STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort HoodSTANDARD OPERATING PROCEDURE FOR LINE MARKING FOR LAND EXCAVATIONWITHIN FORT HOOD CANTONMENT AREASDIRECTORATE OF PUBLIC WORKSOPERATIONS AND MAINTENANCE DIVISION (DPW-OMD)JUNE 20181. REFERENCES.a. American Public Works Association (APWA) Uniform Color Code (ANSI StandardZ535.1, Safety Color Code).b. Army Regulation 350-19 The Army Sustainable Range Programc. Military Training Excavation SOP (Range Control)d. Texas Administrative Code (TAC) Title 16, Part 1, Chapter 18, Rule §18.6 GeneralMarking Requirementse. Utilities Code Title 5, Chapter 251f. Line Marking for Land Excavation Form DPW-OMD 001, March 2018 DPW-OMDcoordination for line locating and marking for excavation within Fort Hood CantonmentAreas.2. PURPOSE. To establish policies, procedures and coordination for all entities requiringLine Marking for Land Excavation on the Fort Hood, Texas military installation.3. APPLICABILITY. This standard operating procedure applies to all Soldiers, civilianemployees, contractors, and private individuals requiring Line Marking for LandExcavation within the Fort Hood Cantonment Areas. Obtaining a DPW-OMD Line MarkingForm is required for coordination of land excavation. Line marking is essential to safety ofproject personnel, and to prevent damage of utility systems, fiber optic cable, andinfrastructure.4. DEFINITIONS.a. “Line Marking” means the physical act of identifying underground utilities utilizing paintand/or flags in accordance with (IAW) American Public Works Association (APWA)Uniform Color Code (ANSI Standard Z535.1, Safety Color Code).b. “Emergency” means an unplanned or unexpected situation has occurred in which theInstallation or public life, health, safety (LHS), property, or post protection is at risk and1

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort Hoodc. “Excavation” means any movement of soil (mechanical or hand digging) and includesdigging, staking, and any other type of ground disturbance or penetration. Excavationactions include, but are not limited to, tank ditches, battle positions, foxholes,foundation excavations, utility line ditches and right-of-ways, grading, post holes,borrow pits, stakes, grounding rods, any hole or ground insertion, and otherconstruction activities that disturb the soil.d. “Damage” means the defacing, scraping, displacement, penetration, destruction,damage to utility trench fill materials, or partial or complete severance of anunderground utilities or of any protective coating, housing, or other protective device ofan underground utilities.e. “Non-routine” means an unplanned or unexpected situation has occurred in which theInstallation or public need for uninterrupted service and immediate reestablishment ofservice if service is interrupted compels immediate action but does not place theInstallation or public LHS, property, or post protection at risk.f. “Valid,” as in “valid form,” means the DPW-OMD Line Marking for Land ExcavationForm has all parts complete to include signature and confirmation that each utilityowner has identified and marked their assets.5. POLICY. Any persons on the Fort Hood Cantonment Areas will not engage in landexcavation without securing a valid DPW-OMD Line Marking for Land Excavation Form.6. RESPONSIBILITIES.a. Requestor or Proponent Responsibilities:1) Requestor must review and comply with their contract requirements (if applicable).2) Requestor must coordinate with external utility system owners (i.e., Spectrum,AT&T, Embarq, etc.) by contacting them directly or by calling 811 for assistance.3) Requestor is responsible for obtaining a valid Line Marking for Land ExcavationForm as part of their permit request process prior to beginning any excavation(s).4) Line Marking for Land Excavation Forms are located in Building 40001. Forms andgeneral information can be requested via-email tes@mail.mil5) Requests for Line Marking for Land Excavation Forms must be submitted aminimum of 10-Business days before the planned excavation start date.6) Requestor must identify Emergency (i.e., life, health, safety (LHS), property, orpost protection) or non-routine (a situation in which the Installation or public needfor uninterrupted service and immediate reestablishment of service if service isinterrupted compels immediate action) Line Marking for Land Excavation needs.a. Justification is required.2

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort Hoodb. Emergency or non-routine Line Marking for Land Excavation requests maybe approved on a case-by-case basis.7) Each requestor performing land excavation must obtain a valid Line Marking forLand Excavation Form for excavation within the identified and approved area. Ifexcavation has not begun 14-days after approval the form is no longer valid andthe requestor will be responsible for submitting a new Line Marking for LandExcavation Form.8) The requestor is responsible for maintaining the location markings and/or flags forthe duration of the project, construction, or excavation work. Failure to maintainmarkings IAW this SOP or if flags fade, or are lost or washed off during the courseof the project, the requestor must submit a new Line Marking for Land ExcavationForm. This resubmittal will be scheduled by the DPW-OMD Line Locating andMarking Department within 10-Business days of form submittal, and may require arescheduled start date.9) The requestor must hand dig within three feet (36 in.) on either side of the groundmarkings indicating the presence of an underground utility.10) It is the requestor’s responsibility to prevent any damages to marked utilities,whether hand digging or using mechanical excavation, to include damages toadditional infrastructure within the marked boundaries.b. DPW-OMD Responsibilities:1) Supply Line Marking for Land Excavation Forms, review approval process withrequestor, and provide coordination for land excavation guidance in accordancewith regulatory requirements.2) Line Marking will be scheduled by the DPW-OMD Line Locating Department andwill typically occur within 10-Business days of form submittal.a. Have Line Marking for Land Excavation Form assigned a DemandMaintenance Order (DMO) via request from the DPW-OMD Line LocatingDepartment to DPW Work Reception (dispatch) and assign the DMOnumber to the Line Marking for Land Excavation Form (i.e., use DMOnumber as form control number for tracking and accountability purposes).3) Emergency line marking for land excavation will be completed within 24-Hoursfrom request submittal.4) Non-routine line marking for land excavation will be completed within 72-Hoursfrom request submittal.5) Schedule a Line Marking for Land Excavation on-site meeting for special orunusual circumstances, if required.6) DPW-OMD will monitor field use of a Line Marking for Land Excavation Form toensure excavation is in compliance with valid line markings.a. G3 or DPTMS-Range Division is responsible for establishing proceduresand controlling access to maneuver and live fire training areas on theinstallation (AR 350-19).3

STANDARD OPERATING PROCEDURENO. DPW-OMD 001c.Operations and Maintenance DivisionUS Army Garrison Fort HoodDPW-Work Management Branch (WMB) Responsibilities:1) In the event of emergency line markings, WMB dispatch will call all requiredparties, OMD line locate, American Water, Dominion Energy, and NEC point ofcontacts.7. LINE MARKING FOR LAND EXCAVATION REQUEST AND FORM PROCEDURES.a. Line Marking for Land Excavation Form shall be completed as follows:1) Name, Rank, Title, and Organization of Requestor (Telephone, Projected dates ofExcavation) or include business or company name and Point of Contact (POC)information.2) Phone number.3) Projected dates of excavation.4) Location, Purpose, and Description of Excavation (i.e., project number, contracttitle, type of work or utility type, military mission, etc.)a. Map: Provide detailed maps and descriptions of the proposed excavationwork and include building numbers, street names, and planned excavationlocations. Map(s) must be attached to the Line Marking for Land ExcavationForm.5) Site POC (i.e., Program Manager, Contracting Officer Representative (COR),NCOIC, etc.).6) Site POC phone number.7) Read Line Marking for Land Excavation SOP and reference Line Marking for LandExcavation Form, Section II – Requestor Responsibilities.8) Signature of Requester.9) Date of form submittal.10) Line Marking for Land Excavation Forms will require signature and confirmationthat each utility owner has identified and marked their assets:a. Network Enterprise Communication (NEC)b. Dominion Energy (DE)c. American Water (AW)d. (DPW-OMD)11) Line Marking for Land Excavation becomes invalid 14-days after all utility assetshave been marked.b. Email, s@mail.mil, or hand delivera completed Line Marking for Land Excavation Form to 40001, DPW-OMD LineLocating Department.4

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort Hood8. UTILITY MARKINGS.a. Marking Agencies:1) OMD-DPW, NEC, Dominion Energy, and American Water will mark utility locations.2) Other Utility agencies (i.e., Spectrum, AT&T, Embarq, etc., and 811) will beresponsible for marking utilities IAW Federal and State regulations.3) Any damages to any unmarked utilities due to a marking failure will be theresponsibility of the respective utility owning agency.9. PROPONENT. The proponent for this standing operating procedure is the Chief,Operations and Maintenance Division, Directorate of Public Works, Fort Hood, Texas.10. EXPIRATION. This standing operating procedure supersedes previous policies issuedand will remain in effect until superseded or rescinded.ALEXANDER.ADAM.HENRY.1262348071Digitally signed byALEXANDER.ADAM.HENRY.1262348071Date: 2018.06.21 12:50:16 -05'00'Adam H. AlexanderChief, Operations & Maintenance DivisionDirectorate of Public WorksDirectorate of Public Works DISTRIBUTION:DPW all DivisionsAPPENDIX ADPW-OMD Line Marking for Land Excavation FormAPPENDIX A.1SAMPLE DPW-OMD Line Marking for Land Excavation FormAPPENDIX BDPW-OMD Line Locating and Marking Department MapAPPENDIX CCoordination for Line Marking in Cantonment Map5

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort HoodAPPENDIX A. DPW-OMD Line Marking for Land Excavation Form6

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort HoodAPPENDIX A.1 SAMPLE DPW-OMD Line Marking for Land Excavation Form7

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort HoodAPPENDIX B. DPW-OMD Line Locating Department Map8

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort HoodAPPENDIX C. Coordination for Line Marking in Cantonment Map9

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort HoodGlossaryAbbreviationsARArmy RegulationAWAmerican WaterCORContracting Officer’s RepresentativeDADepartment of the ArmyDEDominion EnergyDPTMSDirectorate of Plans, Training, Mobilization, and SecurityDPWDirectorate of Public WorksDPW-OMDDirectorate of Public Works – Operations & Maintenance DivisionFHFort HoodLHSLife, Health, Safety10

STANDARD OPERATING PROCEDURENO. DPW-OMD 001Operations and Maintenance DivisionUS Army Garrison Fort HoodNECNetwork Enterprise CenterOMDOperations & Maintenance DivisionPMProgram ManagerPOCPoint of Contact11

standard operating procedure operations and maintenance division no. dpw-omd 001 us army garrison fort hood 1 standard operating procedure for line marking for land excavation within fort hood cantonment areas directorate of public works operations and maintenance division (dpw-omd) june 2018 1.

Related Documents:

SOP-HR-020: Professional Development and Training SOP-HR-021: Disciplinary Proceedings SOP-HR-022: Retention and Exit Policy SOP-HR-023: Transfer Policy SOP-HR-024: Travel Reimbursement Policy SOP-HR-025: Rewards and Recognition SOP-HR-026: Employee Suggestion Scheme SOP-HR-027: IT, Internet, Email and Social Media Policy .File Size: 371KB

43 Bagian 3 – PENYUSUNAN STANDAR OPERASIONAL PROSEDUR 43 Prinsip-Prinsip Penyusunan SOP 44 Tahapan Penyusunan SOP 1. Persiapan Penyusunan SOP 2. Penilaian Kebutuhan SOP 3. Pengembangan SOP 4. Penerapan SOP dalam Manajemen 5. Monitoring dan Evaluasi Penerapan SOP 45 47 52 58 58 60 Bagian 4 - IMPLEMENTASI STANDAR OPERASIONAL PROSEDUR 60 .

Supply Chain Management is a critical function in achieving the overall objectives of DPW. In virtually all aspects of its core business DPW depends on suppliers of different kinds to: f. deliver goods and services to DPW; g. increase its own capacity by sourcing in private sector capacity; h. supply accommodation to its clients; and i. deliver services to DPW and its clients. 7. Supply Chain .

May 05, 2017 · Waukesha County Employee Survey; DPW results were below the County average. To improve those scores, DPW aimed to actively engaging “internal customers” in the pursuit of solutions. This effort informed several DPW Objectives in this plan. Into the DPW strategic plan, we inc

DPW-099A DPW-120A Heating System Data Heat Input (Btu/h) 47,800 - 99,000 47,800 - 120,000 AFUE (%) 90 90 Htg Water Temp (DegF) Working Pressure (psi) Freeze Protection Device Heating Min Flow (GPM) Htg Heat Exch Water Volume (gal) 0.2 0.2 Ignition Type Domestic Hot Water DHW Production Energy Factor 0.83 0.85 Temperature Setting DHW Minimum Flow Rate (GPM)

DPW-099A DPW-120A Heating System Data Heat Input (Btu/h) 47,800 - 99,000 47,800 - 120,000 AFUE (%) 90 90 Htg Water Temp (DegF) Working Pressure (psi) Freeze Protection Device Heating Min Flow (GPM) Htg Heat Exch Water Volume (gal) 0.2 0.2 Ignition Type Domestic Hot Water DHW Production Energy Factor 0.83 0.85 Temperature Setting DHW Minimum Flow Rate (GPM)

DPW unit. Unit Controls & Zoning A DSR-100F Controller is provided with the unit. This is not used as a thermostat, but is a unit controller and should be mounted adjacent to the DPW unit. It is connected to the DPW via the 2 Yellow wires and is powered by 20V DC. The DSR controller allows both the heating loop and DHW water temperatures to be set