Cranes And Monorails (With Underhung Trolley Or Bridge)

3y ago
32 Views
2 Downloads
582.90 KB
5 Pages
Last View : 2m ago
Last Download : 3m ago
Upload by : Julia Hutchens
Transcription

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI store.ASME B30.17-2015(Consolidation of ASME B30.11 and B30.17)Cranes and Monorails(With UnderhungTrolley or Bridge)Safety Standard for Cableways,Cranes, Derricks, Hoists, Hooks,Jacks, and SlingsA N A M E R I C A N N AT I O N A L STA N DA R D

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI store.ASME B30.17-2015(Consolidation of ASME B30.11 and B30.17)Cranes and Monorails(With UnderhungTrolley or Bridge)Safety Standard for Cableways,Cranes, Derricks, Hoists, Hooks,Jacks, and SlingsA N A M E R I C A N N AT I O N A L S TA N D A R DTwo Park Avenue New York, NY 10016 USA

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI store.Date of Issuance: March 9, 2016The next edition of this Standard is scheduled for publication in 2020. This Standard will becomeeffective 1 year after the Date of Issuance.ASME issues written replies to inquiries concerning interpretations of technical aspects of thisStandard. Interpretations are published on the ASME Web site under the Committee Pages athttp://cstools.asme.org/ as they are issued. Interpretations will also be included with each edition.Errata to codes and standards may be posted on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical errorsin codes and standards. Such errata shall be used on the date posted.The Committee Pages can be found at http://cstools.asme.org/. There is an option available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the appropriate Committee Page after selecting “Errata” in the “PublicationInformation” section.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with anyitems mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk of infringement of such rights, isentirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990Copyright 2016 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI store.CONTENTSForeword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Committee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B30 Standard Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Summary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .vviiixxiiChapter 17-0Section 17-0.1Section 17-0.2Section 17-0.3Section 17-0.4Scope, Definitions, References, and Personnel Competence . . . . . . . . . . . . . . .Scope of B30.17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Personnel Competence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11145Chapter 17-1Section 17-1.1Section 17-1.2Section 17-1.3Section 17-1.4Section 17-1.5Section 17-1.6Section 17-1.7Section 17-1.8Section 17-1.9Section 17-1.10Section 17-1.11Section 17-1.12Section 17-1.13Section 17-1.14Section 17-1.15Section 17-1.16Section 17-1.17Section 17-1.18Section 17-1.19General Construction and Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Markings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .General Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Track Switches, Track Openers, and Interlocks . . . . . . . . . . . . . . . . . . . . . . . . .Vertical Drop or Lift Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cabs — Normal or Skeleton (If Provided) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Service Platforms (Footwalks) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Stops and Bumpers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Rail Sweeps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Guards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Drop Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Brakes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Electrical Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Hoisting Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Warning Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Trolleys (Carriers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1515151617171718181819202020212223232323Chapter 17-2Section 17-2.1Section 17-2.2Inspection and Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .292930Chapter 17-3Section 17-3.1Section 17-3.2323217-3.317-3.417-3.517-3.617-3.7Operator Training and Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Operator Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Training for Persons Other Than Crane and Monorail SystemOperators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planned Engineered Lifts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Signals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Miscellaneous . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Equipment Lockout/Tagout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .323234353636Chapter 17-4Section 17-4.1Section 17-4.2Maintenance Training and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Maintenance Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Equipment Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .383838Figures17-0.2-117-0.2-2Examples of Styles of Electrification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cab-Operated Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67SectionSectionSectionSectionSectioniii

This is a preview of "ASME B30.17-2015". Click here to purchase the full version from the ANSI 117-1.18-217-3.5.3-1Cantilever Gantry Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Floor-Operated Cranes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Gantry Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Wall-Supported Jib Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Portable Gantry Crane (A-Frame) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Semigantry Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Underhung Bridge Crane With Top Running Trolley . . . . . . . . . . . . . . . . . . .Drop Section (Lift Section) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Interlocking System for Underhung Crane . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Example of One Type of Enclosed Track and Support Bracket . . . . . . . . . .Cab-Operated Trolley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Arrangement of Controllers or Master Switches(Three-Motion Crane) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Arrangement of Controllers or Master Switches(Four-Motion Crane) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Arrangement of Controllers (Pendant Push-ButtonStation Arrangements) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Arrangement of Controllers (Radio Crane ControlTransmitter Lever Arrangements) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Trolley Wheel Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Recommended Trolley Fit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Standard Hand Signals for Cranes and Monorails . . . . . . . . . . . . . . . . . . . . . .iv8910101111121213131424252626272837

ASME B30.17-2015 (Consolidation of ASME B30.11 and B30.17) Cranes and Monorails (With Underhung Trolley or Bridge) Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings AN AMERICAN NATIONAL STANDARD Two Park Avenue New York, NY 10016 USA This is a preview of "ASME B30.17-2015".

Related Documents:

Underhung crane beams have rigid specifications with regard to tolerances. Many suppliers of underhung systems require hardened flanges where crane wheels come in contact with the crane beam. NBS' standard approach to underhung and monorail cranes is to design for the effects on the primary structural system only.

ASME B30.11 Safety Standard for Monorails and Underhung Cranes ASME B30.17 Safety Standard for Overhead and Gantry Cranes, Top Running Bridge, Single Girder, Underhung Hoist. Electric Chain Hoist

Dec 03, 2019 · 1. ASME B30.2 – Overhead and Gantry Cranes 2. ASME B30.11 – Monorails and Underhung Cranes 3. ASME B30.17 – Overhead and Gantry Cranes – Single Girder Top Running Pre-Shift Inspections Both OSHA and ASME agree that overhead cranes must be inspected prior to each shift or use. 1910

Semi EOT Cranes Traveling EOT Cranes P r o d u c t s W e O f f e r. JIB CRANE . Industrial HOT Cranes Overhead HOT Cranes Traveling HOT Cranes UnderSlug HOT Cranes P r o d u c t s W e O f f e r. GOLIATH CRANES . Wire Rope Electric Hoist Single Girder EOT Cranes 360 Swivel Jib Crane H

B30.2 “Safety Standard for Top- Running Double-Girder Cranes”; and ANSI/ASME B30.11 “Safety Standard for Underhung Cranes and Monorails”. Hoists, trolleys and cranes, used to handle hot mol

Refer to ASME B30.17, Safety Standard for Top-Running Single Girder Cranes; ASME B30.2 Safety Standard for Top-Running Double-Girder Cranes; and ASME B30.11 Safety Standard for Underhung Cranes and Monorails. If abelow-the-hook lifting device or sling is used with a hoist, refer to ASME B30.9, Safety Standar

Aluminum bridge crane isometric 11 Steel bridge crane plan view 12 Aluminum bridge crane plan view 13 Bridge Crane Systems & Dimensional Charts Installation Parameters 14 250 lb. capacity bridge cranes 15 - 17 500 lb. capacity bridge cranes 18 - 21 1000 lb. capacity bridge cranes 22 - 25 2000 lb. capacity bridge cranes 26 - 29 4000 lb. capacity .

CAD & BIM Standards Introduction This manual is a guide for consultant s performing, or desiring to perform, engineering design and/or drafting services for the Port of Portland.