Variable Volume Chilled Water Pumping System Controls

3y ago
61 Views
6 Downloads
424.57 KB
28 Pages
Last View : 11d ago
Last Download : 3m ago
Upload by : Philip Renner
Transcription

Variable Volume Chilled Water PumpingSystem ControlsDave Hacker – Engineering ManagerKyle Schroeder, PE – Sales Engineer

Outline Introduction Chilled Water Pumping SystemsConfigurations / Control Strategies– Primary – Secondary Pumping– Variable Primary Pumping Demonstration / Live Web Graphics Discussion and Questions

Local Service and SupportInnovative Energy Solutions 45 year record of successful project installations– Hundreds of local DDC installations On-staff engineers, technicians– Factory-trained 24 hour 7 day on-call service for Temperature Controlsand Full HVAC Mechanical Service Service agreements Comprehensive local parts stock Local training Over 250 years HVAC / Controls experience on staff

Evolution of Pumping sVFDsrellihCwolFelbairaV1990s2000s3-way valvesIn nova Primary / SectiononndaryBypass Valves

Basic Chilled Water Pumping System

Basic Chilled Water Pumping System Single Chiller, Single Constant Speed Pump 3-way valves for all Chilled Water Coils () maintains constant flow. Control strategy: Enable chilled water pumpwhen outside air temperature is abovesetpoint and at least 1 chilled water coilcontrol valve is open to coil. Enable chillerafter flow is proven. Chiller operates tomaintain leaving chilled water temperature atsetpoint. Coil valves modulate to maintaincomfortable space conditions.or evenmore basic – no valves – full flow

Basic Primary / Secondary Chilled WaterPumping System with a 3-way valve

Basic Primary / Secondary Chilled WaterPumping System Single Chiller, Single Constant Speed Primary Pump, bypass loopwith no valve, Variable Speed Secondary Pump.The primary pump pumps water through the chiller. The secondarypump pulls water from the primary system and pumps it to the coils.Add a Water Differential Pressure Transmitter near the end of thepiping run (in an accessible location).VFDs and pumps have minimum recommended operating speeds,typically about 20%. Use 3-way valves for 1 or more coils to ensurethat there is always this amount of water flowing in the secondaryloop. My recommendation is to use 3-way valves at units that areexpected to have full occupancy for the most hours and not atGymnasium or other units that serve areas where significantoperating time is at less than full occupancy (partial / low load areas).Control strategy: Enable both primary and secondary chilled waterpumps when outside air temperature is above setpoint and at least 1chilled water coil control valve is open to coil. Modulate (vary) thespeed of the secondary pump VFD to maintain a constant differentialpressure. Enable chiller after flow is proven. Chiller operates tomaintain leaving chilled water temperature at setpoint. Coil valvesmodulate to maintain comfortable space conditions.

Primary / Secondary Chilled WaterPumping System with Bypass Valve

Primary / Secondary Chilled WaterPumping System with Bypass Valve Single Chiller, Single Constant Speed Primary Pump, bypass loop,Variable Speed Secondary Pump. 2-way valves at all chilled watercoils and secondary bypass loop with 2-way valve.The primary pump pumps water through the chiller. The secondarypump pulls water from the primary system and pumps it to the coils.Water Differential Pressure Transmitter near the end of the piping run.VFDs and pumps have minimum recommended operating speeds,typically about 20%. Use a bypass valve in the secondary loop. Myrecommendation is to locate the valve in the chiller mechanical room.Control strategy: Enable both primary and secondary chilled waterpumps when outside air temperature is above setpoint and at least 1chilled water coil control valve is open to coil. Modulate (vary) thespeed of the secondary pump VFD to maintain a constant differentialpressure. Enable chiller after flow is proven. Chiller operates tomaintain leaving chilled water temperature at setpoint. Coil valvesmodulate to maintain comfortable space conditions.When secondary pump speed is at minimum setting, bypass valvemodulates to maintain secondary loop differential pressure. Afterpressure drops below setpoint and bypass valve is closed, pumpspeed will vary (increase initially) to maintain differential pressure.OR – modulate bypass valve inversely to coil valves (be careful).

Primary / Secondary Chilled WaterPumping System with Lead / Lag

Primary / Secondary Chilled WaterPumping System with Lead / Lag Multiple Chillers, Multiple Constant Speed Primary Pumps, bypass loop,Multiple Variable Speed Secondary Pumps. 2-way valves at all chilled watercoils and secondary bypass loop with 2-way valve.Each primary pump pumps water through a chiller. These can be piped soeither pump can work with either chiller if isolation valves are used at eachchiller or with dedicated primary pumps for each chiller. The secondary pumpspulls water from the primary system and pumps it to the coils.Control strategy: Open 1 chillers isolation valve, enable one primary and onesecondary chilled water pump when outside air temperature is above setpointand at least 1 chilled water coil control valve is open to coil. Modulate (vary)the speed of the secondary pump VFD to maintain a constant differentialpressure. Enable chiller after flow is proven. Chiller operates to maintainleaving chilled water temperature at setpoint. Coil valves modulate to maintaincomfortable space conditions.When lead secondary pump speed is at minimum setting, bypass valvemodulates to maintain secondary loop differential pressure. After pressuredrops below setpoint and bypass valve is closed, pump speed will vary(increase initially) to maintain differential pressure. When pump speed isabove 50%, enable the lag secondary chilled water pump, vary both until theirspeed drops below 20%, then stop the lag pump. Bypass valve should beclosed whenever 2 secondary pumps are operating.Only enable the lag primary pump after the lag chiller’s isolation valve is open,and the lead chiller is not able to maintain the leaving water temperaturesetpoint. Generally, It is best to max out 1 chiller rather than to run 2 partiallyloaded chillers.

Primary / Secondary Chilled WaterPumping System with Lead / Lag withenough 3-way valves and no bypass

Variable Primary Chilled Water PumpingSystem with some 3-way valves

Variable Primary Chilled Water PumpingSystem with some 3-way valves Single Chiller, Single Variable Speed Pump3-way valves for some Chilled Water Coils to maintainminimum flow required for chiller. Chillers have minimum flowsthat are typically higher than their associated VFDs andpumps.The single primary pump pumps water through the chiller andto the coils.Water Differential Pressure Transmitter near the end of thepiping run varies the speed of the VFD.Control strategy: Enable the primary chilled water pump whenoutside air temperature is above setpoint and at least 1 chilledwater coil control valve is open to coil. Modulate (vary) thespeed of the pump VFD to maintain a constant differentialpressure. Enable chiller after flow is proven. Chiller operatesto maintain leaving chilled water temperature at setpoint. Coilvalves modulate to maintain comfortable space conditions.

Variable Primary Chilled Water PumpingSystem with Bypass Valve

Variable Primary Chilled Water PumpingSystem with Bypass Valve Single Chiller, Single Variable Speed Pump. 2-way valves at allchilled water coils and bypass loop with 2-way valveThe single primary pump pumps water through the chiller and to thecoils.Water Differential Pressure Transmitter near the end of the piping runvaries the speed of the VFD and modulates bypass valve.Modulate bypass valve when pump reaches minimum speed.Control strategy: Enable primary chilled water pump when outside airtemperature is above setpoint and at least 1 chilled water coil controlvalve is open to coil. Modulate (vary) the speed of the pump VFD tomaintain a constant differential pressure. Enable chiller after flow isproven. Chiller operates to maintain leaving chilled water temperatureat setpoint. Coil valves modulate to maintain comfortable spaceconditions.When pump speed is at chiller required minimum setting, bypassvalve modulates to maintain secondary loop differential pressure.After pressure drops below setpoint and bypass valve is closed, pumpspeed will vary (increase initially) to maintain differential pressure.

Variable Primary Chilled Water PumpingSystem with Bypass Valve & Flow Meter

Variable Primary Chilled Water PumpingSystem with Bypass Valve & Flow Meter Single Chiller, Single Variable Speed Pump. 2-way valves at allchilled water coils and bypass loop with 2-way valveThe single primary pump pumps water through the chiller and to thecoils.Water Differential Pressure Transmitter near the end of the piping runvaries the speed of the VFD. The flow meter is used to modulate thebypass valve to maintain minimum chiller flow requirement.Modulate bypass valve when flow meter reaches minimum flowsetting.Control strategy: Enable primary chilled water pump when outside airtemperature is above setpoint and at least 1 chilled water coil controlvalve is open to coil. Modulate (vary) the speed of the pump VFD tomaintain a constant differential pressure. Enable chiller after flow isproven. Chiller operates to maintain leaving chilled water temperatureat setpoint. Coil valves modulate to maintain comfortable spaceconditions.Modulate bypass valve to maintain chilled water flow. Pump speedwill continue to vary to maintain differential pressure.

Variable Primary Chilled Water PumpingSystem with Bypass Valve & chiller DPT

Variable Primary Chilled Water PumpingSystem with Bypass Valve & chiller DPT Single Chiller, Single Variable Speed Pump. 2-way valves at allchilled water coils and bypass loop with 2-way valveThe single primary pump pumps water through the chiller and to thecoils.Water Differential Pressure Transmitter near the end of the piping runvaries the speed of the VFD. The Water Differential PressureTransmitter near the chiller is used to modulate the bypass valve tomaintain minimum chiller flow requirement based on differentialpressure setpoint.Modulate bypass valve when chiller evaporator barrel differentialpressure reaches minimum flow setting.Control strategy: Enable primary chilled water pump when outside airtemperature is above setpoint and at least 1 chilled water coil controlvalve is open to coil. Modulate (vary) the speed of the pump VFD tomaintain a constant differential pressure. Enable chiller after flow isproven. Chiller operates to maintain leaving chilled water temperatureat setpoint. Coil valves modulate to maintain comfortable spaceconditions.Modulate bypass valve to maintain chiller evaporator barrel differentialpressure. After pressure rises above setpoint and bypass valve isclosed, pump speed will continue to vary to maintain differentialpressure.

Variable Primary Chilled Water PumpingSystem with Lead / Lag

Variable Primary Chilled Water PumpingSystem with Lead / Lag Multiple Chillers, Multiple Variable Speed Primary Pumps, 2-way valves at allchilled water coils and a bypass loop with a 2-way valve.Each primary pump pumps water through a chiller and to the coils. These canbe piped so either pump can work with either chiller if isolation valves are usedat each chiller or with dedicated primary pumps for each chiller.Control strategy: Open 1 chiller’s isolation valve, enable one primary chilledwater pump when outside air temperature is above setpoint and at least 1chilled water coil control valve is open to coil. Modulate (vary) the speed of thepump VFD to maintain a constant differential pressure. Enable chiller afterflow is proven. Chiller operates to maintain leaving chilled water temperatureat setpoint. Coil valves modulate to maintain comfortable space conditions.Bypass valve modulates to maintain minimum chiller flow through eachoperating chiller.When lead pump speed is above 50%, enable the lag chilled water pump, varyboth until their speed drops below 20%, then stop the lag pump.When the 2nd chiller is needed – which can be determined by adding amatched pair of temperature sensors for each chiller to the associated flowmeter to calculate the BTUs (or Tons), lock both variable speed pumps at 70%(Adj), wait 30 Sec, open the bypass valve to 30% (Adj), then after another 30Sec delay, allow the isolation valve on the lag chiller open and start the lagchiller. Hold the pumps at a minimum of 70% and the bypass valve at a minposition of 30% Open for 15 Min (Adj) to allow 2nd chiller to get loadedup. Once the 15 minutes have expired, return system to normal control.

Flow Meter Selection and InstallationGuidelines Turbine Meters vs. Paddle Wheel. See Accuracy Statement. See Installation Guide. Recommend minimum 25 pipe diameters of straight pipe. 80%upstream and 20% downstream. There are slightly more expensive dual turbine flow metersavailable if there is less than 25 pipe diameters of straight pipe.

Flow Meter Selection and InstallationGuidelines Turbine Meters vs. Paddle Wheel. FeatureInsertion Turbine (O)ReliabilityExcellent – No Fault WarrantyAccuracyExcellent – 1% of RATE !NIST Traceable Volume CalibrationYesTurndownExcellentBearing LifeExcellentInstall & Remove Under PressureYes Paddle Wheel Turbine Meter. Turbine Meter. Paddle Wheel.Paddle Wheel (K).Fair to Poor – Standard Warranty1% of FULL SCALENoFair to PoorFair to PoorNo

Water Differential Pressure Sensor andInstallation Guidelines Dual Pressure Sensor type. Improved Overpressure Tolerance. Basic shutoff valves instead of 3-valve bypass. LCD display.

Demonstrations and Questions?

Questions from Presentation & AnswersQ: What is the price difference between a flow meter and a Differential Pressure Transmitter?A: Cost of instrumentation is about 500 more for flow meter.Q: What type of bypass valves are recommended?A: Ball valves for flows less than 100 GPM (2” and smaller bypass lines) and Balanced Plug Globevalves for flows over 100 GPM. Actuators can be the same as those used for AHU valves. Fast actingactuators can lead to excessive hunting. Use time delays to keep from turning on equipment beforeactuator has a chance to stroke valve. Use spring return, normally open , full port / line size valves forbypass applications.Q: What is the preferred location of load side DPT – near discharge of pump or downstream – 2/3rds?A: Either is fine – they are a reference point. If at pump, setpoint will need to be higher than if remote.Q: Is there more Maintenance of DPT versus Flow Meters.A: Turbine style Flow Meters have excellent long term reliability and use full port ball valve for easyinstallation and removal and need very little maintenance. Visit Onicon website (www.onicon.com) formore information on recommended flow meter. These have a low mass non-metallic turbines withsapphire jewel bearings and tungsten carbide shafts provide a mechanical system that virtually does notwear. HOT-TAP design is recommended for all insertion meters which allows installation and removalwithout system shutdown. These meters can be removed and reinserted by hand without special tools.Q: When a 2nd chiller is needed, how do you keep the 1st chiller on-line? (How do you keep the chillerfrom tripping out on low temp from the flow dropping dramatically).A: An example was given for a system that was started up and commissioned 5-6yrs ago. When the2nd chiller is needed, lock both variable speed pumps at 70% (Adj), wait 30 Sec, open the bypass valveto 30% (Adj), then after another 30 Sec delay, allow the isolation valve on the chiller open and start thechiller. Hold the pumps at a minimum of 70% and the bypass valve at a min position of 30% Open for 15Min (Adj) to allow 2nd chiller to get loaded up. Once the 15 minutes have expired, return system tonormal control.

3-way valves for all Chilled Water Coils (or even more basic – no valves – full flow) maintains constant flow. Control strategy: Enable chilled water pump when outside air temperature is above setpoint and at least 1 chilled water coil control valve is open to coil. Enable chiller after flow is proven. Chiller operates to

Related Documents:

1) Integrated electrical, DDC controls panel 2) Electronically Commutated Motor (ECM) high efficiency, variable speed pump 3) Hot water control valve 4) Chilled water control valve 5) Chilled water return 6) Hot water supply 7)4 Zone loop return connection 8) Chilled water supply 9) Hot water return 10) Zone supply water connection 11) Pete's

Siemens Demand Flow Chilled Water System Optimization offering is a unique, patented, and proven optimization strategy that reduces energy consumption, improves occupant comfort, and extends equipment life. To achieve maximum energy savings, Demand Flow CHW from Siemens employs variable speed pumping on the chilled water and condenser water pumps, and operates variable speed cooling tower fans, without the need for expensive chiller drive options.

PVC. The thickness of the insulation must be identical to that used for chilled water pipes. A green sleeve must be glued to the end of each domestic cold water supply pipe (see Photo 6). Page 3/ 5 20/11/2008 2. Photos of insulation for chilled water and domestic cold water pipes . 40 mm thick for pipe diameters of ¾" to 40 mm, 50 mm thick .

Chilled beams are typically are designed so the typical inlet static pressure is 0.5” w.c. or less. According to DADANCO, chilled beams, when designed in this manner, can achieve a background noise of less the 35dB. 12.9 CHILLED BEAM DISADVANTAGES First cost of chilled beams is typi

climate control and an often-uncomfortable indoor environment. The balanced solution That's why building owners and operators around the world are turning to a more intelligent way to balance their chilled water systems: Distributed Pumping. Distributed Pumping solutions replace larger centralised pumps and energy-consuming

differential temperature across the chilled water coils and the system. Coils are often design for 10 , 12 , and sometimes as high as 15 F ΔT. onset An important but often overlooked metric of chilled water plant performance is chilled water differential temperature or Delta T, often shown as ΔT.

The building system includes all chilled water piping in the building; the chilled water pump and all cooling coils, heat exchangers and other equipment using chilled water. The Designer must consider the following when

The first 100 days of employment within any business represents a golden opportunity to make a positive impact, cement your place in the organization and build a platform for ongoing success. By day 101 you could be sitting on top of the world. Alternatively, in that first 100 days you could relegate your future career with the organization to ‘catch-up’ mode. Even worse, some people will .