PP Production Planning And Control SAP R/3 Enterprise

2y ago
21 Views
2 Downloads
800.00 KB
54 Pages
Last View : 30d ago
Last Download : 3m ago
Upload by : Ellie Forte
Transcription

PP Production Planning and ControlSAP R/3 EnterpriseRelease 4.70Release Notes

Copyright 2002 SAP AG. All rights reserved.No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permissionof SAP AG. The information contained herein may be changed without prior notice.Some software products marketed by SAP AG and its distributors contain proprietary software components of other softwarevendors.Microsoft , WINDOWS , NT , EXCEL , Word , PowerPoint and SQL Server are registered trademarks ofMicrosoft Corporation.IBM , DB2 , OS/2 , DB2/6000 , Parallel Sysplex , MVS/ESA , RS/6000 , AIX , S/390 , AS/400 , OS/390 , andOS/400 are registered trademarks of IBM Corporation.ORACLE is a registered trademark of ORACLE Corporation.INFORMIX -OnLine for SAP and Informix Dynamic ServerIncorporated.TMare registered trademarks of Informix SoftwareUNIX , X/Open , OSF/1 , and Motif are registered trademarks of the Open Group.Citrix , the Citrix logo, ICA , Program Neighborhood , MetaFrame , WinFrame , VideoFrame , MultiWin and otherCitrix product names referenced herein are trademarks of Citrix Systems, Inc.HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C , World Wide Web Consortium,Massachusetts Institute of Technology.JAVA is a registered trademark of Sun Microsystems, Inc.JAVASCRIPT is a registered trademark of Sun Microsystems, Inc., used under license for technology invented andimplemented by Netscape.SAP, SAP Logo, R/2, RIVA, R/3, SAP ArchiveLink, SAP Business Workflow, WebFlow, SAP EarlyWatch, BAPI,SAPPHIRE, Management Cockpit, mySAP.com Logo and mySAP.com are trademarks or registered trademarks of SAP AGin Germany and in several other countries all over the world. All other products mentioned are trademarks or registeredtrademarks of their respective companies.Design: SAP Communications Media

SAPSystemTable of ContentsSAP .4.2PP ProductionPlanning and ControlPP-MRP MaterialRequirements PlanningBusiness Add-Ins in MRPUsability Improvements in MRPPP-SFC ProductionOrdersBusiness Add-Ins for Production Ordersand Process OrdersPreconfigure Batch Split for ProductionOrder (new)Changes to Production and Process OrdersConfirmation: Termination if IncorrectActual Costs/Goods MovementsPP-SFC-IS InformationSystemDRB (Enhanced)PP-REM RepetitiveManufacturingBusiness Add-Ins in RepetitiveManufacturing (REM)Usability Improvements in RepetitiveManufacturing (REM)PP-PI ProductionPlanning for Process IndustriesChanges to the IMG Structure forProduction Planning - ProcessPP-PI-MD Basic DataLinking DMS Documents to ProductionVersions (New)PP-PI-POR Process OrderBusiness Add-Ins for Production Ordersand Process OrdersChanges to Production and Process OrdersConfirmation: Termination if IncorrectActual Costs/Goods MovementsPP-PI-PMA ProcessManagementIntroduction to Decentralized ProcessManagementData Exchange Between Applications in114457788910101212141515SAP AG

SAPSystemTable of ContentsSAP 19.4.4.919.4.4.9.1the SAP R/3 System (New)- Service MDA- Services PSH and PMC- Services ODA and OAE- Service SYSPP-PI-PMA-MSG Process MessageNew Message Destination for SendingAlertsNew Transaction for Automatic ProcessMessage Creation (New)PP-PI-PMA-PMC Browser-Based PISheet / CockpitUser Change in PI Sheets and Cockpits(New)Asynchronous Signature Process forProcess Steps in the PI SheetNew Functions in the PI Sheet ContextMenu (Enhanced)Automatic Execution of Functions in PISheets and ManufacturingUsing Global Variables in PI Sheets andManufacturing CockpitsAutomatic Execution of Calculations andDynamic Function Calls (New)Determining Control Recipe Numbers (New)Intergrating DMS Documents to the PISheet (New)PP-PI-PMA-OPC OPC InterfaceIntroduction of SAP OPC Data Access (SAPODA) (New)173031323233343641444748SAP AG

SAP System19 PPProduction Planning and Control19.1 PP-MRPMaterial Requirements Planning19.1.1 Business Add-Ins in MRPUseAs of SAP R/3 Enterprise 4.70 (SAP APPL 470) Business Add-Ins (BAdIs) are available for thefollowing functions in material requirements planning (MRP):MRP GeneraloChanging subcontracting logic: MD SUBCONT LOGICUsing this BAdI, you can deactivate the separate consideration of provision stocks and requirementsin MRP and the stock/requirements list.oChanging logic for importing MRP data: MD CHANGE MRP DATAUsing this BAdI, you can exclude from, add to, or change the characteristics for certain elements forMRP when the MRP elements are read from the database.oChanging the requirements dates of stock transfers: MD STOCK TRANSFERUsing this BAdI, you can change the requirements dates for requirements for procurement proposalsin the issuing plant.MRP Planning Valuation (PP-MRP-BD)oProcessing the MRP list further: MD MRP LISTUsing this BAdI, you can process the MRP list data further during posting in the planning run.oChanging the display of MRP elements: MD DISPLAY ELEMENTUsing this BAdI, you can change how the system displays MRP elements in the valuation list andthe planning run.oPlanning and preparing planning data: MD PLANNING RESULTUsing this BAdI, you can process the statistical data in the planning run further. You can, forexample, trigger a separate workflow, so that you are informed of dumps or cancellation MRP listvia mail.MRP Procurement Proposal (PP-MRP-PP)oChanging the procurement proposal: MD PURREQ CHANGEUsing this BAdI, you can change the data in purchase requisition before posting in the planning runor before posting during planned order conversion.oProcessing purchase requisitions further: MD PURREQ POSTUsing this BAdI, you can further process data from planned orders that are posted in the planningrun or during planned order conversion.oChanging planned orders: MD PLDORD CHANGEUsing this BAdI, you can change the data from planned orders before posting in the planning run, orbefore posting during manual planned order changes.SAP AG1

SAP SystemoProcessing planned orders further: MD PLDORD POSTUsing this BAdI, you can further process the data from planned orders, which are posted in theplanning run or posted during manual planned order processing. You can, for example, log anychanges made.oChanging source assignment: MD MODIFY SOURCEUsing this BAdI, you can change the assignment of sources in the planning run according to yourown criteria.oDetermining production order: MD MODIFY PRODVERSUsing this BAdI, you can determine production versions according to your own criteria, both duringthe planning run and during manual creation of production versions.oLogging planned order postings due to time stamp problems: MD PLDORD TIME STAMPUsing this BAdI, you can log planned order postings that were rejected by the system due to timestamp problems.oScheduling planned orders: MD PLDORD SCHEDULINGUsing this BAdI, you can change the scheduling parameters for planned orders.MRP Planning Execution (PP-MRP-PR)oChanging the package size in a planning run parallel to MRP: MD MRP RUN PARALLELUsing this BAdI, you can individually determine the size of material packages used for the parallelplanning run.Long-term planning/Simulation (PP-MP-LTP)oDefining additional parameters in the planning scenario: MD PLANNING SCENARIOUsing this BAdI, you can display additional data in the planning scenario and maintain your ownplanning scenario parameters.Effects on CustomizingTo activate a Business Add-In, you have to create an active implementation. To do this, choose Tools - ABAP Workbench - Utilities - Business Add-Ins - Implementation in the SAP menu.You can find further information in the SAP Library under Basis - ABAP-Workbench - Changingthe SAP standard - Business Add-Ins - Implementing a Business Add-Ins.19.1.2 Usability Improvements in MRPUseAs of SAP R/3 Enterprise Core 4.70 (SAP APPL 470) the following new or changed functions areavailable:oOrder tree in the evaluation list (changed)If you work with the order tree in the stock/requirements list or MRP list, you can now display thecorresponding component requirements on multiple levels for a selected order or requirement. Thisfunction is based on the order report. If problems occur in MRP, the system issues an error message.When navigating in the order tree, the corresponding stock/requirements list is displayed in part ofthe screen and the cursor is automatically placed on the corresponding component requirement. ThisSAP AG2

SAP Systemway you get a quick overview of the stock situation at all levels within the order structure. In earlierreleases, there was no discernible relationship between an order and its dependent requirements.You can find more information hereoNavigating to pegged requirements with a double mouse click (new)You can now navigate directly to the pegged requirement on the next highest level for certainobjects in the stock/requirements list and the MRP list. The system displays the stock/requirementslist or the MRP list of the superordinate level and places the cursor automatically on the right line ofthe pegged requirement. This means that it is now much easier to find pegged requirements on thedifferent MRP levels than in earlier releases.You can select this function via the detail display of the requirements element. This function isavailable for the following MRP elements:-Dependent requirements-Order reservations-Stock transfer release orders-Stock transfer reservationsoStock transfer from plant to MRP area with stock transfer purchase requisitions (new)Up to now, the procurement of materials assigned to a storage location MRP area, could be achievedalongside the normal external procurement via the special procurement type stock transfer fromplant to MRP area delivered in the standard system. In this case, the planning run of requirementsplanning creates stock transfer reservations from the plant to the MRP area. As of SAP R/3Enterprise Core 4.70, this process can also be established via stock transfer purchase requisitions.If you execute planning of materials provided for a subcontractor using an MRP area of the type"subcontractor", you can now move the materials provided for subcontractors from plant to MRParea via stock transfer purchase requisitions.For the new function, you can now also enter a material dependent planned delivery time in theMRP area segment. When you create stock transfer purchase orders from the plant to the MRP area(manually or via materials planning), this time is taken into account in the stock transfer time. Theplanned delivery time of the MRP area segment is only used if the indicator Consider PlannedDelivery Time is set.You control whether stock transfer reservations or stock transfer purchase requisitions are to becreated for the process described above by defining the special procurement type stock transferfrom plant to MRP area in the Customizing for Material Requirements Planning.oPrinting the period totals display of the valuation list (new)As of the current release, the print display in the period totals display of the stock/requirements listand the MRO list is WYSIWYG (what you see is what you get). Up until now, this was onlypossible in the individual line display. Now, a print function for cancellation MRP lists is alsoavailable.oStock/requirements list for date problems (new)In earlier releases, an error message was issued when a stock/requirements list was called, for whichthere were MRP elements with invalid dates according to the factory calendar. In this case, the listwas not displayed at all and the document that caused the problem, could not be determined. Nor didthe system construct the valuation lists if no forecast was executed for materials with a forecastingrequirement.From now on, you can display the stock/requirements list even if the master data has not been fullymaintained. For the date problem described above, you can now localize the relevant MRP element.This function is available for the areas of purchasing, consumption, and forecasting.SAP AG3

SAP SystemoNumber ranges for manual planned order processing (changed)As of the current release, you can define number ranges in Customizing for simulative plannedorder types depending on the planned order type (Customizing transaction OMI3). In earlierreleases, you could only define order specific number ranges for operative planned orders.oDefault parameters for long-term planning (changed)Until now, it was not possible to save the parameter with fixed planned orders user-specifically inthe planning transactions of long-term planning. This is possible as of SAP R/3 Enterprise.oIndicator Read order report with buffers (new)As of the current release, you can set the new indicator Buffered reading of order report in thestock/requirements list and in the MRP list. This means that when the order report and the order treeare constructed, the stock/requirements situation at the respective MRP levels is buffered in thememory. Subsequent calls of the order report or the order tree are therefore much quicker thanbefore. You should set this indicator if you use the order report or the order tree for various ordersand requirements.The new function is not valid for make-to-order or engineer-to-order production since only part ofthe MRP element is needed and read per material.You can set this indicator in the user settings for the stocks/requirements list and the MRP list on thetab page General Settings.Effects on CustomizingoDefining number ranges for manual planned order processingTo do this, go to the Customizing for Production and choose Material Requirements Planning - Number Ranges - Define Number Ranges for Manual Processing.oStock transfer from plant to MRP area with stock transfer purchase requisitions (new)To do this, go to the Customizing for Production and choose Material Requirements Planning - Master Data - Define Special Procurement Type.Create the special procurement type Stock transfer from plant to MRP area for the plant wherethe MRP area is. Maintain the following parameters for the special procurement type:-Procurement type: F for external procurement-Special procurement: U for stock transfer-Plant that belongs to the MRP area-Stock transfer: 1 for purchase requisitions from plant to MRP area.19.2 PP-SFCProduction Orders19.2.1 Business Add-Ins for Production Orders and Process OrdersUseIn shop floor control, the following Business Add-Ins (BAdI) for production and process orders areSAP AG4

SAP Systemavailable as of SAP R/3 Enterprise Core 4.70 (SAP APPL 470):oBAdI WORKORDER INFOSYSTEM to fill additional (customer-defined) fields in the orderinformation system (new).In addition, you can define authorization checks for variants in and changes to the field selection.oBAdI WORKORDER REWORK to adjust the yield during confirmation of rework with own tools(new)With the help of the new BAdI WORKORDER REWORK, it is possible to implementcustomer-specific rework logic. It is available for one interface to transfer confirmed quantitiesoutwards, and therefore activate the rework processing. For other interfaces, information can betransferred inwards from the rework processing - like the successfully reworked yield - and istherefore considered in the quantity logic of the order and confirmation.The following BAdIs were changed:oBAdI WORKORDER UPDATE was extended by the BEFORE UPDATE method. This method isimplemented directly before calling the posting. The order data is provided in table form as is theexisting customer exit PPCO0001. Modifications to this data can no longer be made, but subsequentprocesses can be derived and triggered.oBAdI WORKORDER CONFIRM was extended by the BEFORE UPDATE BAdI method. Thisallows, aside from the standard check for whether the selected confirmation can be cancelled, theexecution of additional, customer-specific checks.Effects on CustomizingTo activate a Business Add-In, you must create an active implementation. To do this, choose from theSAP menu Tools - ABAP Workbench - Utilities - Business Add-Ins - Implementation.For more information on the procedure, see the SAP Library under Basis Components - ABAPWorkbench - Changing the SAP Standard - Business Add-Ins - Implementing BusinessAdd-Ins.19.2.2 Preconfigure Batch Split for Production Order (new)UseAs of SAP R/3 Enterprise Core 4.70 (SAP APPL 470), the Always batch split indicator is includedin the production scheduling profile. Previously, batch split records for components in the productionorder were only created if the batch determination had found more than one batch for a component. In theprocess order, on the other hand, split records are created in batch determination, even if only one batch isfound.If this indicator is set in Customizing, then a batch split record is now created in the production order fora single found batch.If the indicator is blank, then the previous system behavior is still the same, in other words, the batchnumber is still directly entered in the reservation record.SAP AG5

SAP System19.2.3 Changes to Production and Process OrdersUseAs of SAP R/3 Enterprise Core 4.70 (SAP APPL 470), the production orders and process ordersfunction has been enhanced as following:oJoint venture connection for process order (only for process orders).In the process order, on the detail screen Assignments, a Joint Venture button is displayed if thejoint venture accounting is active. If the process order is assigned to a WBS element, the relevantjoint venture data is derived from this. Choose the Joint Venture button to display or change thejoint venture data.oDocument link from production version (only for production orders).Previously, the documents that were copied into the production order were linked with the materialmaster of the assembly to be produced or included in the BOM related to the order. Now, documentscan also be assigned to the production version. These documents are then copied into the productionorder.oCapacity requirement reduction by confirmations (production and process orders).In the work center there is a new indicator Control Capacity Reduction for each capacity segment(set up, process, tear down). The indicator controls the capacity reduction of the segment withconfirmations. It has the following features:-In proportion to quantityThe quantity-proportional capacity reduction corresponds with the solution implemented in thereleases up to SAP R/3 4.6. The capacity requirement is therefore considerably reduced if therelevant operation is finally confirmed, or with quantity-dependent forms, (at least) thecomplete quantity of the operations was partially confirmed.-Complete in partial confirmationWith a complete reduction in partial confirmation, the status of the relevant operation isanalyzed. If this is partially or finally confirmed, the relevant capacity requirement iscompletely reduced. A partial reduction is not possible.-Complete in final confirmationWith a complete reduction in final confirmation, the status of the relevant operation isanalyzed. If this is finally confirmed, the relevant capacity requirement is completely reduced.A partial reduction is not possible.-In proportion to activityIf the capacity reduction takes place in proportion to the activity, the activity that is assigned inyour record type group (see tab page Cost Center Assignment from work center) to therelevant capacity segment is determined. The planned capacity is then reduced by theconfirmed activity quantity.oTransfer of WM warehouse numbers from updated supply area (production and process orders).When a new supply area is created on the goods movement overview of the pick list or theconfirmation, checks are carried out to determine whether this supply area exists and is maintainedfor the storage location. When you save the goods movement, the system determines the WMwarehouse numbers using the current supply area.oEnhancement of BAdI WORKORDER UPDATE (production and process orders).SAP AG6

SAP SystemSee release info Business Add-Ins for Production and Process OrdersoEnhancement of BAdI WORKORDER CONFIRM (production and process orders).See release info Business Add-Ins for Production and Process Orders19.2.4 Confirmation: Termination if Incorrect Actual Costs/Goods MovementsUseAs of SAP R/3 Enterprise Core 4.70 (SAP APPL 470), you can prevent a confirmation from beingsaved in production and process orders, if error records appeared during actual cost determination orgoods movement postings.Previous process:When creating a confirmation for orders, processes such as the posting of actual costs or goodsmovements can be linked. If errors appear when posting, a log is issued if you set the correspondingsetting in Customizing. In the case of incorrect goods movements, the user has the option of makingcorrections. If the error still exists, the confirmation itself, however, can be saved. In this case,postprocessing records are created that can be processed with transactions COFC (for actual costs) andCOGI (for goods movements).New:For single entry, you can now prevent saving in the situation described above, by setting thecorresponding indicator in the confirmation parameters. See also Termination if Incorrect Actual Costsand Termination if Incorrect Goods Movements.The system then reacts by terminating the confirmation transaction. The indicators are intepreted bothwhen creating as well as when cancelling the confirmation.19.2.5 PP-SFC-ISInformation System19.2.5.1 DRB (Enhanced)UseFrom SAP R/3 Enterprise Core 4.70 (SAP APPL 470) , the Document Relationship Browser (DRB)offers an extended selection of object types. Object types have been added to the DRB, and object typesthat were already connected in earlier releases have been completed.New object types:oProfit center documentoCosting-based profitability analysisoElectronic account statementoProduction orderoBackflush documentSAP AG7

SAP SystemThe connection of these object types only affects the functions within the DRB. There are no separateaccess programs.Enhanced object types:oAccounting documentFrom the document display (transaction FB03), you can branch to the DRB. You can use reportRDRBFI00 to access the DRB and to find archived accounting documents via the archiveinformation system (SAP AS).oControlling documentFrom the line item reports (for example, transaction KSB1, KSB5, KOB1), you can branch to theDRB.The DRB functions can find Controlling documents in the archives of all archiving objects thatarchive Controlling line items. There are several field catalogs and info structures for this.See alsoFor more information about the Document Relationship Browser, see the SAP note 492938.19.3 PP-REMRepetitive Manufacturing19.3.1 Business Add-Ins in Repetitive Manufacturing (REM)UseIn Repetitive Manufacturing, Business Add-Ins (BAdI) are available as of SAP R/3 Enterprise Core4.70 (SAP APPL 470) for the following functions:Repetitive Manufacturing - PlanningoChange Layout of Production List: BAdI RM LIST PRODUCTIONYou can use this BAdI to replace the default production lists created in SAP R/3 with yourown-defined production lists.oHide Lines in Planning Table: BAdI RM MF50 ROWSYou can use this BAdI to hide individual line categories for certain planning segments in theplanning table in Repetitive Manufacturing.Repetitive Manufacturing - BackflushoEnhance Repetitive Manufacturing Confirmation with HR Data: BAdI RM HR INTEGRATIONYou can use this BAdI to enhance confirmations in REM with HR-relevant data. With theconnection to the HR-components, it is possible to create time tickets based on the confirmations.oImprove Performance of Repetitive Manufacturing Confirmation: BAdIRM PERFORMANCE DREQYou can use this BAdI to improve the performance of confirmations in REM with a limited readingof dependent requirements.SAP AG8

SAP SystemEffects on CustomizingTo activate a Business Add-In, you must create an active implementation. To do this, choose Tools - ABAP Workbench - Utilities - Business Add-Ins - Implementation.For more information on the procedure see the SAP Library, under Basis - ABAP Workbench - Changing the SAP Standard - Business Add-Ins - Implementing Business Add-Ins.19.3.2 Usability Improvements in Repetitive Manufacturing (REM)UseAs of SAP R/3 Enterprise 4.70 (SAP APPL 470), the following new or changed functions areavailable:oCustomizing parameter for synchronous posting during the collective backflush (new)Block problems may occur during the collective backflush (transaction MF42N) if, for example, twoor more items are backflushed to the same assembly. This block problem is caused because postingsin the standard system are generally asynchronous postings. In other words, one backflush processcan still be active, whilst the next one sets blocks.There is now a new indicator Synchronous Posting in Customizing for REM. If you set thisindicator, you can ensure that the posting of one backflush item is finished before the processing ofthe next backflush item starts. The block problem is therefore avoided.Note that setting this indicator leads to longer runtimes in the collective backflush.oBatch where-used list in REM (new)Before Release 4.70 there was no connection from the batch where-used list to the RepetitiveManufacturing backflush. Until now, there has therefore been no significant evaluation regardingthe link of produced and entered batches for materials in repetitive manufacturing.The batch where-used list now also exists in repetitive manufacturing. This enables you to track thecomponent batches, which flow into production, for each produced batch. You must specify therelevant product batch for each component posting.You cannot use this function if you are only working with cumulated postprocessing records.You can activate the batch where-used list for repetitive manufacturing in Customizing with theindicator Update batch where-used list.oClassification of output batch during backflush (new)As of the current release you can also run a classification of the output batch if it is determined inthe movement type Customizing that the classification is to take place online.In Customizing of the movement type, it is determined whether a classification of the batch isallowed, and in which form it will be executed. In the Repetitive Manufacturing backflush, alloutput batches to be classified online have until now not been considered, in other words, in thiscase, a classification was not possible. You can activate the new function in Customizing for REMwith the indicator Batch Classification Active .If the backflush is started in the background (not online), there is generally no call for classifyingthe output batch. The same goes for reporting point quantities without goods receipt posting.SAP AG9

SAP SystemoNon-document-related reversal for each BAPI (new)As of SAP R/3 Enterprise 4.70 , you can now also execute a non-document-related reversal for eachBAPI. For the backflush in the warehouse scenario, the non-document-related reversal is possiblefor the following cases:-Final backflushes-Reporting point backflushes-Separate component scrap message-Separate component consumption messageFurthermore, you can also execute non-document-related reversal for final backflushes in theindividual customer scenario and production lot scenario.You can activate the new function in BAPI RepManConfirmation1 from the input parameterBCKFLTYPE.oVariable file name for EXCEL-download in planning table (new)As of SAP R/3 Enterprise 4.70 , a dialog box appears during the EXCEL download in the planningtable for repetitive manufacturing, in which you can enter a path and a name for the EXCEL file. Inolder releases, you could not change the file name.Effects on CustomizingoDetermine synchronous posting during collective backflushUnder Customizing for Production, choose Repetitive Manufacturing - Backflushing - Maintain Global Settings for Confirmation and LIS. Under Collective Backflush, set the indicatorSynchronous Posting.oActivate the batch where-used list in repetitive manufacturingUnder Customizing for Production, choose Repetitive Manufacturing - Control Data - DefineRepetitive Manufacturing Profiles. Under Batch Where-Used List, set the indicator Update BatchWhere-Used List.oActivate the classification of output batch during the online backflushUnder Customizing for Production, choose Repetitive Manufacturing - Backflushing - Maintain Global Settings for Confirmation and LIS. Under Backflushing, set the indicator BatchClassification Active to ' 1'.19.4 PP-PIProduction Planning for Process Industries19.4.1 Changes to the IMG Structure for Production Planning - ProcessIndustries (PP-PI)UseIn SAP R/3 Enterprise PLM Extension 1.10 (EA-APPL 110), the following changes were made to theSAP AG10

SAP SystemImplementation Guide (IMG) for Production Planning - Process Industries (PP-PI):New IMG ActivitiesBelow Process Management, the structure node Decentralized Process Management was addedalong with the following activities:oDefine RFC Destinations for Control Recipe DestinationsoDefine and Set Up Control Recipe DestinationsoTransport Predefined Messages Categories to Central SAP R/3 SystemoTransport Predefined Messages Categories to Decentralized SAP R/3 SystemoDefine and Set Up Message Destinations in Decentralized SAP R/3 SystemoSet Up Process Message Categories in Decentralized SAP R/3 SystemoDefine Characteristics for Process Messages in Decentralized SAP R/3 SystemBelow Process Management - Control Recipes/PI Sheets - Control Recipe Destinations:oEdit Filters for Process Instruction GenerationBelow Process Management - Process Messages - Process Message Destinations:oDefine Alert CategoriesBel

19.1 PP-MRP Material Requirements Planning 19.1.1 Business Add-Ins in MRP Use As of SAP R/3 Enterprise 4.70 (SAP_APPL 470) Business Add-Ins (BAdIs) are available for the following functions in material requirements planning (MRP): MRP

Related Documents:

of duration is called Aggregate Planning as obvious from the following diagram. Planning process Long range planning ( strategic planning)(for 1-5 years of duration) Intermediate range planning ( aggregate planning)(for 3-12 months) Short term planning (for scheduling and planning for day to day shop floor activities). (for 1-90 days)

actual production Vs the production potential is 43.5 per cent. Unused working time 2019-budget year performance report 15099 hours, major downtime analysis 2992.9 hours lost and 3292.2 tons lost. The production delivery dates specified by the production planning and control section of the company are not usually met. It shows that the company

production of desired goods and services. A representative organization chart of a PPMC Department Objectives 1. Define production management, production function and its component 2. Explain the design of production system and manufacturing process 3. List out the factors influen

Sep 12, 2012 · Integrated Business Planning Elevates planning across departments to meet business goals Demand Generation, Trade Programs Opportunity Management Statistical Forecasting & Demand Mgmt Supply and Distribution Planning Financial Planning, Budgeting, Consolidations Expert Processes SAP Planning and Consolidation Demand Planning MarketingFile Size: 1MBPage Count: 18SAP Connected ManufacturingCEPSA Digital Transformation Strategy and HANABuilding a Digital Supply Chain and Manufacturing Platform .Industry Overview Metal

Welcome to Sales Planning . About Sales Planning 1-1. About Quota Planning 1-2. About Advanced Sales Forecasting 1-3. About Key Account Planning 1-4. Learning More About Sales Planning 1-6. Related Guides1-6. Navigating in Sales Planning 1-7. Working with Smart View 1-8. Reporting in Sales Planning 1-9. Working with the Reports Reporting .

Sales, Inventory, Operations Planning (SIOP) August 6, 2020. Sales, Inventory, Operations Planning (SIOP) Strategic & Financial Planning Demand Forecasting & Planning Supply Planning R&O/Mfg Engineering Planning Material Planning Quality Customer Service oneone consensusconsensus planplan.

Planning Rough Cut Capacity Planning Capacity Requirements Planning Purchasing Shop Floor Control F eedback Sales & Operations Planning Master Production Scheduling Figure 1 Planning hierarchy 1 Creating global data standards, SupplyChainBrain, February 2017. As a result, there's now a constant need for cross-regional collaboration during the .

Design of Production Planning and Control System for A Manufacturing Plant: Case Study . Ignatio Madanhire , Kumbi Mugwindiri and Nyasha Mushonga . . manufacturing ensures that the production equipment is arranged in accordance with the organizational form of flow manufacturing. The following are important production types: discrete .