AASHTO Steel FabricationSpecificationHeather Gilmer, P.E., Steel Operations ManagerHRV Conformance Verification Associates, Inc.

WHAT DO WE HAVE NOW? Lots and lots of DOT steel fabrication specs AASHTO Bridge Construction Specs, Chapter 11 AASHTO/NSBA Steel Bridge Collaboration S2.1 Fabrication provisions in AASHTO/AWS D1.5

State (or other agency) StandardSpecifications Many different ways of doing things Makes errors more likely Can be inefficient with no gain in quality Some states better than others at updating tostate of the art

AASHTO LRFD Bridge Construction Specs,Chapter 11 Until recently, not kept up todate As of 2017 edition, muchbetter maintained Very few states adopt bydirect reference Many use as source for statespecs

S2.1Steel BridgeFabrication

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: SBC Objectives Standardize requirements and practices - try todo things one way instead of 50 ways Share resources and expertise - exchangeinformation about best practices and technologyand help agencies who have lost expertise andresources

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: SBC Background Discussions began March 1997 Adopted by NSBA and AASHTO SCOBS, June1997 First meeting held in Cincinnati, September1997

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: SBC Participants DOTs - designers, fabrication personnel, erectionpersonnel Industry - fabricators, detailers, erectors,material producers FHWA - national, regional and division bridgeand technology transfer engineers Academia Consultants - designers, inspection services

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: SBC Task Groups TG1: Detailing TG2: Fabrication &Repair TG4: QC/QA TG8: Coatings TG9: Bearings TG10: Erection TG11: Steel BridgeHandbook TG13: Analysis TG14: Field Repairs TG15: Data Modeling forInteroperability TG16: Orthotropic DeckPanels

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: SBC Process TG develops document (meetings, ballots) Online ballot to whole Collaboration Comment resolution with reballot as needed AASHTO T-14 review Comment resolution with reballot as needed Second T-14 review & approval for CBS ballot

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: SBC Standards “S” documents: Guide Specifications More recently just “Specifications” Written in spec-type language Intended to be adopted by reference in theirentirety (with or without exceptions—like D1.5) Or “borrow” portions, use as source of good ideas

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: SBC Standards “G” documents: Guides Recommendations Best practices

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: Notable BitsSection 2.2:Communication2.2.3: During the project,maintain effectivecommunications with theOwner’s representatives.Address problems andconcerns as early as possiblein the work.

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: Notable BitsSection 2.2:Communication2.2.4: On complex projects,start communication aboutspecial aspects of the job,including tolerances orother requirements, veryearly in the project.

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: Notable BitsSection 2.4: Prefabrication MeetingSection 2.9: Progress Meetings

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: Notable BitsSection 2.5: ProceduresIncludes list of processesrequiring writtenprocedures

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: Notable BitsSection 6.3: SpecialtyStructures6.3.2: At a prefabricationmeeting with theContractor, Owner, andErector, establish criticaldimensions and tolerancesrequired to ensure properinstallation andperformance of thestructure.

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: Notable BitsSection 7.5:Alternate geometrycontrol methodsFabricators may proposealternate methods ofgeometry control forcontinuous girder bridgesbased on demonstratedaccuracy that precludes thenecessity for assembly.

AASHTO/NSBA STEEL BRIDGECOLLABORATION S2.1: Notable BitsCommentary Welding tubular members Extra end distance for bolted field splices Rotational capacity & preinstallationverification tests Shop assembly methods

AASHTO/AWS D1.5 Base metal requirements Thermal cutting Dimensional tolerances Welding distortion Bending/straightening Fracture-critical: Definitions Engineer responsibilities Material requirements

Source: https://m.xkcd.com/927/

PARTICIPANTS AASHTO T-17 owns Was Welding Now Metals Fabrication SBC TG2 will advise & maintain Annual co-location AASHTO T-14

INGREDIENTS AASHTO LRFD BCS Ch. 11 SBC S2.1 D1.5 RCSC AREMA AISC Certification Programs

SCOPE 1st Edition: Vehicular bridge superstructure only Later: Tubular members Pedestrian bridges Transportation structures Bearings

SEQUENCE Publish Fab Spec Archive S2.1 Cut BCS Ch 11; leave erection Cut some D1.5 & refer to Fab Spec DOTs

STATUS 1ST draft has gone to T-17 Questions & outstanding issues have beendiscussed at T-17/SBC TG2 meetings 2nd draft in progress

TABLE OF CONTENTS1. General (scope, definitions, certs)2. Communication (notification; prefab &progress meetings)3. Inspection (fabricator & owner roles)4. Shop drawings5. Written procedures

TABLE OF CONTENTS6. Materials “Satisfy contract requirements” Most deleted7. Handling and Storage8. Cutting and Shearing Plates and Shapes

TABLE OF CONTENTS9. Bending Plates Cold bending Heat-assisted mechanical bending Upset shortening

TABLE OF CONTENTS10. Curving Beams and Girders11. Cambering Beams and Girders12. Straightening

TABLE OF CONTENTS13. Application of Heat Upset shortening Heat-assisted mechanical forming AASHTO minimum radius equations14. Thermal Treatments

TABLE OF CONTENTS15. Tolerances Cut Flange Width Straightness Camber Sweep Web Alignment Web Flatness Flange Warpage and Tilt Depth Fit of Stiffeners Abutting Joints Alignment of MechanicallyConnected Joints Facing of Bearing Surfaces Steel Pier Caps

TABLE OF CONTENTS16. Bolted Connections RCSC Torque test per contract17. Surface Preparation of Uncoated WeatheringSteel18. Orthotropic Deck Superstructures (BCS)

TABLE OF CONTENTS19. Pins and Rollers20. Eyebars21. Ultrasonic Impact Treatment Procedure moved to annex

TABLE OF CONTENTS22. Marking and Shipping23. Measurement for Payment (not payment)24. References

INFORMATIONAL ANNEXESA. AASHTO BDS Designation of Primary andSecondary MembersB. Sample Ultrasonic Impact TreatmentProcedure (deleted from chapter)C. Items to be Specified in the ContractDocuments

INFORMATIONAL ANNEXESC. Items to be Specified in the Contract Documents Procedures & submittals Start of fabrication (cutting vs. welding) Torque test Other tolerances Additional testing Which measurement method (nominal or computed) Payment

Questions?hgilmer@hrvinc.com412-299-2000

DOTs - designers, fabrication personnel, erection personnel Industry - fabricators, detailers, erectors, material producers . installation and performance of the structure. AASHTO/NSBA STEEL BRIDGE COLLABORATION S2.1: Notable Bits . Procedure moved to annex. TABLE OF CONTENTS 22. Marking and Shipping 23. Measurement for Payment .

Related Documents:

aashto t 99 aashto t 104 . page 6 of 23 aashto m 145 aashto m 170 aashto m 196 aashto m 197 aashto m 198 aashto m 207 aashto m 294 aashto m 295 aashto m 302 aashto m 315

AASHTO T 217 AASHTO T 85 AASHTO T 2 AASHTO T 255 AASHTO T 217 AASHTO T 85 Report on Form BMT-122 and Plant Diary. Test Cylinders One set per PTU*. A set of cylinders consists of two 6” x 12” cylinders, to be tested at 28 days of age. During placement of concrete. AASHTO T 141 AASHTO T 141 ALDOT-210 AASHTO T

KEEPING YOU UP TO DATE WITH ALL OF PENNDOT’S PROJECTS AND INNOVATIONS THROUGHOUT THE YEAR. PENNDOT HONORS ITS 2019 STARS OF EXCELLENCE. DOTcom 1 PENNDOT HONORS ITS 2019 STARS OF EXCELLENCE Every year, PennDOT recognizes some of its most innovative employees who exemplify our mission to provide the very best

AASHTO T 23 AASHTO T 24 AASHTO T 97 AASHTO T 119 . Alabama Dept. of Transportation ALDOT Procedures Bureau of Materials and Tests ALDOT-405 Testing Manual Revision Date: 08/08/19 Page 5 of 8 AASHTO T 121 AASHTO T 141 AASHTO T 152 AASHTO T 23

steel fabrication – bound series of standards AISC Code of Standard Practice for Steel Buildings and Bridges AISC Code of Standard Practice for Steel Buildings and Bridges 5 Specification for steel fabrication for structural steel buildings AISC Specification for Structural Steel Buildings AISC Spec

Proposed AASHTO M 180 Specification Update NCHRP 22-40 UPDATE TO AASHTO M 180-18 AND ASSOCIATED HIGHWAY GUARDRAIL SPECIFICATIONS Proposed AASHTO M 180 Specification Update w/ Redline Strikeout 6 July 2021 Chuck A. Plaxico, Ph.D. Ethan M. Ray Roadsafe LLC P. O. Box 312 12 Main Street Canton Maine 04221 TRANSPORTATION RESEARCH BOARD NAS-NRC

AASHTO LRFD Bridge Design Specifications, 4th Edition, with 2009 interims AASHTO LRFD Bridge Design Specifications, 5th Edition AASHTO LRFD Bridge Design Specifications, 5th Edition, with 2010 interims AASHTO LRFD Bridge Design Specifications, 6th Edition AASHTO LRFD Bridge Design

NOT A performance standard . ISO 14001 - 2004 4.2 Environmental Policy 4.6 Management Review 4.5 Checking 4.5.1 Monitoring and Measurement 4.5.2 Evaluation of Compliance 4.5.3 Nonconformity, Corrective Action and Preventive Action 4.5.4 Control of Records 4.5.5 Internal Audits 4.3 Planning 4.3.1 Environmental Aspects 4.3.2 Legal/Other Requirements 4.3.3 Objectives, Targets and Programs 4 .