Deck Board Railing Installation Guide - Default Store View

20d ago
16 Views
0 Downloads
609.45 KB
5 Pages
Last View : 14d ago
Last Download : n/a
Upload by : Jerry Bolanos
Transcription

Deck Board Railing Installation Guide

Deck Board Railing Installation Thank you for choosing a Weatherables! We are proud to provide the highest quality vinyl fencing and railing available and are fully committed to providing you with superior service from the very first time we work together to long after we've delivered your product. This guide is designed the walk you through the installation of your new deck board railing. If you have any questions, please give us a call at 1-888-743-3673 and welcome to Weatherables. Below are supplemental installation instructions for Weatherables Deck Board Railing. Please read the Premium Straight and Stair Installation guides before installing. Please note the deck board is not included. You'll want to match to your existing deck board. 1. CHOOSE YOUR INSTALLATION METHOD Post to Post Over The Post Deckboard Top Rail Deckboard Top Rail Post to Post Step 1 NOTE: Post Post Over The Post Install all of your railing sections folllowing the directions provided in the Premium Straight Railing Installation Guide. Step 1 Step 2 Be sure to leave at least 3" from the top of the top rail to the top of the post, to ensure the deck board and the post cap fit correctly. NOTE: Follow the Premium Straight Railing Installation Guide through Section 4 Step 6. The 2" x 3.5" bracket covers are 2 pieces - the longer piece is the top and is marked "2" x 3.5" Top". Put the top cover only on top of the rail and hold at correct elevation - next make a pencil mark on the post, from the top of the cover to get the elevation to cut the post. Step 3 Now it is time to cut the post at the pencil line. Step 4 Go to step number 7 in the Premium Straight Railing Installation Guide. Deck board top rails should be installed after all railing is installed. We’re happy to help. Call 1-866-719-5782. 2

Deck Board Railing Installation 2. INSTALLING THE DECK CLIPS Now that your railing is installed, it's time to install the deck board clips. Install 2 of the deck clips about 2" from each post by placing a screw in each of the 2 middle holes on the deck clip. Then install the other 2 deck clips equal distances apart. 2 INCHES 2 INCHES #10 x 2" screws Insert a screw up through each of the 2 outer holes on the deck board clip securing the deck board into place. #10 x .75" screws We’re happy to help. Call 1-866-719-5782. 3

Deck Board Railing Installation 3. JOINTS Step 1 Use the 22.5 scarf joints when connecting deck rails together. Step 2 Use milter joints at corners. Step 3 NOTE: If the Deck Board end of run is not visible, it can be left exposed. If it is visible, terminate the run with a short mitered piece. We recommend the short piece be fastened with glue and a trim head screw, but make sure you pre-drill the cap rail to prevent splitting. Joints should be sealed with caulk or glue per deck board manufacturer's specifications. 4. ANGLES 45 Degree Adapter 1. The 45 adapter is used in conjuction with the existing straight brackets (height is the same). 2. We recommend dry fitting with the adapters to set the elevation. Then follow the Premium Straight Railing Installation Guide. Field Cut Angle Bracket The maximum cut angle for the 4" x 4" posts can be cut no greater than 22 . NOTE: Use miter joints at corners; joints should be sealed with caulk or glue per deck manufacturer's specifications if installing using the "Over the Post" method. We’re happy to help. Call 1-866-719-5782. 4

Deck Board Railing Installation Stairs Below are supplemental installation instructions for Weatherables Deck Board Railing. Step 1 Step 2 Step 3 Step 4 Step 5 NOTE: Follow the Premium Stair Railing Installation Guide through Section 1 Step 4. The top rail stair brackets have covers that need to be cut at the correct angle. The brackets can handle angles of 30 to 40 . MARK LINE RAILS The covers for the top rail are marked "Upper Cover" and "Lower Cover". The upper cover is for the top of the stairs and the lower is for the bottom of the stairs. MARK LINE PICKETS Slide the upper cover onto the upper portion of the top rail and the lower cover onto the lower portion of the top rail. Picking up at Step 5 of Section 1 of the Premium Stair Railing Installation Guide, follow the instructions until you reach step 8. On step 8, hold the covers so that the bottom of the cover is touching the bottom of the top rail. Mark the angle with a pencil on the top of the cover, repeat on the lower cover. MARK LINE Be sure to leave at least 3" from the top of the top rail to the top of the post, to ensure the deck board and the post cap fit correctly. Field Cut Angle Bracket for Stairs If you have an angle outside of 30 to 40 , use the Field Cut Angle Bracket. 1. Follow the Premium Stair Railing Installation Guide through Section 1 Step 7 (marking the rails), then use a speed square and line up the pencil mark on the rail to get the correct angle. Next, cut the field cut bracket at the correct angle. IMPORTANT TIP: Make sure the first picket is less than 4" from the post. We’re happy to help. Call 1-866-719-5782. 5

Deck Board Railing Installation Stairs Below are supplemental installation instructions for Weatherables Deck Board Railing. Step 1 Follow the Premium Stair Railing Installation Guide through Section 1 Step 4. Step 2 The top rail stair brackets have covers that need to be cut at the correct angle. The brackets can handle angles of 30 to 40 .

Related Documents:

ROYAL BABIES AND TOTS NURSERY FLOWRIDER DECK 11 DECK 10 DECK 9 DECK 8 DECK 7 DECK 6 DECK 5 DECK 4 DECK 3 DECK 2 Navigator of the Seas PROFILE 1723 - Starts April 27, 2017 DECK 13 DECK 12 DECK 15 DECK 14 OCEAN VIEW H I Ocean View Stateroom Two twin beds that convert to Royal

NOrwegiaN ePiC Category Descriptions Deck Plans Staterooms DECK 17 DECK 15 DECK 13 DECK 11 DECK 7 DECK 9 DECK 5 EPICPROFILE DECK 18 DECK 16 DECK 14 DECK 12 DECK 10 DECK 6 DECK 8 DECK 19 Built 2010 gross Tonnage: 153,000 Overall Length: 1,080 feet Beam: 133 feet Draft: 28.5 feet engines: Diesel Electric Cruise Speed: 22 knots

Oasis of the Seas DECK 18 DECK 17 DECK 16 DECK 15 DECK 14DECK 12 Last Update: April 21, 2014Profile 1688 - starts May 1, 2016 DECK THREE ON PUBLIC AREAS Opal Theater The state of the art theater features our award winning Broadway-style theater productions and aerial acts. Studio B A multipurpose studio complex filled with activity all day long.

Endurance Railing Original Rail Installation Instructions Author: Railing Dynamics Subject: Railing Dynamics, Inc. (RDI) is a company that produces vinyl railing and composite railing for residential and commercial applications. Created Date: 3/17/2008 11:32:11 AM

AVALON ALUMINUM RAILING METALWORKS EXCALIBUR ENDURANCE ORIGINAL RAIL DECORATIVE SCREEN PANELS VINYL RAILING STEEL RAILING COMPOSITE RAILING ALUMINUM RAILING FINYL LINE RAIL . 96" Transform Top Rail Adapter for mix'n'match with RDI MetalWorks Excalibur (2 hardware) 73019236 TRANSFORM - LIGHTING ACCESSORIES

AVALON ALUMINUM RAILING METALWORKS EXCALIBUR ENDURANCE ORIGINAL RAIL DECORATIVE SCREEN PANELS VINYL RAILING STEEL RAILING COMPOSITE RAILING ALUMINUM RAILING FINYL LINE RAIL . 96" Transform Top Rail Adapter for mix'n'match with RDI MetalWorks Excalibur (2 hardware) 73019236 TRANSFORM - LIGHTING ACCESSORIES

ADI Cable Railing by Ultra-tec Cable Railing Kits for Metal Posts 232 Series Cable for 2” Metal Posts 252 Series Cable for 3” Metal Posts Cable railing kit, made in USA from 1/8” high quality 316 grade stainless steel includes 1 strand of cable w/swage, applicable washers, Invisiware receiver, Pull-Lock end fitting and end cap .

Advanced Engineering Mathematics Dr. Elisabeth Brown c 2019 1. Mathematics 2of37 Fundamentals of Engineering (FE) Other Disciplines Computer-Based Test (CBT) Exam Specifications. Mathematics 3of37 1. What is the value of x in the equation given by log 3 2x 4 log 3 x2 1? (a) 10 (b) 1(c)3(d)5 E. Brown . Mathematics 4of37 2. Consider the sets X and Y given by X {5, 7,9} and Y { ,} and the .