SL72 MESH (2m LONG) TYPICAL EQUAL EQUAL BUILDING/PROPERTY LINE GUTTER 2100 KERB FACE OF KERB SIZE TO SUIT EXISTING FOOTPATH 1800 TYP, 1200 MIN NOTE: 1. 2. 3. 4. 5. LEGEND ALL EXPOSED CONCRETE SURFACES MUST BE FINISHED WITH A MEDIUM BROOM FINISH GENERALLY PERPENDICULAR TO THE DIRECTION OF TRAVEL. ALL CONCRETE SLABS MUST HAVE A JOINT ALONG THE BUILDING LINE, KERB LINE AND ANY PENETRATIONS (EXCEPT WHEN USING BRICK KERBS). ANY FOOTPATH THAT MAY BE SUBJECT TO VEHICULAR LOADS (SUCH AS GARBAGE TRUCKS IN NARROW LANES OR AT INTERSECTIONS WITH A TIGHT TURNING CIRCLE WHERE VEHICLES MAY MOUNT THE FOOTWAY) MUST HAVE AT LEAST 150mm THICK REINFORCED CONCRETE BASE (SL72). CONCRETE FOOTWAYS TO BE A MINIMUM OF 1.2m WIDE, OR AS DIRECTED BY COUNCIL. TYPICALLY ALLOW FOR EXPANSION JOINTS AT 12m (MAX) SPACING AND CONTRACTION JOINTS AT THE LESSER OF 6m OR 1.5 TIMES THE PAVEMENT WIDTH SPACING. CJ CONTRACTION JOINTS EJ EXPANSION JOINTS IJ ISOLATION JOINTS NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED CONCRETE PAVING TYPICAL CONCRETE PAVING JOINTING DETAILS - NO PLANTING Rev Date Approved FOOTWAYS D 01.12.19 PS Dwg No. 2.6.1

EQUAL EQUAL TRIPSTOP OR EQUIVALENT TO BE USED ON CONTROL JOINTS ADJACENT TO EXISTING TREES TREE PLANTING REFER STREET TREE MASTER PLAN EQUAL EQUAL TRIPSTOP OR EQUIVALENT TO BE USED ON CONTROL JOINTS ADJACENT TO EXISTING TREES FACE OF KERB TREE PLANTING REFER STREET TREE MASTER PLAN KERB SL72 MESH (2m LONG) TYPICAL BUILDING/PROPERTY LINE SL72 MESH (2m LONG) TYPICAL BUILDING/PROPERTY LINE GUTTER 2100 GUTTER 2100 KERB FACE OF KERB 900 MIN 900 MIN SIZE TO SUIT EXISTING FOOTPATH 1800 TYP, 1200 MIN SIZE TO SUIT EXISTING FOOTPATH 1800 TYP, 1200 MIN NOTE: 1. 2. 3. 4. 5. 6. DETAIL ONLY TO BE USED IF MATCHING EXISTING, CITY REPRESENTATIVE TO APPROVE. ALL EXPOSED CONCRETE SURFACES MUST BE FINISHED WITH A MEDIUM BROOM FINISH GENERALLY PERPENDICULAR TO THE DIRECTION OF TRAVEL. ALL CONCRETE SLABS MUST HAVE A JOINT ALONG THE BUILDING LINE, KERB LINE AND ANY PENETRATIONS (EXCEPT WHEN USING BRICK KERBS). ANY FOOTPATH THAT MAY BE SUBJECT TO VEHICULAR LOADS (SUCH AS GARBAGE TRUCKS IN NARROW LANES OR AT INTERSECTIONS WITH A TIGHT TURNING CIRCLE WHERE VEHICLES MAY MOUNT THE FOOTWAY) MUST HAVE AT LEAST 150mm THICK REINFORCED CONCRETE BASE (SL72). CONCRETE FOOTWAYS TO BE A MINIMUM OF 1.2m WIDE, OR AS DIRECTED BY COUNCIL. TYPICALLY ALLOW FOR EXPANSION JOINTS AT 12m (MAX) SPACING AND CONTRACTION JOINTS AT THE LESSER OF 6m OR 1 TO 1.5 TIMES THE WIDTH OF FOOTPATH SPACING IN PLAIN CONCRETE FOOTPATHS. LEGEND CJ CONTRACTION/CONTROL JOINTS EJ EXPANSION JOINTS IJ ISOLATION JOINTS GRASS/PLANTED VERGE NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED CONCRETE PAVING TYPICAL CONCRETE PAVING JOINTING DETAILS Rev Date Approved FOOTWAYS D 01.12.19 PS Dwg No. 2.6.2

PATH/GARDEN GARDEN/GRASS VERGE SL72 40mm COVER 110mm THICK 32MPa CONCRETE FOOTPATH 100mm THICK COMPACTED DGB20. MIN 98% STD MDD COMPACTED SUB-GRADE (CBR4) PATH/BUILDING LINE BUILDING/BOUNDARY LINE SL72 40mm COVER 10mm THICK APPROVED SELF EXPANDING JOINT FILLER 110mm THICK 32MPa CONCRETE 100mm THICK COMPACTED DGB20 MIN 98% STD MDD COMPACTED SUB-GRADE (CBR4) PATH/KERB 10mm THICK APPROVED SELF EXPANDING JOINT FILLER (STONE KERB ONLY) KERB SL72 40mm COVER GUTTER 110mm THICK 32MPa CONCRETE FOOTPATH 100mm THICK COMPACTED DGB20. MIN 98% STD MDD COMPACTED SUB-GRADE (CBR4) SECTION 1:10 NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED CONCRETE PAVING JUNCTIONS Rev Date Approved FOOTWAYS D 01.12.19 PS Dwg No. 2.6.3

EXPANSION JOINT 10mm THICK APPROVED SELF EXPANDING JOINT FILLER SL72 40mm COVER CAP REQUIRED FOR EXPANSION DOWEL JOINT, 400mm LONG N16 @ 300mm CENTRES BOND-BREAKING COMPOUND 230 NOTE: BOND-BREAKING COMPONENT AND END CAP MAY BE REPLACED WITH A PURPOSE-MADE DOWEL SLEEVE. CONTRACTION/CONTROL JOINT SAWCUT 25mm DEEP OR 31 TO 41 OF SLAB DEPTH OR PROVIDE DUMMY (TOOLED JOINT) SL72 40mm COVER 50 50 CONSTRUCTION JOINT 600mm LONG GALVANISED N12 TIE BARS AT 500 C/C EPOXY GROUT, DRILL HOLES FOR EXISTING SLAB ISOLATION JOINT 10mm THICK APPROVED SELF EXPANDING JOINT FILLER ABUTTING PAVEMENT OR OTHER STRUCTURE NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED CONCRETE PAVING JOINTS Rev Date Approved FOOTWAYS D 01.12.19 PS Dwg No. 2.6.4

1200 MIN 1500 TYP. 2000 MIN AT SHARED PATH TOOL/DUMMY JOINTS 45 45 CONCRETE NOTE: 600mm MIN WHERE RESTRICTED BY SITE CONDITIONS SUBJECT TO APPROVAL PLAN 1:50 110mm THICK 32MPa CONCRETE RAMP 1500 TYP. CONCRETE FOOTPATH SL72 40mm COVER 150-300 TO MATCH ADJACENT FALL KERB 8 1 MAX. ROAD GUTTER MIN. 100mm THICK COMPACTED DGB20 BASE COMPACTED SUBGRADE TO CBR4 APPROVED SELF EXPANDING JOINT FILLER (STONE KERB ONLY) SECTION 1:20 NOTES: 1. ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED. 2. THE 45 WING ANGLE ON KERB RAMPS IS THE GENERAL STANDARD AND RMS RECOMMENDATION. IF RESTRICTED BY SITE CONDITIONS, THE WING ANGLE CAN BE REDUCED AND DESIGNED TO SUIT SUBJECT TO APPROVAL. CONCRETE PAVING PEDESTRIAN RAMP Rev Date Approved FOOTWAYS D 01.12.19 PS Dwg No. 2.6.5

SHARP TRANSITION GARDEN/TURF GARDEN/TURF EDGE KERB FALL EDGE KERB 1500 1500 BACK OF KERB FOR STONE KERB DETAILS REFER TO STONE KERB SECTION BACK OF KERB FRONT OF KERB FRONT OF KERB KERB CONCRETE KERB RAMP 100mm FILLET 100mm FILLET GUTTER LIP GUTTER LIP PLAN 1:20 110mm THICK 32MPa CONCRETE RAMP KERB BEYOND 1500 CONCRETE FOOTPATH SL72 40mm COVER FALL 150-300 TO FALL MATCH ADJACENT 8 1 MAX. KERB ROAD GUTTER MIN. 100mm THICK COMPACTED DGB20 BASE COMPACTED SUBGRADE TO CBR4 APPROVED SELF EXPANDING JOINT FILLER (STONE KERB ONLY) SECTION 1:20 NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED CONCRETE PAVING PEDESTRIAN RAMP (ADJACENT GARDEN) Rev Date Approved FOOTWAYS D 01.12.19 PS Dwg No. 2.6.6

CONCRETE FOOTPATH MIN 200 VARIES GUTTER MIN 200 KERB MIN 200 CONCRETE EDGE FORMED TO SUIT BLOCKOUT PLAN 1:20 POWER POLE OR SMART POLE 600 MIN (MIN 1000 FOR TRAFFIC SIGNALS) AC COLD MIX INFILL MIN CONCRETE FOOTPATH VARIES 200 KERB GUTTER 100mm DGB20 COMPACTED SUBGRADE - CBR4 SECTION 1:20 NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED CONCRETE PAVING PAVING AROUND LIGHT POLES AND SMARTPOLES Rev Date Approved FOOTWAYS D 01.12.19 PS Dwg No. 2.6.7

MIN 1500 FROM PROVIDE EXPANSION JOINT PROPERTY BOUNDARY CONCRETE DRIVEWAY (REFER TO TABLE FOR DETAILS) CONCRETE FOOTPATH EXPANSION JOINT ALONG EDGE OF DRIVEWAY EXPANSION JOINT ALONG EDGE OF DRIVEWAY PROVIDE TOOL JOINT AT CHANGE IN GRADE WIDTH OF KERB TO MATCH ADJACENT WIDTH (VARIES BETWEEN 150mm - 300mm) GRASS-VERGE IF APPLICABLE CONCRETE WING DROP KERB WING: MAX 900 2500 MIN - 6000 MAX WING: MAX 900 MIN 450 (3000 TYP) MIN 450 1200 GRASS-VERGE IF APPLICABLE 2500 CONCRETE FOOTPATH GUTTER NOTES: 1. 2. 3. 4. 5. DRIVEWAY TO BE GENERALLY PERPENDICULAR TO KERB LINE, UNLESS APPROVED OTHERWISE. VERTICAL AND HORIZONTAL CLEARANCE SHALL BE CHECKED BY THE DESIGNER IN ACCORDANCE WITH AS2890.1. FOR NARROW FOOTPATHS LENGTH OF RAMP TO BE AS SHORT AS POSSIBLE, OR LAYBACK ONLY TO BE USED IN APPROVED APPLICATIONS. FOR DRIVEWAYS WIDER THAN 6.0m A TOOL JOINT SHALL BE PROVIDED ALONG THE CENTRE OF THE DRIVEWAY. DRIVEWAY CONCRETE SHALL BE WOOD FLOAT FINISHED. PLAN KERB APPROVED SELF EXPANDING JOINT FILLER 25mm HIGH CHAMFERED LIP. LIP CAN BE OMITTED WHEN DRIVEWAY IS ADJACENT TO CYCLEWAYS. PROVIDE TOOL JOINT AT CHANGE OF GRADE 1200 TYP 450 LIP OF KERB 1:50 25mm HIGH CHAMFERED LIP. 450 600 RECONSTRUCTED ROAD SHOULDER CONCRETE DRIVEWAY REFER TABLE FOR DETAILS COMPACTED SUB-BASE TO CBR4 GUTTER MIN. 100mm THICK COMPACTED DGB20 BASE CONSTRUCTION JOINT 15mm EPOXY MODIFIED SAND/CEMENT MORTAR GUTTER APPROVED SELF EXPANDING JOINT FILLER (STONE KERB ONLY) N12-300, 800 LONG SECTION ( STONE KERB) SECTION ( CONCRETE KERB) 1:20 1:20 DRIVEWAY SPECIFICATIONS DRIVEWAY USE CONCRETE STRENGTH THICKNESS REINFORCEMENT SINGLE RESIDENTIAL 32MPa 150mm SL82 32MPa 200mm SL82 32MPa 250mm TWO LAYERS SL82 MULTI RESIDENTIAL COMMERCIAL/ INDUSTRIAL NOTE: ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED CONCRETE PAVING VEHICULAR CROSSING Rev Date Approved FOOTWAYS D 01.12.19 PS Dwg No. 2.6.8

expanding joint filler sawcut 25mm deep or . 1 3. to . 4. of slab depth or provide dummy (tooled joint) contraction/control joint expansion joint. sl72 40mm cover sl72 40mm cover dowel joint, 400mm long n16 @ 300mm centres. construction joint. 600mm long galvanised n12 tie bars at 500 c/c epoxy grout, drill holes for existing slab cap required .

Related Documents:

for paving stone surfaces for streets of high cultural or historic importance". In this subtask investigations of noise from streets with paving stones will be carried out. The objectives are: To produce a ranking in relation to noise of commonly used types of paving stones. To develop and test less noisy types of paving stones.

Paving block is a building material product of cement used as an alternative cover or hardening of the soil surface. Paving blocks are also known as concrete blocks (concrete blocks) or cone blocks. Paving blocks also have some form of commonly available in the market, among others, Hexantik (hexagonal type with .

Central Ave Milling & Paving (Umpqua Sunny Ln.) 9/28/2017 10/6/2017 1.8 Night Work One Lane Closure or Two Way Coned Misc Paving of side St. & misc. paving behind sidewalks 10/9/2017 10/13/2017 1 Possibly Night Work Shoulder & Intersection Closure Striping 10/16/2017 10/18/2017

porous paving. Traffic type The table below provides an overview of the suitability of the various porous paving options in terms of traffic type joints between each paver, while an and frequency. Soil type Porous paving is most effective when installed in sandy areas where rainwater can easily drain away from the soil.

paving bock is made in laboratory of Environmental Engineering IST AKPRIND Yogyakarta. Furthermore, a compressive strength test, flexible strength test and leachate test. The result of this research shows that adding textile industrial sludge waste has no effect on paving block quality. Also, the strength compression number of paving blck

1.1. Inventorying Concrete Materials 1.2. Storing Concrete Materials 1.3. Water-Cement Ratio 1.4. Concrete Batching 1.5. Stationary Mixing and Delivery 1.6. Ready Mixing and Delivery 1.7. Hot Weather Batching 1.8. Cold Weather Batching 2. Concrete Paving Site Preparation and Construction 2.1. Preparing the Subgrade and Subbase 2.2. Setting .

(Portland Cement Concrete) pavements, and 4) Paving fabric and AC overlay over existing AC pavements. Most applications included an asphalt cement concrete overlay (Conditions 3 and 4) and the comments of this summary are based on those conditions. Performance of the nonwoven paving fabric system was generally measured by evaluating the

The Expocrete segmental pavers and slabs represented by this cradle-to-gate EPD are produced at the Acheson plant, #38 - 53016 Hwy 60 Acheson, Alberta T7X 5A7 under CSA A231.1 and A231.2 specifications for interlocking concrete pavers and segmental concrete paving slabs. Interlocking concrete pavement systems Declared Unit