2045 Metropolitan Transportation Plan - Roadway ProjectsProject oad NameOld Wake Forest RdMorrisville ParkwayReedy Creek Turn LaneTen Ten RdTen Ten RdNC 55NC 55McCrimmon ParkwayNorthside Loop (east)Northside Loop (east)Ligon Mill Rd ConnectorLigon Mill Rd ConnectorMitchell Mill Rd (West)US 401/Mitchell Mill Rd Interchange (New)US 70 / Timber Drive Interchange (New)Falls of Neuse BlvdRock Quarry RdRalph Stephens Rd (Part NL)Ralph Stephens Rd (Part NL)Ralph Stephens Rd (Part NL)Ralph Stephens Rd (Part NL)Green Level Church RdGreen Level Ch RdGreen Level Church RdCenter St/1010Green Level West RdMartin Pond Road WideningApex Peakway (East)Apex Peakway (South)Pullen RdJudd Parkway NEJudd Parkway WHillsborough St Safety & Enhancement (Road Diet)Jones Dairy RdJessie Dr (part NL)McCrimmon Parkway ExtMorrisville Carpenter RdMorrisville Carpenter RdMorrisville Carpenter RdNC 54FromToLitchford Rd / Atlantic BlvdGreen Level Ch RdN.E. Maynard RdUS 1Kildaire Farm RoadJicarilla RdKennebec Church RoadAirport BlvdN. White St / Flaherty AveFlaherty AveUS 1ARichland CreekUS 401Capital BlvdNC 55Harrison AvenueUS 1US 1Kennebec Church RdNorth Broad StNC 54West of undeveloped section of RoyEastern portion of existing Royal MilNC 98 BypassNC 98Watkins RdHammond RoadI-540Old Birch DrRalph Stevens Rd ExtRalph Stevens RdPiney Grove WilbonAvent FerryO'Kelly Chapel RdCarpenter Fire Station RdFolklore WayUS 1NC 55Wendell Falls ParkwayCenter St / Ten Ten RdTingen RdWestern BlvdProducts Road (future ext)Wilbon RdGardner StNC 98 (Wake Forest Bypass)NC 55NC 54Page StDavis DrLouis Stephens DrPerimeter Park DrTimber DriveDurant RdSunnybrook RdNC 55NC 55Ralph Stevens RdRalph Stevens RdMcCrimmon ParkwayMorrisville ParkwayO'Kelly Chapel RdApex PeakwayI-540Poole RoadNC 55Old US 1Centennial PkwyOld Honeycutt RoadNC 42Gormat StChalk RdTen Ten RdDavis DrDavis DrLouis Stephens DrGood Hope Ch RdNorthern Twn Limits12/13/2017Note: Total Cost is less than the actual capital cost for toll, managed lane and railroad projects.Existing Proposed .61.20.840.81.581.10.60.70.281.8Total CostSTICategory 8,600,000.00 24,802,000.00 13,390,000.00 26,392,087.00 15,259,000.00 27,514,000.00 9,706,000.00 20,702,000.00 8,768,623.50 8,768,623.50 5,576,756.64 5,851,243.13 13,650,975.00 64,620,000.00 18,938,000.00 11,798,000.00 10,200,000.00 4,843,512.96 3,285,316.32 3,260,846.16 4,437,781.92 8,319,423.84 11,062,091.04 3,656,889.60 9,507,913.00 8,228,001.60 4,104,672.00 8,800,000.00 3,971,153.55 3,451,895.34 1,350,000.00 26,200,000.00 1,000,000.00 7,313,779.20 10,417,520.30 13,000,000.00 9,000,000.00 6,399,556.80 2,559,822.72 onDivisionDivisionDivisionRegionalTraditional Additional Horizon 025202520252025202520252025Page 1 of 17

Project A622A623d2A630A634A635bA637A638A640Road NameChapel Hill RdChapel Hill RdSouth Harrison AvenueMcCrimmon ParkwayMcCrimmon ParkwayLouis Stephens Dr Ext (NL)Davis DrSouthall RdNC 42US 70 - Upgrade to FreewayKildaire Farm ConnectorAvent Ferry RdAvent Ferry RdBuck Jones RdCarpenter Fire Station RdCarpenter Fire Station ExtSix Forks RdRTP Access RoutesTryon RdTryon RdTryon RdUS 401(South)NC 54-Blue Ridge Grade SeparationPoole RdO'Kelley Chapel RdPleasant Valley RdGreen Lvl W Rd WideningWade Ave WideningSandy Forks RdHigh Speed Rail - Rogers Rd IntersectionNC 98 WideningStadium Dr WideningMarsh Creek/ Trawick Rd MedianUS 401 MedianNC 55 WideningHilltop Needmore ExtensionJudd Parkway NWUS 70 / Brier Creek InterchangeUS 401 Superstreet401/55/42 InterchangeUS 70 / Jones Sausage Int. ImprovementsAviation Parkway Interchange (Impr)FromToExisting Proposed DistanceLanesLanes(Miles)NW Maynard RdAcademy StDry RdAirport BlvdAirport BlvdLittle DriveFarm Pond RdSouthall Rd (Existing)NC 50Durham / Wake County LineSunset Lake RdPiney Grove WilbonCass HoltFarmgate RdCameron Pond DriveNC 55Ramblewood RoadInternal RTP access pointsLake Wheeler RdNorfolk Southern RailNew Tryon Rd AlignmentTen Ten RdBlue Ridge RdMaybrook DrLouis Stephens DrDuraleigh RdNC 540I-40Falls of NeuseRogers RdHampton WayUS 1Capital BlvdNC 55/42 (FV)Apex Peakway (South)Herbert Atkins RoadNC 55Academy StNE Maynard RdKildaire Farm RdAviation ParkwayAviation ParkwayPoplar Pike LaneUS 64Hedingham BlvdI-40Lumley/Westgate RdHolly Springs RdElm StPiney Grove WilbonXebec WayNC-55Morrisville Carpenter RdLynn RoadExternal access pointsPar DriveExisting Tryon Rd AlignmentS. Wilmington StNC 540Beryl RdBarwell RdNC 55Glenwood AvenueGreen Level Ch RdI-440Six Forks RdRogers RdTyler Run DrUS 1ANew Hope RdJudd ParkwaySalem StBasal Creek (East Fork)Judd Pkwy 6444344644446444346343334424Legend RdEast of Fuquay-VarinaPurser Dr4446National Guard Dr12/13/2017Note: Total Cost is less than the actual capital cost for toll, managed lane and railroad tal CostSTICategory 11,310,000.00 11,500,000.00 1,794,381.23 11,487,602.57 11,870,000.00 3,036,000.00 10,056,446.40 3,800,000.00 12,713,033.00 47,500,000.00 9,612,521.10 5,485,334.40 5,399,222.40 6,500,000.00 7,850,005.80 3,204,173.70 45,000,000.00 6,299,092.80 6,800,000.00 14,273,729.00 2,569,271.00 21,985,000.00 28,634,000.00 9,800,000.00 5,946,248.88 1,367,377.83 12,923,000.00 39,565,000.00 9,850,000.00 10,890,000.00 2,547,625.00 893,000.00 10,700,000.00 9,120,000.00 5,581,930.00 1,938,327.30 4,949,287.20 13,400,000.00 3,245,000.00 54,684,000.00 7,000,000.00 ideTraditional Additional Horizon 0252025202520252025202520252025202520252025Page 2 of 17

Project 1F15a2F15a3F16F43F43bF44aF44bRoad NameAirport Blvd Interchange (Impr)N Harrison Ave HSR Grade SepChatham / Maynard Grade SeparationUS 70 / TW Alexander InterchangeTarboro St Road DietWest St ExtensionUS 1 / Friendship InterchangeAviation ParkwayAviation ParkwayAviation ParkwayKipling RealignApex Peakway / Salem St InterchangeNew Hope Road Grade SeparationDurant Rd Grade SeparationDixie Forest RoadBlue Ridge RdBarwell RdBlount/Person Streets Two Way ConversionWake Forest Rd / Brookside Drive RoundaboutAtlantic Avenue WideningNew Hope Church RdTrinity Rd ExtTrinity Rd ExtLeesville RdLeesville RdUS 401 Rolesville BypassUS 401 WideningNC 55I-440 WideningUS 1 North - Upgrade to FreewayUS 1 North - Upgrade to FreewayUS 1 North - Upgrade to FreewayUS 1 North - Upgrade to FreewayNC 147 Toll Extension (CAMPO Portion)US 64 / Laura Duncan Interchange (New)US 64 / Lake Pine Interchange (New)US 64 (superstreet)I-40I-40I-40 / US 1 / US 64 InterchangeI-40 (East)I-40 (East)FromToExisting Proposed 920.490Adams StW Chatham St4242New Bern AveMartin StOld US 1 HighwayGateway Centre BlvdEvans RdI-40US 401Martin Luther King JrCabarrus StFriendship RoadDominion DrNC 54Gateway Centre BlvdHarnett Central Rd403222404462Spring Forest RoadDuraleighRock Quarry RdBlount St / Person St / Sasser StAtlantic Ave / Litchford RoadCrabtree Valley AvenueBerkley Lake DriveBlount St / Person St / Hoke St2223330.2521.154.1Highwoods BlvdGreen RdWalnut CreekWalnut CreekWestgate RdI-540 InterchangeUS 401US 401 Rolesville BypassSalem StUS 1/64I-540Thornton RdBurlington Mills RdNew Fall of Neuse BlvdNC 540US 64Lake Pine DriveUS 1US 1-64US 1/64I-40 / US 1 / US 64I-440US 70 Business (Garner)New Hope Church RdDeana LnCary Towne BlvdChatham StO'Neal Rd (@ Leesville Road CampuNew Leesville BlvdUS 401Flat Rock Church RdBryan DrWade AvenueThornton RoadBurlington Mills RdNew Falls of Neuse BlvdNC 98 (Durham Rd)McCrimmon Pkwy / Little DriveLaura Duncan RdLake Pine DriveLake Pine DrWade AvenueLake Wheeler RdI-40 / US 1 / US 64US 70 Business (Garner)NC 4364884.46.312/13/2017Note: Total Cost is less than the actual capital cost for toll, managed lane and railroad projects.Total Cost 34,720,000.00 22,600,000.00 38,000,000.00 29,300,000.00 1,000,000.00 10,000,000.00 13,946,625.00 6,957,000.00 10,795,000.00 11,035,000.00 1,625,000.00 12,500,000.00 15,346,000.00 12,525,000.00 1,600,000.00 10,500,000.00 10,800,000.00 6,100,000.00 2,300,000.00 11,600,000.00 2,637,180.00 8,938,045.41 2,688,165.48 11,600,000.00 10,696,402.08 42,625,440.00 27,950,000.00 3,324,070.00 348,002,000.00 124,700,000.00 120,100,000.00 64,050,000.00 64,050,000.00 23,880,000.00 38,200,000.00 38,200,000.00 36,400,000.00 81,058,666.94 27,250,000.00 151,750,000.00 106,600,000.00 atewideStatewideStatewideStatewideTraditional Additional Horizon 0252025202520252025202520252025202520252025Page 3 of 17

Project 195Road NameCleveland Road / I-40 InterchangeNC-42 / I-40 Diverging Diamond InterchangeNC 540 TriEx / Veridea Parkway InterchangeNC 540 Tri-Ex (Phase IV)NC 540 Tri-Ex (Phase V)I-40/NC 54 DDII-440 Interchange ImprovementsNC 56 RealignmentNC 55Front St ExtNC 42 East WideningNC 42 WestNC 42 West WideningPerry Creek Rd Ext (Widening)US 70Morrisville ParkwaySmithfield RdTen Ten RdNorthside Loop (Harris Rd)Lead Mine RdLake Wheeler RdOld Stage RdOld Stage RdOld Stage RdTimber Dr/Jones Sausage ConnectorTimber Dr/Jones Sausage ConnectorVandora Springs Rd & ExtTimber Dr EastI-40 / White Oak InterchangeNC 98T.W. Alexander Dr ExtBuffaloe RdHolly Springs RdFriendship Rd WideningGreen Level Church RdAirport Blvd ExtGreen Level Church RdApex Peakway (East)Apex Peakway (East)New Hill Holleman Rd WideningSunset Lake RdCreedmoor RdFromToExisting Proposed DistanceLanesLanes(Miles)NC 55 BypassUS 401 (South)NC 54Wake Forest Road (SR 2000)NC 50North Broad StreetFront StGlen Laurel RdUS 70 BusinessUS 70 BypassUS 401Lumley/Westgate RdGreen Level Ch RdUS 64 BypassHolly Springs RdUS 1ALynn RdTryon RdUS 401Ten Ten RdRock Service StationUS 70Jones Sausage RdTimber DrWaterfield RdUS 401 (South)I-40 (South)NC 54Wake Forest Road (SR 2000)US 15Church StNC 42Buffaloe RdUS 70 BypassI-40Fox RoadDuraleigh/Millbrook RdNC 55Major Slade RdBells Lake RdWhite StSawmill RdPenny RdTen Ten RdRock Service StatoinNC 42Timber Dr ExtUS 70Old Stage RdWhite Oak 0.991.794.21.493.270.720.281.021.17Durham County LineBrier Creek ParkwaySouthall RdOld Holly Springs RdRichardson RdKit Creek RoadDavis DrGreen Level WestLaura DuncanOld Raleigh RdOld US 1Hilltop-Needmore RdGlenwood AveNC 98 BypassLeesville RdStone Station DriveN. of 540 InterchangeOld Holly Springs ApexPrecept WayLouis Stephens RdMorrisville ParkwayOld Raleigh RoadCenter StreetAvent Ferry RdOptimist Farm RdStrickland 0.361.860.30.754.852.554.1112/13/2017Note: Total Cost is less than the actual capital cost for toll, managed lane and railroad projects.Total Cost 35,945,500.00 35,945,500.00 13,202,805.00 172,519,000.00 425,527,000.00 8,004,000.00 10,632,000.00 4,480,000.00 12,400,000.00 4,901,925.60 43,100,000.00 27,430,000.00 25,015,967.00 4,350,952.32 105,548,000.00 15,000,000.00 23,769,782.40 17,827,336.80 7,205,384.34 9,050,801.76 13,423,066.80 31,495,464.00 11,470,823.93 24,521,468.40 7,690,016.88 10,400,000.00 9,325,068.48 12,496,277.43 13,946,625.00 81,000,104.64 17,050,176.00 13,713,336.00 40,591,474.56 31,084,996.80 8,685,112.80 3,139,829.04 13,947,991.20 2,742,667.20 6,856,668.00 39,377,514.30 23,312,671.20 ionDivisionRegionalTraditional Additional Horizon 0352035203520352035203520352035203520352035Page 4 of 17

Project 29aA432A435A440cA444A446A449A480aA49bRoad NamePerry Creek Rd Ext (Part NL)Creech/Jones Sausage ConnectorRock Quarry RdSix Forks ExtJudd Parkway NELake Boone Trail ExtOld Holly Springs Apex RdJessie Dr (part NL)Veridea ParkwayTingen RdMcCrimmon Parkway ExtMcCrimmon Parkway ExtNC 54NC 54Kit Creek RdJohnson Pond RdNC 50NC 50S.E. Maynard RdNC 54Old Apex RdLouis Stephens Dr Ext (part existing)Spring Forest Rd ExtUS 70US 70Walnut StAlston AvenueBuffaloe RdSouth Franklin St (part NL)NC 42NC 42Spring Forest RdWoods Creek RdLeesville-Westgate ConnectorSkycrest DrBattle Bridge RdNC-55/Carpenter Fire Station Road DDINC 50Glenwood AvenuePerry Rd ExtUS 401(South)Poole RdFromFox RdCreech RdNew Hope RdAtlantic AvenueNC 55Blue Ridge RdHolly Springs RdVeridea ParkwayTingen RdApex PeakwayDavis DrLouis Stephens RdN.W. Maynard RdWeston ParkwayWake RdOptimist Farm RdTimber DrNC 42Cary Towne BlvdReedy Creek RdWest Chatham StPoplar Pike LaneUS 401US 401I-40Maynard RdKit Creek RdSpring Forest Rd ExtensionNC 98 (Wake Forest Bypass)NC 401John Adams RdFox RdFriendship RdWestgate RdBrentwood RdRock Quarry RdNC-55I 540Womans Club DrApex PeakwayUS 70Barwell Rd12/13/2017Note: Total Cost is less than the actual capital cost for toll, managed lane and railroad projects.ToBuffaloe RoadJones Sausage RdBattle Bridge RdCapital BlvdProducts Road (future ext)Edwards Mill ExtJessie DrNC 55Jessie DrOld Holly Springs Apex RdLouis Stephens RdNC 55Wilson RdMcCrimmon Pkwy Grade SepGreen Level Ch RdHilltop-Needmore RdI-540NC 210Walnut StChapel Hill RdCary ParkwayAirport BlvdBuffaloe RdI-40NC 42Macedonia RdNC 55Forestville RdRogers RdOld Stage RdNC 50US 401Old Holly Springs Apex RdLeesville RdNew Hope RdAuburn-Knightdale RdCarpenter Fire Station RoadNC 98Oberlin RdNC 55 BypassTen Ten RdI-540Existing Proposed 72.015.591.57Total CostSTICategory 22,251,814.83 10,324,828.80 20,350,000.00 25,981,124.00 11,248,380.00 2,990,562.12 23,592,212.28 17,516,149.56 3,828,001.32 3,598,001.55 4,727,273.00 8,903,980.80 8,502,268.32 21,941,337.60 3,978,374.40 18,741,559.20 36,819,697.20 42,516,352.73 2,571,250.50 3,955,770.00 14,170,447.20 10,188,305.40 31,389,472.00 70,417,777.50 71,302,754.25 12,757,358.25 15,897,710.40 19,247,948.00 10,056,446.40 30,745,572.00 32,920,258.80 8,125,290.00 14,002,457.04 26,880,940.56 14,627,558.40 6,680,945.70 14,876,400.00 82,016,000.00 10,581,684.75 35,414,588.79 77,328,266.79 Traditional Additional Horizon 0352035203520352035203520352035203520352035Page 5 of 17

Project A75bA75cA77b2A79aA79bA82cA85b2A86bA90c1Road NameEvans RdUS 401 WideningNC 42 WideningRex Rd RealignmentAvent Ferry CnctrAvent Ferry Cnctr WideningArthur Pierce RdStephenson RdJones Franklin WideningJones Franklin WideningAckerman RoadN.E. Regional CenterSumner Blvd ExtN.W. Regional CenterHarris Rd WideningNew Hill PlaceUS 401 BypassUS 401 WideningUS 401 WideningHilltop Needmore WideningHoneycutt ConnectorI-87 / I-495 Bypass WideningChatham / Trinity Grade SeparationNC 55Hilltop Road RelocationO'Kelley Chapel RdUnicon Drive ExtSouthport Drive ConnectorSquare Loop InterchangeNorthern Judd ParkwayBarwell RdCorporate Center ExtensionBeryl Road RealignmentYates Store RdWimberley RdWest Lake RdCrabtree Valley Ave / I-440 ConnectorCrabtree Valley Ave Widening/RealignTrinity Rd ExtLeesville RdLeesville RdUS 401 & NC 98 InterchangeFromToAviation ParkwayJudd PkwyChristian Light RdAvent Ferry Connector (NL)Old Holly Springs ApexHolly Springs RdKildaire FarmTen Ten RdWestern BlvdI-440NC 50Gresham Lake RdOld Wake Forest RdRuritaniaUS 1NC 55 (Bus)US 401 (E of FV)NC 540US 401 BypassSunset Lake RdCass Holt RdI-440Weston ParkwayEastern ParkwayCass Holt RdCass Holt RdHolly Springs RdRex RdHolly Springs RdSunset Lake RdI-440Dillard DrWhite Oak RdI 540Capital BlvdGresham Lake RdUS 1ANC 55 BypassNC 55US 401 BypassNC 55/42 (FV)Keith Hills StPiney Grove WilbonUS-64Morrisville Carpenter RdHilltop RoadAlston AvenueHeight LaneSouthport DriveUS 401 SouthNC 55 / Broad StBerkley Lake DriveCorporate Center DrBeryl RoadYates Store RdMorrisville ParkwayTen Ten RdI-440Blue Ridge RdWalnut CreekO'Neal Road (A Leesville Road CampuNew Leesville BlvdNC 540Lake Wheeler RoadNC 55Unicon DriveSouthport DriveTen Ten RoadOld Honeycutt RoadPoole RdBashford RdRoyal StMorrisville ParkwayGreen Level West RdMiddle Creek Park AvenueBlue Ridge RdCreedmoor RdChatam StLynn RdTW Alexander Dr Ext12/13/2017Note: Total Cost is less than the actual capital cost for toll, managed lane and railroad projects.Existing Proposed 1.750.97Total Cost 4,944,712.50 11,473,347.60 22,046,824.80 3,119,945.40 9,377,596.80 31,542,825.60 6,097,806.00 13,279,896.63 6,750,451.13 10,015,399.68 11,710,846.29 9,979,963.95 14,058,620.00 10,905,005.55 23,171,966.40 8,503,775.28 145,979,684.40 17,772,440.40 37,344,621.60 5,099,265.60 8,240,918.40 115,124,664.60 50,410,000.00 17,434,989.00 2,350,000.00 9,073,693.20 1,187,576.25 2,966,827.50 18,753,676.70 53,449,214.70 7,911,540.00 22,000,000.00 5,000,000.00 10,453,889.16 14,002,457.04 11,244,935.52 72,568,194.00 18,096,806.00 4,022,578.56 15,998,892.00 8,867,957.28 DivisionStatewideTraditional Additional Horizon 0352035203520352035203520352035203520352035Page 6 of 17

Project 7A118aA120A131cA133A134A135aA136cRoad NameUS 401 WideningNC 55NC 55 BypassHolly Springs Road InterchangeSouth Main Street InterchangeUS 1US 1 / NC 55 Diverging Diamond InterchangeUS 1 North - Upgrade to FreewayUS 1 North - Upgrade to FreewayClayton Bypass WideningUS 64 West Conversion to ExpresswayUS 64 West Conversion to FreewayAviation Parkway ExtNC 540 Tri-Ex (Phase VI)I-40 Managed LanesI-40 Managed LanesI-40 Managed LanesI-540 Managed LanesI-40 (East)I-40 (East)I-40 Managed LanesI-40 Managed LanesUS 64 EastI-40 WideningI-40 / Wade Avenue Interchange ImprovementCapital Blvd - Corridor UpgradesUS 1Lane Store ExtensionWestern Service RdI-85 / Brogden Interchange (New)Ranch Road ExtensionNorth ConnectorEdwards Mill Rd Ext - part IIITen Ten RdNew Hope RdNC 55Tryon Rd ExtNC 96Burlington Mills RdLitchford RdLead Mine RdLake Wheeler RdFromToExisting Proposed DistanceLanesLanes(Miles)Flat Rock Church RdNC 540North Main StHolly Springs RoadSouth Main StreetUS 64Fox Park RdKit Creek RdHoneycutt ConnectorNC-55 BypassNC-55 BypassNC 5402444665.321.585.954605.3NC 98 (Durham Road)Harris RoadI-40Laura Duncan RoadNC-540 Tri-Ex TurnpikeBrier Creek ParkwayI-40 (South)Durham County LineWade AvenueJohnston CountyI-40NC 42NC 210Cornwallis RdNC 210US 64 Bypass (Wendell)Wade AvenueHarris RoadUS 1A (Youngsville)US 70I-540NC 751US 70US 64 East BypassWade AvenueJohnston CountyCornwallis RdUS-64 BypassNC 210CAMPO MABNC 210CAMPO MABUS 64/US 264 (Zebulon)US 54.18I-440Extend frwy project from US-1AOak Park BlvdBert Winston RdI-540CAMPO MABLane Store RdPocomoke Rd04000622US 70 BUS / NC 42NC 42 EastChapel Hill RdHolly Springs RdOld Poole RdOld Honeycutt RoadGarner RdUS 401US 1Old Wake Forest RdTown & Country RdTen Ten RdRanch RoadCovered Bridge RdWestern Blvd ExtKildaire Farm RoadRock Quarry RdJicarilla RdRock Quarry RdSE of YoungsvilleUS 401Falls of Neuse RdMillbrook RdHilltop-Needmore te: Total Cost is less than the actual capital cost for toll, managed lane and railroad projects.Total Cost 16,333,091.00 11,907,535.07 66,927,861.00 19,897,185.00 19,897,185.00 200,716,129.00 22,300,000.00 90,112,000.00 43,981,165.80 97,748,422.20 51,193,039.59 67,978,386.00 33,160,066.14 315,430,000.00 579,090,000.00 211,274,569.00 20,462,870.00 367,809,456.96 89,679,815.78 94,574,375.28 26,920,480.00 36,179,936.00 92,070,546.75 37,734,000.00 30,000,000.00 54,227,013.75 131,004,519.53 8,064,496.44 14,812,340.40 13,946,625.00 2,556,411.00 12,782,501.16 46,425,000.00 11,884,891.20 16,456,003.20 29,055,000.00 26,310,434.85 30,160,768.37 35,769,848.40 27,335,249.76 4,936,800.96 lDivisionDivisionDivisionDivisionTraditional Additional Horizon 0352045203520452045203520452035203520352035Page 7 of 17

Project 5aRoad NameTimber Dr/Jones Sausage ConnectorFalls of Neuse BlvdVandora Springs Rd & ExtWhite Oak RdNC 50Eagle Rock RdEastern ParkwayEastern Parkway / US 401 InterchangeEastern Parkway / Angier Road InterchangeSkycrest Dr ExtFriendship Rd WideningAirport Blvd ExtRichardson Rd (East)Old Battle Bridge / Tarboro RdHolland Rd Turn LaneSunset Lake RdSunset Lake RdSunset Lake Rd ExtSunset Lake Rd ExtJessie Dr (part widening)NC 50NC 54Trinity RdNC 54US 1ANC 97Hodge Rd (Widening)Amelia Ch RdNC 42NC 54 (Chapel Hill Rd)Milburnie RdFox RdNC 96 Bypass (Youngsville)NC 55 (Main St)Avent Ferry RdSunnybrook RdNC 50NC 50Westgate RdPiney Grove Wilbon RdSmithfield RdNC 42 WideningFromToExisting Proposed DistanceLanesLanes(Miles)White Oak RdDurant RdOld Stage RdUS 70Timber DrOld Tarboro RoadPiney Grove WilbonI-40 (South)New Falls of Neuse BlvdUS 401I-540US 70Martin Pond RdNC 55242222046443441.682.061.624.461.50.754.2New Hope RdOld Holly Springs ApexGarden Square LnPoole RdKnightdale-Eagle Rock RdOld US 1US 401Main StOld Holly Springs ApexWoodfield Deadend RdNC 55I-540Chapel Hill RdEdwards Mill Rd ExtReedy Creek RdRogers RdWendell BlvdPoole RdUS 70Old Stage RdCorporate Center DrHodge Rd ExtOld Wake Forest RdNC 96Holly Springs RdNew Hill HollemanRock Quarry RdNC 98Beaver Creek RecLeesville RdBrayton Park RdBethlehem RdChristian Light RdForestville RdNew Hill HollemanNC 54Knightdale-Eagle Rock RdWendell BlvdKelly RdHilltop-Needmore RdOptimist Farm RdMain StMain StTen Ten RdNC 42Harrison AvenueTrenton Rd /Arrington RdHarrison AvenueForbes RdHospital RdUS 64East of NC 42John Adams RdHillsborough StForestville RdUS 401US 1Technology DriveCass HoltPoole RdBeaver Creek RecOld Weaver TrailUS 70Southern FV BypassUS 64 BypassColey Farm 992.793.691.813.921.46.51.82.9812/13/2017Note: Total Cost is less than the actual capital cost for toll, managed lane and railroad projects.Total Cost 15,358,936.32 20,372,215.50 14,810,402.88 40,774,319.04 9,889,425.00 6,263,302.50 40,081,177.13 12,523,500.00 12,523,500.00 50,923,058.29 17,075,830.20 15,852,021.36 4,736,160.00 7,577,856.00 5,380,869.78 19,872,138.00 31,083,561.60 18,156,984.30 7,423,930.80 11,884,891.20 13,873,002.00 7,911,540.00 10,056,446.40 9,790,530.75 2,376,978.24 42,054,230.40 30,180,781.13 14,997,840.00 7,123,974.00 14,159,158.00 14,044,568.34 18,832,981.44 30,411,959.76 25,506,804.96 27,671,014.80 16,547,425.44 32,016,441.60 16,418,688.00 12,799,113.60 48,742,980.00 16,456,003.20 onRegionalTraditional Additional Horizon 0352045204520452035204520452035203520452045Page 8 of 17

Project A98cF7bF84F85Frnk4aFrnk4bRoad NameBass Lake Rd WideningTrinity RdHillsborough St WideningNC 98Old Faison Rd WideningOld Faison Rd ExtNC 96 BypassMailman Rd WideningNC 96 WideningOld Wake Forest RdPeebles Road Ext.Rogers Rd WideningNC 98 WideningNC 98 Turn LaneUS 401 BypassUS 401 BypassHilltop Needmore WideningHoneycutt ConnectorAngier Western BypassJones Frankli

A27c1 Louis Stephens Dr Ext (NL) Little Drive Poplar Pike Lane 0 4 0.72 3,036,000.00 Division 2025 2025 A28b Davis Dr Farm Pond Rd US 64 2 4 1.1 10,056,446.40 Division 2025 2025 A2b Southall Rd Southall Rd (Existing) Hedingham Blvd 0 4 0.28 3,800,000.00 Division 2025 2025 A407b3 NC 42 NC

Related Documents:

Mar 26, 2021 · The Florida-Alabama Transportation Planning Organization 2040 Long-Range Transportation Plan (LRTP) was adopted on November 3, 2015. T he System Performance Report is part of the Florida-Alabama TPO 2045 Long Range Transportation Plan that was on adopted October 14, 2020 On .January 13, 2021 t,he 2045 LRTP

Marina Henry - Metropolitan Nazifa Mim - Metropolitan Cypress Lakes . 2014 Metropolitan, Opportunity, School Art, Military, . Sam Rayburn DeAngelo Jackson - Opportunity Genesis Jimenez - Metropolitan Jose Perales - Metropolitan South Houston Luzdivina Ruiz - Metropolitan Pearland ISD

the final roadway design in different perspective. WEB-BASED ROADWAY GEOMETRY DESIGN There are several commercially available software packages that offer flexible design of roadway geometry [5] and evaluate the impact of potential roadway design. However, these tools are generally complicated, expensive, and have a relatively steep learning curve.

This 2045 Long Range Transportation Plan has been financed in part by the U. S. Department of Transportation, Federal Highway Administration, Federal Transit Administration, and local governm

decision concerning the inclusion of roadway lighting in the roadway contract, a quorum of 50% 1 of all voting members must be present or have provided feedback. It will be the responsibility of the Roadway Lighting Committee to establish the Base Priority

Nov 05, 2015 · SEAL 36786 ROADWAY DESIGN ENGINEER PROJECT REFERENCE NO. SHEET NO. 2012 ROADWAY ENGLISH STANDARD DRAWINGS The following Roadway Standards as appear in "Roadway Standard Drawings" Highway Design Branch - N. C. Department of Transportation - Raleigh,

State Highway System Needs . Oklahoma Long Range Transportation Plan: 2020 -2045 August 2020 3. corresponding with the state highway system’s needs. The largest activity is “preservation”; 85.2 percent of the state highway system receives at least one preservation treatment,

Chapter 10 - Roadway Modeling A Practical Guide for Using InRoads V8i SS2 Roadway Designer Roadway Designer is a new interactive approach to modeling with templates in InRoads, allowing you to see the results of your the results of your design simultaneously in plan, profile, and cross section before creating your proposed surface.