Power Supply Standard Operating Procedures (Gel Electrophoresis Usage)

11m ago
8 Views
1 Downloads
755.26 KB
11 Pages
Last View : 14d ago
Last Download : 3m ago
Upload by : Abby Duckworth
Transcription

Thermo EC105 Sigma Techware PS 250 Power Supply Standard Operating Procedures (Gel Electrophoresis Usage) OSP-135 VWR 300 @ BR Prepared by: Bob Morrison STLCC, Instrumentation Specialist Initial Jul 09, Last Revision Jan 2013 Note, if probes become lose or pop out , expose the metallic portion on the male probe and expand the thin metal strips to increase friction in the female socket. AC Power Supply Example Page 1 STLCC-CPLS;Morrison 1/18/2013

Power Supply: Typical Gel Electrophoresis Setup On/Off Red ( ) Electrical Probe; leads to far or receiving end of plate. If lose or pops out, expose metallic end and expand thin strips. Black ( – ) Electrical Probe; leads to well or start end of plate Safety Notes: 1) Connect all wiring and probes before turning the unit on. 2) Never touch the probes or power supply box while the device is on. 3) Turn off the device before disconnecting electrical probes. 4) Do not handle the device with wet hands or on wet countertop. STLCC-CPLS;Morrison 1/18/2013 Voltage or Amps dial control. Typically set to maintain 95 volts during run. Digital Volt or Amp readout Window Rocker Switch: Set to constant Volts (or Amps) per lab procedure. Typically 95 Volts DC. Red Electrical Probe; goes to far or receiving end of plate. Note, if probes become lose or pop out , expose the metallic portion and expand the thin metal strips to increase friction in the female socket. Page 2

Power Supply: Gel Electrophoresis Typical Instructions and Guidelines 1. Place the cover on the electrophoresis unit, making sure to have the negative (black) electrode at the well end of the gel. 2. Insert the electrode cords into the proper inputs of the power supply. Set the power supply on ‘low’ and turn it on. Set the voltage at 90-95 volts. Check to make sure bubbles are forming in the buffer on the platinum wire electrodes along the ends of the gel box. Watch the gel closely for 2 – 5 minutes to make sure that the dye is migrating in the correct direction. 3. If you hear an audible alarm or any of small red lights (Fuse or 500mA) come on during the run, turn off the unit immediately and unplug. The audible alarm and overcurrent lights indicate potential breakdown of the gel mixture or higher than normal temperatures in the gel. For further information on Voltage, Current, and Resistance, see the following slides. 4. If the Gel Rig Electrode/probes pop out or become lose during the run. Turn off and unplug the Power Supply and remove each electrode. Inspect each electrode probe end by exposing the metallic portion. Use a sharp tool to “spring” the thin strips on the metallic probe ends to create a better grip in the power supply female sockets. 5. Allow the tracking dye to migrate 4-5 centimeters from the wells so that the molecular weight marker fragments separate sufficiently. 6. Turn off the power supply, unplug it, and disconnect the electrodes from it. Then remove the lid from the gel box. STLCC-CPLS;Morrison 1/18/2013 Page 3

Power Supply: Electrophoresis, BRDG,VWR, 4 outlet pairs Model 302 93000-744 For a wide range of applications including DNA, RNA, and protein separations, isoelectric focusing, and blotting. Compatible with most electrophoresis systems, including VWR horizontal and vertical electrophoresis systems. Each unit features operating modes for constant voltage or constant current with automatic crossover. Four sets of color-coded output terminals allow multiple gels to be run simultaneously. For safety, power supplies also include no-load and load-change detection systems, short circuit and over current/over voltage protection, and automatic recovery after a power failure. Each unit measures 19Wx25Dx8Hcm (71/2x97/8x35/32") and is stackable to save space. STLCC-CPLS;Morrison 1/18/2013 Page 4

Power Supply: Electrophoresis, VWR, Controls 1. On/Off toggle in rear 3. After Pressing “Mode” use up/down keypads to select values 2. Mode: Press to cycle through options to set Voltage, Time, Amps. 4. Constant: Press to toggle between constant Voltage or Amps. 5. Press Start after settings have been made. Note, Unit will not proceed unless a “load” ( rigs plugged into the sockets) is present. STLCC-CPLS;Morrison 1/18/2013 Page 5

Power Supply: Sigma Techware PS 250 or Thermo EC105 Description General description Constant voltage operation mode Digital display of mA or volts (selectable) Dual output run two gels at once at the same voltage (current requirements permitting) Output: 20-250 V selectable in 10 V steps Capacity: up to 300 mA at 150-250 V up to 500 mA below 150 V LED Fault Display for overcurrent and blown fuse. Audible overcurrent alarm. Operating temperature range: 0 to 40 C H W D 4 1/2 in. 8 in. 5 1/4 in. STLCC-CPLS;Morrison 1/18/2013 Page 6

Power Supply: Owl OSP-135, Analog controls Actual Voltage Milli-amps readout /- ports to device DC Start ,Off, and indicator buttons Can be activated after short warm-up period Toggle: Constant Voltage or Amps Increase/decrease setting on Volts/Amps Must have device requiring power engaged before DC will “start”. STLCC-CPLS;Morrison 1/18/2013 Page 7

Electrophoresis: Power-Relationships of V, A, R What are the relations between Voltage, Current, Power and Resistance? Power (W) Voltage (V) x Current (A) Resistance (Ω) Voltage (V) / Current (A) How does a power supply react after pressing RUN? The internal generator will start building up the high voltage at the output terminals while voltage and current are constantly measured and power calculated. When one of the pre-set parameters is exceeded, the generator stops and will keep that parameter constant. How important is the resistance of an electrophoresis unit? The resistance of an electrophoresis unit depends on its size, gel thickness, amount of buffer, buffer conductivity and temperature. This resistance will normally decrease in time due to a slowly increasing temperature. Electrophoresis units which have a resistance below the minimum load resistance of a power supply will trigger an alarm! Read the output voltage and current during a run to measure the resistance and use above formula to calculate the value. How to keep a constant voltage during a run? Program the desired voltage and a higher current and power then the maximum expected values: Current Voltage / Resistance Power Voltage x Current How to keep a constant current during a run? Program the desired current and a higher voltage and power then the maximum expected values: Voltage Current x Resistance Power Voltage x Current How to keep a constant power during a run? Program the desired power and a higher voltage and current then the maximum expected values: Voltage Current x Resistance Current Voltage / Resistance Why are my output values different from those of a similar experiment? Either your programmed parameters are not equal to those described or the resistance of your electrophoresis unit is different (see above). It cannot be due to e.g. an other model of power supply as the relations between Voltage, Current, Power and Resistance are monitored in the same way by any instrument (the electrical laws cannot be disregarded!). What about connecting more than one unit to the same power supply? The outlets being in parallel each electrophoresis unit will be supplied with exactly the same voltage. However, current and power may differ due to differences between them even when exactly the same model, gel, buffers, etc. are used. Therefore, it is recommended to run several electrophoresis units only in the constant voltage mode on the same power supply. STLCC-CPLS;Morrison 1/18/2013 Page 8

Electrophoresis: How to Select a Power Supply (Thermo Corp) STLCC-CPLS;Morrison 1/18/2013 Page 9

Electrophoresis: Thermo-Power Supply Selection Guidelines Same as Sigma Techware PS 250-1 Unit STLCC-CPLS;Morrison 1/18/2013 Page 10

Power Supply: AC Source/Control Example Hotlink to AC Power Source Manual STLCC-CPLS;Morrison 1/18/2013 Page 11

Power Supply: Gel Electrophoresis Typical Instructions and Guidelines 1. Place the cover on the electrophoresis unit, making sure to have the negative (black) electrode at the well end of the gel. 2. Insert the electrode cords into the proper inputs of the power supply. Set the power supply on 'low' and turn it on. Set the voltage at 90-95 .

Related Documents:

green bar no security clearance . company private security standard operating procedures 10 company private . company private security standard operating procedures company private . security standard operating procedures . operating procedures . security standard .

QuickSpecs HP ProLiant ML350 Generation9 (Gen9) Overview c04375628 - DA - 15035 North America — Version 3 — October 13, 2014 Page 2 Rear View (Tower Model) 1. Power supply Power LED 2. Power supply Power connection 3. HP Flexible Slot 4 Power Supply (Optional - 500w Power Supply shown) 4. Power supply Power LED 5. Power supply Power .

2. Standard Operation Procedure for Receiving of Pharmaceutical products 3. Standard Operating Procedure for Dispatch and Transport 4. Standard Operating Procedure for Inventory 5. Standard Operating Procedure for Cleaning 6. Standard Operating Procedure for Self-inspection 7. Standard operating

Intro: Convert an ATX Power Supply Into a Regular DC Power Supply! A DC power supply can be hard to find and expensive. With features that are more or less hit or miss for what you need. In this Instructable, I will show you how to convert a computer power supply into a regular DC power supply with 12, 5 and 3.3 volt outputs. For about 10!

Standard Operating Procedures This ESF # 11 Standard Operating Procedures (SOP) document establishes procedures and protocols for OEPC’s coordination of DOI actions in support of the activation and operations of ESF # 11. These procedures are to be used in conjunction with the Department of

Jul 22, 2015 · Standard Operating Procedures . Ka Paia Kanaloa - ʻĀina . DRAFT . Last Revised: July 22, 2015 . Exhibit A - OHA's Commercial Property Management Standard Operating Procedures Exhibit A OHA's Commercial Property Management Standard Operating Procedures RFP No. KM 201 Page 1 of 30

through cable between the PC and the EV kit. 3) With the power supply turned off, connect the 3.3V power supply to VBAT and VCCAUX. Connect the power-supply ground to the header labeled GND. 4) With the power supply turned off, connect the 5V power supply to the 5V pin and the -5V power supply to the -5V pin. C

QuickSpecs HPE ProLiant DL360 Generation9 (Gen9) Overview Page 2 2. HPE Flexible Slot Power Supply Bay 2 3. Power Supply 2 Status LED 4. Power Supply 2 C13 Connection 5. HPE Flexible Slot Power Supply Bay 1 6. Power Supply 1 Status LED 7. Power Supply 1 C13 Connection 12. USB 3.0 Connectors (2) 13. Unit Identification LED 14.