Supply, Distribution, Configuration, Testing, Commissioning, Training andMaintenance of TVL Tools and Equipment Packages to Public Senior High Schools(Cabinets, Various Tools and Equipment)2022 BLR4(007to008)-CB-BIV-003List of AnnexesAnnex A- Bidder’s Information SheetAnnex B- List of ItemsAnnex C- Computations for Bid Security, SLCC and NFCCAnnex D- Quality Assurance Procedures during Contract Implementation (MassProduction)Annex E- Location for Submission and Evaluation of SamplesAnnex F &F.1- Test and Inspection ProtocolAnnex G- Price Schedule FormsAnnex H- Minimum Tools and Equipment Requirements (for the Award of MassProduction)Annex I- Warranty per ItemAnnex J- Drawings (Mass Production)

Republic of the PhilippinesDepartment of EducationProcurement Management ServiceBAC Secretariat DivisionKgwrn N Eduks yo n Kgwrn N Edu ks yon Kgwrn N Edu ks yon Kgwrn N Eduks yo n Kgwrn N Edu ks yon Kgwrn N Eduks yo n Kgwrn N Edu ks yon Kgwrn N Edu ks yon Kgwrn N Eduks yo n Kgwrn BIDDER’S INFORMATION SHEETANNEX “A”Directions: Please fill out all information requested legibly. Also, place a checkmark ( ) in the box(es) corresponding to all applicable items.This form is not for sale, and may be reproduced. Information to be provided may be supported by additional documents for firm s security.To be filled by ProcMS-BACSec staff only:Control No.:PROJECT NO.: 2022-BLR4(007to008)-BV-CB-003PROJECT:Supply, Distribution, Configuration, Testing, Commissioning, Training andMaintenance of TVL Tools and Equipment Packages to Public Senior HighSchools (Cabinets, Various Tools and Equipment)TOTAL ABC:PhP293,070,140.00COST OF BIDDING DOCUMENTS: in PhPLot1Lot 2Lot 3Lot 4Lot 53,6004,3002,20018,0001,300DATE:GENERAL INFORMATIONFULL NAME OF FIRM/COMPANY:ADDRESS:TEL. NO(S).:FAX NO(S).:EMAIL ADD. :PERSON MANAGING AFFAIRS OF THE FIRMNAME:POSITION:TEL. NO.:MOBILE NO. :AUTHORIZEDNAMEPOSITIONTEL. NO.MOBILE NO.REPRESENTATIVE::::Where did you find out about this project?PhilGEPSDepEd websiteBulletin BoardYour Firm/Company will join in the following lots:Bid Docs:OR No:OR No:Date:Date:Amount:Amount:Received from Procurement Management Service – BAC Secretariat Division the following:Document(s) Received byPrinted NameSignatureDate ReceivedBidding Documentsand Annexes A-JNotes:1.2.3.4.Interested Bidders may signify their intent to purchase the Bidding Documents through email at depedcentral.bacsecretariat@deped.gov.ph byaccomplishing this form.Upon receipt of the bidder’s information sheet, the BAC Secretariat Division will send through email the details of the DECS OSEC Trust Fund Accountfor payment.Upon payment, bidders may send through email the proof of payment before the deadline for submission of bids indicated in the Invitation to Bid, BiddingDocuments or Bid Bulletin.Upon receipt of proof of payment, the BAC Secretariat will send the electronic copy of the Bidding Documents.Room M-511, 5th Floor, Mabini Building, DepEd Complex, Meralco Avenue, Pasig City 1600Telephone No.: (02) 8633-9343; 8636-6542Email Address: depedcentral.bacsecretariat@deped.gov.ph

Supply, Distribution, Configuration, Testing, Commissioning, Training and Maintenance of TVL Tools andEquipment Packages to Public Senior High Schools(Cabinets, Various Tools and Equipment)Annex “B”LIST OF ITEMSItemNo.Lot l:12345678910DescriptionQuantityAgricultural EquipmentChainsaw, Portable397 unitsChipper shredder6 unitsCompactor, Mechanical6 unitsCutter, Grass923 unitsHedge trimmer, Power12 unitsMower, Lawn52 unitsSoil auger, One-man6 unitsSoil auger, Two-man6 unitsSprayer, Power415 unitsTelescopic shaft or Power high12 unitsbranch pruner11Tractor, Hand, with Implements389 unitsLot 2: Bread and Pastry and Cookery Equipment1Commercial Stand Mixer with316 unitsComplete Attachment2Decker Oven316 units3Mechanical Dough Roller316 units4Gas range w/ oven, 4 burner674 units5Stock pan burner21 unitsLot 3: Refrigerators and Freezers1Freezer93 units2Reach-in freezer21 units3Reach-in refrigerator21 units4Refrigerator, 7 cu. ft.543 units5Refrigerator51 units(for Artificial Insemination)6Upright Freezer316 unitsLot 4: Information Technology Devices and Accessories1Computer, Laptop4,721 units2Plotter29 units3Printer411 units4Smart TV213 unitsLot 5: Mass Production1Cabinet, Design 1 (Storage/tool270 unitscabinet)2Cabinet, Design 2 (Condiment86 unitscabinet)3Cabinet, Design 3 (Display Cabinet)40 units4Cabinet, Design 4 (Filing cabinet)43 units5Cabinet, Design 5 (First Aid Cabinet)141 units6Cabinet, Design 6 (Waiter Station42 unitsCabinet)7Work Bench with Bench Vise on70 unitsFour Corners1 PageABCin 163.5113,818,760.48

Supply, Distribution, Configuration, Testing, Commissioning, Training and Maintenance of TVL Tools and Equipment Packages to Public Senior High Schools(Cabinets, Various Tools and Equipment)Annex “C”COMPUTATION(Bid Security, SLCC and NFCC)Forms of Bid Security (in PhP)SLCCNFCCBank draft/guarantee or irrevocableletter of credit issued by a Universalor Commercial Bank: Provided,however, that it shall be confirmed orauthenticated by a Universal orCommercial Bank, if issued by aforeign bank; Cashier’s / manager’s check issuedby a Universal or Commercial Bank(2% of ABC)Surety bond callable upondemand issued by a suretyor insurance company dulycertified by the InsuranceCommission as authorizedto issue such security(5% of %25%100%8,915,210.3935,660,841.55LotNo.ABC(in 7.27 10,533,138.63 18-89,433,581.76 44,716,790.88 178,867,163.51513,818,760.48276,375.21690,938.02-1 .9313,818,760.48

Supply, Distribution, Configuration, Testing, Commissioning, Training and Maintenance of TVL Tools andEquipment Packages to Public Senior High Schools(Cabinets, Various Tools and Equipment)Annex “D”Quality Assurance Procedures During Contract Implementation(Pursuant to DO 041, s. 2021)Pre-Delivery Inspection (PDI):I.General Instructions:(a)The Supplier shall send request for inspection stating the goods to be inspectedand the quantity to Contract Management Division (CMD). The Supplier shallensure that the goods for inspection are available in their warehouse in thePhilippines.(b)The Supplier in coordination with the DepEd Inspectors shall prepare theinspection area, to ensure smooth inspection flow. The inspection area shallhave enough space and well ventilated.(c)The approved sample shall be used as reference during PDI. Change of approvedsample is not allowed.(d)The Inspection and Test Protocol shall guide the conduct of the PDI.(e)The PDI shall be based on the sampling plan prepared by the End User (EU)pursuant to DO 041 s 2021.(f)The conduct of the PDI shall be properly documented by the DepEd InspectionTeam including the taking of pictures to the goods inspected and the executionof the actual inspection.(g)DepEd Inspectors shall prepare the Inspection Report and the Supplier orhis/her authorize representative must sign the Inspection Report asconcurrence.(h)The goods shall pass the international or local quality control standards. Forimported goods such as ISO, CE, ASTM, and the likes while PS mark for locallyproduced goods. This shall be manifested by sticker found in the goods orsubmit documents that the manufacturer not the supplier is ISO, CE, ASTMcertified on quality process only. The Procuring Entity shall conduct validationof the submitted documents.

2.Steel Cabinets:Preparation by the Supplier:1. Lifting equipment and personnel shall be available and ready to assist the DepEdinspectors to fast track the PDI.Conduct of the PDI by the DepEd Inspectors:1. The conduct of the PDI for the steel cabinets shall be of two steps as follows:1.1: Step 1: PDI of the still disassembled parts of the cabinet. Dimensional and visual inspection of the parts of the still disassembledcabinet shall be based on the random sampling plan prepared by the EUpursuant to DO 041 s 2021. It shall conform to the drawing and the technicalspecifications. There must be no deformities, dents, and otherdeficiencies/defects.Conduct powder-coating test to ensure that surface is powder coated notliquid paint coated and to validate the quality of the powder coat.Rejection shall follow the sampling plan. The rejected lot shall be sorted bythe Supplier and re-submit to the DepEd inspectors for reinspection/evaluation.1.2. Step 2: Stability test of the assembled cabinets. Assemble one (1) unit per lot of the disassembled cabinets that passed Step1.The assembled cabinets shall be subjected to visual inspection, dimensionalinspection, and stability test by moving it sideways, forward, and backwardand tilt 30 degrees both ways from the vertical position.If the first assembled cabinet is found to be to be conformance to the drawingand technical specifications and stable during the stability test, the lot shallbe accepted.However, if the first assembled cabinet is found to have any of the followingfindings: a) nonconformance to the drawing and the technical specificationsand b) not stable during the stability test, assemble the second cabinet fromthe same lot and to be subjected to same inspection and test proceduresconducted to the first assembled cabinet, if the second assembled cabinet isagain found to have the defects similar with the first assembled cabinet,reject the entire lot and discuss with the Supplier the defects found forrectification or replacement.The Supplier shall sort the rejected lot and re-submit the sorted lot to theDepEd inspectors for re-inspection/evaluation.The Supplier/Forwarder upon delivery shall properly assemble the cabinets at thedelivery site (recipient school). The Procuring Entity shall make no payment to theSupplier/Forwarder if the cabinets are found to be: a) not assembled; b) assembly isdefective; and c) not place in the proper location as recommended by the school heador his/her authorized representative/s such as but not limited to Science/TVLLaboratories. The school head or his/her authorized representative shall properlydocument all deficiencies found and submit a report to Contract ManagementDivision (CMD) or BLR Cebu copy furnish Schools Division Office and Regional Office.2 of 2

Supply, Distribution, Configuration, Testing, Commissioning, Training and Maintenance of TVL Tools andEquipment Packages to Public Senior High Schools(Cabinets, Various Tools and Equipment)Annex “E”LOCATION OF SAMPLE SUBMISSION AND EVALUATIONItemNo.Lot l:12345678910DescriptionQuantityAgricultural EquipmentChainsaw, Portable397 unitsChipper shredder6 unitsCompactor, Mechanical6 unitsCutter, Grass923 unitsHedge trimmer, Power12 unitsMower, Lawn52 unitsSoil auger, One-man6 unitsSoil auger, Two-man6 unitsSprayer, Power415 unitsTelescopic shaft or Power high12 unitsbranch pruner11Tractor, Hand, with Implements389 unitsLot 2: Bread and Pastry and Cookery Equipment1Commercial Stand Mixer with316 unitsComplete Attachment2Decker Oven316 units3Mechanical Dough Roller316 units4Gas range w/ oven, 4 burner674 units5Stock pan burner21 unitsLot 3: Refrigerators and Freezers1Freezer93 units2Reach-in freezer21 units3Reach-in refrigerator21 units4Refrigerator, 7 cu. ft.543 units5Refrigerator51 units(for Artificial Insemination)6Upright Freezer316 unitsLot 4: Information Technology Devices and Accessories1Computer, Laptop4,721 units2Plotter29 units3Printer411 units4Smart TV213 unitsLot 5: Mass Production1Cabinet, Design 1 (Storage/tool270 unitscabinet)2Cabinet, Design 2 (Condiment86 unitscabinet)3Cabinet, Design 3 (Display Cabinet)40 units4Cabinet, Design 4 (Filing cabinet)43 units5Cabinet, Design 5 (First Aid Cabinet)141 units6Cabinet, Design 6 (Waiter Station42 unitsCabinet)7Work Bench with Bench Vise on70 unitsFour Corners1 PageLocationBidder’s WarehouseBidder’s WarehouseBidder’s WarehouseCentral OfficeBidder’s Warehouse

Supply, Distribution, Configuration, Testing, Commissioning, Training and Maintenance of TVL Tools andEquipment Packages to Public Senior High Schools(Cabinets, Various Tools and Equipment)Annex “F”Inspection and Test ProtocolI.General Procedures:All items will be subjected to the following procedures, whichever is applicable:a. Evaluate the parameters of the goods as indicated in the specifications e.g.,material, dimensions, capacity, power rating, etc. which can be found in theitem's nameplate. All areas must conform to the technical specifications.Please note that variations on dimensions without tolerance will be evaluatedaccording to “DIN ISO 2768- T1, c (coarse)";b. Look for any evidence of defects such as, but not limited to, rust formation,broken parts, etc. that affects function or overall performance as a whole. Allitems must be free from defects;c. Check the completeness of parts/accessories;d. Evaluate the functionality and performance of each item. A representativefrom the Bidder/Supplier shall perform the functionality and performance testin the presence of the TWG.II.Detailed Inspection and Test ProceduresItemNo.DescriptionInspection and Test ProceduresLot l: Agricultural Equipment12Chainsaw, PortableChipper shredder1 PageFunctionality/Performance1. Idle Run. Start the engine and let it run idle for at leasta minute. Repeat for at least 3 trials. The engine shall runcontinuously with the blade at rest.2. Speed Test. Measure the speed using the tachometerand a reflector. Remove the cover momentarily tofacilitate access on the sprocket. Attached the reflector tothe sprocket. Let the engine run and measure the speed.It shall give a reading of at least 3,000 rev/minute.3. Take note of the initial condition of its cutter. Conductactual cutting of wood like coco lumber with the size atleast 6"x6"x6' across and along the grain. It must cut thelumber with minimal effort without permanentdeformation on cutter, blade and on the chain saw as awhole.Needed tools & materials: ruler, tachometer, gasoline, 2Toil and coco-lumber or equivalent 6"x6"x6' minimum size(shall be provided by the Bidder/Supplier during test).Functionality/Performance1. Check engine type (4-Stroke) by the followingindicators:a. mark on its nameplate or in user's manualb. There must a lube oil of working level in the engine2. Operate the machine to check: engine condition (e.g.,runs smooth, no clunky/explosive sound); the chippingcapacity of up to 3”-size as stipulated in the specification;it shall run in 1 or 2 pull start.Take more trials to verify reliability and serviceability.

Needed tools & materials: gasoline, engine lube oil, twigsand up to 3”' wood/tree branch (shall be provided by theBidder/Supplier during test)3456Compactor, MechanicalCutter, GrassHedge trimmer, PowerMower, Lawn2 PageFunctionality/Performance1. Check engine type (4-Stroke) by the followingindicators:a. mark on its nameplate or in user's manualb. There must a lube oil of working level in the engine2. Start the engine and let it run for at least a minute.Repeat for at least 3 trials. The engine shall run in 1 or 2pull start and continuously run with no irregular noiselike knocking and clunking/popping sound.3. Frequency. Use the tachometer and attach the reflectorto the weighed eccentric shaft. Let the unit run and shallgive a reading of 4200 RPM or VPM equivalent to 70Hzspecified.4. Conduct actual compacting of soil (loose) for 5 minutesto verify reliability and serviceability.Needed tools and materials: ruler, tachometer, gasoline,engine lube oil, ground with shallow loose top soil (shallbe provided by the Bidder during test)Functionality/Performance1. Idle Run. Start the engine and let it run idle for at leasta minute. Repeat for at least 3 trials. The engine shall runcontinuously smooth with the cutter head at rest,without strange sound e.g. clunking, explosive2. Speed Test. Let the grass cutter run. Measure therotation speed of the cutter head using the tachometerand a reflector. It shall give a reading of at least 2,800rev/minute.3. Conduct actual cutting of grass for several trialsto verify reliability and serviceability.Needed tools and materials: gasoline, 2T oil, lawn withmedium to long grass (shall be provided by the Bidderduring test)Functionality/Performance1. Check engine type (4-Stroke) by the followingindicators:a. mark on its nameplate or in user's manualb. There must a lube oil of working level in the engine2. Idle Run. Start the engine and let it run idle for at leasta minute. Repeat for at least 3 trials. The engine shall runcontinuously smooth with the cutter head at rest,without strange sound e.g. clunking, explosive3. Conduct actual cutting of a 10 to 20-inch wide hedgegrass. It must cut the hedge grass with minimal effort andwithout permanent deformation on cutter, blade and onthe unit as a whole.Take more trials to verify reliability and serviceability.Needed tools and materials: gasoline, engine lube oil,hedge grass 10 to 20 inches wide (shall be provided bythe Bidder during test)Functionality/Performance

1. Check engine type (4-Stroke) by the followingindicators:a. mark on its nameplate or in user's manualb. There must a lube oil of working level in the engine2. Start the engine and let it run idle for at least a minute.Repeat for at least 3 trials. The engine shall runcontinuously smooth, without strange sound e.g.clunking, explosive3. Conduct actual cutting of grass. It shall cut the grassat specified cutting width and height fast with minimaleffort and without permanent deformation on cutter,blade and on the unit as a whole.Take more trials to verify reliability and serviceability.789Soil auger, One-manSoil auger, Two-manSprayer, Power3 PageNeeded tools and materials: gasoline, engine lube oil,lawn with medium to long grass (shall be provided by theBidder during test)Functionality/Performance1. Check engine type (4-Stroke) by the followingindicators:a. mark on its nameplate or in user's manualb. There must a lube oil of working level in the engine2. Start the engine and let it run idle for at least a minute.Repeat for at least 3 trials. The engine shall runcontinuously smooth with the blade at rest, withoutstrange sound e.g. clunking, explosive.3. Conduct a one-man digging of hole on soil at least onefoot deep. It shall dig fast with minimal effort withoutdeformation on the blade and the unit as a whole.Take more trials to verify reliability and serviceability.Needed tools and materials: gasoline, engine lube oil,earth (shall be provided by the Bidder during test)Functionality /Performance1. Start the engine and let it run idle for at least a minute.Repeat for at least 3 trials. The engine shall runcontinuously smooth with the blade at rest, withoutstrange sound e.g. clunking, explosive.2. Conduct a two-man digging of hole on earth at leastone foot deep. It shall dig fast with minimal effort withoutdeformation on blade and the unit as a whole.Take more trials to verify reliability and serviceability.Needed tools and materials: gasoline, 2T oil, earth (shallbe provided by the Bidder during test)Functionality/Performance1. Check engine type (4-Stroke) by the followingindicators:a. mark on its nameplate or in user's manualb. There must a lube oil of working level in the engine2. Start the engine and let it run idle for at least a minute.Repeat for at least 3 trials. The engine shall runcontinuously smooth, without strange sound e.g.clunking, explosive.3. At full tank capacity, carry on the sprayer and conductactual spraying on grass and trees using water for 5minutes or until the tank dries to verify reliability andserviceability of the unit and its accessories. It shall

spray a) in different patterns b) on higher altitude objectlike trees and c) at volume rate stated in the specification.1011Telescopic shaft orPower high branchprunerTractor, Hand, withImplementsNeeded tools and materials: water, gasoline, engine lubeoil (shall be provided by the Bidder during test)Functionality/Performance1. Idle Run. Start the engine and let it run idle for at leasta minute. Repeat for at least 3 trials. The engine shall runin 1 or 2-pull start and continuously run smooth with lunking and popping sound.2. Take note of the initial condition of its cutter. Conductactual pruning in five cuttings of a high branch 6-inchdiameter with its pole in full length to verify reliability andserviceability. It shall cut tree branch with minimal effortwithout permanent deformation on cutter, blade and onthe chain saw as a whole.Needed tools and materials: tape rule, gasoline, 2T (shallbe provided by the Bidder during test)Functionality/Performancea) Start the engine for five (5) minutes and switch it"OFF". After two (2) minutes start again the engine andrepeat the same procedure three (3) times. There must beno strange sound like thumps or clunks.b) Check each agricultural implement such as; singlefurrow plough, disc plough, and rototiller. It must fit tothe linkage of the equipment either by towing behind ormounting. Perform the functionality test using eachagricultural implement on a 2 ft. x 20 ft. plot. Eachimplement must function as intended. The single furrowplough and disc plough must be able to turn over theuppermost soil. The rototiller must turn the soil, breakup large deposits, and kill weeds at the surface.Needed tools and materials: tape rule, diesel fuel (shall beprovided by the Bidder during test)Lot 2: Bread and Pastry and Cookery Equipment1Commercial Stand Mixerwith CompleteAttachmentFunctionality/Performance1. Administer mandatory functional testing by runningthe machine for fifteen minutes based on the specifiedoperating procedure to determine that it is fullyserviceable2. Monitor all moving parts, it shall without anyabnormalities, sparks, and irregular noise in motorbearing4. Execute endurance testing for a series of five test runswith one minute each to determine how the machinebehaves under sustained use.Load Testing using the three (3) attachments:by using the aluminum dough hookby using the stainless wire whipby using the aluminum flat beaterNeeded tools and materials: 5 kilo flour, water, tape rule,shall be provided by the Bidder during test)4 Page

2Decker OvenFunctionality/Performance1. Administer mandatory functionality testing based onthe operating instructions. The following tests are asfollows: a. Ignition system test, b. Gas leak test of LPGregulator and hose using soap and water2. execute endurance testing for a series of five test runsfor one minute each to determine how the equipmentbehaves under sustained use.3. Verify oven Temperature range from 0 to at least 350degrees centigrade using infrared thermometer relative tothe digital display.4. Check heat of the oven exterior as stated in thespecification #11.5. Monitor the machine, it shall without anyabnormalities and irregular noiseLoad testing6. The supplier should perform the actual demonstrationand provide raw materials needed like dough, etc. for loadtesting3Mechanical DoughRollerNeeded tools and materials: 5 kilos dough, tape rule,(shall be provided by the Bidder during test)Functionality/Performance1. Administer mandatory functional testing by runningthe machine for fifteen minutes based on the specifiedoperating procedure to determine that it is fullyserviceable2. Monitor the motor, it must be without anyabnormalities, sparks, and irregular noise in motorbearing3. Execute endurance testing for a series of five test runswith one minute each to determine how the machinebehaves under sustained use.Load testing4. The supplier should perform the actual demonstrationin dough load testing and provide dough at least 5 kilosof flour use for testing4Gas range w/ oven, 4burners5 PageNeeded tools and materials: 5 kilos freshly mixed dough,tape rule, (shall be provided by the Bidder during test)Functionality test:1. administer mandatory functionality testing based onthe operating instructions. The following tests are asfollows: a. Automatic electronic Ignition system test, b.Gas leak test of LPG regulator and hose using soap andwater2. execute endurance testing in every burner for a seriesof five test runs for one minute each to determine how theequipment behaves under sustained use3. Monitor the machine without any abnormalities andirregular noise4. Measure the temperature of the oven by using theinfrared thermometer to verify Temperature range from 0to at least 250 degrees centigrade.

Load testing:5. The supplier should perform the actual demonstrationon how to use and provide any kitchen utensil and rawmaterials for cooking test.5Stock pan burnerNeeded tools and materials: tape rule, micrometer/Verniercaliper, infrared thermometer, soap, water, rugs (shall beprovided by the Bidder during test)Functionality test:1. administer mandatory functionality testing based onthe operating instructions as follows: Turn on the gas andhave a leak test on the LPG regulator and hose using soapand water2. Execute endurance testing for a series of five test runsfor one minute each to determine how the equipmentbehaves under sustained use3. Monitor the burner without any abnormalities andirregular noiseLoad testing:4. The supplier should perform the actual demonstrationon how to use and provide any kitchen utensil and rawmaterials for cooking test.Needed tools and materials: soap, water, rugs (shall beprovided by the Bidder during test)Lot 3: Refrigerators and Freezers12FreezerReach-in freezerFunctionality test:1. Administer mandatory Functional Testing by runningthe machine for one hour based on the specifiedoperating procedures to determine that it is fullyserviceable. Freeze a bottle of water using the equipment;2. Monitor the motor. There must be no abnormalitiesand irregular noise;3. Execute endurance testing for a series of five test runswith one minute each to determine how the machinebehaves under sustained use.Needed tools and materials: tape rule, thermometer (18 C or lower), Bottled water (shall be provided by theBidder during test)Functionality test:1. Administer mandatory Functional Testing by runningthe machine for one hour based on the specifiedoperating procedures to determine that it is fullyserviceable. Freeze a bottle of water using the equipment;2. Temperature setting at least -18 C3. Monitor the motor. There must be no abnormalitiesand irregular noise;4. Execute endurance testing for a series of five test runswith one minute each to determine how the machinebehaves under sustained use.Needed tools and materials: tape rule, thermometer (18 C or lower), Bottled water (shall be provided by theBidder during test)6 Page

3456Reach-in refrigeratorRefrigerator, 7 cu. ft.Refrigerator(for ArtificialInsemination)Upright FreezerFunctionality test:1. Administer mandatory Functional Testing by runningthe machine for one hour based on the specifiedoperating procedures to determine that it is fullyserviceable. Freeze a bottle of water using the equipment;2. Temperature Range: 0⁰C to 10⁰C3. Monitor the motor. There must be no abnormalitiesand irregular noise;4. Execute endurance testing for a series of five test runswith one minute each to determine how the machinebehaves under sustained use.Needed tools and materials: tape rule, thermometer (-0 Cor lower), Bottled water (shall be provided by the Bidderduring test)Functionality test:1. Administer mandatory Functional Testing by runningthe machine for one hour based on the specifiedoperating procedures to determine that it is fullyserviceable. Freeze a bottle of water using the equipment;2. Monitor the motor. There must be no abnormalitiesand irregular noise;3. Execute endurance testing for a series of five test runswith one minute each to determine how the machinebehaves under sustained use.Needed tools and materials: tape rule, thermometer (-0 Cor lower), Bottled water (shall be provided by the Bidderduring test)Functionality test1. Administer mandatory Functional Testing by runningthe machine for 40 minutes to one hour based on thespecified operating procedures to determine that it is fullyserviceable. It must maintain 16 to 17-degree Centigradetemperature.2. Monitor the motor. There must be no abnormalitiesand irregular noise;3. Execute endurance testing for a series of five test runswith one minute each to determine how the machinebehaves under sustained use.Needed tools and materials: tape rule, thermometer (-0 Cor lower)Functionality test1. Administer mandatory Functional Testing by runningthe machine for one hour based on the specifiedoperating procedures to determine that it is fullyserviceable. Freeze a bottle of water using the equipment;2. Monitor the motor. There must be no abnormalitiesand irregular noise;3. Execute endurance testing for a series of five test runswith one minute each to determine how the machinebehaves under sustained useNeeded tools and materials: tape rule, magnet,thermometer (-18oC or lower), Bottled water (shall beprovided by the Bidder during test)7 Page

Lot 4: Information Technology Devices and Accessories1234Computer, LaptopPlotterPrinterSmart TV8 Page1. Operate the laptop computer in accordance with itsuser's manual. Turn on the laptop, take access and viewits full specifications on the screen. Crosscheck thespecifications displayed on the screen with the requiredspecification. The laptop computer shall at least meet theminimum of the required specifications.2. Optical Drive. Place CD (with data information orsoftware) in the drive. It shall read, process, store, displaydata information in the CD of at least the following: a)driver and software of printer/plotter, b) CAD, c) windowsfile, d) MS Excel file, e) video and audio.3. Moreover, verify the rest of the features e.g., built-incamera, Ethernet connection, wireless LAN, Bluetooth,keyboard, wi

1 Freezer 93 units 3 2 Reach-in freezer 21 units Reach-in refrigerator 21 units 4 Refrigerator, 7 cu. ft. 543 units 5 Refrigerator (for Artificial Insemination) 51 units 6 Upright Freezer 316 units Lot 4: Information Technology Devices and Accessories 1 Computer, Laptop 4,721 units 3 Plotter 29 units Printer 411 units 4 Smart TV 213 units

Related Documents:

Defining Commissioning for GSA Buildings Commissioning ensures the delivery of efficient, durable, and comfortable facilities. ASHRAE Guideline 0‐2019 The Commissioning Process defines commissioning as follows: “Commissioning Process (Cx): a quality‐focused process for enhancing the delivery of a project. The

Commissioning Your Way To High Performance Buildings THE COMMISSIONING PROCESS Core Phases Of The Commissioning Process PRE-DESIGN STAGE The owner selects the design team, which includes the commissioning authority (CxA). Commissioning authority consists of the initial Cx team and team leader, and they are involved from project initiation

HV/EHV AC HiPot & PD Testing and Commissioning Capabilities On-Site Testing Commissioning Testing On-Site AC HiPot Commissioning Testing as per IEC 60840 and IEC 62067 Testing of up to 500 kV cables at 1.7U0 via extension set. Terminal Partial Discharge Testing for short, non-jointed cable systems

Commissioning the Building Building Commissioning Building commissioning: Is a systematic and designed process coordi nated by a commissioning authority or team. Includes documentation, verification pro cedures, functional performance tests, valida tion, and training. Is performed specifically to ensure building

“Commissioning” (Cx) Process Applied to New Buildings “Re-Commissioning” (RCx) Process Repeated for Buildings That Have Been Commissioned “Existing Building Commissioning” (EBCx) Process Applied to Existing Buildings Not Previously Commissioned (replaces the older term “Retro-commissioning”). 5

This guideline describes the total building commissioning process and the responsibilities of the Commissioning Authority and the Owner. Selecting and developing a Commissioning Plan following this guideline assures Caltech of whole-building commissioning meeting the OPR, and a sustaina

Commissioning Commissioning is the phase in a project when design process fluids are introduced to the process. Note that for hydrocarbon systems the commissioning activities commence with inerting operations. Commissioning activities normally consist of activities associ

b. A Certified Building Commissioning Professional, certified by the Association of Energy Engineers (AEE); c. An Existing Building Commissioning Professional (CBCP) as certified by the AEE; or d. A Commissioning Process Management Professional (CPMP) certified by ASHRAE The retro-commissioning