Operation Manual - Willoughby Ind

1y ago
9 Views
2 Downloads
2.08 MB
22 Pages
Last View : 18d ago
Last Download : 3m ago
Upload by : Alexia Money
Transcription

NotedJob Name:Angle /- 1Part Number:N/AE1L1111/13/122 Of 3Installation &Operation Manual11028E1L1 and E1L23Lead-FreeElectronic Series7Valves(Plastic Bodied)94Willoughby Industries Inc.Indianapolis, IndianaTolerancesExcept asNoted2 Places /- 033 Places /- 015Fractions /- 1/32"Angle /- 1Drawing #:Title or Part Description:E1L21 DUAL TEMP ELECTRONIC VALVE ASSEMBLY O&M PAGE 4 ISODrawn By:Material:Job Name:TRB Scale: 1:8 5Date:Qty:N/A5/1/12 6Part Number:N/AE1L21OPTIONAL 3/8"x 3/8" ELBOW980610Revision #:AApproved By:Sheet:Table of ContentsE1L14E1L25105 West 78th StreetIndianapolis, IN 46268Toll Free:(800) 428-4065Local:(317) 875-0830Fax:(317) 875-0837www.willoughby-ind.com2 Of 3Pre-Installation Information 311General1 Specifications 4Physical Dimensions E1L12 Single Temp Solenoid Valve Assembly10#980408 5E1L11 Valve Breakdown 63E1L12 Manifold Valve Breakdown 710E1L21 Valve Breakdown 8E1L22 Manifold Valve Breakdown 9Checking Contents 119Installation Instructions 12Electronic Piezo Switch Detail 13OPTIONAL 3/8" x 3/8"ELBOWJaco Fitting Instructions 148Care and Maintenance 7Electronic Valve Assembly OperationandMaintenance 156Cleaning Instructions 16Troubleshooting Electronic Valves 17Replacement Part Numbers E1L1 Single Temp Solenoid Valve Assembly#980408 18Checkstop5 Breakdown P/N 980183 19Drawings Pushbutton Assembly #600313 20Pushbutton Assembly #600314LR 21Warranty 22Willoughby Industries, Inc.Rev. 6/20198MADE IN THE U.S.A.

E1L1 and E1L2Electronic Series ValvesInstallation & Operation Manual(Page left intentionally blank)Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 2

INSTALLATION INSTRUCTIONSE1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualPre-Installation InformationInstallation notice!CheckCheckRough-inlocationandPRIORflush linesprior to hook up!Rough-Inlocationto installationFlush lines thoroughly PRIOR to hook-upWheninstallingthe WilloughbyIndustries'E1L1 andE1L2 WAF,Lead-freeElectronicSeries Valves:Wheninstallingthe WilloughbyIndustries’WAW,or WWFserieswashfountains or lavatory deck systems:Before step 1 of the installation instructions, ensure that rough-ins are in the correct location.Before1 of theinstallationinstructions,thatrough-insin the correctThevalveStepassembly,includingthe sprayhead, MUSTensureNOT BEconnecteduntilareafteralllocation.lines have been flushed to remove the small particles of debris that are inherentwith new construction projects and all chemicals that are used in flushing are purgedfromsystem. that the water supply lines be thoroughly flushed prior to making finalIt istheessentialconnection to the hot and cold water supply lines. These lines must be flushedChemicalsusedflushing theplumbingcanofattackthethatinternalof isare componentsinherent withthe valve and spray head and severely damage them, so any flushing of the systemconstruction projects. If this debris is not removed, the valving in these units will bemust be followed by a full flushing with pure water to clear any harsh chemicalsdamaged.Donot attempttotheremovedebrisintothe lavatory. Theremainingin thesystem.Debris insystemaeratorsif allowedtoto flushenter thevalveassemblydamagecan canonlycausebe fixedreplacingorthevalves.Damage to valves caused by debrisandspray headpoor byperformanceoutrightfailure.INSTALLATION INSTRUCTIONSwill not be covered by the manufacturers warranty.Again DO NOT attempt to connect the valve assembly and spray head until after allflushing is complete and pure water is the only media that will be passing through thesystem. Damage to the valve assembly or spray head caused by harsh chemicals ordebris will not be covered by the manufacturer's warranty.Installation notice!Installation notice!Check Rough-in location and flush lines prior to hook up!CheckCheckRough-inlocationandPRIORflush linesprior to hook up!Rough-Inlocationto installationFlush lines thoroughly PRIOR to hook-upWhen installing the Willoughby Industries’ WAW, WAF, or WWF serieswashfountains or lavatory deck systems:Before Step 1 of Rev.Rev.11/20075/2010location.Visit our website at http.//www.willoughby-ind.com2210 West Morris Street P.O. Box 21217 Indianapolis, IN 46221the installationinstructions, ensure that rough-ins are(317) 638-2381 Fax: (317) 638-6110 (800) 428-4065Willoughby Industries, Inc.Rev.It 6/2019is essentialin the correctPage 3TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837that the water supply www.willoughby-ind.comlines be thoroughly flushed prior to making final Page 3connection to the hot and cold water supply lines. These lines must be flushed

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualGeneral SpecificationsElectronic valve assembly shall be Willoughby Model No. E1L1 or E1L2 as noted. Valve shall be constructed of plastic and stainless steel materials and complies with NSF-61 standard.Stainless steel pushbutton switches on the fixture shall be wired to an appropriate electronic valvecontrol (select from the list of control choices). The vandalproof pushbuttons shall be keyed andnon-removable from the front of the fixture. The pushbuttons shall require less than 5 lbs. of force tooperate.The single temperature solenoid valve assembly shall include a stainless steel screwdriver stop andan integral mounting bracket. Replaceable stainless steel strainer and optional 0.5 GPM flowcontrol shall be field serviceable. The connection to the filler/bubbler/showerhead shall be 3/8" O.D.flexible tubing. The water inlet shall be 1/2" FPT (S/S flexible supply line) and shall be reversible foreither top or bottom supply. Valve assembly shall be accessible from the pipe chase only.Flexible tubing shall be supplied for walls up to 8 inches thick. Recommended operating pressureshall be 35-70 psi. The valve shall withstand pressures up to 90 psi. Cost reducing manifoldedvalves shall consist of multiple valve assemblies served by a common supply line. A 24 volt ACsource shall be required for timer and valve operation.Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 4

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualPhysicalDimensionsWilloughby Industries Inc.Drawing #:Title or Part Description:E1L VALVE ASSEMBLYIndianapolis, IndianaE1L1 Single Temp Solenoid Valve t asNoted2 Places /- 033 Places /- 015Fractions /- 1/32"Angle /- 1Drawn By:Material:Job Name:N/ASUB-ASSY#1N/A980534NYLON NUT, 5/16-1812N/A980532COIL, 24V DC13N/A980170#8-32 x 1/2 " SCREW4N/A980002SPLIT LOCK WASHER45N/A980530ARMATURE CAP, 24v VALVE16N/A980533SPRING, 5/8 24v VALVE17N/A980565ARMATURE BUMPER ASSEMBLY, EL VALVE1910980305N/ADESCRIPTIONRevision #:EApproved By:Sheet:QTY 49801283 PRONGED INSERT1980129WATER SIDE DIAPHRAGM1980420SINGLE TEMP BASE W/INSERTS1NOTE: REPAIR KIT ORDERING #'S ARELISTED IN THE EXPLODED VIEW ASSEMBLED VIEW10NOTE: PARTS LISTED IN THE PVK REPAIRKITS ARE NOT SOLD INDIVIDUALLY8EVK-4 KIT(1-9) PLUS (*) BELOW7345921Qty:Date:Part Number:ITEM #8PART #Scale:PVK-3(8,9)6* EVK-4 KIT INCLUDES380897 VALVE SEAT W/ 0-RING (NOT SHOWN)Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.com980408Page 51 Of 1

Willoughby Industries Inc.Indianapolis, IndianaPlaces /- 03E1L1Tolerancesand E1L232Places /- 015Except asFractions /- 1/32"NotedElectronicSeriesValvesAngle /- 1WILLOUGHBYDrawing #:Title or Part Description:E1L11 SINGLE TEMP ELECTRONIC VALVE ASSEMBLY O&M PAGE 2 ISODrawn By:Material:Job Name:TRB Scale:1:8Date:3/15/11Qty:N/ARevision #:980576STANDARD DWG BSheet:Installation&11/13/12OperationManualE1L112 Of 3Part Number:N/APhysical DimensionsE1L11 Valve Breakdown1102983748OPTIONAL 3/8" x 3/8" ELBOW5ITEM NO.DESCRIPTIONQTY1980408PRE1L VALVE ASSEMBLY, RIGHT-PLUGGED PORT12980140SPRING CLIP23980183CHECKSTOP ASSEMBLY14800133#10-16 SELF TAP TYPE B HEX HEAD SCREW45980506(OPTIONAL) 6" STAINLESS STEEL FLEX HOSE15980520(OPTIONAL) 20" STAINLESS STEEL FLEX HOSE16600523FLEXIBLE TUBING 3/8" (10mm) O.D. 20 FT. TOTAL7980600AVALVE FITTING ASSEMBLY, 3/8" ELBOW18320566(OPTIONAL) CONNECTOR, 3/8" TUBE x 3/8" MPT18320577(OPTIONAL) ELBOW, 3/8" TUBE x 3/8" MPT19380138FLOW CONTROL 0.5 GPM (RED)110980501PM1 VALVE BRACKET1Willoughby Industries, Inc.Rev. 6/2019PART #6PERFOOTTOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 6

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualPhysical DimensionsE1L12 Manifold Valve Breakdown1132345101211610OPTIONAL 3/8" x 3/8" ELBOW897ITEM NO.PART #QTY1980408PRE1L VALVE ASSEMBLY, RIGHT-PLUGGED PORT12980164'O'-RING, #01523980197PLASTIC VALVE COUPLING14980140SPRING CLIP55980408E1L VALVE ASSEMBLY16980183CHECKSTOP ASSEMBLY17980506(OPTIONAL) 6" STAINLESS STEEL FLEX HOSE17980520(OPTIONAL) 20" STAINLESS STEEL FLEX HOSE18800133#10-16 SELF TAP TYPE B HEX HEAD SCREW69600523FLEXIBLE TUBING 3/8" (10mm) O.D. 20 FT. TOTALPER FOOT10320566(OPTIONAL) CONNECTOR, 3/8" TUBE x 3/8" MPT210320577(OPTIONAL) ELBOW, 3/8" TUBE x 3/8" MPT211980600AVALVE FITTING ASSEMBLY, 3/8" ELBOW212380138FLOW CONTROL 0.5 GPM (RED)2139805012PM1-MA2 VALVE BRACKET-PLASTIC1Willoughby Industries, Inc.Rev. 6/2019DESCRIPTIONTOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 7

Drawing #:E1L1Industriesand E1L2WilloughbyInc. Title or Part MBLYO&MPAGE4ISOIndianapolis, Indiana2 Places /- 033 Places /- 015Fractions /- 1/32"Angle /- 1Drawn By:Material:Physical DimensionsTolerancesExcept asNotedJob Name:TRB Scale: 1:8Date:5/1/12Part Number:N/AQty:N/ARevision #:Approved By:AE1L21Sheet:2 Of 3E1L21 Valve Breakdown111210310984OPTIONAL 3/8" x 3/8"ELBOW765ITEM NO.DESCRIPTIONQTY1980409PART #DUAL TEMP, WILLOUGHBY SOLENOID PARTS ASSY (E1L2)12380138FLOW CONTROL 0.5 GPM (RED)13321010CONNECTOR, 3/8" TUBE x 1/4" MPT14600523FLEXIBLE TUBING 3/8" (10mm) O.D. 20 FT. TOTAL5980506(OPTIONAL) 6" STAINLESS STEEL FLEX HOSE25980520(OPTIONAL) 20" STAINLESS STEEL FLEX HOSE26980183CHECKSTOP ASSEMBLY27800133#10-16 SELF TAP TYPE B HEX HEAD SCREW88980164'O'-RING #01529980140SPRING CLIP210320566(OPTIONAL) CONNECTOR, 3/8" TUBE x 3/8" MPT110320577(OPTIONAL) ELBOW, 3/8" TUBE x 3/8" MPT111980502PM2 VALVE BRACKET-PLASTIC1Willoughby Industries, Inc.Rev. 6/2019PER FOOTTOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 8

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualPhysical DimensionsE1L22 Manifold Valve Breakdown1142341013561189147OPTIONAL 3/8" x 3/8" ELBOWITEM NO.DESCRIPTIONQTY1980409PART #DUAL TEMP, WILLOUGHBY SOLENOID PARTS ASSY (E1L2)12980197PLASTIC VALVE COUPLING23980140SPRING CLIP84980408E1L VALVE ASSEMBLY25321010CONNECTOR, 3/8" TUBE x 1/4" MPT26980183CHECKSTOP ASSEMBLY27980506(OPTIONAL) 6" STAINLESS STEEL FLEX HOSE27980520(OPTIONAL) 20" STAINLESS STEEL FLEX HOSE28380138FLOW CONTROL 0.5 GPM (RED)29980196PLASTIC VALVE 'T'110980164'O'-RING, #0153119805022PM22 VALVE MOUNTING PLATE112800133#10-16 SELF TAP TYPE B HEX HEAD SCREW13600523FLEXIBLE TUBING 3/8" (10mm) O.D. 20 FT. TOTALPER FOOT14320566(OPTIONAL) CONNECTOR, 3/8" TUBE x 3/8" MPT214320577(OPTIONAL) ELBOW, 3/8" TUBE x 3/8" MPT2Willoughby Industries, Inc.Rev. 6/201912TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 9

E1L1 and E1L2Electronic Series ValvesInstallation & Operation Manual(Page left intentionally blank)Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 10

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualCheck Contents Separate all parts from packaging and make sure all parts are accounted for before discardingany packaging material. If any parts are missing, do not attempt to install E1L1 or E1L2 Lead-freeElectronic Series Valves until you obtain the missing parts.NOTE: Before beginning installation, all supply, drain and waste piping for theE1L1 and E1L2 Lead-free Electronic Series Valves must be completed according to specified rough-ins. If you have not received rough-in details, please contact Willoughby Industries, Inc. (800) 428-4065 IMPORTANT: Flush all the water supply linesbefore making connections.Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 11

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualInstallation Instructions(1)Clear and flush all supply lines to valves.(2)Mount the valves at any convenient location. Make sure to have sufficient length of wireleads to reach between the electrical piezo switches and the valves.(3)Connect water supply lines to valves. Close the check stop valves.(4)Assemble the push buttons to the fixture backsplash. Connect the push button wire leads tothe timer assembly or Water Management System.(5)Connect the valve wires from the timer or Water Management System to the solenoid valves.(6)Install 3/8" MPT x comp. plastic adapter into filler/bubbler or shower head, on fixture.(7)Insert one end of plastic tube into adapter on filler/bubbler or shower head, and the otherend into adapter on valve assembly.(8)Open water supply stops and checkstop valves, checking for leaks.(9)Connect the power supply transformer into a 110 volt power source.(10)Actuate push buttons several times to clear water lines and valves of trapped air. Check forleaks at all connections.(11)Adjust hot and cold water mixing valve, if applicable, by pressing pushbutton and realeasingto start the water flowing.Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 12

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualInstallation Instructions (cont.)Electronic Piezo Switch DetailWilloughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 13

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualInstallation Instructions (cont.)Operation and Maintenance ManualFitting InstructionsJaco Fitting InstructionsNote: It is not necessary to disassemble this fitting for application. Merely insert tubing to stop andtighten seal.1. Cut tubing end squarely and remove the internal burrs.2. Insert the tubing through the back of the nut all the way through the nut assembly to the tube stopin the fitting body (see illustration). If the tubing does not enter the nut easily, loosen the nut one turnand reinsert the tubing all the way to the tube stop in the fitting body.3. Turn the nut hand tight.4. Wrench tighten the nut 1½ - 2 turns.5. All nuts must be retightened when the system reaches projected operating temperature.Note: To ensure proper assembly, tubing MUST be fully inserted into the fitting body all the way tothe tube stop.Note: Squeaking sound when tightening nut is normal. For pipe threaded connections, Teflon tapemust be used.Rev. 3/2012Willoughby Industries, Inc.Rev. 6/2019visit our website at http./ /www.willoughby-ind.com5105 West 78th Street Indianapolis, IN. 46268(317) 638-2381 Fax: (317) 638-6110 (800) 428-4065Page 11TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 14

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualCare and MaintenanceElectronic Valve Assembly Operation and MaintenanceThe Willoughby Electronic Valve Assembly is designed as an electrically operated, normally closedvalve, low voltage valve. This type of valve is used for lavatories as well as showers.A strainer/checkstop is an integral part of the valve assembly and provides a means of shutting off thewater if the valve needs servicing. A check valve in the checkstop eliminates cross flow of hot or coldwater into the opposite supply line. Fine mesh stainless steel strainers keep normal line debris frominterfering with the mechanical components of the valves.By virtue of its design, the electronic valve is a 24 VAC operated valve and is a normally closed valve.The operating sequence of the valve begins with pressing the push button. Based upon what thevalve is connected to, a timer or a water management system, the valve will open and stay open untilthe voltage stops.The valve contains a valve seat, water side diaphragm, an armature and a coil. When voltage isapplied to the coil, the armature is pulled upwards. The water pressure will then push up against therubber diaphragm and water will flow thru to the outlet side of the valve.The bypass hole is the rubber diaphragm assist the valve in closing. The bypass orifices are moldedin the edge of the diaphragm. Both of these orifices must be clear for the valve to function properly.Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 15

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualCare and MaintenanceCleaning InstructionsWilloughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 16

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualTroubleshooting Electronic ValvesVALVE LEAKS, WILL NOT OPEN, OR WILL NOT SHUT OFF:(1)Make sure the checkstop/strainer on the supply line to the valve is fully open. Do not partially closethe checkstop for any reason as it is not a throttling valve. The check stop should be fully open(normal operation) or fully closed (when servicing the valve).(2)Close the check stop, then remove the cap. Remove and inspect the strainer in the supply line tomake sure the strainer is not blocked or partially blocked and prohibiting water flow.(3)Check the voltage at the valve for 24 VAC after pressing the pushbutton.(4)Verify that the appropriate DIP switches are in the "ON" position on the timer (if applicable).(5)If the above steps do not solve the problem, follow the steps below to disassemble and inspect thevalve:a)Separate valve motor from valve base by removing the four (4) #8 screws.b)Inspect the water diaphragm assembly to see if bypass hole in diaphragm is blocked. Removeany debris by blowing on diaphragm or using compressed air. DO NOT use any tool (such asa straight pin) to remove any debris. Enlarging the hole will shorten the valve cycling, causeerratic behavior, and possibly shorten the life of the valve.c)Inspect seating area on valve base to make sure no debris, pitting, or scoring is present. Cleanseat as necessary.d)Inspect seating area on diaphragm for debris and clean as necessary. If debris has causedpermanent indentations in the rubber, it may have to be replaced.e)Check the rubber bumper on the end of the solenoid armature for any debris, marks,indentations, scratches, or deformations. Replacement may be necessary.f)Ensure that the armature spring is in place and not missing.g)Using the exploded view provided with this manual, reassemble the valve and test it's operationto determine if the problem has been fixed.Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 17

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualReplacement Part NumbersWilloughby Industries Inc.Indianapolis, IndianaE1L1 SingleTemp Solenoid Valve Assembly3/15/11#980408TolerancesExcept asNotedWILLOUGHBY2 Places /- 033 Places /- 015Fractions /- 1/32"Angle /- 1E1L VALVE ASSEMBLYDrawn By:Material:Job Name:Part Number:1N/A980534NYLON NUT, 5/16-1812N/A980532COIL, 24V DC13N/A980170#8-32 x 1/2 " SCREW4N/A980002SPLIT LOCK WASHER45N/A980530ARMATURE CAP, 24v VALVE16N/A980533SPRING, 5/8 24v VALVE17N/A980565ARMATURE BUMPER ASSEMBLY, EL VALVE110980305N/ADESCRIPTIONRevision #:E980408Approved By:Sheet:1 Of 1QTY 49801283 PRONGED INSERT1980129WATER SIDE DIAPHRAGM1980420SINGLE TEMP BASE W/INSERTS1NOTE: REPAIR KIT ORDERING #'S ARELISTED IN THE EXPLODED VIEW ASSEMBLED VIEW10NOTE: PARTS LISTED IN THE PVK REPAIRKITS ARE NOT SOLD INDIVIDUALLY8EVK-4 KIT(1-9) PLUS (*) BELOW7345921Qty:Date:N/ASUB-ASSY#9PART #TRBScale:ITEM #8Drawing #:Title or Part Description:PVK-3(8,9)6* EVK-4 KIT INCLUDES380897 VALVE SEAT W/ 0-RING (NOT SHOWN)Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 18

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualReplacement Part NumbersCheckstop Breakdown P/N 9801834ASSEMBLED VIEW876325EXPLODED VIEW1ITEM #PART #1980580CHECKSTOP BASE AND FLOW RESTRICTOR ASSY12980194STRAINER PLUNGER13980201SPRING, CHECKSTOP/STRAINER14980192STRAINER CAP15980168SCREEN, STRAINER16980200CHECKSTOP SCREW17980163O-RING, #01218980165O-RING, #13019980164O-RING, #0159Willoughby Industries, Inc.WILLOUGHBYWilloughby Industries, Inc.Rev. 6/20192 PLCS:3 PLCS:FRACTIONS:ANGLE:0 03 SIZE:0 0151/32" SCALE:1QTY 1TITLE / DESC :PART #:CHECKSTOP ASSEMBLYIndianapolis, IndianaTOLERANCESEXCEPT ASNOTEDDESCRIPTIONAMAT'L:1:2REF :N/AREVISION: ORIG :AREV :980183EEF 1/19/15TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comSTANDARDEEF 1/19/15SHEET:Page 191 OF 1

ASSEMBLED VIEW(NOT TO SCALE)Rev. 6/2019Willoughby Industries, Inc.1TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 345TOLERANCESEXCEPT ASNOTED2 PLCS:3 PLCS:FRACTIONS:ANGLE:0.03 SIZE:0.0151/32" SCALE:1Indianapolis, Indiana1:4AWilloughby Industries, Inc.6000572PART #3801241ITEM #2REF.:MAT'L:AREVISION: ORIG.:TBPART #:AS NOTEDREV.:1JDR 8/2/191/22/15SHEET:1 OF 1STANDARD6003131BODY, EL DIAPHRAGM PUMP, ASSEMBLYELECTRONIC PUSHBUTTON ASSEMBLY1DIAPHRAGM, PNEUMATIC PUMP1CAP, DIAPHRAGM PUMP, MOLDED1QTY.PUSHBUTTON, DIAPHRAGM PUMPDESCRIPTION5SLEEVE, DIAPHRAGM PUMP PUSHBUTTONTITLE / DESC.:341/4" FEMALE SPADE CONNECTORS(IF CONNECTORS ARE NOT NEEDEDFOR INSTALLATION, CUT OFF ANDSTRIP WIRES AS NEEDEDE1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualDrawing- Pushbutton Assembly #600313Page 20

Rev. 6/2019Willoughby Industries, Inc.1WILLOUGHBYASSEMBLED VIEW(NOT TO SCALE)2TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 345TOLERANCESEXCEPT ASNOTED2 PLCS:3 PLCS:FRACTIONS:ANGLE:0.03 SIZE:0.0151/32" SCALE:1Indianapolis, Indiana1:4AWilloughby Industries, Inc.6000462PART #3801191ITEM #34REF.:N/AAREV.:REVISION: ORIG.:LIGATURE RESISTANT ELECTRONIC PUSHBUTTON ASSYEEF 4/5/17EEF 4/5/17SHEET:1 OF 1STANDARD600314LR1BODY, EL DIAPHRAGM PUMP, ASSEMBLYPART #:1111QTY.DIAPHRAGM, PNEUMATIC PUMPCAP, DIAPHRAGM PUMP, MOLDEDLIGATURE-RESISTANT PUSHBUTTON, DIAPHRAGM PUMPTITLE / DESC.:MAT'L:DESCRIPTIONNOTE: INVENTORY PART# 600313AIS MADE FROM ITEM# (3,4 & 5)LIGATURE-RESISTANT SLEEVE, DIAPHRAGM PUMP51/4" FEMALE SPADE CONNECTORS(IF CONNECTORS ARE NOT NEEDEDFOR INSTALLATION, CUT OFF ANDSTRIP WIRES AS NEEDED)E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualDrawing- Pushbutton Assembly #600314LRPage 21

E1L1 and E1L2Electronic Series ValvesInstallation & Operation ManualWarrantyWilloughby Industries, Inc. warrants to commercial and institutional purchasers only that eachunit will be free from defects in workmanship and materials under normal use and service uponthe following terms and conditions. The period during which components are warranted is as follows:1. Solid surface components are warranted for 2 years from date of shipment.2. All other components warranted for 1 year from date of shipment.This warranty does not cover installation or any other labor charges and does not apply to anycomponents damaged by accident, abuse, improper installation or improper maintenance. Thiswarranty does not cover any installation that did not comply with national, state and local building,plumbing or electrical codes. The warranty is limited to replacing or repairing at manufacturer's option,transportation charges prepaid by the purchaser, any component or part which upon our inspectionshall be deemed as defective within the limitations of this warranty. The replacement or repair ofdefective units as stated in this warranty shall constitute the sole remedy of the purchaser and thesole liability of Willoughby Industries, Inc. Willoughby Industries, Inc. shall not otherwise be liableunder any indirect damages caused by defects in the repair or replacement thereof.This warranty only extends to commercial and industrial purchasers and does not extend to anyothers, including consumer customers of commercial institutional purchasers. This warranty is inlieu of all other warranties, expressed or implied, including implied warranty of merchantability orfitness for a particular purpose or otherwise.Willoughby Industries, Inc.Rev. 6/2019TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837www.willoughby-ind.comPage 22

Willoughby Industries, Inc TOLL FREE (800) 428-4065 OCA (317) 875-0830 FA; (317) 875-0837 Rev 6/2019 www willoughby-ind com Page 3 INSTALLATION INSTRUCTIONS Visit our website at http.//www.willoughby-ind.com 2210 West Morris Street P.O. Box 21217 Indianapolis, IN 46221

Related Documents:

7 Enclosure of Willoughby 8 School and School House 9 Communications . . 10 Railway . . 11 Oxford Canal and Navigation House 12 Village Hall . 13 Hostelries . 14 Organisations 15 Improvements 16 Village Enterprises '1 7 Sports at Willoughby . 18 Willoughby House and Mineral Springs 19 Memorable Happenings in Willoughby's History 20 Hayward Lodge

supervision of Staff Sgt. William Willoughby, of Sumter, S.C. Willoughby, a “quiet professional” according to Caldwell, recently assumed duties as CLP commander after several months acting as assistant CLP command-er. “Every time I come out, it’s never the same,” said Willoughby. Backing up Willoughby were gunner Spc. Fran

Rev. 3/2015 www.willoughby-ind.com Page 13 Installation & Operation Manual Bariatric Lavatory BHS-3123 Series Willoughby Industries, Inc. TOLL FREE (800) 428-4065 LOCAL (317) 875-0830 FAX (317) 875-0837 Installation Instructions (cont.) To Install Q NOTE: Installation should be in accordance with accepted plumbing practices.

beautiful trees! If you would like to learn more about Willoughby’s environment, please contact Willoughby City Council on 02 9777 1000 or visit www.willoughby.nsw.gov.au to view our list of guided bushwalks, events and

Willoughby-Eastlake City School District 37047 Ridge Road Willoughby, Ohio 44094 We have reviewed the Independent Auditor's Report of the Willoughby-Eastlake City School District, Lake County, prepared by Rea & Associates, Inc., for the audit period July 1, 2008 through June 30, 2009.

October 2, 2020 Planning Meeting with all K-8 Willoughby Slope Principals October 13, 2020 Finance and Facilities Committee October 19, 2020 Meet with Willoughby PAC (Face to Face) October 26, 2020 Host Town Hall Meeting with the Willoughby Community November 9, 2020 Hold space for second Town Hall meeting (if needed)

Olmann v Willoughby Rehabilitation & Health Care LLC 2020 NY Slip Op 33567(U) October 21, 2020 Supreme Court, Kings County Docket Number: 514289/15 Judge: Bernard J. Graham . Willoughby Rehabilitation and Health Center LLC d/b/a Spring Creek Rehabilitation & Nursing Care Center, s/h/a Willoughby Rehabilitation and Health Care Center LLC and .

10. Efrain Balli Jr. 23. Madelynn Cortez 36. Alfredo Avila Lopez . 11 . Eligio Meudiola 24. George Garcia 37. Jesus Ruben Briseno . 12. Natalia Quintero Moreno 25. Diego Gonzalez Corpus 38. Juan E. Vela . NUMBER OF VOTES RECEIVED -49 . ELECTORS FOR TOM HOEFLING . 1. Tim Sedgwick 2. Dixie Sedgwick 3. Jared McCurrin 4. Jessica Kimberly Fagin 5. Andrew C. Sanders 6. Megan Sanders 7. Lynn Sanders .