FALLING BEHINDon Electrical SafetyWide Variations inState Adoptions of the NEC Reveal Neglectof Electrical SafetyMarch 15, 2018

FALLING BEHINDon Electrical SafetyTHE NATIONAL ELECTRICAL CODE (NEC ) is thebenchmark for safe electrical design, installation, and inspectionto protect people and property from electrical hazards. Acrossthe country, states and local governments adopt the NEC to helpensure electrical safety for their citizens. However, while theNEC is updated in a national process every three years, statesvary widely in when—or if—they adopt these updates, deprivingcitizens of the benefits the updated codes offer.EXECUTIVE SUMMARYIn an independent survey commissioned by the NFPA Fire& Life Safety Policy Institute, over 80 percent of U.S. residents polled feel that policymakers should make it a priorityto ensure electrical and fire safety codes are up-to-date, and86 percent believe that if they purchased a newly-constructed home today, it would meet the most up-to-date codes.States should strive to meet these expectations.First published in 1897, the NEC has been an integralcomponent of electrical safety for over 120 years. Itsdevelopment and publication is overseen by the NationalFire Protection Association (NFPA), an independent, notfor-profit organization. The update process brings togetherhundreds of participants, all representing interests impacted by the NEC. Those involved work toward consensus ina process marked by checks and balances that ensure noone group of stakeholders can dominate. Because technology changes frequently, updates every three years ensure theNEC enables innovation while guiding safety for electricaldesign, installation, and inspection. These updates advancethe level of safety provided by the NEC as new technologyor new knowledge helps reduce the risk of fire and shockhazards inherent in the use of electricity. While electricalsafety has improved considerably over the past 35 years,continued progress is needed to address the fact that stillan average of 432 people still die each year in fires attributed to an electrical malfunction.1Despite the NEC’s role as the most current guidancefor electrical safety—and its role in promoting economicover61,000The averagenumber of fireseach year dueto electricalfailures ormalfunctionsefficiency through uniformity—statepractices for adopting these updatesvary significantly across the country. For example, in Massachusetts,the effective date for state's updatedelectrical code is typically six monthsfrom the time it is published by NFPA.In other states, the timeline for thesame task can stretch months, andyears, longer. Moreover, over the past3 cycles of the NEC (2008, 2011, and2014), nearly one third of the statesthat adopt a statewide electrical codehave skipped one or more updates.Not only do states devote markedlydifferent amounts of time to completing the same task, many also eliminaterequirements, reducing the overalllevel of safety offered by each update.Review of state statutes andpractices, as well as insights frominterviews with individuals recentlyresponsible for state level adoptions,reveal that there are a number of factors contributing to this patchwork ofdelays and amendments. One of thesefactors is political pressure, whichcan be seen in the form of greaterlegislative involvement in constrcution codes, an increased scrutiny of2

FALLING BEHINDon Electrical Safetyregulatory activities, a focus on cost without consideration of benefits, and less independence for the appointedexperts involved in code adoption. Other issues impactthe process, too. States that entrust adoption to electricalboards, and those with statewide licensing for electricians,are quicker to adopt updates. In addition, some statesprioritize the NEC, adopting updates independent of otherconstructioncodes and thus“Legislators are having a moreadopting moreinvolved role, which wasn’t thepromptly.case in the past. Even whenWhatever theit first went that way, it didn’tcause, the delayreally go on. They usually wentin implementon the recommendation ofthese boards . . . You wouldn’ting the updatedexpect an elected officialelectrical code—to know anything about theor pressures toelectrical codes. They’d relyremove safetyon the committee to adviserequirements—the legislators that, ‘yes, thismeans delaysis good.’”in safety for—Interview Participantresidents and theforestalling ofinnovation. As policymakers consider how to meet theexpectations of the overwhelming number of citizenswho expect to be protected by the most current knowledge available, the national NEC development processshould be a resource. Policymakers should consider empowering and cultivating electrical experts, prioritizingthe adoption of the NEC statewide, and considering costsin a holistic context.that same time period, resulting in anadditional 10 fatalities and 200 injuries.6 Collectively, these fires cause anestimated 2.014 billion in damageeach year.7 Shock hazards also remaina significant issue. In 2016, the mostrecent year for which data is available in the CPSC National ElectronicInjury Surveillance System database,injuries involving electrical receptacles(outlets) sent an estimated 4,750 people to hospital emergency rooms. Thedata show that 61percent of injurieswere burns due to electrical shock,and that 59 percent of those injuredwere children age 17 and younger.8The NEC is updated every threeyears in order to incorporate recentadvances in safety and continue toaddress the loss of life and propertyfrom electrical fires and related hazards. In addition, the updates enableinnovation—be it new technology orcost reducing measures. The updateprocess is robust and relies on theinput of hundreds of experts.CHANGES TO THE NECBACKGROUNDOver the past 30 to 35 years, electrical safety has steadilyimproved, due to advances in wiring and technology andfacilitated by updates to the NEC. From 1980 to 2014,the number of home fires in the U.S. involving electricalmalfunctions or failure fell from 75,000 to 48,100.2 Relatedly, according to the Consumer Product Safety Commission (CPSC), electrocutions associated with homewiring fell by more than half between the mid 1970s andmid 1990s due largely to requirements in the NEC.3Over the same 1980 to 2014 period, the number of nonhome electrical fires fell from 34,800 to 14,400.4Despite these successes, from 2010 to 2014, an average of 45,210 reported U.S. home fires involved electricalfailures or malfunctions. These fires claimed an averageof 420 lives each year and injured 1,370.5 An estimated16,070 non-home electrical fires took place each year over2,899burns orelectric shockinjuries in2016 involvingelectricalreceptacles(outlets)The incorporation of technology andnew knowledge helps reduce the risksof fire and shock injuries as the NECis applied to electrical installations inhomes, schools, businesses, and othersettings. These advances include:» The inclusion of arc fault circuitinterrupters (AFCIs) beginningin the 1999 NEC. AFCIs preventdangerous arcs of current bydetecting—and rapidly respondingto—damage to wires, whether theybe concealed in walls or ceilings,or are a part of lamps, appliances,extension cords, or other devicesplugged into a receptacle. Preventing these arcs of current reducesthe risk of electrical fires.» Restricting the use of aluminuminternal wiring in houses and other buildings since the 1970s when3

FALLING BEHINDon Electrical Safetyit was discovered to be prone to degradation, increasingthe risk of electrical fire.» Expanding the use of ground fault circuit interrupters(GFCIs) from underwater swimming pool lighting in1968 to additional locations where electrical receptaclesare in proximity to water. GFCIs shut off power near instantaneously if they detect current has “strayed” fromits intended path, preventing shocks to people.» Requiring tamper-resistant receptacles since the 2008NEC to reduce the risk of shock injury to young children. Each year, approximately 2,400 children suffersevere injuries from inserting objects into electricalsockets, and as many as 12 die each year.9 These receptacles, which only open if equal pressure is exerted onboth slots simultaneously, stand to significantly reducethese injuries to children.» Requirements to protect people working on or nearelectrical equipment. The 2017 NEC includes provisionsthat decrease the risk of dangerous arc flashes from highvoltage electrical equipment. It also includes provisionsfor the rapid shutdown of Photovoltaic (PV) systems toprotect fire fighters and other emergency responders whomay require access to locations with charged PV systems.THE MAKING OF THE 2017Updated versions of the NEC often enable more costefficient electrical installations as well. For example, bytaking into account the lower electricity load of buildingsconstructed to modern energy conservation codes, the2017 edition of the NEC permits the design of electricalsystems with smaller components that not only costless, but are also less hazardous for workers who mayneed to service them. Ongoing research continues topursue data tosupport furtherOver the previous“right-sizing” ofelectrical systemcomponents, ensuring they canof the NEC (2008, 2011, andsafely handle re2014), as many as one thirdquired loads butof the states have skippedare not over-deone or more updates.signed andtherefore morecostly. As buildings use less energy through advancesin smart building technology and new building materials, future versions of the NEC can enable the savings ofmillions of dollars.103 cyclesNATIONAL ELECTRICAL CODE Hundreds of participants give theirtime and expertise to each update.Each panel member represents oneof the following interest categories:LaborManufacturersEnforcerTesting LabTHE NEC EQUATIONThe 520 panel members serve on 19 code-makingpanels. Each panel can have no more than one thirdof its representation from the same interest category.This principle of balance prevents any single interestcategory from dominating the process and ensuresall voices have the opportunity to be heard. The 520panel members reviewed and debated more than5,500 public inputs during 35,000 pecial Experts520 5,500 35,000PANELMEMBERSPUBLIC INPUTSTHROUGHTWO ROUNDS OFPUBLIC ers33%MAXIMUMREPRESENTATION ONANY PANEL OF ANYINTEREST CATEGORY4

FALLING BEHINDon Electrical SafetyOutdated requirements can also pose roadblocks tonew technologies and to the goals those technologies enable, like the increased use of renewable energy sourcesand improved energy efficiency. Updates to the NEC canenable new technology, such as energy storage systems(ESS), which analysts predict will be the key to advancing a renewable energy future. Anticipating greater useof ESS, the 2017 NEC has provisions guiding the installation of a wide variety of ESS technologies in homesand commercial settings. ESS not only hold the key forgreater use of renewables but may also minimize theneed to construct new power plants, potentially savingmillions of dollars.Photovoltaic (PV) panels provide another example ofhow the NEC supports new technology. As the efficiencyof PV panels has improved, energy providers are considering larger systems to supply wholesale power. While theNEC has long considered building-integrated PV systems,the 2017 NEC includes provisions specifically for theselarge-scale PV electric power production facilities with ageneration capacity over 5000 Kilowatts, helping designers, installers, and inspectors ensure they meet minimumsafety requirements and making their installations morecost efficient.DEVELOPMENT OF THE NECAs shown in the figure at the bottom of page 4, eachupdate to the NEC is the product of an extensive processof stakeholder input, dedication from participants, and aprocess marked by checks and balances that ensures nosingle group of stakeholders can dominate. Importantfeatures of the process include:» T he involvement of over 500 experts who represent tendifferent stakeholder categories. For the 2017 NEC, theseparticipants collectively contribute 35,000 hours of timeto meetings facilitated by NFPA staff.» P ublic participation in the form of over 5,500 public comments, accepted at two different stages in the developmentprocess. Anyone can submit a comment through NFPA’sonline system and each comment must be considered.» B alance requirements which govern the participation onthe NEC code making panels as well as the number ofvotes needed to approve a change to the code. No morethan one third of each NEC code making panel can becomprised of stakeholders representing a single stakeholder category, preventing dominance by any one group. Inaddition, any changes require the approval of two thirds ofthe panel member before they can become part of the code.Adoption Duration in Months: Northeast5

FALLING BEHINDon Electrical SafetyAdoption Duration in Months: SouthAdoption Duration in Months: MidwestGraphs show the number of months from availability of updated NEC edition to the date on which it went into effect in each state. The striped bars indicate that theadoption process for that particular code is ongoing or the effective date is not yet official. Note: Arizona, Kansas, Nevada, Illinois, Missouri, and Mississippi are notpictured above. In those states, electrical code decisions are made solely at the county level. The states of Alabama, Texas, Tennessee, and Maryland, which are picturedabove, rely on statewide adoptions for some applications but authorize counties (or cities) to adopt and enforce their own codes. Data current through January 20186

FALLING BEHINDon Electrical SafetyAdoption Duration in Months: West»O pportunities to appeal code provisions to dis-interestedparties, such as the independent NFPA Standards Council.REVIEW OF STATE ADOPTION PRACTICESAdoption DataCurrently 44 states adopt a statewide electrical code,generally following some type of administrative processto do so. In other states, electrical safety is governedthrough a patchwork of county- or local-level rules. Aspictured in the graphs above, the number of monthsbetween the availability of the updated NEC“It was the lesser of twofrom NFPA (typically,evils. Give them this andthe August before theget the majority of thetitle year) and the efcode or fight for it andfective date enforced bylose all of it. We had toa state for the updatechoose our battles tovaries widely.win the war.”The data reveal—Interview Participantthat about one thirdof the states shownabove have skipped one or more of the updates thatwere available for 2008, 2011, and 2014. In addition,while the average length of time between the availabilityof each update and its enforcement date is nearly thesame for 2008, 2011, and 2014—23, 23, and 24 monthsrespectively—there is considerable variation at the statelevel that correlates with different adoption practices, asdiscussed below.Role of SpecialistsTo facilitate code update review and promulgation, statestypically rely on one of the following: a dedicated electricalregulatory board that is composed entirely of professionalswithin the electrical field, a more generalized constructionboard that is responsible for the adoption of all construction codes, or a state agency.200820112014With Electrical Board151313Without Electrical Board282931Average adoption duration, monthsStates without dedicated electrical boards were twotimes as likely to skip an update over the past threeNEC cycles as those with such boards. (see Appendix Afor breakdown of state practices). States with electricalboards also tend to adopt new updates in roughly half thetime as states that do not rely on an electrical board.Most states require electricians, electrical contractors,and/or electrical inspectors to be licensed, often under requirements set by an electrical board. Those states which7

FALLING BEHINDon Electrical Safetyleave licensing decisions to the local level take over threeyears to adopt NEC updates, if they are adopted at all.Prioritization of the NECThe NEC is just one of several nationally developed codesthat impact construction. Other codes include those forresidential and commercial building, energy conservationand plumbing. Some states use the building code’s reference to the NEC as the electrical code for the state. Otherstates move to adopt all of the codes at one time. Thecodes are developed by different organizations and adhereto different publication schedules. States that packagetheir code adoptions inevitably are much further behind intheir adoption of the NEC.200820112014NEC adopted with other codes 312931NEC adopted independently191816Average adoption duration, monthsINSIGHTS FROM INTERVIEWSTo gain a greater understanding of the strengths and challenges of the electrical code update process, the Policy Institute commissioned 27 in-depth interviews with professionals who had served oncode promulgating boards“My goals were to getor commissions in theit adopted withoutpast five years, but whoamendment. Somewere no longer serving.things I agreed toThe interviews, conductedamend, but only whenvia phone (19) or onlinethey are stricter thansurvey (8), sought thethe code.”experiences and insights—Interview Participantof participants from acrossthe U.S. In addition, theresearchers engaged a follow-up focus group of five of the27 participants to further discuss their experiences withthe NEC adoption process.Growing Political PressuresSurvey and interview participants expressed concernsover the growing influence of politics in the electricalcode update adoption process. Some relayed that legislators were increasingly circumventing the committees andboards responsible for code adoption and worried thatsafety decisions were being made more political in natureand not on the basis of expertise. Such involvement, theynoted, tended to delay adoption and dilute safety standards. Moreover, some reported that content that mightraise objections was preemptively removed, regardless oftechnical merit,for the sake ofOf the states that have amoving forwarddedicated electrical board,with the update.Across theboard, interviewand survey parhave skipped an NECticipants notedupdate over the last threethat the homecycles, compared tobuilding industrywas the most vocal constituencyfor states that do notdriving politicalhave an electrical board.involvement andcontributing todelays through demands for exhaustive reviews and political pressure. Nevertheless, they recognized the importanceof including builders and other voices in the adoption process to ensure their concerns were addressed. The morefamiliar the interviewee or survey participant was with theNEC development process, the more likely they were to bein favor of adopting the NEC without amendment, seeing itas the product of extensive input of stakeholders who workin a consensus process.Along with these insights, the trend of growing political influence in code adoption is also reflected in a number of bills introduced in state legislatures over the pastseveral years. These bills seek to lengthen code updatecycles for all construction codes or make other changes inthe code update process.11only 211ExpertiseThe study participants universally agreed that thecentral role of the boards they served on was safety, andthey praised the high professionalism and dedicationof their board colleagues. They also stated that committees needed diversity to be successful, representingeach related industry. However, many of the participantsnoted the growing difficulty in recruiting new membersto the time-consuming, volunteer positions. They alsoexpressed concern about attracting younger individualsto the code adoption process and into taking a greaterinterest in the code. Further, there was concern that politics and special interests were increasingly influencingboard appointments, resulting in appointees who actedwith less autonomy.8

FALLING BEHINDon Electrical SafetyNarrow Focus on CostsThe interview and survey participants frequently notedthat concerns about costs associated with code compliancerequirements dominated discussions of NEC adoptions,particularlyby home“Serving on the board in my statebuildinghas been the highlight of myinterests. Thecareer, and it’s been an honorfocus on costgetting to work with such expertsoften slowedand leaders in my field”down the up—Interview Participantdate adoptionprocess andresulted in the removal of safety requirements. Further,costs were not considered in the context of benefits, leaving the discussion one-sided.Recommendations for PolicymakersThe NEC is an important tool for reducing the risk of electrical fires and injuries. Adopting NEC updates, withoutamendments that weaken safety provisions, is the bestway for policymakers to advance safety and technologyand to protect people and property from electrical hazards.Citizens expect that the codes followed in their states andcommunities are the most current and contain these latestadvances. Following the recommendations below, policymakers can better meet these expectations.Ease Political Pressure:Leverage the National ProcessElected officials naturally want to ensure laws and regulations are in the best interests of their constituents. However, time-consuming, line-by-line scrutiny of updates to theNEC may veer from those interests. Because the nationalprocess draws extensive, nationwide participation andupholds principles of consensus and balance, states canrely on it to advance safety without creating unnecessaryburdens. Changes to the nationally developed documentsought through political pressure may create undue risks.Instead of taking risks, elected officials should direct specialinterest groups to the NEC development process whereanyone can participate.Rely on Experts: Establish an Electrical Boardand Statewide Licensing for ElectriciansNot only does the NEC draw expertise at the nationallevel, it draws it at the state and local level, too. As highlighted by interviews and surveys, individuals directingthe code adoption are professionals interested in promoting safety. When technical disagreements do arise in theNEC update adoption process, the public is well servedby these independent, skilled experts. Especially givenconcerns about the ability to recruit professionals to servein time-consuming volunteer roles, all efforts should bemade to attract the best in the state, including consideration of compensation for time and travel expenses. Also,given that states where electrical boards are responsiblefor adoption tend to act more quickly to adopt updates,as do states with licensure requirements for electricians,states should consider both of these measures as ways toengage and foster electrical expertise in service to publicexpectations regarding electrical safety codes.Established state electrical boards vary in the numberof representatives who serve but generally have a similarcomposition. Electrical boards should have at least thechief electrical inspector from a jurisdiction within thestate, an electrical contractor operating within the jurisdiction, a licensed professional engineer engaged primarily in the design or maintenance of electrical installations,and a journeyman electrician.12 These individuals,“We would go throughtypically appointed byevery single codethe governor, should bechange. We’d si[f]tchosen solely on the basisthrough the code pieceof skill, experience, andby piece and the legisprofessional reputation.lature wanted to know—In addition, some stateswhat is a legitimatealso include on theirchange? What type ofchange was it? Was itboards any of the followa clarity type change?ing: a representative fromIf not, what type ofa power utility operatingmonetary value or costwithin the state, a masterto the consumer? Theyelectrician, a fire marshalwere big on that—HUGEor chief, a representativeon that here . . .”from the property/casu—Interview Participantalty insurance industry, atelecommunications contractor, a representative from an electrical manufactureror distributor, a member of the labor organization thatrepresents the electrical workforce, a representative of atelecommunications utility operating in the jurisdiction,and a member of the public unaffiliated with any otherrepresented group.Under most statutes, these boards are directed to adoptthe NEC and updates by rule and are empowered to adoptregulations that establish statewide standards for theconstruction, installation, and maintenance of electricalfacilities and performance of electrical work. A numberof statutes also require that the code adopted by theboard “conform as nearly as practicable to the National9

FALLING BEHINDon Electrical SafetyElectrical Code, National Fire Protection AssociationStandard # 70” (MRS §1153-A).Electrical boards are often also charged with establishingthe qualifications necessary for electrical inspectors andelectricians and overseeing the administration of those requirements. In addition to supporting the development ofskilled labor, statewide licensing for electricians promotesuniformity and efficiency throughout the state.Through statewide licensing and electrical boards,states can adopt NEC updates more efficiently and fosterthe professional interest needed to facilitate up-to-dateregulations.Prioritize Regular, Statewide Adoptionof the NEC UpdatesThe NEC is just one of several nationally developed codesthat govern construction. States that adopt the NEC aspart of a package with other codes, take at least 10 monthslonger to do so. Because waiting to adopt the updated NECwith other codes creates inevitable delays in advancing electrical safety and technology, states should begin the processof NEC adoption as soon as it is available (typically Augustof the year before the title year). Furthermore, states shouldconsider statutory language that regularizes this review. Forexample, the state of Washington requires that “Prior toJanuary 1 of each year, the Director [of the Department ofLabor and Industries] shall obtain an authentic copy of theNational Electrical Code, the latest revision. The Department, after consulting with the [state electrical] Board andreceiving the Board’s recommendations, shall adopt reasonable rules in furtherance of safety to life and property . . .”(RCW §19.28.031). This language ensures that the stateregularly adopts NEC updates.Finally, as discussed above, most states adopt the electrical code on a statewide basis; counties or other localgovernment jurisdictions are granted limited leave to amendthe code adopted at the state level. However, in a minorityof states, counties or municipalities are responsible forthe adoption. This patchwork leaves some state residentsunprotected by the latest safety advances that people inneighboring counties may already be using. In addition, italso fails to take advantage of a key benefit of a national-level code—economic efficiency through uniformity. Thus,statutory language should ensure that the NEC, and adoptedupdates, cover all electrical installations, maintenance, andwork statewide.Consider Costs Holistically and in ContextPolicymakers are understandably concerned with thecosts that regulations can impose on the constituents theyserve, with some states imposing rigorous cost analysisrequirements on code update processes.13 Because it coversall electrical installations, cost implications may varyingdepending on the context, adding costs to some types ofinstallations but reducing it for others, making cost generalizations difficult to assess. More importantly though, inthese analyses, most states are not considering the safetybenefit alongside the cost. Every year, electrical-relatedfires are responsible for over 2 billion in direct propertylosses and are responsible for an average of 61,000 fires,resulting in 432 deaths. Improvements made through thecode are an important means for reducing these losses.Updates to the code also benefit worker safety. While benefits are more difficult than costs to quantify, they shouldnot be ignored.End Notes1 ampbell, Richard. Electrical Fires. National Fire Protection Association (2017), at 1, ell, supra note 1 at 13G arrett, Robert; Kyle, Susan. An Evaluation of the U.S. Consumer Product SafetyCommission’s Electrocution Reduction Program. U.S. Consumer Product SafetyCommission (2002) p. 9: ell, supra note 1 at 195Campbell, supra note 1, at 16Campbell, supra note 1, at 197Campbell, supre note 1, at 1, 198 .S. Consumer Product Safety Commission National Electronic Injury SurveillanceUSystem (https://www.cpsc.gov/cgibin NEISSQuery/Home.aspx), queried for “electrical outlets or receptacles” in 2016.9C itation found in: acles-trrs-20510I n cost impact analyses performed by the Utah Uniform Building /844.html) and the North CarolinaBuilding Code Commission (http://www.ncdoi.com/OSFM/Engineering and Codes/Default.aspx?field1 Codes - Current and Past&user State Building Codes#Elec),both concluded this provision, 220.12, would save over 10,000 per office buildingconstructed.11e .g., HB 316 (Utah-2016 General Session); HB 409 (Pennsylvania-Regular Session2016-2018); and SB 7000 (Florida-Regular Session 2017)12 journeyman electrician is one who has successfully completed the required apprenAticeship program and passed the Electrical Journeyman exam13S uch as Utah, which requires that all construction code adoption recommendationsmade to the state legislature include a report that “describes the costs and benefitsof each recommended change in the update or in any modifica

home electrical fires fell from 34,800 to 14,400.4 Despite these successes, from 2010 to 2014, an aver-age of 45,210 reported U.S. home fires involved electrical failures or malfunctions. These fires claimed an average of 420 lives each year and injured 1,370.5 An estimated 16,070 non-home electrical fires took place each year over 2,899 burns or

Related Documents:

NFPA 13 Sprinkler Systems 2010 NFPA 45 Laboratories 2011 NFPA 55 Compressed Gases & Cryo 2010 NFPA 70 Electrical 2011 NFPA 72 Fire Alarm 2010 NFPA 80 Fire Doors 2010 NFPA 90A Ventilation 2012 NFPA 96 Cooking 2011 NFPA 99 Healthcare 2012 NFPA 110 Emergency Power 2010

Competency of third-party field evaluation bodies NFPA 790 Standards for securing power system communications IEC 62351 Fire suppression NFPA 1, NFPA 13, NFPA 15, NFPA 101, NFPA 850, NFPA 851, NFPA 853,

Confined Space. (secondary) NFPA 97, 2000 ed.; NFPA 211, 2000 ed. A space whose volume is less than 50 ft 3 /1000 Btu/hr (1.42 m /293 W) of the aggregate input rating of all appliances installed in that space. Draft. (preferred) NFPA 211, 2000 ed. The pressure differential that causes the flow of File Size: 345KBPage Count: 30Explore furtherNFPA 211: Standard for Chimneys, Fireplaces, Vents, and .www.nfpa.orgNFPA 211, Standard for Chimneys, Fireplaces, Vents, 2019 .blog.ansi.orgNFPA 211 & Your Chimney - Chimneys.comchimneys.comFree access NFPA codes and standardswww.nfpa.orgRecommended to you b

REQUIREMENTS FOR THE SUBMITTAL OF COMBINED NFPA 13, NFPA 14 AND NFPA 20 FIRE PROTECTION SYSTEMS (ePlans) Effective: June 1, 2016 Supersedes: October 1, 2014 A. GENERAL INFORMATION 1. For systems designed using other standards or codes please refer to requirements as appropriate. (e.g. NFPA 13D, NFPA 13R, NFPA 14, and NFPA 20) 2.

NFPA 101 – 2012 NFPA 99 – 2012 NFPA 72 – 2010 NFPA 13 – 2010 NFPA 96 – 2011 NFPA 90A – 2012 NFPA 80 – 2010 NFPA 110 – 2010. Fire Sprinklers painted, corroded, loaded etc. Fire Sprinkler in freezer Sprinkler cabinet must have at least 6 sprinklers, 2 of each type and temperature rating.

NFPA 25 & NFPA 72 Overview Address portions of NFPA-25, NFPA-72 and related requirements of The Joint Commission. Not a complete review of NFPA-25, NFPA-72 and related requirement of The Joint Commission. www.jfahern.

NFPA 72 & 1221 - Section 9.6 Emergency Services Communications Systems NFPA 72 CODES NFPA 72 - 2013 NFPA 1221 - 2016 NFPA 1221 - 2019 In-Building Solution Required NFPA 1 Section 11.10 NFPA 1 Section 11.10 NFPA 1 Section 11.10 Pathway Survivability for Coaxial Cable Required 2 Hour for Riser Coaxial Cable - Sec. 24.3.6.8 2-Hour for Riser Coaxial Cable - Sec. 9.6.2.1.3 Backbone Cable Rout .

NFPA 13-2002* Sprinkler Systems NFPA 14-2003 Standpipe and Hose Systems NFPA 15-2007 Water Spray Fixed Systems NFPA 16-2003 Foam-Water Sprinkler Systems NFPA 20-2007 Centrifugal Fire Pumps NFPA 22-2008 Water Tanks for Private Fire Protection NFPA 24-2007 Private Fire Service Mains