ASME PCC-2 & ISO 24817Certification DocumentArmor Plate 360 ZED Repair SystemPrepared for:Armor Plate, Inc.Houston, Texas17 January 2017SES Document No.: 1461029-PL-RP-01 (Rev B)RevBDate17-Jan-2017DescriptionIssued for Client Comment & FeedbackOriginatorC. DenowhChecker--ReviewerC. Alexander

ASME PCC-2 & ISO 24817Certification DocumentArmor Plate 360 ZED Repair SystemSES Document No.: 1461029-PL-RP-01 (Rev B)17 January 2017Prepared for:Armor Plate, Inc.Houston, TexasPrepared by:Chantz Denowh, PhDAnalystReviewed by:Dr. Chris Alexander, PEPrincipalStress Engineering Services, Inc.13800 Westfair East DriveHouston, Texas 77041-1101Phone: 281-955-2900Web: www.stress.comTexas Registered Engineering Firm F-195

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System17 January 2017Limitations of This ReportThis report is prepared for the sole benefit of the Client, and the scope is limited to matters expresslycovered within the text. In preparing this report, SES has relied on information provided by the Clientand, if requested by the Client, third parties. SES may not have made an independent investigation as tothe accuracy or completeness of such information unless specifically requested by the Client orotherwise required. Any inaccuracy, omission, or change in the information or circumstances on whichthis report is based may affect the recommendations, findings, and conclusions expressed in this report.SES has prepared this report in accordance with the standard of care appropriate for competentprofessionals in the relevant discipline and the generally applicable industry standards. However, SES isnot able to direct or control operation or maintenance of the Client’s equipment or processes.Stress Engineering Services, Inc.Page iiiSES Doc. No.: 1461029-PL-RP-01 (Rev B)

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System17 January 2017Executive SummaryStress Engineering Services, Inc. (SES) was contracted by Armor Plate, Inc. (AP) to perform anindependent technical assessment of their AP 360 ZED (ZED) pipeline repair system with respect to thequalification requirements of ASME PCC-2-2015 (2015 edition), Repair of Pressure Equipment and Pipe,Article 4.1, Nonmetallic Composite Repair Systems for Pipelines and Pipework: High-Risk Applications.The ZED resin system has been formulated for cold weather environments where lower temperatureconditions pose challenges for curing on conventional epoxy resin systems.The ASME PCC-2 standard provides composite manufacturers and operators with a comprehensiveuniform approach for the proper design of composite repair systems based on required coupon materialproperties testing, along with assessing overall system performance using full-scale testing. Includedwithin this review is a comprehensive assessment to validate that the ZED pipeline repair system isadequately designed for its intended use in accordance with ASME PCC-2 at elevated temperatures at orbelow 104 F. The emphasis of the work performed by SES in this assessment is the repair andreinforcement of high pressure transmission pipelines.Testing performed by Stress Engineering Services Inc. (SES) has demonstrated that the AP 360 ZED repairsystem meets the minimum requirements of ASME PCC-2-2015 (2015 edition), Article 4.1- NonmetallicComposite Repair Systems: High Risk Applications for application temperatures at or below 104 F.The table below summarizes the results from the ASME PCC-2 qualification tests including coupontesting, spool survival, and 1000-hr long-term strength. In addition to testing required by ASME PCC-2,SES requires two additional tests before certifying a repair system. Both involve the repair of pipesamples made using 12.75-inch x 0.375-inch, Grade X42 pipe with 75% deep corrosion. The firstmeasures the inter-layer strains during a static pressure test to failure. The inter-layer strains (andcorresponding stresses) are compared to design stresses per ASME PCC-2. The second test is a pressurecycle fatigue test to provide useful information on the long-term performance of the repair. All theabove testing was completed at or above temperatures of 104 F. The results confirm that the AP 360ZED composite repair system meets the minimum requirements designated in the ASME PCC-2-2015Standard for applications at or below temperatures of 104 F.1The applicability of the results associated with the testing work completed by SES in this study are basedon the premise that all materials, techniques, and installation methods used to repair actual pipelineanomalies are consistent with those used in completing the tests detailed in this report, including thoseassociated with testing specific to ASME PCC-2. Any certified designs using the AP 360 ZED repair systemmust meet the minimum composite thickness requirements of ASME PCC-2-2015 (based off theminimum thickness formulas).1The temperature range over which the ZED resin system has been tested up to 104 F. Coupon testing has been conducteddown to -40 F with no apparent loss of strength, elastic modulus, or elongation.Stress Engineering Services, Inc.Page ivSES Doc. No.: 1461029-PL-RP-01 (Rev B)

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System17 January 2017Armor Plate ZED – ASME PCC-2 Qualification Test SummaryPropertyDetailsTemperatureTest StandardTest ore DHoop--Above 32 F-ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D 3039ASTM D695ASTM D695ASTM D695ASTM D695ASTM D 3039ASTM D 2583ASTM E 8310.062573,200 psi2.1%3,565,000 psi60,700 psi1.7%3,579,000 psi9,8501.9%1,328,0009,5001.9%1,196,000536,400 psi11,200 psi208,500 psi7,600 psi0.22290.234.8·10-6 1/ FCTE*AxialAbove 32 FASTM E 83116.0·10-6 1/ FGlass Transition Temp - TgFillerASTM E 1640128 FGlass Transition Temp - TgEpoxyASTM E 1640121 FLayer ThicknessTensile StrengthUltimate Tensile StrainModulusTensile StrengthUltimate Tensile StrainModulusTensile StrengthUltimate Tensile StrainModulusTensile StrengthUltimate Tensile StrainModulusCompressive ModulusCompressive StrengthCompressive ModulusCompressive StrengthPoisson's RatioHardnessCTE*Lap Shear AdhesionCathodic Disbondment104 F70 F104 F70 F104 FN/AAdhesivestrength70 F104 FASTM D 5868ASTM D 58685,1007,40028 Day TestDurationN/ANACE TM01152015No ObservedDisbondmentASME PCC-2ASME PCC-2SES AdditionalSES Additional23,760 psiSurvivedCompletedCompletedLong Term Strength1,000 hoursSpool Survival Test75% WT DefectInter-Layer Strain75% WT DefectPressure Cycle Fatigue75% WT Defect*CTE - Coefficient of Thermal ExpansionStress Engineering Services, Inc.70 F104 F104 FPage vSES Doc. No.: 1461029-PL-RP-01 (Rev B)

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System17 January 2017Table of ContentsLimitations of This Report . iiiExecutive Summary. iv1. Introduction . 12. Test Sample Preparation . 22.1 Pipe Test Samples . 23. ASME PPC-2 Qualification Tests . 53.1 Mandatory Appendix II – Qualification Data for the ZED Repair System . 53.2 Mandatory Appendix III – Short-Term Pipe Spool Survival Test. 73.3 Mandatory Appendix V – Measurement of Performance Test Data . 103.3.1 Testing Program Details. 113.3.2 Pre-Hold Burst Test. 123.3.3 1,000 Hour Test Results . 133.4 ASME PCC-2 and ISO 24817 Comparison . 154. Strain Based Performance Verification. 174.1 Inter-Layer Strain Measurement . 174.2 Inter-Layer Strain Results . 184.3 Pressure Cycle Fatigue Test . 235. ASME PCC-2 Verification . 266. Closing Comments . 30Appendix A: Comparison of ASME PCC-2 and ISO 2481Appendix B: Pipe Sample Mechanical TestingStress Engineering Services, Inc.Page viSES Doc. No.: 1461029-PL-RP-01 (Rev B)

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System17 January 2017List of TablesTable 3-1: Summary of composite repair material properties . 6Table 4-1: Measure hoop and axial strains at layers 1, 3, 5, and 7 at 72% and 100% SMYS (all valuesin microstrain – 10,000 microstrain 1.0% strain) . 21Table 4-2: Hoop and axial inter-layer stress values at 72% SMYS (1,780 psi) calculated frommeasured strain values . 22Table 4-3: Hoop and axial inter-layer stress values at 100% SMYS (2,740 psi) calculated frommeasured strain values . 22Table 4-4: Sample strains after 200 pressure cycles . 24Table 4-5: Sample strains after 100,000 pressure cycles . 25Table 5-1: AP ZED Repair System ASME PCC-2 Qualification Test Summary. 27Table 5-2: Design stresses as a function of the ASME PCC-2 Service Factor . 28Table 5-3: Annual pressure cycle data for typical gas pipelines (Kiefner et al) . 29Stress Engineering Services, Inc.Page viiSES Doc. No.: 1461029-PL-RP-01 (Rev B)

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System17 January 2017List of FiguresFigure 2-1: Schematic diagram showing details on the corroded pipe samples . 3Figure 2-2: Details on strain gage locations for corroded pipe samples. 4Figure 3-3: Spool survival thickness calculations . 8Figure 3-4: ZED spool survival sample in burst tube pre-test . 9Figure 3-5: Internal pressure vs. hoop strain for ZED spool survival test . 9Figure 3-6: ZED spool survival sample after failure – maximum pressure 4,167 psi . 10Figure 3-7: Three ZED 1,000 hour samples in insulated box. 12Figure 3-8: Internal pressure vs. hoop strain for 1,000hr pre-burst test . 13Figure 3-9: ZED 1,000 hour pressure and temperature data vs. elapsed time . 14Figure 3-10: Calculation of long-term design stress for ZED repair system according Appendix V,Equation V-2 . 15Figure 4-1: Inter-layer strain sample after burst test . 18Figure 4-2: Pressure and temperature vs. time for the ZED inter-layer burst test . 19Figure 4-3: Internal pressure vs. hoop strain (in microstrain) for the ZED inter-layer strain gages . 19Figure 4-4: Summary of strain measurements from the PRCI MATR-3-4 program – measurementsfrom 12 samples repaired using different composite materials 12.75-inch x 0.375-inch,Grade X42 with 75% corrosion . 20Figure 4-5: Hoop strains at the corroded region R1, on the filler, and at layers 2, 4, 6, 8, and on topof the composite at 72% SMYS (1,780 psi) and 100% SMYS (2,470 psi) pressure levels. 21Figure 4-6: Biaxial stress calculations for a composite material for inter-layer gage 2 at 72% SMYSpressure . 23Figure 4-7: Hoop strain measurements during pressure cycling fatigue test at 200 cycles . 24Figure 4-8: Hoop strain measurements during pressure cycling fatigue test at 100,000 cycles . 25Stress Engineering Services, Inc.Page viiiSES Doc. No.: 1461029-PL-RP-01 (Rev B)

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System1.17 January 2017IntroductionStress Engineering Services, Inc. (SES) was contracted by Armor Plate, Inc. (AP) to evaluate their AP 360ZED (ZED) fiberglass composite repair system. The intent was to certify that the ZED repair systemmeets the required testing qualifications associated with the ASME PCC-2 standard2; specificallyMandatory Appendices II, III, and V in ASME Article 4.1 – Nonmetallic Composite Repair Systems: HighRisk Applications. The three mandatory appendices include coupon level material testing of the repairsystem, a short-term spool survival test, and a 1,000-hr test to establish long term strength. In additionto the PCC-2 tests, SES completed two other non-mandatory performance based tests: inter-layer strainmeasurement during a burst test and a pressure cyclic fatigue test. The inter-layer strain tests provideda means to compare experimental stress in the composite material at design pressure conditions to theASME PCC-2 long-term design stress. The pressure cyclic fatigue test was another form of long-termstrength verification in addition to the 1,000-hr test.The ZED repair system is an elevated temperature repair system and can be used at temperatures up to104 F. SES conducted all the PCC-2 qualification tests in the following report at the elevatedtemperature of 104 F per requirements of the ASME PCC-2 standard. Any repair made with the ZEDsystem is ASME PCC-2 qualified at operating temperatures of 104 F or below (repair must also meet allother requirements of PCC-2).This report has been prepared to provide the reader with an overview of the testing performed toevaluate the performance of the ZED repair system and its qualification under ASME PCC-2. The sectionsof this document are organized into the follow subjects: ASME PCC-2 Qualification TestsoMandatory Appendix II – Qualification Data for the Repair System – Mechanical Testingand Cathodic DisbondmentoMandatory Appendix III – Short-Term Pipe Spool Survival TestoMandatory Appendix V – Measurement of Performance Test Data Section – Section V1,000-hr Test to Establish Long Term StrengthoASME PCC-2 and ISO 24817 ComparisonStrain Based Performance Verification (additional tests not required in ASME PCC-2)oInter-layer Strain MeasurementsoPressure Cycling Fatigue Testing ASME PCC-2 Verification Closing Comments2ASME PCC-2-2015 Repair of Pressure Equipment and Piping. Revision of ASME PCC-2-2015. American Society of MechanicalEngineers.Stress Engineering Services, Inc.Page 1SES Doc. No.: 1461029-PL-RP-01 (Rev B)

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System2.17 January 2017Test Sample PreparationASME PCC-2 – Repair of Pressure Equipment and Piping, Part 4 – Nonmetallic and Bonded Repairs, dealsspecifically with the design requirements for composite repair systems and can be used to determinethe appropriate composite repair thickness for a given corrosion defect. The design basis for the ZEDrepair system is based on the ASME PCC-2 methodology in that a damaged pipe (e.g. corrosion) canachieve a target design pressure with a sufficient level of reinforcement from the composite material.From a design standpoint this involves selecting the correct composite thickness, using a compositematerial with sufficient strength and stiffness, and integrating a load transfer (i.e. filler) material havingan adequate level of stiffness.To ensure long-term performance, it is essential that stresses in the composite material be limited toacceptable levels during pressurization to a target design level. The primary design variable remaining,once materials for the repair system have been selected, is the thickness of the repair. Listed below aresome of the input variables used to compute the required thickness for the ZED repair system: Pipe geometry and grade Corrosion depth and length Design factor (for gas pipelines designed per ASME B31.8) Other service factors that address the effects of temperature and weldsFor this testing program, the necessary inputs used to determine the repair thickness were pipegeometry, grade, corrosion depth, and corrosion length. These inputs were kept consistent for all partsof the testing program as illustrated in the following section.2.1Pipe Test SamplesAll test samples for the full-scale testing were 12.75-inch x 0.375-inch, Grade X42 pipe. Mechanicaltesting was performed on steel pipe samples prior to testing to determine yield strengths. The 1,000-hrsample and spool survival sample had yield strengths of 45.2 ksi and 63.4 ksi respectively. Appendix Bincludes the original mechanical testing reports.The samples for the spool survival test, inter-layer strain measurement, and pressure cycling fatigue hada section of simulated corrosion in the center of the sample. The simulated corrosion was a 6-inch wideby 8-inch long machined section in the pipe samples with a 75% wall thickness depth as shown in Figure2-1. After machining was completed, the sample was sandblasted to near white metal. Three straingages were installed on each sample in the regions shown in Figure 2-2 prior to applying the compositerepair. Gage #1: Gage installed in the center of the corrosion region (labeled R1)Stress Engineering Services, Inc.Page 2SES Doc. No.: 1461029-PL-RP-01 (Rev B)

Armor Plate, Inc.ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System17 January 2017 Gage #2: Gage installed 2 inches from the center of the corrosion region (labeled R2) Gage #3: Gage installed on the base pipe (labeled Base)

ASME PCC-2 & ISO 24817 Certification Document – Armor Plate 360 ZED Repair System 17 January 2017 Stress Engineering Services, Inc. Page iii SES Doc. No.: 1461029-PL-RP-01 (Rev B) Limitations of This Report This report is prepared for the sole benefit of the Client, and the scope is limited to matters expressly covered within the text.

Related Documents:

1½" ASME, 300 lb 5 E 1½" ASME, 600 lb 5 F 2" ASME, 150 lb 5 G 2" ASME, 300 lb 5 H 2" ASME, 600 lb 5 J 3" ASME, 150 lb 5 K 3" ASME, 300 lb 5 L 3" ASME, 600 lb 5 M 4" ASME, 150 lb 5 N 4" ASME, 300 lb 5 P 4" ASME, 600 lb 5 Q Welded flange, 316L stainless steel, Type A flat faced1) DN 25, PN 16 6 A DN 25, PN 40 6 B DN 40, PN 16 6 C DN 40, PN 40 6 .

1½" ASME, 300 lb 5 E 1½" ASME, 600 lb 5 F 2" ASME, 150 lb 5 G 2" ASME, 300 lb 5 H 2" ASME, 600 lb 5 J 3" ASME, 150 lb 5 K 3" ASME, 300 lb 5 L 3" ASME, 600 lb 5 M 4" ASME, 150 lb 5 N 4" ASME, 300 lb 5 P 4" ASME, 600 lb 5 Q Welded flange, 316L stainless steel, Type A flat faced DN 25, PN 16 6 A DN 25, PN 40 6 B DN 40, PN 16 6 C DN 40, PN 40 6 D .

40.2.1 - Required Training for PCC Staff. 40.2.2 - PCC Training Program. 40.2.2.1 - PCC Training Closure Determination. 40.2.2.2 - Provider Complaints. about PCC Training Time Closures 40.2.2.3 – Provider Notification of PCC Training Closures. 40.2.2.4 - PCC Staff

ISO 10381-1:2002 da ISO 10381-2:2002 da ISO 10381-3:2001 da ISO 10381-4:2003 da ISO 10381-5:2001 da ISO 10381-6:1993 da ISO 10381-7:2005 ne ISO 10381-8:2006 ne ISO/DIS 18512:2006 ne ISO 5667-13 da ISO 5667-15 da Priprema uzoraka za laboratorijske analize u skladu s normama: HRN ISO 11464:2004 ne ISO 14507:2003 ne ISO/DIS 16720:2005 ne

ISO 10771-1 ISO 16860 ISO 16889 ISO 18413 ISO 23181 ISO 2941 ISO 2942 ISO 2943 ISO 3724 ISO 3968 ISO 4405 ISO 4406 ISO 4407 ISO 16232-7 DIN 51777 PASSION TO PERFORM PASSION TO PERFORM www.mp ltri.com HEADQUARTERS MP Filtri S.p.A. Via 1 Maggio, 3 20060 Pessano con Bornago (MI) Italy 39 02 957

ASME B16.11 Tees Dimensions ASME B16.11 Reducers Dimensions ASME B16.11 Bushing Dimensions ASME B16.11 Caps Dimensions ASME B16.11 Crosses Dimensions ASME B16.11 Couplings Dimensions ASME B16.11 Plugs Dimensions ASME B16.11/BS 3799 Pipe Nipples Dimensions BS 3799 Unions Dimensions ASME B16.11/BS 3799 Swag

ASME B 31.1, B31.3 , B31.4 and B31.8, ASME Sec VIII, BS-5500, TEMA, API -650, IS 803, API 579, etc. He has conducted Training Courses (ASME Sec. I, ASME B 31.3 Piping Codes, ASME Sec. VIII, API 579, ASME PCC-2 Repair practices, and Hea

BASICS!OF!SCRUM!IN!AGILE! Abstract(Basic!Scrum!handbookfor!the!beginners!in! the!Agile!world!and!CSM!(Certified!Scrum! Master)!aspirants.! SudaRamakrishna((Thiparthy .