed that due to proposed project water pollutionstripper, MEE, ATFD, Biological treatmentwill be caused and they are against the setting up of thesystem followed by Reverse Osmosisproposed project.system. The treated effluent will be reusedin cooling towers. There is no discharge ofeffluent either on ground or in the drains/ water bodies.The drainage pattern of the area isHe informed that the total proposed land procured by the extracted and presented in page 5-6. Theproponent is in the catchment area of the Peddacheruvu site area falls in various water sheds. Thelake situated in the downstream on one side and forest on estate will function in line with thethe other side. Due to establishment of the proposed project standards of MoEF&CC, the proponentthe nearby lake and ground water will be polluted and the requested the people to clear theirvillagers will be facing problems. He informed that they are apprehensions over agricultural prospects,against these type of polluting industries and if government healthhazards,environmentaldecides to give permissions to the proposed unit they are degradationetc,aseffectiveready to commit suicide.environmental and pollution controlmeasures based on the guidelines of MoEF1-4Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.S.NoIssues11Smt, Bal Bhai,SirsanagandlaVillageShe informed that they don’t want the proposed company.She informed that they do not want this industry and arehappy to work if any other industry is established. Sherequested the officials not to file any cases against thevillagers for causing the disturbance.12Sri. YegundaSwamy, DistrictPresident, DalithaPortaOrganization,GajwelHe informed that due to the proposed project a lot ofinjustice will be done to Daliths as they are losing the landsand all the villagers unanimously are opposing theproposed project. He requested the officials to reject theproposed project.13He informed that Peddacheruvu is located in thedownstream of the proposed project and they arecultivating paddy and sugarcane. Due to the proposedproject the lake will get polluted. He informed that theyhave 10 Acres of the land with open well adjacent to theSri. Kanaka Reddy, proposed project and they will lose their livelihood due toMarpada Villagethe pollution from the proposed project. He informed thattheir son, brothers, mother and entire family is dependenton these lands doing agricultural and if they allow theproposed project they will all commit suicide. He furtherinformed that Marpada Gram Panchayat has passed aresolution against the proposed project.Responseand CPCB are adopted.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution controlmeasures based on the guidelines of MoEFand CPCB are adopted.Most of site area was acquired fromprivate owners, Govt and about 10.61acres of TSIIC land is in the process ofAcquisition from Govt of Telangana.(Copy of letter issued by TSIIC Enclosed)The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted.Zero Liquid discharge will be adopted toensure all effluents are treated and reused.The management assured that theproposed plant shall ensure the emissions1-5Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.S.NoIssues14Sri. T.MallaReddy,PeddamasanpallyVillageHe informed that due to establishment of proposed projectsurroundings will get polluted like the situation in thePatancheru, Bollaram industrial areas and the pollutioncaused by the bulk drug industries in these areas, thechildren are effected with health diseases. He also informedthat such type of industry will not be allowed here and theywill sacrifice their lives to stop the proposed project.15Sri. Jai RamReddy,PeddamasanpallyVillageHe informed that the total public are opposing theproposed project.Responseand effluent are treated / controlled andthat the same shall be within theprescribed limits of MoEF&CC andTSPCB, which will assure minimal impacton agricultural prospects.The estate will function in line with thestandards of MoEF&CC, the proponentrequestedthepeopletoremoveapprehensions over the agriculturalprospects, health hazards, environmentaldegradation etc. The estate will function inline with the standards of MoEF&CC, theproponent requested the people to cleartheir apprehensions over agriculturalprospects, health hazards, al and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted.The estate will function in line with thestandards of MoEF&CC, the proponentrequestedthepeopletoremoveapprehensions over the agriculturalprospects, health hazards, environmentaldegradation etc.1-6Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.IssuesS.No16Sri. HanumanthnReddy, BJPPresident,PeddamasanpallyVillageHe informed that they are rejecting the proposal forestablishment of proposed factory and requested theofficials to reject the proposed project.17Smt, D. CliinpnPndma,PeddamasanpallyVillageShe informed that they do not want the factory. Sheinformed that they will carryout livelihood by doingagricultural.18Smt. NallaNarasamma,PeddamasanpallyVillageShe informed that they are against the proposed project andrequested officials not to give permission,19Smt, K. Yadammn,PeddamasanpallyVillageShe informed that they are opposing the proposed project.20Sri. Anil Reddy,PeddamasanpallyVillageHe informed that out of the lands procured by the industry54 Acres of land is under ceiling and a notice board wasalso put up by the government. He requested theResponseThe estate will function in line with thestandards of MoEF&CC, the proponentrequestedthepeopletoremoveapprehensions over the agriculturalprospects, health hazards, environmentaldegradation etc.The estate will function in line with thestandards of MoEF&CC, the proponentrequestedthepeopletoremoveapprehensions over the agriculturalprospects, health hazards, environmentaldegradation etc.The management assured that theproposed plant shall ensure the emissionsand effluent are treated / controlled andthat the same shall be within theprescribed limits of MoEF&CC andTSPCB, which will assure minimal impacton agricultural prospects.The management assured that theproposed plant shall ensure the emissionsand effluent are treated / controlled andthat the same shall be within theprescribed limits of MoEF&CC andTSPCB, which will assure minimal impacton agricultural prospects.Most of site area was acquired fromprivate owners and about 10.6 acres ofTSIIC land is in the process of Acquisition1-7Team Labs and Consultants

Honour Infraestates Ltd.S.No21Sri. Sanjeev,KhammampallyVillage22Sri, Raja Goud,SarpanchPeddamasanpallyVillage23Sri. Ramulu, IndraNagarPublic ConsultationIssuesResponsegovernment to take back the 54 acres of ceiling land and from Govt of Telangana. (Copy of letterdistribute to the poor and Dalith people. He informed that issued by TSIIC Enclosed)he strongly objecting the proposed project.The estate proposed “Zero Liquiddischarge” and wastewater will not beHe informed that already due to pollution from thedischarged. All the effluents are treated infactories in the Nalgonda district the people in theEffluent treatment system containingNalgonda district are affected with fluoride problem. Hestripper, MEE, ATFD, Biological treatmentinformed that the same thing will be repeated in this area ifsystem followed by Reverse Osmosiswe allow the proposed project. He informed that on behalfsystem. The treated effluent will be reusedthe villagers and Gram Panchayat they have passedin cooling towers. There is no discharge ofresolution not to allow the proposed project.effluent either on ground or in the drains/ water bodies.The estate will function in line with thestandards of MoEF&CC, the proponentrequestedthepeopletoremoveHe informed that the villagers of peddamasanpally areapprehensions over the agriculturalagainst the industry and the opinion of the villagers is finalprospects, health hazards, environmentaland he is in support of villagers rejecting the ental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted.He informed that their habitation is located less than 500 In EIA Report, Page No 5-6, The drainagemtrs from the proposed site. He informed that their Map showing the drainage patterngenerations to generations, since 100 years are living in this including china kunte and the estatearea and a water body called Chinta Kunta cheruvu is also proposed “Zero Liquid discharge” tolocated near to the proposed site. But the proponent in their ensure reuse of treated waste water. AllEIA report has not shown this lake and hiding the facts. the effluents are treated in EffluentDue to the establishment of the proposed project the lake treatment system containing stripper,1-8Team Labs and Consultants

Honour Infraestates Ltd.Issueswill be polluted and requested not to give permission.S.No242526Public ConsultationResponseMEE, ATFD, Biological treatment systemfollowed by Reverse Osmosis system. Thetreated effluent will be reused in coolingtowers. There is no discharge of effluenteither on ground or in the drains / waterbodies.He informed that for 1000 questions asked about theproposed project their answer will be no to the The barren lands are purchased fromestablishment of proposed project. He informed that lands villagers and govt of Telangana. The landbelonging to SC’s were occupied.documents are enclosed.The estate will function in line with thestandards of MoEF&CC, the proponentShe informed that government has given 2 Acres of land to requestedthepeopletoremoveSmt. Yerukalithem and the existing bore wells are not having sufficient apprehensions over the agriculturalkomurvva,water. Due to proposed project, their there may prospects, health hazards, environmentalPeddamasanpallydrying/pollution of ground water in future. Hence she is degradationetc,aseffectiveVillageopposing the proposed project.environmental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted.The estate will function in line with thestandards of MoEF&CC, the proponentrequestedthepeopletoremoveSri. Naira Yadagiri, He informed that he has lost 7 Acres of land in the land apprehensions over the agriculturalacquisition and requested the officials to hand over his 7 prospects, health hazards, environmentalSirsanagandlaVillageAcres of land from the proponent.degradationetc,aseffectiveenvironmental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted.Sri. Srinivas,SirsanagandlaVillage1-9Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.The following representations were received during the notification period and during public hearing are enclosed (34 Nos):Table 1.2 Representations and ResponseS.No12Name of theRepresentativeRepresentationRepresentationsfrom GramPanchayat,PeddamansapallyVillage,Marpadaga Village,KhammhpallyVillage andSirisanagandlaVillage1. It is requested not to construct the chemical company inthe village under any circumstances.2. Company related information sent to our Gramapanchayati is written in the book to their convenience.A representationfrom K. VenkatReddy, MasaipetVillageWe came to know that there is a landfill facility with 30years post closure monitoring facility is coming up as a partof Industrial Estate proposed at Peddamasanpally, ThogutaMandal, Medak Dist for which a public hearing is going tobe conducted on 19.11.2014.We strongly feel that, it is not advisable to have morenumber of landfills which may have design, operation andmonitoring issues.Proponent ResponseThe proposed project is an industrialestate for Active pharma ingredient(API’s) manufacturing units, 30 MW cogeneration plant (CPP) and securedlandfill appraised as an infrstructureproject. The details of waste water, airpollution and solid waste generationquantities are presented in chapter 2. Themitigation measures for the same arepresented in Chapter 4. The details of zeroliquid discharge system proposed foreffluent treatment are presented inChapter 4. The drainage pattern of thearea is extracted and presented in page 56.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution controlmeasures based on the guidelines of1-10Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.S.No3Name of theRepresentativeSri. RaghnnadanRao, OfficialSpokes Person, BJPLeaderRepresentationIn view of the above concern, we request you to examinebefore recommending EC for not to develop any facility inthis area at Peddamasanpally Thoguta mandal medak dist,as there is already a TSDF exists at Dundigal RR distHyderabad.a) The company in their report submitted to P.C.B. has notmentioned about their product prepared in the factory.b) In case, more than one or two drugs or formulaspreparation / production, they should have mentionedthe details of such drugs and formulas. But, they didnot do it.c) In case of producing one product, what are the wastesfrom them? What is the quantity of that waste?d) What is the procedure of disposing the waste such assolids, liquids? Whether they be disposed in scientificmethod? They did not mention these details.e) What is the source of the water supply to the company?f) What are permissions that were sanctioned to thecompany by the Sripada Project? In case how muchTMC ? These details were not mentioned in the projectReportg) They have not mentioned in their Pollution or ForestClearance documents, which products will bemanufactured at their factoryh) What is the chemical wastes purifying capacity of thecompany ? How much capability?i) Our opinion is that the pollution coming from thecompany will vanish the agriculture crops and effectProponent ResponseMoEF&CC and CPCB are adopted.The proposed project is an industrialestate for Active pharma ingredient(API’s) manufacturing units, 30 MW cogeneration plant (CPP) and securedlandfill appraised as an infrstructureproject. The details of waste water, airpollution and solid waste generationquantities are presented in chapter 2. Themitigation measures for the same arepresented in Chapter 4. The details of zeroliquid discharge system proposed foreffluent treatment are presented inChapter 4. The drainage pattern of thearea is extracted and presented in page 56.The source of water supply is groundwater / stored storm water and surfacewater from Sripadasagar project. We areawaiting approval for supply of surfacewater from government of Telangana.1-11Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.S.NoName of theRepresentativeRepresentationProponent Responsethe peaceful atmosphere of the villagej) There are cheruvus and ponds with in the 3 kms distanceof the proposed company and fishes in the cheruvusand other people such as fisher men depended onfishing and fish business will be put in trouble with thispollution.k) The establishment of the company in question issurrounded by green forests, agriculture crops,cheruvus ponds.l) It appears that the pollution may also cause ecologicalimbalances. Hence, we are opposing the establishmentof the companym) It appears that there will not be proper monitoring onthe company by the PCB Officers since the companysite is alone itself and much distant from the PCBOffice.4Sri. G. Bal RajuGoud, Ex MPTC,R/o. MarpadgaWith regard to the referendum conducted at the outskirts ofPedamasanpally village on the issue of establishing HonourInfra Estates Ltd, company, my personal opinion is that thepeople in our village are illiterates and most of them arepoor and there is unemployed youth in our village. It isrequested to provide employment opportunity to our localsin the industry which is being established in our village andalso it is requested to give assurance to us that there will beno harm to the village people, water, crops and cattle fromthe chemicals coming from the Industry.Qualified and competent persons innearby villages shall be given prioritywhile recruitment.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted. Local1-12Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.S.No56Name of theRepresentativeRepresentationSri. MD. Sadulula,Ex Upa SarpanchWith regard to the referendum conducted at the outskirts ofPedamasanpally village on the issue of establishing HonourInfra Estates Ltd, company, my personal opinion is that thepeople in our village are illiterates and most of them arepoor and there is unemployed youth in our village. It isrequested to provide employment opportunity to our localsin the industry which is being established in our village andalso it is requested to give assurance to us that there will beno harm to the village people, water, crops and cattle fromthe chemicals coming from the Industry.Sri. G. Linga Goud,Ex Upa SarpanchWith regard to the referendum conducted at the outskirts ofPedamasanpally village on the issue of establishing HonourInfra Estates Ltd, company, my personal opinion is that thepeople in our village are illiterates and most of them arepoor and there is unemployed youth in our village. It isrequested to provide employment opportunity to our localsin the industry which is being established in our village andalso it is requested to give assurance to us that there will beno harm to the village people, water, crops and cattle fromthe chemicals coming from the Industry.Proponent Responseare preferred in proving employment.Qualified and competent persons innearby villages shall be given prioritywhile recruitment.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted. Localare preferred in proving employment.Qualified and competent persons innearby villages shall be given prioritywhile recruitment.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted.1-13Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.S.No789Name of theRepresentativeRepresentationSri. K. Venugopal,Marpadaga VillageYouth PresidentWith regard to the referendum conducted at the outskirts ofPedamasanpally village on the issue of establishing HonourInfra Estates Ltd, company, my personal opinion is that thepeople in our village are illiterates and most of them arepoor and there is unemployed youth in our village. It isrequested to provide employment opportunity to our localsin the industry which is being established in our village andalso it is requested to give assurance to us that there will beno harm to the village people, water, crops and cattle fromthe chemicals coming from the Industry.Sri. A. RavinderReddy, Farmer,MarpadagaIn our village, we completed our education and dependingon labour work. Our’s is a small Gramapanchayat. Firsttime in our village the referendum was conducted. But, wedid not get opportunity to convey our opinions. Therefore,we have no objection for the establishment of the proposedcompany in our village if it provides village developmentand subject to non-pollution. This proposed company mayalso be constructed without pollution. If you also feel thesame, the establishment of the company is agreeable to us.Sri. U. ThirupathiReddy, Ex - UpaSarpanch,MarpadagaTherefore, we have no objection for the establishment of theproposed company in our village if it provides villagedevelopment and subject to non-pollution. This proposedcompany may also be constructed without pollution. If youalso feel the same, the establishment of the company isagreeable to us.Proponent ResponseQualified and competent persons ofnearby villages shall be given prioritywhile recruitment.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution controlmeasures based on the guidelines ofMoEF&CC and CPCB are adopted.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffectiveenvironmental and pollution control1-14Team Labs and Consultants

Public ConsultationHonour Infraestates Ltd.S.NoName of theRepresentativeRepresentationSri. D. VenkatReddy, KondapakIt is requested to take required remedies and measures tomake our village atmosphere and environment pollutionfree from the Honour Infra Estates Ltd. Company beingestablished in the outskirts of the village and as such wehave no objection for the construction of the company.Local youth shall be given preference in providingemployment.11Sri. P. Veeresham,Retired Lecture,R/o. Kondapak,GDC - SiddipetIt is requested to take required remedies and measures tomake our village atmosphere and environment pollutionfree from the Honour Infra Estates Ltd. Company beingestablished in the outskirts of the village and as such wehave no objection for the construction of the company.Employment shall be created to local youth and extend cooperation to the development of the village. It is requestedto provide required plantation in the premises of thecompany for protecting environment from the pollution.12Sri. Domata RajaVenkat Reddy, Rt.It is requested to take required remedies and measures tomake our village atmosphere and environment pollution10Proponent Responsemeasures based on the guidelines ofMoEF&CC and CPCB are adopted.The estate will function in line with thestandards of MoEF&CC, the proponentrequested the people to clear theirapprehensions over agricultural c,aseffecti

District, Telangana State. 1.1 Advertisement Advertisement for the public hearing was notified in two prominent news papers namely, Eenadu, a Telugu daily news paper on 17.10.2014 and Times of India (English), an English newspaper on 18.10.2011. Minutes of the meeting The minutes of the publ

Related Documents:

«vérifications périodiques " page 2 sur 8 r.c. reglement de la consultation sommaire article premier : objet et etendue de la consultation 3 1.1 - objet de la consultation 3 1.2 - etendue de la consultation 3 1.3 - decomposition de la consultation 3 1.4 - conditions de participation des concurrents 3 1.5 - nomenclature communautaire 3 art

Consultation paper overview & next steps EIOPA carries out this consultation in accordance with Article 29(2) of Regulation (EU) No 1094/2010. This Consultation Paper presents the Supervisory Statement on ORSA in the context of COVID-19. EIOPA will consider the feedback received, 3 develop Impact assessment and publish a Final Report on the consultation and submit the Supervisory Statement for .

The results of the consultation activities will be summarised in a synopsis report annexed to the impact assessment and published on the consultation page. 5. Summary /overview on consultation activities by stakeholder groups and indicative timing The following table summarises the envisaged consultation activities, their stakeholder coverage and

2. Self-Assessment and Planning Tool: assess past citizen participation and consultation activities and create citizen participation and consultation priorities and goals 3. Citizen Participation and Consultation Activities: potential methods or approaches grantees can use to support outreach to the public and stakeholders 4.

About this consultation To: This consultation is open to the public and targeted at individuals, businesses and organisations in England, Wales and Scotland with an interest in the firearms safety issues that are the subject of this consultation. Duration: From 24 November 2020 to 16 February 2021 Enquiries (including requests for the paper in

consultation will inform the review reports for the European Parliament and the Council (see Article 90 of MiFID II and Article 52 of MiFIR), including legislative proposals where considered necessary. This consultation document contains three sections. The first section aims to gather views from all stakeholders (including non-specialists) on the experience of two years of application of .

VRP Proposition Consultation Paper A consultation on item A2(b)(i) on the Revised Roadmap to meet the objectives and requirements of the CMA Order Date: 9th November 2020 Disclaimer: The contents of this document do not constitute legal advice. Whilst the VRP Proposition Consultation Paper has been drafted with regard to relevant regulatory provisions and best practice, it is not a complete .

CONSULTATION PAPER 334 Proposed changes to simplify the ASIC Derivative Transaction Rules (Reporting): First consultation . November 2020. About this paper This consultation paper sets out our first proposals to amend the ASIC Derivative Transaction Rules (Reporting) 2013 made under s901A of the Corporations Act. We are seeking the views of interested stakeholders on our proposals. We also .