RCRA Permit Training EPA Region 4—Frankfort, KY July 20-23, 2004

SESSION 10 RCRA PERMIT TRAINING: WHO NEEDS A PERMIT & REGULATORY REQUIREMENTS

Session 10 Agenda: Who Needs a Permit & Regulatory Requirements Permit Applicability Permit Exemptions Types of Permits Permitting Process Permitting process is extensive—permits can take several years to review and approve

Permit Applicability RCRA requires a permit for the treatment, storage, and disposal of any hazardous waste as identified or listed in 40 CFR Part 261 Owners or operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit under Subtitle C of RCRA Treatment, storage or disposal facilities (TSDFs) in existence on November 19, 1980, operate under interim status until a final permit decision is made New TSDFs (those that were not in operation before November 19, 1980) are ineligible for interim status and must receive a RCRA permit before construction can commence 40 CFR §270.1(c)

Permit Exemptions The following entities are exempt from the permitting requirements Large quantity generators accumulating waste on site for less than 90 days Small quantity generators who accumulate waste on site for less than 180 days Farmers disposing of their own (hazardous) pesticides on site Owners or operators of totally enclosed treatment facilities, wastewater treatment units (tanks) and elementary neutralization units

Permit Exemptions The following entities are exempt from the permitting requirements (continued) Transporters storing manifested wastes at a transfer facility for less than 10 days Persons engaged in containment activities during an immediate response to an emergency Owners or operators of solid waste disposal facilities handling only conditionally exempt small quantity generator waste Persons engaged in Superfund on-site cleanups and RCRA §7003 cleanups

Types of Permits There are several different types of permits Treatment, storage, and disposal permits – RCRA permits issued for treatment, storage, and disposal units – HSWA requires facilities to correct releases to all media, thus interim status facilities or facilities permitted prior to HSWA, are required to include provisions in their Part B Permit application or to revise their permit, respectively, to comply with this requirement Research, development, and demonstration permits Post-closure permits

Types of Permits In potentially dangerous situations, EPA can forego the normal permitting process EPA can issue emergency permits When there is an "imminent and substantial endangerment to human health and the environment," a temporary (90 days or less) emergency permit can be issued to a: – Non-permitted facility for the treatment, storage, or disposal of hazardous waste – Permitted facility for the treatment, storage, or disposal of hazardous waste not covered by its existing permit 40 CFR §270.61

Types of Permits EPA has tried to abbreviate the application process for facilities that need to be permitted under two or more statutes EPA issues permits under a number of different laws, and in some instances, the requirements of one statute's permitting regulations are quite similar to those in RCRA Permit-by-rule – Ocean disposal barges or vessels – Injection wells – Publicly owned treatment works 40 CFR §270.60

Types of Permits Facilities have special requirements for trial burn and land demonstration permits Land treatment facilities and incinerators must go through a trial period during which their ability to perform properly under operating conditions is tested Owners or operators of these two types of facilities are required to obtain temporary permits that are enforced while the facility is being tested Final permit may be modified based on trial results

Permitting Process The permitting process involves many steps Public’s Role Facility’s Role EPA’s Role 1. Preapplication meeting 2. Prepare two-part application Form required for everyone (Part A) Facility-specific data (Part B) 3. Receipt and review of application 4. Preparation of first draft 5. Public comments 6. Final permit decision 40 CFR Part 270

Permitting Process The permitting process involves many steps (continued) Pre-application public meeting – Notify public (newspaper, signs, or broadcast) of intent to apply for a permit Part A permit application submitted – Permitting agency notifies public using facility mailing list that application received Existing facilities, allowed at least six months from the date of request to submit Part B permit application For new facilities, Part A and Part B Permit application submitted together

Permitting Process The permitting process involves many steps (continued) No required format for the Part B, however the Part A is a specific form that must be filled out properly (EPA Form 8700-23) Same permit process also used for closure and post-closure permits Notice of Deficiencies (NOD) issued NOD response evaluation Part B application approved or denied

Permitting Process The permitting process involves many steps (continued) Draft Permit – Includes conditions based on the application (should be reviewed by enforcement staff) – Includes certain sections of the application (contingency plan, waste analysis plan) – Includes corrective action requirements Fact sheet or Statement of Basis – Explains the principal facts and technical issues considered when preparing the draft permit Public Notice – Intent to issue (or deny) the permit – Public comment period – Opportunity for public hearing

Permitting Process The permitting process involves many steps (continued) Usually 45 days to comment, can be extended if public hearing not within the 45 days Public hearings must be announced 30 days prior to being held The Agency evaluates public comments and decides to: – Issue permit – Deny permit Agency must respond to all comments

Permitting Process The permitting process involves many steps (continued) Opportunity to appeal permit Negotiate to resolve any issues If unsuccessful, follow process in Part 124 Administrative record – Paper trail supporting agency findings – Includes any appeals or other legal actions

Permitting Process Commonly encountered problems in the permitting process Quality and completeness of Part B Constant negotiations Public hearings Size of applications can often be cumbersome and overwhelming The permitting process is quite extensive and can last years: – Land disposal permit – 4 years – Incineration permit – 3 years – Storage or treatment permit – 2 years

RCRA Permit Training : Who Needs a Permit and Regulatory Requirements US EPA ARCHIVE DOCUMENT Author: US EPA, OSWER, Office of Resource Conservation and Recovery Subject: A presentation from a permit-training program for EPA Region 4 on regulations under RCRA that took place July 20-23, 2004.

Related Documents:

Rapid Flow, Titration, Turbidimetry, Ultraviolet- Visible Spectroscopy (UV/VIS) Parameter/Analyte Water pH EPA 150.1 Turbidity EPA 180.1 Calcium EPA 200.7 Iron EPA 200.7 Magnesium EPA 200.7 Potassium EPA 200.7 Silica, Total EPA 200.7 Sodium EPA 200.7 Aluminum EPA 200.8 Antimony EPA 200.8 Arsenic EPA 200.8 .

110001581155 ascot steel equip rcra . 110004319274 electric meter shop rcra 110004320949 noritsu c o ny marriott marquis rcra . 110004342202 myrtle motors pontiac rcra 110004342471 davis & warshow rcra 110004344576 s & w

RCRA Hazardous Waste Permit Application consists of EPA Form 8700-23 (includes both the RCRA Subtitle C Site Identification Form and the Hazardous Waste Permit Information Form), along with maps,

RCRA Air Emission Training Jeopardy Game with complete questions and answers US EPA ARCHIVE DOCUMENT . This is the complete Jeopardy Game used for the RCRA Air Emission Training sessions Keywords: EPA Region 6,Hazardous Waste Combustion,Air Emission Training,40 CFR Parts 264/265, Subparts AA/BB/CC,Jeopardy Game Created Date: 11/17/2011 1:25 .

EPA Test Method 1: EPA Test Method 2 EPA Test Method 3A. EPA Test Method 4 . Method 3A Oxygen & Carbon Dioxide . EPA Test Method 3A. Method 6C SO. 2. EPA Test Method 6C . Method 7E NOx . EPA Test Method 7E. Method 10 CO . EPA Test Method 10 . Method 25A Hydrocarbons (THC) EPA Test Method 25A. Method 30B Mercury (sorbent trap) EPA Test Method .

RCRA EPA ID Numbers and as a training tool for those new to the assignment and management of RCRA EPA ID Numbers. In order to get a better "picture" of the generation and movement of waste throughout the country, it is important that, when tracked, data be made available nationally. Currently when tracked, conditionally exempt

Nov 18, 2020 · By 2030, the RCRA Corrective Action Program will eliminate or control adverse impacts beyond facility boundaries at RCRA Corrective Action facilities wherever practicable and the program will focus attention on cleanups that will not meet this target. 3. By 2030, the RCRA Corrective A

Accounting for Nature: A Natural Capital Account of the RSPB’s estate in England 77. Puffin by Chris Gomersall (rspb-images.com) 8. Humans depend on nature, not only for the provision of drinking water and food production, but also through the inspiring landscapes and amazing wildlife spectacles that enrich our lives. It is increasingly understood that protecting and enhancing the natural .