Finance and Capital CommitteeInformation Item IV-AOctober 14, 2021Capital Program Update133 of 165

Washington Metropolitan Area Transit AuthorityBoard Action/Information SummaryActionInformationMEAD Number:202306Resolution:YesNoTITLE:Capital Improvement Program OverviewPRESENTATION SUMMARY:Staff will provide an overview of the capital improvement program featuring accomplishmentsfrom FY2021, upcoming FY2022 projects, and a review of upcoming major project outages.The presentation also includes an update on the maintenance backlog and an overview ofbaseline state of good repair needs.PURPOSE:To communicate progress and achievements of the Capital Improvement Program and toprovide insight on how safety, state of good repair, and resiliency projects are scheduled tomove forward in the both the near and long term.DESCRIPTION:Please see the attachment for a list of major vendors associated with the Metro CapitalImprovement Program.With the help of Dedicated Funding backed debt, Federal Passenger Rail InfrastructureImprovement Act (PRIIA) Funding, and local government contributions, Metro has embarkedon an aggressive rehabilitation program to improve state of good repair, safety, and reliabilityacross all modes of service. Progress is being made, and there is both more to do and ongoing effort required to maintain a safe, reliable, and efficient system.Key Highlights: FY2021 capital programs and projects invested over 1.8B in safety, state of goodrepair, and resiliency projects. FY2022 capital programs and projects are on-pace to invest approximately 2 billionacross all components of the Metro System. Fiscal 2023 through 2028 Capital Improvement Program is planning investmentsbetween 11 and 13 billion in safety, state of good repair, and resiliency programs andprojects.Background and History:In 2018, the Compact Signatories – the State of Maryland, the District of Columbia, andthe Commonwealth of Virginia – passed legislation creating a cumulative 500M in134 of 165

annual dedicated funding for Metro. This funding stream provided Metro the ability toissue the debt needed to fund overdue capital needs. These needs, the ‘backlog’ ofprojects previously unfunded, were impacting safety and reliability of Metro’s services.Today, the backlog has been reduced, and is shrinking rather than growing.Metro projects a backlog of approximately 3.2B after implementing projects andprograms planned for FY2022 through FY2027. Work on reducing the backlog is inaddition to investing approximately 1.2B per year to maintain assets and preventaccumulation of additional unfunded needs.In the Fall, Metro will present the Board with a FY2023 Capital Budget and a Six-YearCIP. Metro anticipates continued Jurisdictional funding, including up to 3% increases inJurisdictional Capital Contributions, and continuation of state and Federal PRIIA fundingthrough the planning period. In addition to these baseline assumptions, Metroanticipates leveraging Dedicated-Funding backed debt to address additional fundingneeds and continue to address previously unfunded needs in the CIP in the near term.Discussion:The programs and projects funded in FY2022 focus on safety and state of good repairanticipated to enhance system safety, reliability, and convenience for customers.As Metro prepares the FY2023 Capital Budget and Six-Year Capital ImprovementProgram (CIP) for consideration by the Board this fall, the focus remains the provision ofsafe, reliable, and affordable transit. To achieve this goal, Metro’s CIP invests in safety,state of good repair, and resiliency projects across all Metro operations anddepartments: Rail; Bus/Paratransit; and Operations and Business Support.CIP investments promote reliability, improve asset performance, and increase theoverall safety of WMATA’s infrastructure. Examples include, but are not limited to,maintaining average fleet age in bus, paratransit, and rail fleets; improving reliability ofelevators and escalators; modernizing bus garages, rail overhaul facilities, andadministrative offices; and providing a more comfortable, safer ride to customers. Somecapital investments reduce future operating costs by updating equipment to moreefficient models, reducing energy consumption, or changing to a less impactful fuel.Since Fiscal Year 2019, Metro has issued Dedicated-Funding backed debt each year toproviding funding to address previously unmet needs. Of the 500M of dedicatedfunding provided each year, approximately 470M is available for use as debt servicedue to restrictions placed on the use of the remaining funds. The current funding plan,as approved by the Board in April 2021, fully leverages the dedicated funding as asource for debt service by approximately FY2027. Metro staff will continue to workcollaboratively and cooperatively with internal and external stakeholders in developingthe FY2023 to 2028 CIP in an effort to balance the availability of dedicated funding as asource for debt service, the need to address previously unfunded needs, and the abilityto deliver quality, on-time projects and programs.Near Term Projects Updates Design & Procurement135 of 165

o Yellow Line Tunnel & Bridge Rehabilitation Constructiono Platform Rehabilitation – Phase 4o Northern Bus Garage Replacemento Tunnel Ventilation PilotMajor Outage ScheduleFall/Winter 2021 Rockville Platform Canopy Replacement Aerial Structure Rehabilitations at Minnesota Avenue Structure (D&G), GrosvenorAerial Structure, West Hyattsville Aerial Structure, Branch Avenue A&B Bridges,Cameron Run Bridge, Eisenhower Avenue Bridge, Naylor Road Aerial Structure, andSouth Van Dorn Street BridgeSpring/Summer 2022 Tunnel Leak Mitigation between Silver Spring and Forest Glen and Tenleytown/AUand Friendship Heights Phase 4 of the Platform Rehabilitation Program (3-month shutdown from MinnesotaAve to New Carrollton including the Cheverly Aerial Structure rehabilitation )Fall/Winter 2022 Potomac Yard Station Yellow Line Tunnel and Bridge RehabilitationFUNDING IMPACT:There is no funding impact from providing this information.TIMELINE:Previous ActionsN/AAnticipated actions after Fall 2021 – Present General Manager Proposed Capital Budgetpresentationand Six-Year Capital Improvement ProgramRECOMMENDATION:No recommendation is associated with this information item.136 of 165

The following parties may have an interest in the decisions made by the Board withregard to these topics:A-Connection, Inc.AECOM USA Inc.AECOM-STV JVAldridge Electric, Inc.Alstom Transportation Inc.American Truck & Bus, Inc.ANC Sports Enterprises LLCBadger Mills Supply CompanyBirlasoft Consulting Inc.Biswas Information Technology SolutionsBoxBoat TechnologiesBrian Hoskins FordC3M Power Systems, LLCCH2M HILL, Inc.CHKAMERCintas CorporationCity ConstructionClark Construction Group, LLCClever Devices Ltd.Concrete Protection & Restoration, Inc.Consolidated Construction & EngineeringCopper River Information TechnologyCriswell ChevroletCrowe Horwath LLPCubic Transportation System IncCummins Power Systems LLCCW Professional Services LLC AdvancedDigital Systems, Inc.Dell Marketing LPDHA/RK&K Joint VentureDHKDiversified Property ServicesDJB ContractingEastBanc Technologies, LLCECS CorporationEdward Kocharian & Co Inc.Ensco Rail Inc.eVigilant SecurityF.H. Paschen, S.N. Nielsen & Assoc.,LLCFive Points Infrastructure Services, LLCGannett Fleming Engineers andArchitectsGannett Fleming-Parsons Joint VentureGannett Fleming-Parsons Joint Venture IIGENFAREGlebe ElectronicHabor RoofingHARSCO Metro Rail LLCHelix Electric, Inc.Hensel Phelps Construction Co.Hitachi Railcars Inc.HNTB CorporationHogan Lovell Law FirmHR&A AdvisorsIdeal Electrical Supply Corp.immixTechnology, Inc.InfraStrategies LLCJacobs Engineering Group, Inc.Johnson, Mirmiran & Thompson IncJones Lang LaSalleK&J Consulting Services Inc.Kawasaki Rail Car Inc.Kiewit Infrastructure CompanyKimley-Horn and Associates, Inc.KoneKORBATOLDA 2395 Mill Rd LLCLDA 300 7th St LLCLimbach Company LLCLos Alamos Technical Associates, Inc.Louis Berger (DC)LTK EngineeringLuminator Mass Transit, LLCLytx, IncM & M Welding & FabricatorsM.C. Dean, Inc.Merak North AmericaMetro Paving CorporationMotorola Solutions Inc.Mott MacDonald I&E, LLCMythics, Inc.137 of 165

Networking for Future, Inc. (NFF, Inc.)New Carrollton Parking LLCNew Flyer of America, Inc.North Eastern Bus Rebuilders Inc.Orion Management, LLCParamount Mechanical Corp.Parkmobile USA, Inc.Parsons Transportation Group Inc.Patuxent Roofing and Contracting, Inc.PLLC/Urban EngineersPotomac Construction Co. Inc.Potomac Yard ConstructorsPower Test, Inc.Precision Escalator ProductsRacine Railroad ProductsRailQuickRK Chevrolet, IncSafeware Inc.Schindler Elevator CorporationShred-IT USA LLCSingleton Electric Company, Inc.Software Information ResourceCorporationSonny MerrymanA Inc.Source Inc.Stand SteelStout & Teaque Management CorpStraffic America, LLCSusan Fitzgerald & Associates, Inc.Swingmaster CorpSyApps LLCSystems Technology GroupT/A TMG ConstructionThe Aftermarket Parts CompanyThe Matthews Group, Inc.TMAKm Joint VentureTransit Information ProductsTransportation Management Service Inc.Trapeze Software GroupTrigyn Technologies, Inc.Urban Atlantic LLCV Group Inc.VHB - Vanasse Hangen Brustlin, IncVivsoft Technologies LLCW.M. Schlosser Co.Whitaker Parking Systems Inc.WSP US138 of 165

Capital ImprovementProgram UpdateFinance & Capital CommitteeOctober 14, 20211WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY139 of 165

Capital Improvement Program (CIP) UpdatePurpose Review Capital Program Strategy Capital Program Highlights Upcoming Major Projects2WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY140 of 165

Capital Improvement Program (CIP) Update 12 Billion Safety & State of Good Repair CIP Improve system safety, state of good repair, and reliability Rehabilitate, replace, and modernize the system Integrate resilience and sustainability Accelerate delivery of projects to address critical, long-standing needs Maintain fiscal accountability 3% aggregate cap on jurisdictional capital assistance Dedicated funding supported debt3WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY141 of 165

Capital Improvement Program (CIP) UpdateCapital Program Development and Structure10-Year Capital PlanIdentifies viable initiatives to address needs identifiedfor next 10 years; financially unconstrainedSix-Year Capital Improvement Program (CIP)Capital investments planned for, or continuing in,six-year capital programOne-Year Capital BudgetExpenditure forecast for capital projects andprograms in current budget year4WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY142 of 165

Capital Program Overview5WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY143 of 165

Major FY2021 Capital ProgressFY2021 Capital Program ProgressAdvancing Safety & State of Good Repair Improvements6 1.84BInvested in FY2021Largest Annual Capital InvestmentPlatform Phase 2 – two of four stationsrehabilitated over Summer 2020 reopenedahead of schedule – East Falls Church andWest Falls ChurchPlatform Phase 3 – two stations rehabilitatedover Spring 2021 – completed 12 stationsslated for platform reconstruction in VirginiaFaregate Modernization – new faregatesinstalled at six pilot stations prior to systemwidereplacement effort to improve safety andcustomer experienceEscalator Replacement – started new contractfor 130 escalators across 32 stations – GalleryPlace completed 6 weeks ahead of scheduleSignal System Rehabilitation in AlexandriaRail Yard – improves safety, reliability, and ontime rail service performanceInterlocking System Upgraded at Fort Totten– allows trains to safely cross tracksWASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY144 of 165

Capital Program OverviewCapital Program Outlook7SafetyReliabilityState of Good Repair Over 2 billion to be invested in FY2022 Accelerating safety and state of good repairprograms during period of lower ridership Advancing critical safety and state of good repair projects including nextphases of platform program, bridge and tunnel structural rehabilitation, andtunnel ventilation pilot Continuing to develop project pipeline, needs identification, and deliveryefficienciesWASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY145 of 165

Planned Capital InvestmentsMetrorail Capital InvestmentsSafety, Reliability & State of Good RepairRailCapital Program OutlookFY2023 ProjectedCapital BudgetRangeFY2023-FY2028Projected CapitalProgram Range 2.3 - 2.5B 12 - 13B Railcar Acquisition & Testing – 8000 Series Water Leak Mitigation in Tunnels Yellow Line Portal Tunnel Remediation Track Rehabilitation Program Aerial Structure & Bridge Rehabilitation Train Control Rehabilitation Radio Infrastructure Replacement Railcar Preventive Maintenance & Rehab Station Platform Rehabilitation Railcar Heavy Repair & Overhaul Facility Traction Power State of Good Repair Escalator & Elevator Replacement/Rehab Ventilation Improvements – Red Line Pilot8WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY146 of 165

Planned Capital InvestmentsMetrobus & MetroAccess Capital InvestmentsSafety, Reliability & State of Good RepairBus & Paratransit MetroAccess Vehicle Acquisition Bus Garage Replacements –Northern & Bladensburg Bus Preventive Maintenance &Rehabilitation Bus priority – Roadway & SignalImprovements (with jurisdictions) Bus Acquisition/ReplacementCapital Program OutlookFY2023 ProjectedCapital BudgetRangeFY2023-FY2028Projected CapitalProgram Range 2.3 - 2.5B 12 - 13B Zero Emission Bus Implementation9WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY147 of 165

Planned Capital InvestmentsOperations & Support Capital InvestmentsSafety, Reliability & State of Good RepairOperations & Admin Support IT System PreservationCapital Program OutlookFY2023 ProjectedCapital BudgetRangeFY2023-FY2028Projected CapitalProgram Range 2.3 - 2.5B 12 - 13B Roof Replacement Office Consolidation – DC, MD, VA Financial System Replacement New Data Center IT Infrastructure Fare Collection SystemReplacement& Equipment10WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY148 of 165

Capital Program BacklogAddressing Overdue Needs and Sustaining Safety & SGRRegional & Federal Investment Addressing Overdue Needs & Supporting Programs to Sustain Safety and SOGRADDRESSING OVERDUE CAPITAL NEEDSSubstantial Progress (Highlights) More To Do to Catch Up (Priority Needs)Replacement of Legacy Railcars with 7000 SeriesTrack Rehab & SafeTrackPlatform Program – 17 Stations Complete INVESTING IN ONGOING PROGRAMSStructures - Bridges, Platforms, TunnelsSystems - Train Control, Radio and Comms, PowerFacilities - Bus Divisions, Rail Maintenance, OfficesTOSUSTAIN SAFETY & SOGRRecurring & Cyclical Maintenance, Rehabilitation & Replacement Programs 11BusesRailcarsParatransit VehiclesService Vehicles TrackParking FacilitiesElevators & EscalatorsMechanical Systems Traction PowerSignal SystemsLighting SystemsCooling SystemsWASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Bus Customer FacilitiesBus, Rail & AdminMaintenance Facilities149 of 165

Capital Program BacklogInvestment Reducing State of Good Repair Backlog ( B)SystemsTrack &Stations Structures Vehicles2016 Backlog 7.1B 0.8 Regional and Federal investment improving safety andreliability and addressing overdue needs 1.2B - 1.5B investment is needed annually to preventassets from going into a state of disrepair2018 Backlog 1.6 0.8 2.7 5.0B 0.1 0.6 0.6 2.5PROJECTED Backlogafter FY22-FY27 Investment 3.2B 0.1 0.2 0.2PROJECTED Backlogafter FY22-FY31 InvestmentFacilities 2.112 1.1 1.2WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY 0.6 1.2B 0.75 0.28150 of 165Progress assumes full implementation of the Six-year CIP and 10-Year Plan. Excludes expansion and major enhancements. 0.03 0.2 0.2

Capital Program OverviewNext Steps Fall: Propose Six-Year CIP, FY2023 CapitalBudget, and 10-Year Capital Plan Winter: Budget work sessions & public hearings Spring: Board adoption of CIP & Capital Budget(March)13WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY151 of 165

Upcoming Projects14WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY152 of 165

Project Execution PlanningProject Execution Planning Near Term Focus (FY2022) Design & Procurement— YellowLine Tunnel & Bridge Rehabilitation Construction— PlatformRehabilitation – Phase 4— Northern Bus Garage Replacement— Tunnel Ventilation Pilot15WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY153 of 165

Project Execution PlanningYellow Line Tunnel & Bridge Rehab Steel lined tunnel has excessive corrosion andsection loss from stray current impacts and waterpenetration Scope includes tunnel liner, dry standpipe, andbridge repair First Construction Manager At Risk (CMAR) –construction anticipated in Spring 2022 Additional scope identified – bridge corrosioncontrol, tunnel crack repairs, and systems cablereplacementL-Line Tunnel16WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY154 of 165

Project Execution PlanningPlatform Improvement Project – Phase 4 Final phase of 20 outdoor stations 17 complete; remaining three stations in Summer 2022 Scope includes: Platform rehabilitation and station upgrades atCheverly, Landover, and New Carrollton Station upgrades at Minnesota Ave. and Deanwood Additional scope includes five bridges & aerial structures Contract awarded in Summer 2021 Awarded contract value – 267M17WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY155 of 165

Project Execution PlanningNorthern Bus Garage Replacement Garage closed in July 2019 Scope of new facility includes: Support of 100% electric vehicles at opening 590K SF with storage for 150 buses Commercial/retail and community spaceAerial view of existing Northern Bus GarageFaçade of existing Northern Bus Garage LEED certified Contract awarded in Summer 2019 18Progressive D/B converted to Hybrid Design-Build CMAR in March 2020WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY156 of 165

Project Execution PlanningNorthern Bus Garage Replacement Mayor’s Agent approval September 2021 90% designs due late Fall 2021 Demolition/construction anticipated to start Spring 2022andtake approximately four yearsProposed design for new Northern Bus Garage Service impacts include bus routes adjustments Bus storage/maintenance moved to other garages Art-in-Transit fencing during construction for communityProposed AIT fencingaesthetics19WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY157 of 165

Project Execution PlanningTunnel Ventilation System Modifications – Pilot NTSB recommendation to upgrade ventilation Pilot project in tunnel shafts between Woodley Park andCleveland Park stations to add fans and platform dampers Leveraged advanced computational models to assesslocation and inform designs Awarded contract value – 34MTunnel ventilation fan Construction underway – expected completion bySummer 2022Construction of fan platform in tunnel shaft20WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY158 of 165

Project Execution PlanningPublic Outreach WMATA website, news releases, andproject websites inform customers about: PublicengagementcalendarPlanned service impactsAlternate travel routesEngagement opportunitiesExpected project outcomesand benefits for ridersand communities Visit wmata.com/initiatives/plansCustomer information video21WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITYCustomer information video159 of 165

Major Outage Schedule22WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY160 of 165

Major Outage Schedule – Near-termSeptember 2021 through December 2021RockvilleCanopyAerial RehabPhase ATunnel Ventilation Pilot –Dupont Circle to Van NessTunnelVentilation Future Weekend Shutdown (WSD)events planned in 2022Aerial Structure Rehab Phase A &Rockville Canopy Three-Month Continuous Shutdownfrom Rockville to Shady GroveKeyContinuous Shutdown Three-Weekend Single Tracking (WST)events on Green (E) Line north of FortTotten to Prince George’s PlazaSingle TrackingWeekend Shutdown23WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY161 of 165

Major Outage Schedule – Near-termJanuary 2022 through June 2022Leak Mitigation Six Single Tracking (WST) weekends on RedLine between Silver Spring and Forest GlenLeak MitigationPlatform 4Aerial RehabPhase AKeyContinuous ShutdownPlatform 4 Three Prep Weekend Shutdowns (WSD) onOrange Line from Minnesota Ave to NewCarrollton Summer Shutdown from Minnesota Ave toNew CarrolltonAerial Structure Rehab Phase A Four Weekend Shutdowns (WSD) atGrosvenor D&G prep work during Platform four WSDs two WSD on F-LineSingle TrackingWeekend Shutdown24WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY162 of 165

Major Outage Schedule – Mid-termJuly 2022 through December 2022Leak MitigationPlatform 4TunnelVentilationPotomac YardStationAerial RehabPhase AKeyContinuous ShutdownSingle TrackingWeekend Shutdown25Yellow Line Bridge andTunnel Liner RehabYellow Line Bridge and Tunnel Liner Rehab Extended Shutdown between Pentagon andL’Enfant anticipated Fall 2022, still working throughspecific construction durationTunnel Ventilation (Fans/Dampers) Four Weekend Shutdowns (WSD) betweenCleveland Park and Woodley ParkPotomac Yard Station Late Summer/early Fall shutdown for track cutoverPlatform 4 Summer Continuous Shutdown from Minnesota Aveto New CarrolltonAerial Structure Rehab Phase A D&G prep work during Platform 4 WSDsLeak Mitigation Nine Single Tracking Weekends (WST) betweenSilver Spring and Forest Glen Three WST events between Tenleytown-AU andFriendship HeightsWASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY163 of 165

Capital Program Development and Structure Capital Improvement Program (CIP) Update 10-Year Capital Plan. Identifies viable initiatives to address needs identified for next 10 years; financially unconstrained. Six-Year Capital Improvement Program (CIP) Capital investments planned for, or continuing in, six-year capital program. One-Year Capital .

Related Documents:

COVID-19 - Potential implications on Banking and Capital Markets 06 Capital markets Overview of Ghana’s capital market Ghana’s capital market is gradually playing a pivotal role in attracting long-term capital financing for economic activities. The largest capital market i

The International Roadmap for Devices and Systems 2017 edition (published in Q1 2018). Prior to this, the International Technology Roadmap for Semiconductors (ITRS) was published in 1999, 2000 Update, 2001, 2002 Update, 2003, 2004 Update, 2005, 2006 Update, 2007, 2008 Update, 2009, 2010 Update, 2011, 2012 Update, 2013, and 2015

leaked update fortnite, leaked updates animal crossing, leaked update, among us leaked update, acnh leaks updates, minecraft leaked update, modern warfare leaked update, gta 5 leaked update

Always update your product before installing on a vehicle using the Update Agent internet update software. Get a free copy of the Update Agent online at bullydog.com. See the system requirements below for running the Update Agent on your PC. Sorry the Update Agent is not Mac compatible. Hardware & Software requirements for the Update Agent include:

2019-29 Capital Budget Instructions June 2018 TABLE OF CONTENTS . Chapter 1: Capital Budget Basics 1 Introduction 1 What is a capital project? . Capital project administration costs are for activities directly related to the completion of a capital project or program. See Chapter 4 for the appropriate use of tax-exempt bond proceeds related to

O capital social corresponde à quantia que os proprietários entregam à sociedade e constitui o capital de risco, ou seja, o capital que é necessário para iniciar ou desenvolver determinada atividade. O capital social é uma massa patrimonial que integra o capital próprio e a sua importância prende-se, fundamentalmente,

Valuation Handbook – Industry Cost of Capital: This annual book is the U.S.-centric version of the 2015 International Valuation Handbook – Industry Cost of Capital.The Valuation Handbook – Industry Cost of Capital provides cost of capital estimates (i.e., equity capital, debt capital, and WACC) for approximately 180 U.S. industries and size groupings (i.e., Large-, Mid-, Low-, and

state’s content standards in ELA and Mathematics –Grades 3 – 8 ELA and 9th and 10th grade literature and American Literature –Grades 3 – 8 Mathematics and Coordinate Algebra, Analytic Geometry and Advanced Algebra Created for exclusive use in Georgia classrooms Piloted with Georgia students Reviewed by Georgia educators