RK MIDWAY - Saint Paul, Minnesota

4m ago
10 Views
0 Downloads
8.25 MB
33 Pages
Last View : 2d ago
Last Download : n/a
Upload by : Lilly Kaiser
Transcription

SNELLING MIDWAY REDEVELOPMENT SITE MASTER PLAN ST. PAUL, MN FEBRUARY 18, 2016 RK MIDWAY

REGIONAL CONTEXT SNELLING-MIDWAY SITE RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 2

TRANSPORTATION CORRIDORS SNELLING-MIDWAY SITE LRT GREEN LINE BRT A LINE RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 3

NEIGHBORHOOD CONTEXT HAMLINE-MIDWAY NEIGHBORHOOD ST. ANTHONY PARK NEIGHBORHOOD SNELLING-MIDWAY SITE THOMAS DALE / FROGTOWN NEIGHBORHOOD UNIVERSITY AVE LEXINGTON PKWY UNION PARK NEIGHBORHOOD SNELLING AVE INTERSTATE 94 SUMMIT-UNIVERSITY NEIGHBORHOOD LRT GREEN LINE BRT A LINE RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 4

SITE AREA 1230’ UNIVERSITY AVE RK MIDWAY (24.6 AC) SNELLING AVE PASCAL ST N TOTAL SITE AREA 34.4 AC 1220’ SHIELDS AVE 1190’ SPRUCE TREE AVE MET COUNCIL (9.8 AC) ST. ANTHONY AVE 1240’ I-94 RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 5

ST. PAUL DOWNTOWN BLOCKS OVERLAY 7TH ST W FORT RD MINNESOTA CHILDREN’S MUSEUM MINNESOTA STATE COLLEGES & UNIVERSITIES 7TH PL E 7TH PL W NEARLY 12 BLOCKS OF ST. PAUL DOWNTOWN BLOCK 6TH ST E LANDMARK PLAZA MEARS PARK 5TH ST E RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. N SIBLEY ST JACKSON ST ROBERT ST N 4TH ST E MINNESOTA ST CEDAR ST WABASHA ST N ST PETER ST CENTRAL STATION UNION DEPOT STATION MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 6

DESIGN PRINCIPLES 1. TOD - Pedestrian first (walkable neighborhood) Direct link to Green Line train stations and BRT stops Public open spaces for citizens of the Twin Cities Creation of new mixed use neighborhood 2. Amending the street grid and urban fabric Creation of a new neighborhood district respective to surrounding existing neighborhoods Walkable block dimensions 3. Emphasizing public open spaces Creation of open space network Connecting parks and bike paths Creation of new public open spaces for four season use 4. Mixed-use Mix of 24/7 uses including stadium, office, retail, residential, entertainment, hotel, and open space Active retail street fronts on principal streets Day and night uses Mix of international, regional, and local programs 5. Sustainable stormwater management Green infrastructure such as tree trenches, rain gardens, boulevard swales, and green roofs Sustainable landscape Permeable paving surface Irrigation cistern Grey water recycling station Water feature incorporating stormwater management system. RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 7

MIXED-USE OFFICE RESIDENTIAL RETAIL OPEN SPACE ENTERTAINMENT HOTEL RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 8

FOUR SEASONS PUBLIC SPACE WINTER SPRING RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. SUMMER FALL MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 9

EVENTS OUTDOOR YOGA LA LIVE LOS ANGELES, CA RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. ST. CATHERINE STREET BRYANT PARK, NY MONTRÉAL, CANADA MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 10

EXISTING SITE CONDITIONS NORTHEAST CORNER NORTHWEST CORNER 1 2 SOUTHWEST CORNER 3 UNIVERSITY AVE 2 PASCAL ST N SNELLING AVE 1 4 SOUTHEAST CORNER 3 4 RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 11

EXISTING SITE CONDITIONS PASCAL STREET 1 UNIVERSITY AVE PASCAL ST N SNELLING AVE UNIVERSITY AVENUE 2 3 1 2 4 SNELLING AVENUE I-94 3 4 RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 12

SIMPSON ST N ASBURY ST PUBLIC TRANSIT & PEDESTRIAN ENTRIES UNIVERSITY AVE SPRUCE TREE AVE SHIELDS AVE SNELLING AVE PASCAL ST N LRT GREEN LINE LRT PLATFORM BRT A LINE BRT STOP PEDESTRIAN CIRCULATION EXISTING TRAFFIC SIGNAL ST. ANTHONY AVE I-94 RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 13

SIMPSON ST N ASBURY ST PUBLIC TRANSIT & PEDESTRIAN ENTRIES UNIVERSITY AVE SPRUCE TREE AVE PASCAL ST N SNELLING AVE SHIELDS AVE LRT GREEN LINE BRT A LINE VEHICULAR CIRCULATION EXISTING TRAFFIC SIGNAL ST. ANTHONY AVE I-94 RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 14

SIMPSON ST N ASBURY ST BIKE ROUTES CONNECTION TO CHARLES AVE BIKE ROUTE UNIVERSITY AVE SPRUCE TREE AVE CONNECTION TO LEXINGTON PARKWAY SHIELDS AVE LRT GREEN LINE PASCAL ST N SNELLING AVE CONNECTION TO ALDINE ST BIKE ROUTE LRT PLATFORM BRT A LINE BRT STOP BICYCLE CIRCULATION ST. ANTHONY AVE EXISTING TRAFFIC SIGNAL CONNECTION TO SELBY DEVELOPMENT I-94 RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 15

SIMPSON ST N ASBURY ST MENDING THE STREET GRID (CONNECTING NEIGHBORHOODS) UNIVERSITY AVE SPRUCE TREE AVE SNELLING AVE PASCAL ST N SHIELDS AVE ST. ANTHONY AVE I-94 RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 16

“SNELLING-MIDWAY SMARTSITE” RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 17

SITE PLAN SNELLING AVE. STATION WESTBOUND PLAT FORM SNELLING AVE. STATION EASTBOUND PLAT FORM OFFICE UNIVERSITY AVE. CINEMA MIDWAY SQUARE BRT BUS STOPS RESIDENTIAL SPRUCE TREE AVE. SHOPS IN THE GREEN FITNESS CLUB OFFICE RESIDENTIAL VICTORY PLAZA RESIDENTIAL SHIELDS AVE. SNELLING COMMONS SOCCER STADIUM UNITED CHAMPION PLAZA SIMPSON PLACE SNELLING PLACE OFFICE PROPOSED TRAFFIC SIGNAL HOTEL HOTEL SNELLING AVE. OFFICE PASCAL GREEN PASCAL ST. RELOCATED TRAFFIC SIGNAL ST ANTHONY AVE. I-94 50’ 0’ RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. 200’ 100’ MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 18

GROUND FLOOR PLAN UNIVERSITY AVE. SPRUCE TREE AVE. PASCAL ST. SIMPSON PLACE OFFICE RETAIL RESIDENTIAL SNELLING AVE. SNELLING PLACE PROPOSED TRAFFIC SIGNAL HOTEL CINEMA FITNESS LOADING PARKING/SERVICE ST ANTHONY AVE. CIRCULATION STADIUM RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 19

PROPOSED BLOCK PLAN 0.1 AC UNIVERSITY AVE 3.4 AC 210’ SPRUCE TREE AVE D E 460’ A 210’ 390’ 320’ 210’ 390’ B 8.0 AC 520’ 330’ 340’ 200’ PASCAL ST. 7.9 AC C 2.3 AC 1.3 AC DEVELOPABLE BLOCKS: 11.4 AC (33.1%) 200’ 280’ 7.1 AC OPEN SPACES 8.0 AC STREET 7.9 AC STADIUM TOTAL PUBLIC REALM 23.0 AC (66.9%) 300’ 650’ 430’ F SNELLING AVE PROPOSED LAND USAGE 240’ 210’ SHIELDS AVE ST. ANTHONY AVE I-94 CURRENT OWNERSHIP PRIVATE OWNERSHIP CITY LAND 24.6 AC 09.8 AC *ALL AREAS ARE APPROXIMATE RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 20

PUBLIC PLACES MIDWAY SQUARE SPRUCE TREE AVE VICTORY PLAZA SHOPS ON THE GREEN UNIVERSITY AVE THE BOULEVARD PASCAL ST. SHIELDS AVE PASCAL GREEN UNITED CHAMPION PLAZA ST. ANTHONY AVE RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. OBJECTIVE: CREATE A CIVIC SPACE THAT ENHANCES GAME DAY EXPERIENCE AND ADDS VITALITY TO THE VILLAGE DURING EVENTS AND NONEVENT DAYS. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 21

460’ PROJECT COMPARISON - LANSDOWNE, OTTAWA 2.5 AC 180’ 180’ 155’ RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 22

SCALE COMPARISON RICE PARK, ST. PAUL 250’ PEAVEY PLAZA, MINNEAPOLIS RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. 3.7 AC 2.7 AC 3.7 AC 5.8 AC 560’ 405’ 400’ 355’ 475’ 450’ RICE PARK PEAVEY PLAZA MEARS PARK MIDWAY MEARS PARK, ST. PAUL 450’ MIDWAY, ST. PAUL MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 23

THE CENTRAL SQUARE SHOPS ON THE GREEN PRECEDENTS MIDWAY SQUARE AND VICTORY PLAZA PRECEDENTS RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 24

THE BOULEVARD THE BOULEVARD PRECEDENTS UNITED CHAMPION PLAZA PRECEDENTS RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 25

PASCAL GREEN PASCAL GREEN PRECEDENTS PERMEABLE PAVING EXAMPLES RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 26

STREET GRID AND DIRECTIONS EXISTING TRAFFIC SIGNAL EXISTING TRAFFIC SIGNAL UNIVERSITY AVE. 70’ ROW SPRUCE TREE AVE. 90’ ROW SNELLING AVE. SHIELDS AVE. 70’ ROW 70’ ROW 80’ ROW 85’ ROW 70’ ROW CURBLESS STREET - SHARED STREET 90’ ROW 85’ ROW 70’ ROW ST ANTHONY AVE. PROPOSED TRAFFIC SIGNAL I-94 PASCAL ST. RELOCATED TRAFFIC SIGNAL TRAFFIC DIRECTION PAVED STREET - SHARED STREET GREEN SPACE RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 27

STREET SECTIONS B PL A EXISTING SIDEWALK MEDIAN 2 DRIVING LANES 3 DRIVING LANES SNELLING AVENUE SIDEWALK MIN. 15’ A PARKING PARKING LANE LANE 2 DRIVING SIDEWALK SIDEWALK LANES 15’ 15’ NEW SECONDARY STREET 70’ ROW B RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 28

STREET SECTIONS D C BIKE SIDEWALK LANE 15’ 4 DRIVING LANES NEW PRIMARY STREET 90’ ROW BIKE LANE SIDEWALK 15’ C PL PL SIDEWALK MIN. 15’ BIKE LANE EXISTING 3 DRIVING LANES PASCAL STREET D RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 29

CURBLESS STREETS Schadowstraße Mariahilfer Straße Director Park PORTLAND, OREGON RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. VIENNA, AUSTRIA DUSSELDORF, GERMANY MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 30

BIKE ROUTES CONNECTION TO CHARLES AVE BIKE ROUTE CONNECTION TO LEXINGTON PARKWAY CONNECTION TO ALDINE ST BIKE ROUTE CONNECTION TO SELBY DEVELOPMENT AND BEYOND RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 31

LANDSCAPE: SUSTAINABILITY AND STORMWATER INITIATIVES UNDERGROUND LOCATION POTENTIAL STORMWATER DETENTION LOCATION PERVIOUS SURFACE/ PAVING/LANDSCAPE GREEN ROOF PERMEABLE PAVING SURFACE RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. IRRIGATION CISTERN SIDEWALK LANDSCAPE/ RAIN GARDEN POTENTIAL CENTRALIZED GREY WATER RECYCLING STATION MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 32

SITE PLAN SNELLING AVE. STATION WESTBOUND PLAT FORM SNELLING AVE. STATION EASTBOUND PLAT FORM OFFICE UNIVERSITY AVE. CINEMA MIDWAY SQUARE BRT BUS STOPS RESIDENTIAL SPRUCE TREE AVE. FITNESS CLUB OFFICE VICTORY PLAZA SHOPS IN THE GREEN RESIDENTIAL RESIDENTIAL SHIELDS AVE. SNELLING COMMONS SOCCER STADIUM UNITED CHAMPION PLAZA SIMPSON PLACE SNELLING PLACE OFFICE PROPOSED TRAFFIC SIGNAL HOTEL HOTEL SNELLING AVE. OFFICE PASCAL GREEN PASCAL ST. RELOCATED TRAFFIC SIGNAL ST ANTHONY AVE. I-94 50’ 0’ RK MIDWAY THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. 200’ 100’ MIDWAY, ST. PAUL, MN FEBRUARY 18, 2016 33

midway february 18 2016 y vey rk midway objective: create a civic space that enhances game day experience and adds vit ality to the village during events and non-event days. pascal st. the boulevard united champion plaza victory plaza pascal green midway square shops on the green spruce tree ave shields ave university ave st. anthony ave

Related Documents:

St. Zachariah, pray for us. Saint Joseph, Protector of the Church, pray for us. Saint Peter, pray for us. Saint Paul, pray for us. Saint Andrew, pray for us. Saint James, pray for us. Saint John, pray for us. Saint Jude, pray for us. Saint Christopher, pray for us. Saint Timothy, pray for us. Saint Andre Besette, pray for us. Saint Thomas Aquinas,

3. Saint Clare 4. Holy Cross 5. Saint Victor 15. 6. Saint Simon 16. 7. Santa Teresa 8. Chinese Catholic Mission 9. Saint Joseph, Mtn. View Holy Spirit 10. Saint Cyprian 11. Saint Maria Goretti Sacred Heart of Jesus 13. 14. Saint Lawrence the Martyr Saint Francis of Assisi Saint Athanasius 17. Christ the King 18. Saint Frances Cabrini 19. 20 .

district, the "State Fair Parking District." Remaining issues involve the best way to handle bus and pedestrian traffic, which, although brief in time span, does significant damage to Midway Parkway paving and lawn. Goal and Strategies The goal developed for this Small Area Plan is: To conserve and strengthen the Midway Parkway-West Como

Minnesota Literacy Council Children’s Tutor Training 60,000 Minnesota Education Equity Partnership Restorative Practices in Saint Paul Public Schools Pilot Project 30,000 Minnesota Network of Hospice and Palliative Care The Hospice Stories Project – Advancing Awareness and Accessibility 20,000 Minnesota State Council on

Seven Corners Gateway, Saint Paul, Minnesota A Premier Development Opportunity in the Capital City's Downtown REQUEST FOR PROPOSALS The City of Saint Paul and its Housing and Redevelopment Au thority (the "City" or "HRA") is pleased to announce

2018 Green Bond Report for the City of Saint Paul Page 1 Annual Reporting Commitment The City of Saint Paul (the “City”) intends to report on its Green Bond program at least annually, or until the proceeds of a series have bee

balanced and met. A central green provides residents and visitors with a place to gather. The neighborhood has a strong sense of place and identity. Copies of the full-length plan are available at the Saint Paul Department of Planning and Economic Development, Saint Paul on the Mississippi Design Center and CapitolRiver Council (District 17 .

First aiders must complete a training course approved by the Health and Safety Executive (HSE). 20 At school, the main duties of a first aider are to: give immediate help to casualties with common injuries or illnesses and those arising from specific hazards at school; when necessary, ensure that an ambulance or other professional medical help is called. PERSON? WHAT IS AN APPOINTED . 21 An .