Rehabilitation of the West 79thStreet Rotunda Complex and West79th Street Bridge Over AmtrakManhattan Community Board 7May 9, 2019City of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019Title1

SCENICLANDMARKProject LocationCity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019ProjectLocation2

Project History / Existing Structure CharacteristicsWest 79th St. Bridge Over Amtrak(BIN 2-22929-0) Constructed in 1937 Owned/Operated by NYCDOT Last Major Rehab 1975 Carries E/W Traffic on West 79th Street over Amtrak 74’-3” Single Span Bridge Reinforced Concrete Deck Non-Composite Riveted Built-Up Plate Girders Reinforced Concrete Gravity Abutment (East) Multi-Column Steel Bent (West)Henry Hudson Parkway(Above)(Amtrak Below)2 Travel Lanes, 2 Parking Lanes (Bus LayoverAreas), Barrier Separated Sidewalks (Both Sides) Out-to-Out Width 64’-4” Traveled Way Width 44’-1” Sidewalk Widths 6’-2”City of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019West 79th Street Bridge over Amtrak(BIN 2-22929-0)3

Project History / Existing Structure CharacteristicsRotunda Structure(Six Bridge Structures – Multiple BINS) Constructed in 1936 Owned/Operated by NYCDPR No Major Rehabilitation Since Construction Three Level Multimodal Facility Vehicles Pedestrians Bicycles Houses NYCDPR Maintenance and OperationStaff, Concessionaire, and Boat Basin Parking Terminus of West 79th Street and Interchangewith Henry Hudson Parkway Concrete Encased Steel Superstructure 7.5” Reinf. Concrete Deck w/ Asphalt Overlay Supported on Concrete Filled Steel Piles BIN 2-26771-ABIN 2-26771-BBIN 2-26771-CBIN 2-26771-DBIN 2-26771-7BIN 2-26771-8Column Grid SystemCity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 20194

Rotunda StructureTraffic Circle LevelPedestrian Plaza LevelGarage LevelCity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019Rotunda Structure5

Proposed Kitchen Exhaust Locations Designed for North and South NYCDPRSpaces Provides Flexibility of NYCDPR Operations Provides Symmetric Aesthetic Meets NYC Building Code Requirements Minimally InvasiveStructural Modifications Reuse of ExistingStonework to Blend withExisting StructureProposed ConditionExisting ConditionCity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019Proposed KitchenExhaust Locations6

Proposed Kitchen Exhaust LocationsProposed ConditionCity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019Proposed KitchenExhaust Locations7

Existing Conditions - Bicycle DesignBicycle Circulationto Riverside ParkScheme ACity of New YorkDepartment of TransportationDepartment of Parks and Recreation Stop Control at HHP Exit Ramp Results in traffic queues that reach HHP mainline Pavement Markings Directs traffic entering traffic circle from HHP Exit Rampto turn away from traffic coming from the left Substandard Sight Distance for Vehicles on the HHP ExitRamp to See & Avoid conflicts with other vehicles and cyclists Sight Distance Provided 40 feet Standard Sight Distance 80 feet Stop Control at HHP Exit Ramp Intended to mitigate substandard sight distance Vehicles are observed to not stop Without proper enforcement, stop control is not effectivein maintaining safe operations Substandard barrier heights for cyclistsBicycle Circulationfrom Riverside ParkRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 20198

Proposed Conditions - Bicycle Design Improves Operations and Safety of HHP Interchange for All Users Stop Control and Advanced Signage at HHP Exit Ramp Increases visibility of cyclists Improves vehicle response times Pavement Marking Improvements Narrower traffic lanes reduces speeds Redirects traffic entering traffic circle from HHP Exit Ramp toreflect normal roundabout movements Moving traffic away from wall increases sight distance Improves SightDistance for Vehicleson the HHP ExitRamp to See & Avoidconflicts with othervehicles and cyclists Provides NYSDOTstandard barrierheight for cyclistsBicycle Circulationto Riverside ParkBicycle Circulationfrom Riverside ParkCity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 20199

Community Generated Bicycle SchemeDirect Impact to Operationof Rotunda Ramp to GarageSchemes A & BBike Lanes OutsideTraffic Circle 2-Way PhysicallySeparated Bike Lane onSouth Side of West 79thStreetAcross and Over HHPEntrance RampConnects to RiversidePark Upper Bike LaneFeasibility StudyScheme A - Infeasibledue to the direct impact onthe operation of theRotunda ramp to theGarage Level. Not StudiedFurther.Scheme ACity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019Scheme BStudied B - Infeasibledue to physical, geometrc,safety constraints.10

Community Generated Bicycle SchemeSub-Scheme B-1: On-Grade Option HUDSON RIVERRIVERSIDE DRIVEPROPOSED BICYCLE BOXBOAT BASIN CAFE UNDERPASSEXISTING CROSSWALK14’-0”PROPOSEDADA RAMP SHARED USED PATHPOTENTIAL BACKEDUP TRAFFIC ONROTUNDA DUE TOPROPOSED TRAFFICSIGNAL1’-0” EXISTING VENTILATIONSHAFT16’-0”7’-8”EXISTING PATH WILLNEED TO EXPAND INORDER TO MAINTAIN A14’ WIDE SHARED USEPATHStudied 2 Additional Sub-SchemesSub-Scheme B-2 2-way Shared Use Path with Overpass Structure atHHP Entrance RampSub-Scheme B-3 2-Way Shared Used Path with UnderpassTunnel/Structure at HHP Entrance RampEXISTING COLUMNS96 AND 97HENRYHUDSONPARKWAYCity of New YorkDepartment of TransportationDepartment of Parks and Recreation Crosswalk on the entrance (acceleration)ramp to the Henry Hudson Parkway (HHP)Vehicles and cyclists (and other park users)will be in direct conflict creating an unsafecrossingRequires signalized crossing Potential for traffic backup into trafficcircle Increases likelihood of rear-endcollisions on entrance rampNo sight distance at key point ofpedestrian/bicycle mixingExisting park path improvementsW 79th Street/Riverside Drive intersectionoperationMTA Bus layover area conflictSignificant impacts to parkland(landscaping/tree removals/drainage)Rehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 201911

Community Generated Creative Idea – Reversal of Traffic Circle FlowReversal of Traffic Circle FlowReversal of Traffic Flow and Protected Bike Lane on Rotunda Reversal of Traffic Flow Addition of Traffic Signals within Traffic Circle Increased traffic queues on West 79h Street and HHP RampTraffic Circle and HHP Interchange level of service significantly reducedNegatively impacts response times of emergency vehiclesAffects M79 bus operation and scheduleMTA Bus Operations on the West Half of Traffic Circle Clockwise operation unfamiliarTurning conflicts at West 79th StreetIncreased potential for accidentsRestricts NYCDPR and Public Access (Marina Residents) to the RotundaGarageGeometric Considerations Complex Left Turning Movements for Snow Plow/Emergency VehiclesFeasibility StudyStudied from an operational perspective and determined to be infeasibledue to the direct impact on the operation and safety of the Rotunda TrafficCircle and Interchange with the HHPScheme ACity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 201912

Potential Staging AreasWest 79th Street Lanes: Located within the existing travel lanes of West 79th Street east of the Rotunda between West EndAvenue and Riverside Drive; deliveries via local roads.North Project Adjacent: Located within Riverside Park; deliveries via local roads/park paths by construction barge in theHudson River north of the NYCDPR Boat Basin.South Project Adjacent: Located within Riverside Park in area currently occupied by ball fields; deliveries via local roads/parkpaths or by construction barge in the Hudson River south of the NYCDPR Boat Basin.96th Street Interchange: Located within Riverside Park at the 96th Street interchange with the Henry Hudson Parkway;deliveries by local roads/park paths.Riverside Drive Adjacent: Located withinRiverside Park near the northwest corner ofRiverside Drive and West 79th Street;deliveries by local roads/park paths.South Track: Located within Riverside Parkat West 74th Street; deliveries via localroads/park paths or by construction barge inthe Hudson River at West 74th Street.City of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 20191313

Proposed Staging Area - South Project AdjacentGeneral RehabilitationProject LimitsCity of New YorkDepartment of TransportationDepartment of Parks and RecreationPotential Staging Area(s)Rehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019 Utilize one ballfiled at atime to minimize impacts Switch ballfield locationduring little leagueoffseason, resulting in 2 nefields. Possible to receivedeliveries from HHP Hudson River Greenwayopen during construction Provides a greater amountof suitable land availablefor construction equipment Close proximity to workarea reduces constructionduration and cost14

Aerial RenderingCity of New YorkDepartment of TransportationDepartment of Parks and RecreationRehabilitation of the West 79th Street RotundaComplex And West 79th Street Bridge over AmtrakMay 9, 2019Conceptual AerialRendering1515

Rehabilitation of the West 79 th Street Rotunda Complex And West 79 th Street Bridge over Amtrak May 9, 2019 City of New York Department of Transportation Department of Parks and Recreation 3 Project History / Existing Structure Characteristics West 79 th St. Bridge Over Amtrak (BIN 2-22929-0) Constructed in 1937 Owned/Operated by NYCDOT

Related Documents:

May 02, 2018 · D. Program Evaluation ͟The organization has provided a description of the framework for how each program will be evaluated. The framework should include all the elements below: ͟The evaluation methods are cost-effective for the organization ͟Quantitative and qualitative data is being collected (at Basics tier, data collection must have begun)

Silat is a combative art of self-defense and survival rooted from Matay archipelago. It was traced at thé early of Langkasuka Kingdom (2nd century CE) till thé reign of Melaka (Malaysia) Sultanate era (13th century). Silat has now evolved to become part of social culture and tradition with thé appearance of a fine physical and spiritual .

On an exceptional basis, Member States may request UNESCO to provide thé candidates with access to thé platform so they can complète thé form by themselves. Thèse requests must be addressed to esd rize unesco. or by 15 A ril 2021 UNESCO will provide thé nomineewith accessto thé platform via their émail address.

̶The leading indicator of employee engagement is based on the quality of the relationship between employee and supervisor Empower your managers! ̶Help them understand the impact on the organization ̶Share important changes, plan options, tasks, and deadlines ̶Provide key messages and talking points ̶Prepare them to answer employee questions

Dr. Sunita Bharatwal** Dr. Pawan Garga*** Abstract Customer satisfaction is derived from thè functionalities and values, a product or Service can provide. The current study aims to segregate thè dimensions of ordine Service quality and gather insights on its impact on web shopping. The trends of purchases have

Chính Văn.- Còn đức Thế tôn thì tuệ giác cực kỳ trong sạch 8: hiện hành bất nhị 9, đạt đến vô tướng 10, đứng vào chỗ đứng của các đức Thế tôn 11, thể hiện tính bình đẳng của các Ngài, đến chỗ không còn chướng ngại 12, giáo pháp không thể khuynh đảo, tâm thức không bị cản trở, cái được

Le genou de Lucy. Odile Jacob. 1999. Coppens Y. Pré-textes. L’homme préhistorique en morceaux. Eds Odile Jacob. 2011. Costentin J., Delaveau P. Café, thé, chocolat, les bons effets sur le cerveau et pour le corps. Editions Odile Jacob. 2010. Crawford M., Marsh D. The driving force : food in human evolution and the future.

Le genou de Lucy. Odile Jacob. 1999. Coppens Y. Pré-textes. L’homme préhistorique en morceaux. Eds Odile Jacob. 2011. Costentin J., Delaveau P. Café, thé, chocolat, les bons effets sur le cerveau et pour le corps. Editions Odile Jacob. 2010. 3 Crawford M., Marsh D. The driving force : food in human evolution and the future.