Conowingo Dredging Pilot ProjectPublic Information Meeting WebinarApril 1, 2020 6:00 PM

IntroductionsMelissa SlatnickMark Reemts, P.E.Environmental Section ChiefEnvironmental Dredging &RestorationSenior Managing EngineerDredging Design andConstruction

What to Expect Tonight Overview presentation of 30 minutes describing the projectand local considerations Question and answer period– We ask that all attendees hold their questions until the Q&A period– Please use the chat feature to ask questions:Enable the ChatWindow Tonight’s presentation will be recorded and posted on theproject website at owingo pilot.aspx

Agenda Pilot Project Summary Innovative Reuse & BeneficialUse of Dredged Material Conowingo Project Timeline Dredging Overview Staging Area Overview Dorsey Park Boat Launch Peach Bottom Road Boat Launch Primary Trucking Route Additional Info & Feedback

Pilot Project SummaryGoals123Evaluate feasibility of dredging forsediment managementApply Maryland’s Innovative Reuseand Beneficial Use guidanceEvaluate sediment properties for reuseHoltwood DamStaging AreaComponents Mechanically dredge approx. 1,000 cubic yards ofsedimentTransport by barge from dredging area to staging areaTemporarily stockpile material at staging areaTransport material off site for temporary stagingInnovatively reuse material to evaluate possible futurematerial usesDredge AreaConowingo Dam

Innovative Reuse & BeneficialUse of Dredged Material Dredged material is a resource witheconomic value MDE Guidance Document identifiesopportunities and guidelines for uses Innovative Reuse Options–Landfill cover and cap–Soil and fill material Beneficial Uses–Habitat restoration–Shoreline stabilization Guidance is available on MDE’s /dredging.aspx

Conowingo Pilot Project TimelineJune 2016Conowingo DamSedimentManagementWorking Group(WG)August 2016August 2017Governor Hogan announcesPilot Project, MES issuesfirst Request for Proposals(RFP) to perform a pilotdredging projectMarylandEnvironmentalService (MES) issuesfirst Request forInformation (RFI)July 2018Fall/Winter2020February 2019MES issues awardto Northgate-DutraJoint VentureMES issues secondRFP to combinedredging and sedimentcharacterization forbeneficial reuseevaluationsWinter 2020Permits issued Dredging, materialand FERCtransport for reuse,approvaland site restorationSummer/Fall2019Preliminary planning,initial permitting,revised designs, andupdates to sedimentevaluationSpring/Summer 2020Final permittingand outreach

Dredging Overview Sediment will be mechanically removed byan excavator on a floating work platformconstructed of modular barge sections Dredge area is 160x160 ft ( 0.6 acres) andwill target removal of 1.0 foot of sediment GPS positioning and real time visualizationsoftware will be used to confirm locationand dredge depths Sediment will be transported by barge withperimeter controls (filter fabric, strawbundles) and silt curtains will surround thedredge area to protect water quality Dredge will move between the dredge areaand staging area daily, and storedovernight at staging area Dredging anticipated to takeapproximately 4 weeksDredge Platform EquipmentMaterial BargeDredging Software

Staging AreaDredged material will be temporarilystored at Peach Bottom Road BoatLaunchThe temporary staging area will havethe following: Entrance from Peach Bottom road Trailer, generator, and parking foron-site personnel Soil and erosion control fencing Material management equipment Graded area for dried materialstockpiling Nearshore offloading area

Dorsey Park Boat Launch Equipment launch and removal Temporary closure of oneboat ramp, some parking for1 ½ weeks at beginning and endof the project Closures will be posted in advanceonce schedule is finalized Will remain open during dredgingOther RegionalBoat LaunchOptionsApproximateClosure AreaExample Barge Assembly

Peach Bottom Road Boat Launch Staging Area and materialoffloading location Temporarily closed for up to 2months and will be restoredfollowing project completion Multiple other boat launches areavailable for use during this periodOther RegionalBoat LaunchOptionsApproximateClosure AreaExample Sediment Handling

Primary Trucking Route Dredged material transport willfollow the identified route fromPeach Bottom Road toPerryville, Maryland for reusestockpilingOther equipment to support thedredged material dewatering willarrive from multiple locationsAnticipating approximately70 truck loads to haul materialduring two, 1-week periodsDredge and barge sections willbe mobilized at Dorsey Park

How You Can Provide CommentsProvide comments to MarylandEnvironmental ServiceBy email: Bill Buszinski, wbuszinski@menv.comBy mail: 259 Najoles Road, Millersville, MD 21108Public commentsaccepted throughMay 1, 2020Additional information is available on MDE’s er/Pages/conowingo pilot.aspxOr using the shortened URL will take you to the same web pagehttps://bit.ly/2w1krGT

Questions

Apr 01, 2020 · Conowingo Dredging Pilot Project. Public Information Meeting Webinar. April 1, 2020 6:00 PM. Introductions . Conowingo Pilot Project Timeline June 2016 Conowingo Dam Sediment Management Working Group (WG) August 2

Related Documents:

Lake Ogleton Dredge 2 173 Marley Creek Dredging 182 Parker Creek Dredging 2 184 Rock Creek DMP Restoration 178 Rock Creek Dredging 166 Rockhold Crk County Dredging 159 Rockhold Crk Fed Channel Drdg 175 SAV Monitoring 163 Sloop,Eli&Long Coves Retrofits 180 Snug Harbor Dredging 167 Upper Magothy River Dredging 165 Upper West River Dredging 181

DREDGING TECHNICAL MANUAL, “THE MANAGEMENT AND REGULATION OF DREDGING ACTIVITIES AND DREDGED MATERIAL DISPOSAL IN NEW JERSEY’S TIDAL WATERS,” OCTOBER 1997 The Department’s dredging technical manual titled, “The Management and Regulation of Dredging Activities and Dredged Material Disposal in New Jersey’s Tidal Waters” dated

the Columbia River FNC. The Corps anticipates using any of these types of dredging equipment to maintain the Baker Bay FNC and Chinook FNC. Mechanical Dredging . Clamshell Dredge . The Corps frequently uses clamshell dredges to maintain small navigation channels. Clamshell dredging is typically performed using a bucket operated from a crane or a

management of dredging and disposal of dredge spoil material in the Marine Park. Target audience Agency staff; applicants for permissions to undertake dredging and/or dredge spoil material disposal activities in the Marine Park. Purpose 1. The establishment of a formal dredging and dredge spoil material disposal policy is seen as an essential

Dredge guideline 6 . 2.4 Scope and life cycle of a dredge campaign . A dredging campaign involves a number of different components which are considered during the EPA's assessment and regulation of dredging (Figures 1a and 1b). Figure 1a Components associated with dredging. Dredge Campaign. Deployment, installation and decommissioing of all .

Forecast Pilot Supply & Demand. 26 UND U.S. Airline Pilot Supply Forecast (2016) predicts cumulative pilot shortage of 14,000 by 2026. Boeing Pilot Outlook (2017) projects worldwide growth in pilot demand, with 117,000 pilots needed in North America by 2036. CAE Airline Pilot Demand Outlook (2017) indicates 85,000 new

Pilot Approach & Timeline. Virtual Desktop Pilot Implementation Project Systems & Technology . Visio Std 2007 8. Visio Pro 2007 9. Project Pro 2007 10. Firefox 11. Skype 4.1.x 12. Snagit 7 13. 7-zip 14. Various media protocols 15. Flash . The Pilot Project –Assess the Pilot: 1-month s

2 Annual Book of ASTM Standards, Vol 06.03. 3 Annual Book of ASTM Standards, Vol 14.03. 4 Reagent Chemicals, American Chemical Society Specifications, American Chemical Society, Washington, DC. For suggestions on the testing of reagents not listed by the American Chemical Society, see Analar Standards for Laboratory Chemicals, BDH Ltd., Poole, Dorset, U.K., and the United States Pharmacopeia .