Download DIVISION - SCOPE OF WORK [PDF]

  • Description: Page 1 of 34– SCOPE OF WORK DIVISION - SCOPE OF WORK A.01 APPLICABILITY OF CONTRACT DOCUMENTS & CONTRACTORS RESPONSIBILITY A. All work performed under the following Sections are subject to the Contract Documents, Contract Drawings and the General Conditions of all Contracts all of which.

  • Size: 483.33 KB

  • Type: PDF

  • Pages: 34

  • This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form.

    Report this link

Share first without download waiting.

Related Documents:

Chapter 5 Project Scope Management Chapter 5 Project Scope Management 5.1 Plan Scope Management 5.1 Colect Requirements 5.2 Collect Requirements 5.2 Define Scope 5.3 Define Scope 5.3 Create WBS 5.4 Create WBS 5.4 Verify Scope 5.5 Validate Scope 5.5 Control Scope 5.6 Control Scope PMBOK 5th Edition

2016 NHDOT Division 600 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 600-6 The following table list design requirements for 3750-D RCP pipe. Design Requirements For Reinforced Concrete Pipe (3) .

2016 NHDOT Division 400 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 400-6 The State's Asphalt Plant Inspector should visit the commercial plant operation or portable plant as soon as it is set up and ready to operate .

2016 NHDOT Division 100 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 100-7 101.5 - INTRA- DEPARTMENTAL RELATIONS Harmonious working relations among all employees are essential to the efficient operation of the .

2016 NHDOT Division 700 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 700-5 Therefore, the inspector is obligated to know the following: Which materials must be sampled

2016 NHDOT Division 800 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 800-2 Speak with the right -of-way agent responsible for agreements made for the project.

2016 NHDOT Division 500 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 500-7 Care should be taken to drive the sheets well below the bottom elevation of the excavation (toe-in). The Contract Administrator can put a grade .

Scope 2 market-based. 1. Scope 2 location-based. 1. Scope 3 Purchased goods and services. 2. Capital goods. 2. Fuel and energy-related activities Employee commuting Waste generated in operations Total Scope 1, Scope 2 market-based, Scope 3 GHG intensity (Scope 1 and Scope 2 mtCO2e/sq ft) 3. 1,560 10,523 11,171 121,817 89,963 3,522 3,677 15,388 .