Port Houston:UPCOMING DESIGN &CONSTRUCTION PROJECTS(Project & Construction Management)4th Quarter 2020

DESIGN PHASE PROJECTS

Professional Engineering Services for Construction Cost EstimatingPort Wide 2021.Services will include the review of construction cost estimate, construction schedules and developing high level estimate schedules andconceptual designs.Procurement Time FrameNIGP CodesProjected Advertisement - 4th Qtr. 2020Projected Award - 1st Qtr. 2021Consultants961219111491119Design Time Frame1st Qtr. 2021 – 4th Qtr. 2021Small Business Opportunities Construction EstimatingPHA ContactBill Aguirre713-670-2484baguirre@porthouston.com

Professional Services for Construction Materials Testing (CMT) forthe Construction of Wharf 6 and Site Development at Bayport TerminalThe Port of Houston is seeking a consultant or consulting team to perform construction materials testing (CMT) services during the constructionof the wharf 6 and site development at the Bayport Container Terminal.Procurement Time FrameNIGP CodesProjected Advertisement - 4th Qtr. 2020Projected Award - 1st Qtr. n Time Frame1st Qtr. 2021- 3rd Qtr. 2023Small Business Opportunities Concrete testing Soils testing Drilled Shaft InspectionPHA ContactBill Aguirre713-670-2484baguirre@porthouston.com

Facility Inspections and Condition Assessment Program for Bayportand Barbours Cut Container TerminalsThe project consists of performing baseline field inspections of all electrical equipment at Bayport and Barbours Cut Container Terminals,calculate asset condition for all asset classes from component to terminal (property) level and convert all data and store into the PHA assetdatabase and GIS systems.Procurement Time FrameNIGP CodesSmall Business OpportunitiesProjected Advertisement - 4th Qtr. 2020Projected Award - 1st Qtr. 2021Consultants925319367799239 Electrical Inspections Electrical EngineeringDesign Time Frame1st Qtr. 2021 - 4th Qtr. 2021PHA ContactBill Aguirre713-670-2484baguirre@porthouston.com

Bayport – U Shaped Property DevelopmentThis project will include clearing, grubbing, fill and grading of site in preparation for potential tenant development.Procurement Time FrameProjected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021Design Time Frame1st Qtr. 2021 - 2nd Qtr. 2021NIGP 459133990976Small Business Opportunities Earthwork Trucking EnvironmentalPHA ContactHarvey Ross713-670-2665hross@porthouston.com

Barbours Cut Terminal Restoration and Upgrade Project –Rehabilitation Container Yard 4N, 5N, 6 and 7This project will include the development of a Mini Master Plan, 30% design of all Container Yards and 100% Design package for the Rehabilitation ofexisting Container Yards 4 North and 5 North (CY 4N/5N)Procurement Time FrameProjected Advertisement - 4th Qtr. 2020Projected Award – 1st Qtr. 2021Design Time Frame2nd Qtr. 2021 – 2nd Qtr. 2023NIGP rs90957 9139591300 90976913459133991362Small Business Opportunities Concrete PavingTruckingEnvironmentalUnderground UtilitiesElectricalDemolitionPHA ContactHarvey Ross713-670-2665hross@porthouston.com

Barbours Cut Terminal Restoration and Upgrade Project –Rehabilitation of Wharves 4, 5 and 6This project consist of 30% design of wharves 4, 5 and 6, all 2,667 ft and 100% Design package for the Rehabilitation of Wharf 4 (2/3) and Wharf 5(2/3) for a combine 1,333 feetProcurement Time FrameProjected Advertisement - 4th Qtr. 2020Projected Award – 1st Qtr. 2021Design Time Frame2nd Qtr. 2021 – 2nd Qtr. 2023NIGP rs90957 9139591300 90976913459133991362Small Business Opportunities Concrete PavingTruckingEnvironmentalUnderground UtilitiesElectricalDemolitionPHA ContactHarvey Ross713-670-2665hross@porthouston.com

TBN - Replace Dredge Pipe Sleeve Upstream of Wharf 18Condition assessment of existing pipe sleeve route and trenchless design for replacement of approximately 450 LF of steel pipesleeve under the rail yard to house dredge pipe.Procurement Time FrameProjected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021Design Time Frame1st Qtr. 2021 – 3rd Qtr. 2021NIGP 55Small Business Opportunities Surveying Site WorkPHA ContactJessica Shambra713-670-2527jshambra@porthouston.com

CONSTRUCTION PHASEPROJECTS

BCT - Construct Maintenance Complex at BCTBAYPORT M&RBUILDINGEXISTING BCTM&R BUILDINGConstruction of a new Maintenance Complex at Barbours Cut Container Terminal (BCT) including an approximate 128,000 sfmaintenance building, fuel and wash areas, associated utilities, and parking.Procurement Time FrameProjected Advertisement – 1st Qtr. 2021Projected Award – 2nd Qtr. 2021Construction Time Frame2nd Qtr. 2021 – 3rd Qtr. 2022NIGP 91572Small Business Opportunities Utility SystemsElectrical WorkPlumbingHVACBuilding Fixtures & FinishesPhotographyPHA ContactJessica Shambra713-670-2527jshambra@porthouston.com

BCT – Container Yard 3 ReconstructionThe scope of work includes the construction of approximately 9 acres of concrete pavement (18” roller compacted concrete). Also restriping traffic lanesand relocating high mast light poles.Procurement Time FrameProjected Advertisement – 4th 2020Projected Award – 1st 2021Construction Time Frame1st Qtr. 2021 – 4th Qtr. 2021NIGP CodesContractors913609132790976Small Business Opportunities DemolitionConcreteGradingExcavationPHA ContactDerek Garrett713-670-2837dgarrett@porthouston.com

BCT - Fire Suppression SystemThe project consists of the construction of a water tank-based fire suppression system on an existing tank including new mechanical and electricalequipment, tank repairs, minor pipe installation, and pumphouse improvements at the Barbours Cut Terminal.Procurement Time FrameNIGP CodesProjected Advertisement – 4th 2020Projected Award – 4th 20207202783034830739254292539Construction Time Frame1st Qtr. 2021 – 2nd Qtr. 2021Small Business Opportunities Concrete FoundationPlumbing WorkElectrical InstallationPump House RepairsSteel Tank RepairsPHA ContactBill Aguirre713-670-2484baguirre@porthouston.com

Bayport - Construct Wharf 6, SSB #4 and PowerConstruct new 1000’ wharf with drilled shafts, Build 1 story precast concrete stevedore support building of 2595 sq. ft. Constructelectrical infrastructure for ship-to-shore crane power, dredging of 470,000 cubic feet of wet and dry excavation. Trucking excavatedmaterial to disposal areas. Clearing, grubbing, and placement of fill material for land development.Procurement Time FrameProjected Advertisement – 4th 2020Projected Award – 1st 2021Construction Time Frame1st Qtr. 2021 – 3rd Qtr. 2023NIGP Codes95935909769623991219913169136191223Small Business Opportunities ConcretePlumbingHVACHauling and Trucking ServicesPHA ContactDerek Garrett713-670-2400dgarrett@poha.com

Dedicated Right Turn Lanes at Freight Station Rd atBayport Container TerminalConstruct dedicated right turn lanes, one from Port Rd connecting to the U-turn and the other to providing connection from FreightStation Road to the U-turn underneath the entrance gate bridge and merging onto Port Rd westbound.Procurement Time FrameNIGP CodesProjected Advertisement – 1st 2021Projected Award – 2nd 2021Contractors9183291846912533Construction Time Frame2nd Qtr. 2021 - 4th Qtr. 2021Small Business Opportunities Concrete reinforcement Demolition EarthworkPHA ContactHarvey Ross713-670-2665hross@porthouston.com

Bayport and Barbours Cut - Annual Wharf Crane & RTG CranePainting - 2021This is an annual project that will consist of blasting, priming and painting the wharf cranes and RTG cranes on an "as needed" basis.Procurement Time FrameNIGP CodesProjected Advertisement – 4th 2020Projected Award – 1st Qtr. 2021914849146192900Construction Time Frame2nd Qtr. 2021 – 4th Qtr. 2021Small Business Opportunities Not applicablePHA ContactBarbara H. Smith713-670-2483bhsmith@porthouston.com

Bayport and Barbours Cut - Annual PavementReplacement 2021This is an annual contract for concrete replacement at Bayport and Barbours Cut Terminal.The work will consist of removing damaged and / or deteriorating concrete pavement in 2021.Procurement Time FrameNIGP CodesProjected Advertisement – 4th 2020Projected Award – 1st Qtr. 202191327Construction Time Frame1st Qtr. 2021 – 4th Qtr. 2021Small Business Opportunities Saw-cuttingPavingExcavationConcrete traffic barriersPHA ContactBarbara H. Smith713-670-2483bhsmith@porthouston.com

Barbours Cut and Bayport - Annual Fender SystemMaintenance - 2021This is an annual project includes surface preparation, repair and replacement of various fender system elements at Barbours Cut and BayportTerminals in 2021.Procurement Time FrameNIGP CodesProjected Advertisement – 4th 2020Projected Award – 1st Qtr. 202191223Construction Time Frame1st Qtr. 2021 - 4th Qtr. 2021Small Business Opportunities Metal Fabrication Storm Water Controls PhotographyPHA ContactBarbara H. Smith713-670-2483bhsmith@porthouston.com

Industrial Park East - Annual Pavement, Drainage andDust Control 2020This is an annual project of paving and repair of asphalt roads, ditch clearing, clearing and grubbing and implementing dust controlprograms on asphalt roads.Procurement Time FrameNIGP CodesProjected Advertisement – 4th 2020Projected Award – 4th 20209097691327Construction Time Frame1st Qtr. 2021Small Business Opportunities Paving Asphalt DrainagePHA ContactDerek Garrett713-670-2837dgarrett@porthouston.com

Industrial Park East - Annual Pavement, Drainage andDust Control 2021This is an annual project of paving and repair of asphalt roads, ditch clearing and implementing dust control programs on asphaltroads.Procurement Time FrameNIGP CodesProjected Advertisement – 4th 2020Projected Award – 1st Qtr. 20219097691327Construction Time Frame2nd Qtr. 2021 - 4th Qtr. 2021Small Business Opportunities Paving Asphalt DrainagePHA ContactBarbara H. Smith713-670-2483bhsmith@porthouston.com

Rehabilitation and Repair of Wharf 2 atManchester TerminalRehabilitating and repairing of Wharf 2 at Manchester terminal (approximately 600ft long). The work includes demolition of the existing shed building,construction of a new fender, repair of reinforced concrete, fabrication and installation of 54 steel trusses, installation of 152 piles, etc.Procurement Time FrameNIGP CodesProjected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 20219148491223914389097691430Construction Time Frame1st Qtr. 2021 - 4th Qtr. 2021Small Business Opportunities Structural Concrete RepairFender ReplacementPile DrivingSteel RebarConcrete formingStripingPhotographyPHA ContactEddy Kharrazi713-670-2544ekharrazi@porthouston.com

Turning Basin North - Restrooms RestorationDemolish 15 existing restroom buildings and replace with 11 pre-cast concrete restroom buildings within the transit sheds and at City Dock 8. Projectwill also include associated plumbing and electrical work and the rehabilitation of the Amenities Buildings at City Dock 32.Procurement Time FrameProjected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021Construction Time Frame1st Qtr. 2021 – 3rd Qtr. 2021NIGP Codes9092491438909769131691360914309145091468Small Business Opportunities Electrical WorkPlumbingHVACBuilding Fixtures & FinishesPHA ContactJessica Shambra713-670-2527jshambra@porthouston.com

Turning Basin North Splash Zone Painting 2021Painting and resurfacing of Steel Bulkhead walls to prevent corrosion and structural damage at Turning Basin North TerminalProcurement Time FrameNIGP CodesProjected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 202191461914848100063159Construction Time Frame1st Qtr. 2021 – 4th Qtr. 2021Small Business Opportunities PaintingSteel RepairWater blastingPaintingSandblastingPHA ContactBarbara H. Smith713-670-2483bhsmith@porthouston.com

CARE Splash Zone Painting 2021Painting and resurfacing of Steel Bulkhead walls to prevent corrosion and structural damage at CARE TerminalProcurement Time FrameNIGP CodesProjected Advertisement – 2nd Qtr. 2021Projected Award – 3rd Qtr. 202191461914848100063159Construction Time Frame3rd Qtr. 2021 – 4th Qtr. 2021Small Business Opportunities PaintingSteel RepairWater blastingPaintingSandblastingPHA ContactBarbara H. Smith713-670-2483bhsmith@porthouston.com

Turning Basin North - Guardhouse and Arms Change(RR8 Speed Gate)This project will remove existing Speed Gates and replace them with a Manned Guardhouse with Gate armsProcurement Time FrameProjected Advertisement – 1st Qtr. 2021Projected Award – 1st Qtr. 2021Construction Time Frame2nd Qtr. 2021 - 3rd Qtr. 2021NIGP CodesContractors914739097692678Small Business Opportunities ElectricalFiber OpticsDemolitionPavingPHA ContactHarvey Ross713-670-2665hross@porthouston.com

Turning Basin Transit Sheds 30-31This project is approximately 238k square feet of roof repair at transit sheds 30/31 at the Turning Basin Terminal.Procurement Time FrameProjected Advertisement – 2nd Qtr. 2021Projected Award – 3rd Qtr. 2021Construction Time Frame3rd Qtr. 2021 – 4th Qtr. 2021NIGP CodesContractors914739097692678Small Business Opportunities Roofing Repair SurveyingPHA ContactHarvey Ross713-670-2665hross@porthouston.com

Turning Basin – Rehabilitation and Repair of Wharf 8Rehabilitation and Repair of Wharf 8 at Turning Basin Terminal will consist of structural concrete repair and fender replacement.Procurement Time FrameProjected Advertisement – 2nd Qtr. 2021Projected Award – 3rd Qtr. 2021Construction Time Frame3rd Qtr. 2021 - 3rd Qtr. 2022NIGP Codes9148491223914389097691430Small Business Opportunities Structural Concrete RepairFender ReplacementSteel Rebar RepairConcrete formingPhotographyPHA ContactEddy Kharrazi713-670-2544ekharrazi@porthouston.com

Turning Basin South - City Dock 1 West Fender SystemConstruction of freestanding fender for City Dock 1 West of approximately 600ft.Procurement Time FrameProjected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021Construction Time Frame2nd Qtr. 2021 - 1st Qtr. 2022NIGP 2Small Business Opportunities Fender ReplacementPile DrivingSteel RebarConcrete formingStripingPhotographyPHA ContactEddy Kharrazi713-670-2544ekharrazi@porthouston.com

Turning Basin Terminal North – Repair of Wharves 20, 21, 24, 25 and 26Repair of wharves 20, 21, 24, 25, and 26 (each approximately 600ft long) located at Turning Basin Terminal. The work includes (reinforcedconcrete) deck repair, pile repair, sheet pile repair, timber replacement, fender repair, steel sheet / beam repair etc.Procurement Time FrameProjected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021Construction Time Frame2nd Qtr. 2021 – 2nd Qtr. 2022NIGP 2Small Business Opportunities Structural Concrete RepairSteel RebarConcrete formingSheet Pile repairStripingPhotographyWeldingPHA ContactEddy Kharrazi713-670-2544ekharrazi@porthouston.com

Turning Basin - Annual Concrete Replacement 2021This is an annual contract for concrete replacement at Turning Basin Terminal.The work will consist of removing damaged and or deteriorating concrete pavement in 2020.Procurement Time FrameNIGP CodesProjected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 202191327Construction Time Frame1st Qtr. 2021 – 4th Qtr. 2021Small Business Opportunities ConcreteExcavationSaw-cuttingConcrete Traffic BarriersPHA ContactBarbara H. Smith713-670-2483bhsmith@porthouston.com

Turning Basin South – Repair of Wharves 47, 48 and 1EastDeRepair project for Wharf 1E, 47, and 48 (located Turning Basin Terminal - South) - scope includes but is not limited to (reinforced concrete) deck repair,pile repair, timber replacement, fender repair, etc.Procurement Time FrameNIGP CodesSmall Business OpportunitiesProjected Advertisement - 3rd Qtr. 2021Projected Award - 4th Qtr. 2021Contractors9148491223914389097691430 Construction Time Frame4th Qtr. 2021 - 2nd Qtr. 2021Structural Concrete RepairFender ReplacementSteel Rebar RepairConcrete formingPhotographyPHA ContactEddy Kharrazi713-670-2544ekharrazi@porthouston.com

UPCOMING DESIGN & CONSTRUCTION PROJECTS (Project & Construction Management) Port Houston: 4 th Quarter 2020. . The project consists of the construction of a water tank -based fire suppression system on an existing tank including new mechani cal and electrical equipment, tank repairs, minor pipe installation, and pumphouse improvements at the .

Related Documents:

Listed under: Home Automation Projects, LED Projects, Projects 23. Bootload an Arduino with a ZIF Socket Bootloading an Arduino with a ZIF socket allows you to easily program a lot of chips at once without worrying about . 9/6/22, 2:15 PM Advanced View Arduino Projects List - Use Arduino for Projects. Projects Projects Projects. Projects .

projects. These projects can be managed code COBOL projects or native code COBOL projects or can be C# projects or VB.NET projects, etc. Visual COBOL projects can contain only COBOL programs or classes but these programs and classes can interact with the programs or classes contained within projects written in a different language like C#.

Robotics - Automation Projects Arduino RTOS - OS Projects Security - Safety Projects Sensor - Transducer - Detector Projects Sound - Audio Projects Temperature Measurement Projects Recent Projects Temperature and Humidity monitoring with DHT22 sensor Arduino Uno R3 June 28, 2018

NO. OF PROJECTS STUDIED CII Research Summary 10-18 1989 12% total Design 9.5% Construction 2.5% 9 industrial projects Benchmarking & Metrics Data Report9 1997 3.4% 19 industrial projects Investigation of Field Rework In Industrial Construction - CII Research Report 153-1110 2011 4.4% 109 industrial projects Construction Productivity Research

OLG Construction Projects Below is a list of projects that we have been part of since 2008 to date. Projects 2008 Project: General Contractor: . Newark Airport Terminal "" VRH / McCann Construction N.J. Projects 2011 Project: Contractor: Flemington Office Center Allied Building Corp.

road construction projects 4.4 3.3 4.4 40.7 47.3 4.2 0.91 Contractor's experience affects performance of road construction projects 5.5 2.2 2.2 39.6 50.5 4.3 0.75 Technical skills of the contractor affect performance of road construction projects 5.5 11.0 23.1 35.2 25.3 3.6 0.49 Knowledge of the contractor

development in Laosis road construction. However, many road construction projects in Laos suffer from extensive delays. This causes damage such as recurring problems in the road construction industry, and has a negative effect on the success of road construction projects interms of schedule, cost, quality, safety and the amenity of road users.

Alfredo Lopez Austin/ Leonardo Lopeb anz Lujan,d Saburo Sugiyamac a Institute de Investigaciones Antropologicas, and Facultad de Filosofia y Letras, Universidad Nacional Autonoma de Mexico bProyecto Templo Mayor/Subdireccion de Estudios Arqueol6gicos, Instituto Nacional de Antropologia e Historia, Mexico cDepartment of Anthropology, Arizona State University, Tempe, AZ 85287-2402, USA, and .