IntroductionPage 1 of 10Some Characteristics of a Probabilistic Seismic Hazard Map for New MexicoKuo-wan Lin and Allan R. SanfordGeophysics Open-File Report 92Earth and Environmental Science andGeophysical Research CenterNew Mexico TechSocorro, NM 87801July, 2000AbstractWe have estimated probabilistic seismic hazards for New Mexico and bordering areas using instrumental data of durationmagnitude 2.0 or greater for the time period 1962 through 1998. The probabilistic seismic hazard maps are presented in theformat of peak horizontal ground accelerations at 10% and 2% probability of exceedance in a 50 year period. We defined twoseismic source zones based on the distribution of seismicity for the purpose of hazard analysis, the Socorro Seismic Anomaly(SSA) and the rest of the state and bordering areas (RNM). As results, the seismic hazards for the region are moderate to low.The seismic hazard map for 10% probability of exceedance in a 50 year period shows that the area inside the SSA has thehighest level of seismic hazard, 0.18g. Along the major population corridor of the state from Albuquerque to Santa Fe, thepeak ground acceleration is 0.08g.We have examined the distributions of dominant earthquake magnitudes for selected sites with different hazard estimates andseismic trends. Analyses of magnitude-ground acceleration contribution plots for New Mexico and bordering areas indicatedthat at short return period of 500 years the dominant earthquake magnitudes are around or slightly less than 5.0. At longerreturn period of 2500 years the dominant earthquake magnitudes increase to the range between 5.5 and 6.5. The largediscrepancies of the dominant earthquake magnitudes among selected sites reflect differences in the distributions of localseismicity. For areas with relatively high seismicity such as the Socorro area, the probabilistic seismic hazards are dominatedby local seismicity. For areas with low seismicity such as Santa Fe, seismic hazards are mainly from stronger distantearthquakes and the existences of active faults become crucial to seismic hazard estimates.IntroductionWe have evaluated seismic hazards of New Mexico based on instrumental earthquake data from 1962 through 1998. Theprobabilistic seismic hazard maps are presented in the format of peak horizontal ground accelerations at 10% and 2%probability of exceedance in a 50-year period. While the 10% probability map is best suitable for general purposes, the 2%probability map is designed for critical installations such as hospitals and schools. During the probabilistic seismic hazardevaluation, assumptions were required in deriving parameters for hazard estimates. Parameters such as the low-end cut-offmagnitude and the time-and-distance windows for removing dependent events affected the input earthquake data. Otherselected parameters such as the choice of the maximum likelihood slope B and the maximum magnitude earthquake affectedthe outcome of hazard estimates. Sensitivity studies (Lin, 1999) for the probabilistic seismic hazard estimates indicate thatmhtml:file://C:\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2. 10/8/2010

IntroductionPage 2 of 10these parameters were reasonably selected.Two major concerns of the stability of the probabilistic hazard estimates for New Mexico using instrumental data are the useof a maximum magnitude earthquake of 6.5 and the exclusion of faults. In this paper we will demonstrate the contributions ofhigh magnitude earthquakes to hazard analysis for New Mexico and the effects of faults on probabilistic seismic hazardestimates.Probabilistic Seismic Hazard MapsFigure 1 shows the probabilistic seismic hazard map in the format of peak horizontal ground accelerations at 10% probabilityof exceedance in a 50 year period. We define two seismic source zones for the purpose of hazard analysis, the SocorroSeismic Anomaly (SSA) (Sanford et al., 1995) and the rest of the state and bordering areas (RNM). Dependent events in theearthquake catalog were removed using a moving time and distance window of 7 days and 4 km for the SSA and 7 days and25 km for the RNM.We use a truncated exponential recurrence model for the probabilistic seismic hazard assessment for both the SSA and theRNM with a upper and a lower bound magnitudes of 6.5 and 2.0, respectively. The maximum likelihood slope B is derivedusing Bender’s equation (Bender, 1983) and the selected B value of 0.76 for hazard analysis is the average of the SSA andthe RNM. For computing probabilistic ground accelerations for the region, we divided the area into small blocks of 20 x 20km2 and evaluated seismic hazards on the basis of blocks. The size of blocks was selected to accommodate the uncertainty ofearthquake epicenters. The number of earthquakes for each block is based on 75% of the seismicity within the block and 25%background seismicity. The use of background seismicity is to avoid a computational error when there is no seismicity withina block.We select the center point of each block as the representative point for the block. The probabilistic seismic hazard for theblock is the combination of a temporal probability of occurrence and a spatial probability of occurrence. The temporalprobability of occurrence is based on the Poisson distribution and the spatial probability of occurrence the Joyner and Fumal(1985) equation that correlates magnitude, hypocentral distance, and peak horizontal ground acceleration. By combiningthese two probabilities, we evaluate peak ground accelerations using 10% and 2% probability of exceedance in a 50-yearperiod.In general, the seismic hazards for the region are moderate to low. The seismic hazard map for 10% probability ofexceedance in a 50 year period shows that the area inside the SSA has the highest level of seismic hazard, 0.18g. Along themajor population corridor of the state from Albuquerque to Santa Fe, the peak ground acceleration is 0.08g, which generatesModified Mercalli Intensity (MMI) VI effects.Deaggregation of the Seismic Hazard EstimatesWe select four cities with various levels of seismic hazards for the deaggregation analysis: Socorro, Albuquerque, Santa Fe,and Los Alamos. Figure 2 shows the probability-ground acceleration relationships for the four selected cities. At 10%probability of exceedance, Socorro has the highest level of estimated seismic hazard of 0.12g among the selected cities, andSanta Fe has the lowest level of estimated seismic hazard of 0.03g.Maximum Magnitude of 6.5Figure 3 shows the magnitude contribution curves at 10% and 2% probability of exceedance in a 50-year period for theselected sites using a maximum magnitude earthquake of 6.5. At 10% probability of exceedance, seismic hazards arecontributed mostly from moderate magnitude ( 4.5-5.5) earthquakes for all study sites despite differences in the estimatedseismic hazards. Contributions from high magnitude earthquakes to seismic hazards decrease as the earthquake magnitudeincreases.At 2% probability of exceedance, the range of primary contributing earthquakes is not the same for the selected cities exceptthat the magnitude range shifts to above magnitude 5.0. This is because that at long expected return interval of 2500 years,seismic hazard estimates are contributed mostly from high magnitude earthquakes. Therefore, the use of instrumentalearthquake data alone with a maximum magnitude earthquake of 6.5 might not be appropriate at 2% probability ofexceedance in 50 years.Maximum Magnitude of 7.5mhtml:file://C:\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2. 10/8/2010

IntroductionPage 3 of 10Figure 4 shows the magnitude contribution curves at 10% and 2% probability of exceedance in a 50-year period for the fourselected sites using a maximum magnitude of 7.5. Although the maximum magnitude earthquake has been increased to 7.5,the range of primary contributing magnitudes remains at low magnitude range of less than 5.5 for the 10% probability ofexceedance curves. At 2% probability of exceedance, the range of contributed magnitudes is 5.0-7.0.Effects of Active Faults on Probabilistic Seismic Hazard EstimatesWe chose the SSA as the test area and assumed a uniform distribution of seismicity and a single source zone for deriving thebackground seismic hazard map. For modeling the recurrence relationship for the source zone, we used a truncatedexponential recurrence model with a maximum likelihood slope B of 0.82 and a maximum magnitude earthquake of 6.5.Shown in Figure 5 is a seismic hazard map for the SSA in the format of peak horizontal ground accelerations at 10%probability of exceedance in a 50-year period. As shown in Figure 5, contours of horizontal ground acceleration parallel theoutline of the SSA and are most closely spaced along the boundary. The area within the SSA has a maximum groundacceleration of 0.18g.Faults in the region with late Quaternary offsets were examined and three with the latest movements were selected: the LaJencia fault (LJF), the Socorro Canyon fault (SCF), and the Coyote Springs fault (CSF) (Machette et al., 1998). Amongselected faults, the LJF has the most recent movements with 5 to 6 episodes between 3 ka and 33 ka. The expected returninterval for the fault system is roughly 6,000 years. Figure 6 shows the locations of these three faults with respect to thelocation of the SSA. We assigned each fault with a characteristic earthquake of magnitude 7.0 and a specific return intervalfor assessing seismic hazards.In the first test, we assigned return intervals of 5,000 years to the LJF and 10,000 years to the SCF and the CSF, respectively.The probabilistic seismic hazards based solely on these three faults were determined by following the same procedure as forinstrumental earthquakes. Figure 7a and 7b show peak horizontal ground accelerations at 0.2% and 0.5% probabilities ofexceedance in a 50-year period (expected return intervals of 25,000 and 10,000 years). Shown on the maps are contours ofground acceleration of 0.3g or lower. Within the 0.3g contour, accelerations are higher but were not calculated because ofuncertainty involved in the focal depth of earthquakes. The maps illustrate that at very long return intervals, active faults candominate estimates of seismic hazard in the vicinity of their traces.Figure 7c shows the seismic hazard maps after overlaying seismic hazard estimates for the faults on the map based oninstrumental data. At 10% probability of exceedance, the area with the highest level of seismic hazard falls within the SSAand between the LJF and the SCF. For hazard estimates with the short expected return interval of 500 years, the increase inseismic hazard in the region is minor, from 0.18g to 0.20g.We reexamined the effects of these three faults after reducing the expected return intervals by one half, i.e., the expectedreturn interval for the LJF became 2,500 years, and for the SCF and the CSF, they became 5,000 years. Figure 8a and 8bshow the new probabilistic seismic hazard maps for peak ground accelerations at 0.2% and 0.5% probabilities of exceedancein a 50-year period. Both maps indicate that all three faults make significant contributions to estimated hazards at these largereturn intervals (25,000 and 10,000 years). On the other hand, combined hazard maps based on both instrumental earthquakedata and active faults for a 50-year period and 10% probability of exceedance (500-year return interval) produce only aslightly higher level of hazard estimates (Figure 8c). The highest level of seismic hazard increases from 0.18g to 0.21g and islocated between the LJF and the SCF. Even though the return intervals for all three faults were reduced by one half, effects ofthe active faults on estimates of probabilistic seismic hazard are small. This is not a surprising result because 1) the projectedreturn interval for a magnitude 7.0 event is 3300 years within the SSA based on instrumental data and 2) high magnitudeearthquakes (Md 6) have little effect on 50-year 10% probability of exceedance hazard estimates (see Figures 3 and 4).Summary and ConclusionsWe have evaluated probabilistic seismic hazards for New Mexico and bordering areas using instrumental data from 19621998. Deaggregation analyses for the estimated hazards suggest that moderate magnitude ( 5.75) earthquakes contribute themost to estimated seismic hazards for a short return interval of 500 years regardless of the selected maximum magnitudeearthquake. At long return interval of 2500 years, high magnitude ( 5.5) earthquakes dominate the seismic hazard estimates.We have demonstrated the effects of active faults on probabilistic seismic hazard estimates for the SSA. At very lowprobabilities of exceedance in 50 years (0.2% and 0.5%), the active faults are the dominant factor in hazard estimates but atshorter return periods, e.g. 500 years, in their immediate surroundings their effects are small.Referencesmhtml:file://C:\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2. 10/8/2010

Page 4 of 10IntroductionBender, B. (1983). Maximum likelihood estimation of b values for magnitude grouped data, Bull. Seism. Soc. Am., 73, 831852.Joyner, W.B., and T.E. Fumal (1985). Predictive mapping of earthquake ground motion, in Evaluating Earthquake Hazardsin the Los Angeles Region - An Earth-Science Perspective, edited by J.r. Ziony, u.s. Geol. Surv. Professional Paper 1360,203-220.Lin, K. W. (1999). Probabilistic seismic hazard in New MexiCo and bordering areas, Ph.D. Dissertation, New MexicoInstitute of Mining and Technology, Socorro, New Mexico, 194 pp.Machette, M. N., S. F. Personius, K. 1. Kelson, K. M. Haller, and R. L. Dart (1998). Map and data for Quaternary faults andfolds in New Mexico, u.s. Geol. Surv., Open-File Report 98-521 , 443 pp.Sanford, A.R., R.S. Balch, and K.W. Lin (1995). A seismic anomaly in the Rio Grande rift near Socorro, New Mexico, NewMexico Institute of Mining and Technology Geophysics Open-File Report 78, Socorro, New Mexico, 17 pp.373635''';]3.J343332-109.0- 107.0- 105.0-103.0Longitude0.000.040.080.120. 16Peak Ground Acceleration (g)0.20Figure 1. Peak horizontal gro\lnd accelerations for New Mexico and bordering areas at 10% probability of exceedance in a50-year period.mhtml:file://C:\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2.10/8/2010

Introductionle,.f)IPage 5 of 10.------------------- ---------- 11Ql6--- -- %--.--. -. -.--.--.--.--.--Figure 2. Probability-ground acceleration curves for four cities for a period of 50 years. Socorro has the highest level ofseismic hazard ofO.12g at 10% probability of exceedance among selected cities. At the same probability, Santa Fe has thelowest level of seismic hazard of - 0.q3g.mhtml:fiIe:IIC:\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2.10/8/2010

IntroductionPage 6 of 10 u.RoM! t. l!.WJ.Z t,1'IfJi --fMitFigure 3. Magnitude contribution curves for 10% (open circle) and 2% (solid circle) probability ofexceedance in a 50-yearperiod for selected cities using a maximum magnitude earthquake of6.5.mhtml:file:IIC:\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2. . 10/812010

IntroductionPage 7 of 104',"M2-.l!Iof.ll'Qt.jM4.004.55.81U5.815.56 81&.5 .f)I6;.5"'.f)Ut1,'15Uf1.2S,99 .'lSMfCD O. !M. 4.00nilhl . Ii4.5\,Qqo 1000Wo,'lfi&,ot1.151; 1.2S1 , 0,Q , U D.CIe. ,S,. ,' fi1 .1, f U2.,1.5M00.81 , QIU' ,'MMdMMFigure 4. Magnitude contribution curves for 10% (open circle) and 2% (solid circle) probability of exceedance in a 50-yearperiod for selected cities using a maximum magnitude earthquake of7.5.mhtml:file:IIC :\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2.10/812010

IntroductionPage 8 of 1034.5El San Acacia.-.D Socorro34.0- 107.0- 106.5Longitude0.000.060. 120 .180.24Gm1.Uld Acceleration (g)0.30Figure 5. Peak horizontal ground accelerations for the SSA at 10% probability of exceedance in a 50-year period.mhtml:fiIe://C:\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2.10/8/2010

IntroductionPage 9 onor ""' \I3BeJ nC.y'*Sprtap,,I!] BemaJdo .I'[;)S Acacia .' Jmda \ SoeoIHEl M.3:iI.Olena\ayoa,8 Socorro,,rI8San Antonio. WtI#.".;IJfJ· POf,Figure 6. Geographical locations of the Lajencia fault, the Socorro Canyon fault, and the Coyote Springs fault.(c)(b)(a)r""' '- - :--34.534.0- 107.0Longitude-107.0- 106.50.00Longitude0 .060.120. 18-106.50.24Ground Acceleration (g)-107.0Longitude-106.50.30Figure 7. Peak horizontalground accelerations at 0.2%,. probability of exceedance in a 50-year period based on the threemhtml:fiIe:IIC:\Documents and Settings\emussman\Desktop\Geology and Water References\Lin and Sanford. 2. .10/8/2 010

IntroductionPage 10 of 10active faults: the La Jencia fault (LJF), the Socorro Canyon fault (SCF) and the Coyote Springs fault (CSF). All three faultswere assigned characteristic earthquakes of magnitude 7.0, and with return intervals of 5,000 years for the LJF and 10,000years for both the SCF and the 06.5-107.0Longitude- 106.5Grmmd Acceleration (g)Figure 8. Peak horizontal ground accelerations at 0.2% probability of exceedance in a 50-year period based on the threeactive faults: the La Jencia fault (LJF), the Socorro Canyon fault (SCF) and the Coyote Springs fault (CSF). All three faultswere assigned characteristic earthquakes of magnitude 7.0, and with return intervals of2,500 years for the LJF and 5,000years for both the SCF and the CSF.mhtml :file:IIC:\Documents and Setti gs\emussman\Desktop\Geology and Water References\Lin and Sanford. 2.10/8/2010

dominate estimates of seismic hazard in the vicinity of their traces. Figure 7c shows the seismic hazard maps after overlaying seismic hazard estimates for the faults on the map based on instrumental data. At 10% probability of exceedance, the area with the highest level of seismic hazard falls within the SSA and between the LJF and the SCF.

Related Documents:

deterministic polynomial-time algorithms. However, as argued next, we can gain a lot if we are willing to take a somewhat non-traditional step and allow probabilistic veriflcation procedures. In this primer, we shall survey three types of probabilistic proof systems, called interactive proofs, zero-knowledge proofs, and probabilistic checkable .

non-Bayesian approach, called Additive Regularization of Topic Models. ARTM is free of redundant probabilistic assumptions and provides a simple inference for many combined and multi-objective topic models. Keywords: Probabilistic topic modeling · Regularization of ill-posed inverse problems · Stochastic matrix factorization · Probabilistic .

A Model for Uncertainties Data is probabilistic Queries formulated in a standard language Answers are annotated with probabilities This talk: Probabilistic Databases 9. 10 Probabilistic databases: Long History Cavallo&Pitarelli:1987 Barbara,Garcia-Molina, Porter:1992 Lakshmanan,Leone,Ross&Subrahmanian:1997

characteristics of fracture response and reliability of welded structures. Hence, a probabilistic study on weld cracks and an investigation on how the weld and material parameters a ect structural reliability is timely and exciting. This paper presents a probabilistic methodology for fracture-mechanics analysis of weld cracks in a CCT specimen.

Probability and Computing Randomized Algorithms and Probabilistic Analysis '. '. . . \ Michael Mitzenmacher Eli Upfal . Probability and Computing Randomization and probabilistic techniques play an important role in modern com .

vides a language for expressing probabilistic polynomial-time protocol steps, a speci cation method based on a compositional form of equivalence, and a logical basis for reasoning about equivalence. The process calculus is a variant of CCS, with bounded replication and probabilistic polynomial-time expressions allowed in messages and boolean tests.

language for expressing probabilistic polynomial-time protocol steps, a spec-iflcation method based on a compositional form of equivalence, and a logical basis for reasoning about equivalence. The process calculus is a variant of CCS, with bounded replication and probabilistic polynomial-time expressions allowed in messages and boolean tests.

senting within the model resource bounded, probabilistic computations as well as probabilistic relations between systems and system components. Such models include Probabilistic Polynomial-Time Process Calculus (PPC) [13–15], Reac-tive Simulatability (RSIM) [16–18], Universally Composable (UC) Security [19],