TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE .

3y ago
22 Views
2 Downloads
543.88 KB
14 Pages
Last View : 28d ago
Last Download : 3m ago
Upload by : Ronnie Bonney
Transcription

I-.--4U.S. NUCLEAR REGULATORY COMMISSIONNRC FORM 658(9-1999)TRANSMITTAL OF MEETING HANDOUT MATERIALS FORIMMEDIATE PLACEMENT IN THE PUBLIC DOMAINThis form is to be filled out (typed or hand-printed)by the person who announcedthe meeting (i.e., theperson who issued the meeting notice). The completed form, and the attachedcopy of meeting handoutmaterials,will be sent to the Document ControlDesk on the same day of the meeting; under nocircumstanceswill this be done later than the working day after the meeting.Do not include proprietarymaterials.DATE OF MEETING08/2012002The attached document(s), which was/were handed out in this meeting, is/are to be placedin the public domain as soon as possible. The minutes of the meeting will be issued in thenear future. Following are administrative details regarding this meeting:Docket Number(s)Project 689Plant/Facility NameWestinghouse - NEITAC Number(s) (ifavailable)Reference Meeting NoticeML022260412Purpose of Meeting(copy from meeting notice)To meet with Westinghouse to discuss their constructionscheduling software.NAME OF PERSON WHO ISSUED MEETING NOTICETITLEJoseph SebroskySr. Project n of this form and attachments:Docket File/Central FilePUBLICNRC FORM 658 (9-1999)PRINTED ON RECYCLED PAPERThis form was designed using InForms

MEETING TO DISCUSSCONSTRUCTION SCHEDULINGSOFTWAREJames W. WintersManager, Passive Plant Projects412-374-5290 - winterjw@westinghouse.com*)BNFLSlide 1S eWestinghouse

Agenda*11:00IntroductionsAll 11:15Meeting Purpose and ExpectationsNRCe 11:30API000 Primavera Standard Construction ScheduleGenesis, Philosophy, Level of Detail, Form and Formate12:15Break- Lunch*12:45Lunch, continuedW - WintersAll* AP100(0 Plant Design in 3DGenesis, Philosophy, Level of Detail, File Structure, Attendant Data BasesW - Winters 1:15AP1000 Virtual Tour 1:45AP1000 Virtual ConstructionW - ClellandGenesis, Philosophy, Development, DemonstrationW - Winters, Clelland* 2:45Summary of Minutes and Action ItemsNRC* 3:00AdjournAll*BNF,Slide 2d 2Westinghouse

AP1000 Primavera Standard ConstructionSchedule* Prepared in Primavera* Prepared by MK Ferguson, now WashingtonGroupe Prepared in parallel with AP600 design* Includes activities from site selection throughplant turn overe Currently on Primavera P3, version 3.1* One Standard Schedule with custom variantsO BNFLSlide 3O Westinghouse

AP1000 Primavera Standard ConstructionSchedule* Logic Based* Durations established by constructors* 5 10 hour days per week* Inspections and setup on back shifts* Modular construction approach* Nth plant - 5 year overall, 18-36-6* 5700 activities* About "Level 3"* BNFLSlide 4(Westinghouse

AP1000 Primavera Standard Construction ScheduleCurrent SubschedulesLicensing"* Procurement"* Engineering" Yard and Site Preparation"*Nuclear Island - Areas"*"*Nuclear Island - ContainmentNuclear Island - Auxiliary Building"*Annex Building"*Turbine Building"*"*Diesel Building"*Radwaste BuildingTest and Startup"** BNFLSlide 5O Westinghouse

AP1000 Plant Design in 3DInterGraph PDS"*InterGraph Smart Plant Review"*Entire AP600 ( 450M) in 3D"*AP 000 is the same (almost) as AP 000"*Entire AP1000 is in 3D"**BNFLSlide 6S 6Westinghouse

AP1000 Virtual ConstructionInterGraph Smart Plant Review"*Schedule Accessory"*PDS models are attached to selected activitiesfrom the Primavera schedule"**BNFLSlide 7Sd)Westinghouse

4D Virtual ConstructionUses AP600/AP 1000 data:" 3D detailed model of entire plant" Construction schedule ( 5700 activities)"*Construction plan"*Modularization plan"*Startup plan4D Objectives:* Shorten construction schedulePermit construction expert reviewo Schedule confidence0 BNFLSlide 81"-G Westinghouse

Schedule & Model IntegrationIntergraph Design Review productPrimavera Project PlannerContinuing interactions with software vendor3D model boundaries modified to match schedule activitiesLink by activityActivity construction durations maintainedSchedule improvements by logic changes onlyVisualization capability for changing activity sequences9 BNFLSlide 9)Westinghouse

.,----, --i, -."I.-.-------- --.-.-.---------. .-4.-.M.-. .w.--. . . . . .-I .IA-----.-1-I. .---. .--------. . . .- ---.-.-.----------.--.1 -----.1 111II.r.Co1.*- nI,I"0Cl00*0"0

asnoqBuijsaMý ý OPUSIJNG()

*DNFSlide 12OWestinghouse

Summary of Minutes and Action Items()BNF'Slide 13*SeWestinghouse

"* InterGraph PDS "* InterGraph Smart Plant Review "* Entire AP600 ( 450M) in 3D "* AP 000 is the same (almost) as AP 000 "* Entire AP1000 is in 3D *BNFL Slide 6 S 6Westinghouse. AP1000 Virtual Construction "* InterGraph Smart Plant Review "* Schedule Accessory

Related Documents:

Faculty use anecdotal notes to remember observations . Handout 2 – Sample Adequate Nursing Care Plan, pages 14-15 Handout 3 – Faculty Evaluation of Sample Nursing Care Plan, page 16 Handout 4 – Poor Concept Map, page 17 Handout 5 – Faculty Evaluation of Poor Concept Map, page 18 Handout 6 – Concept Care Map, page 19 Handout 7 – Faculty Evaluation of Good Concept Map, page 20 For .

Day 2 1. PB&J Algorithm handout 2. Algorithmic Bias handout 3. Reflection handout 4. Cats and Dogs Dataset cards 5. Playing Cards 6. Instructor Laptop and Projector 7. Student Laptops 8. Robots 9. USB Webcams Day 3 1. Ethical Matrix handouts 2. Final Project Brainstorm handout 3. Final Project Research handout 4. Reflection handout 5.

SUMMARIZING, PARAPHRASING, AND QUOTING WORKSHOP CONTENTS Lesson Plan Handout 1: "The Shanghai Secret" Handout 2: Model Citations Handout 3: A Response to "The Shanghai Secret" Handout 4: When to Use/Effective Features of Each Type of Citation Handout 5: Citations for Improvement Handout 6: "Gilmore Girls: A Girl-Power Gimmick" Reference Sheet: A Response to "The Shanghai Secret"

a) Diet b) Supplements c) Other considerations d) Clinician Handout: GERD Treatment Summary 6. IBD/IBS-D a) Diet b) Supplements c) Medications d) Patient handout: Paleo Low-FODMAP Diet e) Patient handout: GAPS Diet f) Patient Handout: How to Manage Your Stress g) Clinician Handout: IBD Remiss

Lesson 7: Identifying Skills 50 handout: Skills Identification 51 Lesson 8: things I Am Good At 53 handout: things I Am Good At 54 handout: List of 246 Skills as Verbs 55 Lesson 9: Skills Auction 56 Lesson 10: Identifying Job Values 58 handout: Job Values Inventory 60 handout: work Values Clarification 61 Lesson 11: Prioritizing Job Values 62

Lenten Journey Manual Contents Overview Handout A1: Beginning My Lenten Patterns Handout A2: Family Prayer Leader's Guide for Sessions 1, 2 and 3 Handouts for Sessions 1,2 and 3 Leader's Guide for Session 4 Handout 4a Lectio Divina Practice Handout 4b Lectio Divina Practice Handout 4c Lectio Divina Process Leader's Guide for Session 5

The Story of Monetary Policy comic book Handout 1: Prices: The Marketplace's Communication System Reading 1: Prices: The Marketplace's Communication System Handout 2: Prices in the Galaxy Handout 3: A Class Basket Handout 4: The Interest Rate Lever Handout 5: Monetary Policy Review

Apogee Consulting Group, PA www.acg-pa.com Page 1 of 1 Submittal Transmittal TO: Oscar Nordstrom DATE: 7/27/2018 FIRM: Nordstrom Contracting TRANSMITTAL ID: 00088 FROM: Denise Amundson PROJECT: VA Castle Point Relocation of SPS NY ACG PROJECT #: 15-004 RE: Lighting and Lighting Controls SPEC SECTION: 26 51 00 REM