Tender Document:Name of Work: Construction of Pre-Engineered building near Hanger at Airstrip(SH: Civil & Electrical works).No. IWD/CO/2018-19/ 698Note-1:- The intending bidder must read the terms and conditions carefully. He should submit hisbid only if he considers himself eligible and he is in possession of all the documents asrequired.Note-2:- The intending bidder must upload all the documents as detailed in this tender document inPara 25 on pages-9 of this document.Note-3:- Applicants are advised to keep visiting /cppp/latestactivetenders, from time to time (till the deadline for bidsubmission) for any updates in respect of the tender documents, if any. Failure to do soshall not absolve the applicant of his liabilities to submit the applications complete in allrespect including updates thereof, if any. An incomplete application may be liable forrejection.Note-4:- The EMD shall be prepared in favour of the Director, IIT Kanpur payable at Kanpur asdetailed in the tender document. A part of EMD is acceptable in the form of bankguarantee as per the details in the tender document. This bank guarantee shall also be infavour of the Director, IIT KanpurNote-5:-The defect liability period is 36 months from the date of handing over the completedbuilding to the engineer in charge. Other related details are elaborated in the tenderdocument.Note-6:- The contractor shall also carry out the structural analysis and design of the PreEngineered Steel structure, preparation of GA drawings, working & shop drawings andthe complete design system to be vetted by structural designer of IIT/NIT/Anygovernment Institute.Note-7:- Site inspection, if desired, by the intending bidders will be arranged on 11/12/2018 at11:30 AM. The intending bidders must reach the O/o the Executive Engineer, IWD, IITKanpur -208016. The construction site is inside the IIT Kanpur Campus. The intendingbidders shall arrange for the conveyance themselves.Note-8:- The indicative drawings are enclosed.Note-9:- The following condition pertains to GST of Clause 37 & 38 of General Condition ofcontracts and corresponding amendments should be read as follows:a) The quoted rates should be exclusive of GST.b) The GST as applicable shall be paid extra.Page 1

INDIAN INSTITUTE OF TECHNLOGY, KANPURINSTITUTE WORKS DEPARTMENTCENTRAL OFFICETENDER DOCUMENTName of work: -: Construction of Pre-Engineered building near Hanger at Airstrip(SH: Civil & Electrical works).Sl. No. DescriptionPage1Part-A112 pages(NIT, Forms CPWD 6 & 7, Proforma of schedules andspecial conditions etc.)2Part-B19 pages Percentage(Schedule of Quantity and percentage schedule for major Scheduleand minor component of the work uploaded separately)3Part-C27 pages(Special condition of contract for minor component ofwork4Part-D13 pages(Schedule of Quantity uploaded separately &percentage schedule for minor component of the workuploaded along the major component)This NIT amounting to Rs 5,50,78,931 /-contains 144 pages numbered from 01 to 144Notes: The following will be the part of the contract Agreement:The soft copy of the GCC 2014 and Amendments is hereby uploaded separately.Estimated Cost Rs. 5,50,78,931 /- (Rupees Five Core Fifty Lac Seventy Eight Thousand NineHundred Thirty One Only) comprising ofCivil works Rs. 4,91,41,185/- (Rupees Four Core Ninety One Lac Forty One Thousand OneHundred Eighty Five Only)Electrical works Rs. 59,37,746/- (Rupees Fifty Nine Lac Thirty Seven Thousand Seven HundredForty Six Only)Executive Engineer(Electrical)Senior Assistant Engineer(Civil)Approved bySuperintending EngineerPage 2Executive Engineer(Civil)

INDIAN INSTITUTE OF TECHNOLOGY KANPURINSTITUTE WORKS DEPARTMENTCENTRAL OFFICENotice Inviting e-TenderThe Superintending Engineer, IWD, IIT Kanpur invites on behalf of Board of Governors of IITKanpur online percentage rates tender on two envelope system from the enlisted contractors inCPWD, BSNL, MES, UPPWD & Central PSUs in appropriate class of composite category.NIT.No.Name of workEstimated cost (inLacs)25/Civil/D2/201819/01Construction of Pre-Engineered Total Cost Rs.building near Hanger at Airstrip 550.79 [Civil works(SH: Civil & Electrical works).Rs491.41&Electrical Works Rs59.38]Earnestmoney(inLacs)11.02Period ofcompletion06 monthsLast date & time of submission of bid on 28.12.2018 up to 9.30 PM. All details are /latestactivetenders,. The bids can only be submitted online atwww.tenderwizard.com/IIT.No. IWD/CO/2018-19/698Dated:05.12.2018For Publication in the News Paper:Economic Times, All India EditionPage 3Superintending Engineer

Page 4

C.P.W.D-6INDIAN INSTITUTE OF TECHNOLOGY,KANPUR INSTITUTE WORKS DEPARTMENTNotice Inviting e-TenderLast date & timetechnical & financial bidfor online submission ofbidLast date forsubmittinghardcopy ofEMD, proofof Cost ofTenderdocuments,processingfee and otherdocumentsUpto 9:30 PM on 28.12.2018Rs. 55078931/-Comprisingof Civil worksRs. 49141185/& ElectricalWorksRs5937746/-Period of Hanger at Airstrip(SH:Civil&Electrical works).Rs. 11.02 Lacs25/Civil/D2/2018-19/01106 MonthsEstimatedcost putto tenderEarnest MoneyName of workand locationNIT No.S.NThe Superintending Engineer, IWD,IIT Kanpur, on behalf of Board of Governors of IIT Kanpur, invitesonline percentage rate tenders in two envelope system from the enlisted contractors in CPWD, BSNL,MES, UPPWD & Central PSUs in appropriate class of composite category.Time & dateof openingof technicalbidAfterlast Opening atdate and time 3:30 PM on02.01.2019Note: The contractor submitting the tender should read the schedule of quantities, additionalconditions, additional specifications, particular specifications, CPWD- 6 and other terms andconditions given in the NIT and drawings. The bidder should also read the General Conditions ofContract for CPWD Works 2014 with correction slips, upto the date specified in schedule-F, which isavailable as Government of India Publications.1)Contractors who fulfill the following requirements shall be eligible to apply. Joint venturesare not accepted:a)Should have satisfactorily completed the works as mentioned below during the last sevenyears ending previous day of last date of submission of bids.* 3 (three) similar completed works costing not less than Rs. 220.32 Lacs or 2 (two)similar completed works, not less than Rs 275.39 Lacs or 1 (one) similar completedwork of aggregate cost not less than Rs 440.63 Lacs.Page 5

AndOne completed work of any nature (either part of (a) or a separate one) costing not lessthan Rs. 220.32 Lacs with some Central Government Department / State GovernmentDepartment / Central Autonomous Body / Central Public Sector Undertakings).Note: The value of executed works shall be brought to current costing level by enhancing the actualvalue of work at simple rate of 7% per annum; calculated from the date of completion to theprevious day of last date of submission of bids.b)Should have average annual financial turnover of Rs. 165.24 Lacs construction works duringthe last three years ending 31-03-2018.c)Should not have incurred any loss in more than two years during the last five years ending 3103-2018.d)Should have solvency of Rs 220.32 Lacs.e)Should have valid registration with EPF, ESIC and GST authority.2.3.The intending bidder must read the terms and conditions carefully. He should submit his bidonly if he considers himself eligible and he is in possession of all the documents required.Eligibility condition for Associate agency for execution of Internal Electrical Installationworks.a. The associate agency (Non CPWD) having valid electrical license. They should have successfullycompleted works, as mentioned under during last 7 year ending previous day of last date ofsubmission of tender.i) Three similar works each of value not less than Rs. 23,75,098/ORii) Two similar works each of value not less than Rs. 29,68,873/ORiii) One similar work each of value not less than Rs. 47,50,197/-Similar works mean Internal Electrical installation worksThe value of executed works shall be brought to current costing level by enhancing the actualvalue of work at simple rate of 7% per annum; calculated from the date of completion to the previousday of last date of submission of tenders.b. The main contractor / agency has to submit detail of such associate agency to Engineer-In charge(Internal Electrical Installation works) within 15 days of issue of award of letter. (The associateagency shall be approved by Executive Engineer (Elect.) .In case the main contractor intends tochange any of the above agency / agencies during the operation of the contract, he shall obtain priorPage 6

approval of Executive Engineer (Elect.). The new agency / agencies shall also have to satisfy the laiddown eligibility criteria. In case Executive Engineer (Elect.) is not satisfied with the performance ofany agency, he can direct the main contractor to change the agency executing such items of work andthis shall be binding on the contractor.4.The eligible tenderer for major component (i.e. civil) will quote rates for various items ofminor components (i.e. electrical) of work also. It will be obligatory on the part of thetenderer to sign the tender document for all the components (The schedule of quantities,conditions and special conditions etc.). After acceptance of the tender by competent authority,the SE, IWD shall issue letter of award on behalf of the Board of Governors.5.Entire work under the scope of composite tender including major and all minor componentsshall be executed under one agreement.The tenderer has to associate agency(s) for minor component(s) confirming to eligibility criteriaas defined in the tender document and has to submit detail of such agency(s) to Engineer-inCharge of minor component(s) within prescribed time. Name of the agency(s) to be associatedshall be approved by Engineer-in-Charge of minor component(s)The tenderer has to enter into agreement with the contractor(s) associated by him for executionof minor component(s). Copy of such agreement shall be submitted to EE in-charge of minorcomponent as well as to EE in-charge of major component. In case of change of associatecontractor, the main contractor has to enter into agreement with the new contractor associatedby him.In case, the bidder is not having desired experience for execution of electrical works, he shallassociate electrical contractor with adequate experience for the execution of similar nature ofelectrical works. The bidder shall indicate minimum three agencies, to which he would like toassociate for the execution of electrical works. The proposed electrical agencies shall beevaluated on the basis of eligibility criterion for the estimated value of electrical component.The credentials of electrical agency have to be submitted along with the technical bid.The tenderer shall, within fifteen days of issue of award of letter, submit details of the agencywhich he proposes to associate with him for execution of electrical items of work along withconsent letter of Electrical Contractor. The details shall be submitted in the proforma –J―Details of Electrical Contractor‖ attached with the tender documents to the Engineer-in-chargeof electrical item of work. The eligibility of the agency proposed to be associated for electricalitems of work shall be governed by the provisions contained in paras 3 & 8.The bid document consisting of the schedule of quantity, terms and condition, i/c plans,specifications, the schedule of quantities of various types of items to be executed and the set ofterms and conditions of the contract to be complied with and other necessary documents can beseen in the office the Engineer-in-Charge between hours of 11:00 AM and 4:00 PM from dateof publicity of tender to date of submission of tender every day except on Saturday, Sundayand public holidays or can be seen and downloaded testactivetenders, free of cost.Those contractors not registered on the website mentioned above, are required to get registeredbeforehand. If needed they can be imparted training on online bidding process as per detailsavailable on the website.The intending bidder must have valid class-III digital signature to submit the bid.6.7.8.9.10.11.12.Page 7

13.14.15.16.17.18.19.20.(i)(ii)(iii)(iv)(v)21.On opening date, the contractor can login and see the bid opening process. After opening ofbids he will receive the competitor bid sheets.Contractor can upload the documents in the form of JPG format and PDF format.If a tenderer does not quote any percentage above/below on the total amount of the tenderor any section/sub head in the percentage rate tender, the tender shall be treated asinvalid and will not be considered as lowest tenderer.The Institute reserves the right to reject any prospective application without assigning anyreason and to restrict the list of qualified contractors to any number deemed suitable by it, if toomany bids are received satisfying the laid down criterion.After submission of the bid the contractor can re-submit revised bid any number of times butbefore last time and date of submission of bid as notified.a) Earnest Money in the form of Demand Draft or Pay order or Banker‗s Cheque or Deposit atCall Receipt or Fixed Deposit Receipt (drawn in favour of the Director, IIT Kanpur shall bescanned and uploaded to the e-Tendering website by the bidder within the period of bidsubmission.A part of earnest money (EM) is acceptable in the form of bank guarantee also. In such case,minimum 50% of earnest money or Rs. 20 lacs, whichever is less, shall have to be deposited inshape prescribed above, and balance may be deposited in shape of Bank Guarantee of anyscheduled bank having validity for four months or more from the last date of receipt ofbids which also is to be scanned and uploaded by the intending bidders. The original EMDshould be deposited in hardcopy in the office of Executive Engineer along with the mentioneddocuments.b) Tender Document Processing fee – Rs. 1680/- shall be paid online to the Director IIT,Kanpurc) e-Tender Processing Fee – Rs. 8850/- shall be paid online in favour of "ITI Limited"payable at Delhi.Copy of documents as specified in the tender document shall be scanned and uploaded to the eTendering website within the period of bid submission. However, copy (original/self-certifiedas mentioned in Para 25 below) of all the scanned and uploaded documents as specified in biddocument shall have to be submitted by the all bidders, physically in the office of tenderopening authority.The bid submitted shall become invalid and e-Tender processing fee shall not be refunded if:The bidder is found ineligible.The bidder does not deposit original EMD to the office of Executive Engineer, IWD, IITKanpur.The bidder does not upload all the documents (including GST registration) as stipulated in thebid document including the scan copy of the EMD.If any discrepancy is noticed between the documents as uploaded at the time of submission ofbid and hard copies as submitted physically by the bidder in the office of bid openingauthority.If a bidder does not quote any percentage above/below on the total amount of the tender or anysection/sub head in percentage rate tender, the tender shall be treated as invalid and will not beconsidered as lowest tenderer.Intending Bidders are advised to inspect and examine the site and its surroundings and satisfythemselves before submitting their bids as to the nature of the ground and sub-soil (so far as ispracticable), the form and nature of the site, the means of access to the site, the accommodationPage 8

xiii.26.they may require and in general shall themselves obtain all necessary information as to risks,contingencies and other circumstances which may influence or affect their bid. A bidder shallbe deemed to have full knowledge of the site whether he inspects it or not and no extra costconsequent on any misunderstanding or otherwise shall be allowed. The bidders shall beresponsible for arranging and maintaining at his own cost all materials, tools & plants, water,electricity access, facilities for workers and all other services required for executing the workunless otherwise specifically provided for in the contract documents. Submission of a bid by abidders implies that he has read this notice and all other contract documents and has madehimself aware of the scope and specifications of the work to be done and of conditions and ratesat which stores, tools and plant, etc. will be issued to him by the Government and localconditions and other factors having a bearing on the execution of the work.Canvassing whether directly or indirectly, in connection with bidders is strictly prohibited andthe bids submitted by the contractors who resort to canvassing will be liable for rejection.The contractor shall not be permitted to bid for works in the IWD responsible for award andexecution of contracts, in which his near relative is posted a Divisional Accountant or as anofficer in any capacity between the grades of Superintending Engineer and Junior Engineer(both inclusive). He shall also intimate the names of persons who are working with him in anycapacity or are subsequently employed by him and who are near relatives to any officer in theInstitute Works Department. Any breach of this condition by the contractor would render himliable to be removed from the approved list of contractors of this Department.No Engineer of Gazetted Rank or other Gazetted Officer employed in Engineering orAdministrative duties in an Engineering Department of the Government of India is allowed towork as a contractor for a period of one year after his retirement from Government service,without the prior permission of the Government of India in writing. This contract is liable to becancelled if either the contractor or any of his employees is found any time to be such a personwho had not obtained the permission of the Government of India as aforesaid before submissionof the bid or engagement in the contractor's service.List of Documents to be scanned and uploaded within the period of bid submission:Enlistment Order of the Contractor in appropriate class of composite category.Treasury Challan/ demand Draft/ Pay Order or Banker‘s Cheque / Deposit at callReceipt / Bank Guarantee of any scheduled Bank against EMD (All drawn in favourof the Director, IIT Kanpur).Photocopy/scan copy of original EMD.Certificate of Incorporation.Proof of Tender document processing fee.Certificates of Work Experience.Certificate of Financial Turnover from CA.Bank Solvency Certificate.Details of Electrical contractor.Affidavit as per provisions of clause 1.2.3 of CPWD-6.Certificate of Registration of GST.Health, Safety & Environment Policy.Any other Document as required.Certificate of Financial Turnover: At the time of submission of bid, contractor may uploadAffidavit / Certificate form CA mentioning Financial Turnover of last 5 years or for the periodPage 9

27.28.29.30.as specified in the bid document and further details if required may be asked from the contractorafter opening of technical bids. There is no need to upload entire voluminous balance sheet.Contractor must ensure to quote percentage rate separately for civil & electrical works in wordsand figures in column meant for quoting rate in the estimated cost appears in yellow. In additionto this, while selecting any of the cells a warning appears that if cell is left blank the same shallbe treated as ―0‖.The pre-qualification bid shall be opened first on due date and time as mentioned above. Thetime and date of opening of financial bid of contractors qualifying the technical bid shall becommunicated to them at a later date.The Pre-Bid Conference shall be held in the office of the Superintending Engineer, IWD IITKanpur at 15:30 Hrs on 14.12.2018 to answer question of intending bidders, if any. TheSuperintending Engineer, IWD reserves the right not to answer a question raised by a bidder.If any Information furnished by the applicant is found incorrect at a later stage, he shall beliable to be debarred from tendering for future work. The Institute reserves the right to verifythe particulars furnished by the applicant independently.(Rajeev Garg)Superintending EngineerPage 10

SECTION IBRIEF PARTICULARS OF THE WORK:1.Salient details of the work for which bids are invited are as under:Sl.No.1Name of workEstimated CostConstruction of Pre-Engineered Total Estimated cost 5,50,78,931/building near Hanger at Airstrip ,Civil 4,91,41,185/-, Internal electrical(SH: Civil & Electrical works). installation 59,37,746/-,Period ofcompletion06 Months2.The work is situated inside IIT Kanpur Campus, Kalyanpur, Kanpur (UP) Pin: 208016.3.General features/scope of the work is as under: The scope covers construction of preengineered building (G 1). There are two blocks to be constructed, both blocks have attachedtoilet block with them. The toilet block shall be RCC framed structure and balance portion ispre-engineered building. The walls are of AAC blocks and roof is sheet roofing. Each blockhas an RCC staircase. Foundation and column upto ground floor level shall be of RCC gradeM25.The building consists of electrical panels, DBs, raceways, conduits, wirings and fire alarmsystem.Above details and status are only indicative but not exhaustive. The intending bidder shallinspect the site and fully acquaint with nature and quantum of work and site condition andassess/satisfy himself before quoting and submission of his bid. He is also advised to inspectthe indicative drawings attached with this tender document to acquaint with other detailsabout the building.4.Work shall be executed according to General Conditions of Contract for Central P.W.D.Works with correction slips issued upto as specified in schedule F.Page 11

SPECIFIC CONDITIONS FOR THE PRE ENGINEERED BUILDINGS1. SCOPE OF WORKThe main contractor (successful bidder) shall execute the said composite work as follows:Civil works: It includes C/o Pre Engineered Building using structural steel systems including AACmasonry, finishing, etc.As per the tender condition, the successful bidder has to associate eligible specialized agency fordesign, fabrication and erection of Pre Engineered steel structure. The main contractor however willbe responsible for all the works.Any other items which have not been specifically mentioned but are necessary for theconstruction as per good engineering practice, safety norms and successful operation and guaranteedperformance shall be deemed to be included within the scope of the work and shall be provided bythe Contractor.2. PRE ENGINEERED BUILDING USING STRUCTURAL STEEL FRAME WORKBrief Scope of the work:In brief the scope of Pre Engineered Building work shall include design, fabrication, supply &erection of Structural steel system, metal roof system, bracing, all accessories etc as specified/required for successful and satisfactory completion of work.Definition "Pre-engineered steel buildings" are fully fabricated in a controlled environment with thelatest technology in the factory after designing, shipped to site in CKD (completely knocked down)condition; and all components are assembled and erected at site with nut-bolts, thereby reducing thetime of completion.Pre-Engineered Steel Buildings use a combination of built-up sections, which provide the basic steelframe work with a choice of single skin sheeting with added insulation or insulated sandwich panelsfor roofing and wall cladding. The concept is designed to provide a complete building envelopesystem which is optimum in weight, cost and is also designed to fit user requirement.3. DESIGN:The contractor shall carry out the structural analysis and design of the Pre Engineered Steel structurebased on the relevant Indian & American codes (both codes inclusive, but in case of differences inthe recommendation of the codes, the Indian code shall prevail) using STAAD.pro computersoftware, preparation of GA drawings, working & shop drawings and the complete design system tobe vetted by the Structural designers of IIT/NIT/any Govt. institute. The charges/fees for the sameshall be paid by the contractor and will be reimbursed to the contractor on production of properPage 12

receipt from the institute. No extra payment towards establishment cost, over head expenses, etc shallbe entertained on this account. It shall be the responsibility of the contractor to get thedesign/drawing vetted from the Structural designers of IIT/NIT/any Govt. institute. The vetteddrawings shall be submitted, submission of the proof checked/ vetted design details/ drawings, tothe engineer in charge for further issue for execution of the work.The contractor shall get designed the structures and prepare all the required drawings needed forcorrect and accurate construction. The design shall be strictly in accordance with the latest IS codes,―Design Specifications‖ and building description.4. DESIGN SPECIFICATIONSGENERAL:The design considerations given hereunder establish the minimum basic requirements for the design.However, structure shall be designed for the satisfactory performance of the functions for which thesame is to be constructed.Structural Framing: All framing members shall be shop fabricated or bolted field assembly, unlessotherwise noted on approved drawings or desired by the engineer in charge.Primary members: Primary structural framing shall refer to the transverse rigid frames, rafters inrequired shape and Columns canopy rafters, interior columns (beam & column frames), bearingframe rafters and corner columns and end wall wind columns.Members fabricated from plate or bar stock shall have flanges and webs joined on one side of theweb by a continuous welding process. This plate or bar stock shall have minimum yield strength of350 MPa and will confirm to physical specifications of the latest IS:2062 amended up to last date ofreceipt of tender.Secondary members: Secondary structural framing shall refer to Purlins, girts, eave struts, windbracing, flange bracing, base angles, clips and other miscellaneous structural parts. The membersshall have minimum yield strength of 250MPa and will confirm to physical specifications of thelatest IS: 2062.Connections: All field connections shall be bolted (unless specified otherwise)Roof: Roof shall be profile sheet as per the description in the schedule of quantity.Accessories: As per the scheduled/ required items.Wall: Wall shall be of AAC blocks of density 650 Kg/Cum and confirming to relevant IS codes5. LOADINGThe structure shall be designed for all loads, including the weight of structure, live load, wind orearthquake. Due consideration shall be given to loading during the construction/erection phase andaccounted for in the design. The live load on the first floors shall be taken as 500 Kg/Sqm. The livePage 13

load on the roofs and at all other locations not specified herein shall confirm to the latest version of IS875.Design Codes: Design codes that govern the design procedures and calculations are as follows:The members shall be in accordance with the IS codes and the AISC (American Institute of SteelConstruction) specifications for the design, fabrication and erection of structural steel.IS: 875IS: 800::Code of practice for design loads of buildings & structures.Code of practice for general construction in steelWhenever any reference to IS/ BIS Code is made, the same shall be taken as the latest revision (withall amendments issued there to) on the last date of submission of tender.Apart from the IS/BIS Codes mentioned in particular for wind, live and earthquake loads in thevarious clauses of this specifications, all other relevant codes such as American standards (AISC,MBMA, AISI & AWS specifications) related to the specific job under consideration and / orreferred to in the above mentioned codes shall be followed wherever applicable, if the specificationsfor the same are not available in the relevant BIS codes.The contractor shall submit the design basis and General Arrangement (G.A) of the structure alongwith required explanatory sketches/drawings and get the same reviewed by the Engineer incharge and/or his duly nominated authorised representative before starting the final design andapproved for Construction (AFC) drawings.Construction of the structure shall not be taken up at site till all the drawings are reviewed byEngineer in charge and comments/suggestions given by consultants are incorporated.Engineer in charge reserves the right to review all of the designs and drawings. Review byEngineer in charge shall not relieve the contractor of his responsibility for correct design andexecution of the works.The final design and drawings shall directly adhere to the reviewed design basis and generalarrangement and shall incorporate all the comments / suggestions given by Engineer in chargewithout any implication on time schedule for completion of work.After the completion of erection and construction, the contractor shall submit to the engineer incharge ―As Built‖ drawings in six numbers of copies.6. FABRICATION DRAWINGSFabrication and erection drawings shall be prepared by the associate agency on the basis of"Approved for Construction (AFC)" design drawings issued to the Contractor. The contractor shalldesign the structures and prepare all the required ―Fabrication and erection drawings‖ drawingsneeded for correct and accurate construction. The design shall be strictly in accordance with thePage 14

latest IS codes, ―Design Specifications‖ and building de

work of aggregate cost not less than Rs 440.63 Lacs. .N. Name of work and location Estimated cost put to tender y on me ial bid ion of bid Last date for submitting hardcopy of EMD, proof of Cost of Tender documents, processing fee and other documents Time & date of opening of technical bid 1 55078931 D2/2018-19/01 Construction of

Related Documents:

Notice Inviting Tender cum e-Reverse Auction E-Tender Document For Procurement of OTR Tyres of different sizes COAL INDIA LIMITED (A MAHARATNA COMPANY) Coal Bhawan, . can download tender document free of cost from any of the websites mentioned above. 4. Details of tender 1 Tender No. CIL/C2D/OTR TYRE/2020-21/363 dated 02.09.2020

also used on Lima’s Pacific Coast Shays. You may also want to use as a reference the WM #6’s Tender Frame drawing (Lima Card Num-ber 858-A-5000). The Tender Frame drawing shows the Tender Frame End Casting in great detail. The Tender Frame End Casting is part of the Tender Frame and is the primary connection between the engine and tender.

THE TENDER PROCESS A tender, proposal or application (herein referred to as a ‘tender’) is the response to an opportunity and is a way for an organisation to showcase its products, services, skills and talents to others. The most important goal of a tender is to convince a funder of an

4 TECHNOTE – Estimating Topsheets for Tender Finalisation INTRODUCTION Tender Finalisation is a crucial part of any Construction Company’s Procedures.It is the process of completion or approval of a Tender Procedure where all aspects of the Tender are looked at in detail.

Tender Title Colocation Services for DATA Center Procurement Method Open competitive bidding Announced Date of the Tender 29th /01/2020 Expiry Date of the Tender 17th /02/2020 INVITATION TO BID: You are invited to offer a best bid for provision of the above tender as per attached specifications

2.2 BSNL has decided to use process of e-tendering for inviting this tender and thus the physical copy of the tender would not be sold. 3. Sale of physical copy of tender Document: Not applicable. Note 1: The Tender document shall not be available for download on its submission /closing date. 4. Eligibility Criteria for bidders: I. The bidder .

19. Tender completed in all respects shall be submitted as per the instructions given in the “Notice Inviting Tender” forming part of the tender document. 20. The successful tenderer on the acceptance of his tender by CDFD shall within fifteen days from the stipulated date of start of the work sign the formal contract. 21.

Alex Rider [5] Anthony Horowitz New York : Speak, 2006. (2011) SUMMARY: Alex Rider, teen spy, has always been told he is the spitting image of the father he never knew. But when he learns that his father may have been an assassin for the most lethal and powerful terrorist organization in the world, Scorpia, Alex's world shatters. Now Scorpia wants him on their side. And Alex no longer has the .