EA 4-1 CHAPTER 4 JOB COSTING 4-1 Define cost pool, cost tracing, cost allocation, and cost-allocation base. Cost pool––a grouping of individual indirect cost items. Cost tracing––the assigning of direct costs to the chosen cost object. Cost allocation––the assigning of indirect costs to the chosen cost object. Cost-alloca

Cost Accounting 1.2 Objectives and Functions of Cost Accounting 1.3 Cost Accounting and Financial Accounting — Comparison 1.3 Application of Cost Accounting 1.5 Advantages of Cost Accounting 1.6 Limitations or Objections Against cost Accounting 1.7 Installation of a costing system 1.7 Concept of Cost 1.9 Cost Centre 1.10 Cost Unit 1.11 Cost .File Size: 1MB

z find out total fixed cost, total variable cost, average fixed cost, average variable cost, average total cost and marginal cost. 18.1 DEFINITION OF COST AND COST FUNCTION Cost is defined as the expenditure incurred by a firm or producer to purchase or hire factors of production in order to produce a product. As you know, factors of

III. Tabular analysis The cost of production of the selected vegetables were calculated as per the standard cost concept viz; Cost-A, Cost-B, Cost-C and tabulated for interpretation. Cost concepts: These includes cost A 1, A 2, B 1, B 2, C 1, C 2 and C 3 Cost A 1: All actual expenses

Energy Modeling software and developing Life-Cycle Cost Analysis. The life-cycle cost includes the system capital cost, energy cost, system maintenance and replacement cost over a 20-year of life span. The life-cycle cost analysis provides the Present Value (PV) of annual cost and the life cycle cost, and it compares the accumulated cash flow .

Positive overall: 1. One standard is simpler 2. Saves time and cost (no need for 3 to 4 days audits, or six monthly audits) COST SAVINGS HARPS AUDIT COST 245 GST WQA SQF Coles Annual Audit Cost 5,300 WQA Half-Yearly Audit Cost 1,800 Total Annual Cost 7,100 SQFHARPSAudit Cost 5,545 245 Total Annual Cost 5,790 COST SAVINGS

Cost Transparency Storage Storage Average Cost The cost per storage Cost Transparency Storage Storage Average Cost per GB The cost per GB of storage Cost Transparency Storage Storage Devices Count The quantity of storage devices Cost Transparency Storage Storage Tier Designates the level of the storage, such as for a level of service. Apptio .

3.3 CAS 1-24 as issued by The Institute of Cost Accountants of India 174 Study Note 4 : Cost Book Keeping 4.1 Cost Accounting Records, Ledgers and Cost Statements 185 4.2 Items excluded from Cost and Normal and Abnormal Items/Cost 200 4.3 Integral Accounts 201 4.4 Reconciliation of Cost Accounting Records with Financial Accounts 211

replacement cost after 25/30/35 kh LH 2 storage system cost propulsion system cost FCS cost TCO dominated by fuel cost: LNG option slightly cheaper than diesel and much cheaper than LH 2 LH 2 break-even cost at 57% efficiency: 2030 /ton LNG fuel cost factors per MMBTU basis: 4 NG, 5 liquefaction, 4 transport and bunkering LSMGO LNG LH 2-FC

Premium cost Estimated cost of retained losses Risk management costs Total Cost of (Insurable) Risk The premium cost is the fixed element of cost of risk. complete This is the cost of claims not covered by insurance. This is the external and internal costs. TCOR is therefore the best measure of the actual cost of any type of insurable risk.

Case study: insulation for refrigerators Insulation reduces energy cost, but has a cost itself Total cost is the cost of insulation plus the cost of energy lost by hear transfer through walls Objective function: minimize total cost given: x thickness of insulation C. M cost of insulation/mass T temp. di . across insulation C. E cost of .

c. Provide information to management for decision making d. Aid in the fixation of selling price 3. The combination of direct material and direct labor is a. Total production Cost b. Prime Cost c. Conversion Cost d. Total manufacturing Cost 4. The cost expended in the past that cannot be retrieved on product or service a. Relevant Cost b. Sunk Cost

The components of cost that need to be correctly addressed in the estimate include: 1. Base cost - the cost that will result if "all goes according to plan" (Reilly 2004) 2. Risk cost - the cost result of threat and opportunity events, if they should occur . 3. Escalation cost - cost resulting from normally expected inflation . 4.

1. Initial investment for service bus 3. Accelerates cost reduction effect with further system change 1 2 3 H/W Cost SI, S/W cost of traditional mesh type system SI, S/W cost of service bus implement -ation ・・・ Cost benefits of service bus Reduces middle-long term cost in system change 2. Initial cost recovery by SI cost reduction

11.1 ECONOMIC COST AND PROFIT 11.1 ECONOMIC COST AND PROFIT Figure 11.1 shows two views of cost and profit. Economists measure cost as the sum of explicit costs and implicit costs, which equals opportunity cost. 11.1 ECONOMIC COST AND PROFIT Normal profit is an implicit cost. Accountants measure cost as explicit costs and accounting depreciation.

The most criticized issue about alternate construction systems is the price. The stigma is between the knowledge of up-front cost vis-à-vis life cycle cost. The cost of a building is defined as follows: Total Cost Initial construction cost Running cost during life of building disposal cost (This is also known as life-cycle cost)

accounting records? A. Fixed cost. B. Sunk cost. C. Opportunity cost. D. Indirect cost. 42. When a decision is made among a number of alternatives, the potential benefit that is lost by choosing one alternative over another is the: A. realized cost. B. opportunity cost. C. conversion cost. D. accrued cost. 43.

C) A direct cost of one cost object can be an indirect cost of another cost object. D) All fixed costs are direct costs. Answer: C Diff: 1 Objective: 2 AACSB: Application of knowledge 16) A cost may be direct for one cost object and indirect for another cost object. Answer: TRUE Diff: 1 Objective: 2 AACSB: Application of knowledge

Cost-Tolerance Trades: Supplier Expertise Tolerance Cost High precision, high cost process Design tolerance defines the process required; small changes in tolerance may allow alignment to lower cost processes; only suppliers will know if the cost-tolerance sensitivity is high Moderate precision, moderate cost process Low precision, low cost process

Cost Object Any activity or item for which a separate measurement of costs is desired. Any factor whose change “causes” a change in the total cost of a related cost object. Note: Cost drivers can be factors other than volume Cost Driver e.g. Processing Sales Order Cost Object e.g., Product 11 Ba

Marty’s variable cost, VC, is his wage cost ( 80 per worker per day) and his other input costs ( 0.50 per cup). His total cost, TC, is the sum of the variable cost and his fixed cost of 100 per day. The answers are given in the accompanying table. b. The accompanying diagram shows the variable cost and total cost curves. TC VC 0 50 100 .

Primary FY20 Total Actual Rate/ FY21 Total Projected Rate/ FY22 Total Projected Rate/ Cost Driver Actual Cost Cost per FTE Projected Cost Cost per FTE Projected Cost Cost per FTE Notes STRS Salary 116

In this region of cost accounting, cost accounting collects product's material, labor and overhead cost and try to calculate total and per unit cost of product. This total cost calculation will be based on historical or standard or estimated basis. After this, cost accountant will use any method of costing

Step 2: Identify the independent variable or cost driver Identify the independent variable, or cost driver. Step 3: Collect data on the dependent variable and the cost driver. Step 4: Plot the data. Step 5: Estimate the cost function. Step 6: E al ate the cost dri er of the estimated cost Evaluate the cost d

Basic Power Flow Equations . DC terminal Cost AC terminal Cost Cost Break-Even Distance Distance AC Line Cost DC Line Cost 600 800 km Total AC Cost Total DC Cost : Types of

Number Employer Name PERS GS Normal Cost PERS P&F Normal Cost OPSRP GS Normal Cost OPSRP P&F Normal Cost PERS UAL (ALL) OPSRP UAL (ALL) Total Side Accounts PERS July, 1 2019 Contribution Rates PENSION COST DETAIL PENSION TOTALS HEALTHCARE COST DETAIL HEALTHCARE TOTAL EDX RATES DISPLAYED EDX RATES ACTUAL*

Description IA QTY IL QTY Total QTY UOM Unit Cost IA Cost IL Cost Total Cost Detailed Description Unit Cost Documentation 10 TRACK STRUCTURES & TRACK 10.01 Track Structure: Viaduct rr r 10.02 Track Structure: Major/Movable Bridge rr r 10.05 Track Structure: Cut and Fill ( 4' height/depth) rr r .

Co 2 LaseR CuttinG Cost estiMation: MatheMatiCaL ModeL and appLiCation 173 C f C i C m C lab C lg (2) where C i (EUR/h) is the investment cost of buying a CO 2 laser cutting machine, C m (EUR/h) is the maintenance cost, C lab (EUR/h) is the labour cost and C lg (EUR/h) is the laser gas (mixture of CO 2, H e and N 2) cost.The Invest-ment cost of CO 2 laser cutting machine consider .

CPC (cost-per-customer) Cost-per-install (action) CPL (cost-per-lead) CPM (cost-per-thousand; cost-per-mile) CPO (cost-per-order) CPS (cost-per-sale) . displays advertising to support its continued development and maintenance. This software often tracks what internet sites the user visits.

Contract Operations Unit Cost 100 per hour . Regional Biosolids Revenue 70 per wet ton . General Inflation Rate 3% . Land Application Cost Inflation Rate 6% . Nominal Discount Rate 1.8% . Cost of Electricity 0.13 per kWh . Cost of Natural Gas 8 per MMBTU . Cost of Polymer 2 per pound . Cost of Lime 180 per ton

Calculation of Cost Per Unit: In order to calculate the cost per unit, divide the total cost by the number of units. e.g. Total cost is 50,000 and Passenger KMs are 5,00,000. The cost per the cost per unit (or total cost) in accordance of the information given in the question. Costs are classified into the following three heads: 1.

Documen t – i.e. Cost Center to Cost Center, Cost Center to non-grant Internal Order), ZJ (Grant Non-Cost Transfer), ZK (Grant Cost Transfer within 90 days) or ZV (Grant Cost Transfer Over 90 Days). 6 GL acct Required Enter or select GL account to be credited or debited. 7 D/C Requir

SAP Menu Path: Accounting Controlling Cost Center Accounting Information System Reports for Cost Center Accounting Cost Center Accounting (UofT) Cost Center Funding Transaction Code: ZF06 It is required to enter Cost Center or Internal Order Select the Cost

Hole part features are automatically added if separate drilling cost estimation required. SEER-MFG Cost Model Cost Results Summary reported to CATIA Engineer Detailed SEER-MFG cost model created based on . Create detailed sheet metal part cost estimates for labor (setup, direct, inspection, rework), material, and tooling costs.

SECTION 2 COST DEFINITIONS, DATA SOURCES AND METHODOLOGY FOR COST DEVELOPMENT CAISO Operations and Maintenance Cost Report 3 2.1.2 Major Maintenance Costs (MM) Major Maintenance Cost (MM) is the cost of performing periodic O&M work required to maintain the generating unit in an efficient and reliable condition.

New York Buffalo 14210 New York Buffalo 14211 New York Buffalo 14212 New York Buffalo 14215 New York Buffalo 14217 New York Buffalo 14218 New York Buffalo 14222 New York Buffalo 14227 New York Burlington Flats 13315 New York Calcium 13616 New York Canajoharie 13317 New York Canaseraga 14822 New York Candor 13743 New York Cape Vincent 13618 New York Carthage 13619 New York Castleton 12033 New .

Gastrostomy tubes o B4087 Standard—PA not required o B4088 Low Profile-PA not required o B9998: Mickey GT or Bard Mini Button-** PE required Nasogastric tubes o B4081-PA not required o B4082-PA not required Duoderm/Tegaderm for NG Tubes Tegaderm o A6203-04-PA not required o A6257-59-PA not required Ph strips

Section 3, Cost Estimating Methods, discusses historical, conceptual, risk-based, and cost-based estimating methods and estimating software. Section 4, Cost Estimating Factors, discusses cost drivers and the impact that each has on the construction cost estimate throughout the project development process.

2. DEFINE the accounting mechanism used for IT cost categories 3. IDENTIFY the nine (9) IT cost categories 4. UNDERSTAND the broad boundaries for each IT cost category 5. APPLY IT cost categories in CPCS, C.Request and Travel Manager 6. IDENTIFY the primary location for IT cost accounting in

IEC 60300-3-3 [1] is proposing a general cost breakdown structure for high voltage applications which shall be applied here. Cost of acquisition: cost of the equipment (system cost) and the cost of installation . Cost of ownersh