FEE SCHEDULE COMMUNITY DEVELOPMENT - Kitsap County, Washington

1y ago
22 Views
2 Downloads
970.15 KB
9 Pages
Last View : 1m ago
Last Download : 3m ago
Upload by : Jacoby Zeller
Transcription

FEE SCHEDULECOMMUNITY DEVELOPMENTResidential and Commercial Building Permit Fees and Fire Code Construction Permits aredetermined by the building value or value of the improvement as calculated by either using thesquare footage of the project multiplied by the square foot construction cost, as compiled by theInternational Code Council (ICC) and published by the Building Safety Journal magazine annually,or the value of the improvement. For improvements not covered in the ICC table, applicants may beasked to provide the valuation for those projects (i.e., replacement furnaces, decks, or othercomponents of a construction project). That value will then be multiplied by a Permit Fee Multiplieras determined by the type of construction. For single family residences, the Permit Fee may includeall improvements of the structure, i.e., mechanical and/or plumbing permits, fixture fees, and planreview. For commercial projects, the Permit Fee Multiplier includes the main structure only;supporting elements such as mechanical and plumbing, etc. will have a separate fee based on thevalue of improvement. The Director will establish a separate policy regarding the timeframe forpermits and extensions.Where the values are unclear the Department will use RS Means or Saylor Publications Inc. orother regionally accepted valuation determination publication, or contract documents.Mechanical and Plumbing Fees are included in the building permit fee for new singlefamily residences. For all other permit types, mechanical and plumbing fees are basedon valuation with a minimum fee of 75.Land use and development fees are charged a flat fee based on the average processingtime to review/process the application. The flat fee includes two iterations of plans review (firstsubmittal comments and review of second submittal comments), as well as intake and closeoutof the application. Any additional review beyond two iterations of plans review will be chargedmonthly at the approved hourly rate and must be paid in full prior to issuance. No applicant willbe charged additional hours without a review by the appropriate manager to ensure the hoursare valid. Inspections may or may not be included in the flat fee. Inspections that are chargedan hourly rate as identified in the Community Development Fee Schedule, will be chargedmonthly, and must be paid in full prior to final inspection.A non-refundable Base Application Fee of 90 is collected for each permit application unlessotherwise noted.A non-refundable Technology Surcharge of 3% is collected for each permit application, whichwill be maintained in a restricted account for technology initiatives only.Other Agency Fees are included for those agencies that have authorized the Department tocollect specific fees on behalf of their agency. These fees include impact fees for localschools, roads and parks, and the Washington State Building Code Council surcharge.Kitsap County Department of Community Development614 Division Street, MS-36Port Orchard, WA 98366-4682www.kitsapgov.com/dcd/Revision Date: 1/1/2021Phone: (360) 337-5777Form Number: 1200DEmail: Kitsap1@co.kitsap.wa.usPage 1 of 8

Building and Construction Fees - Title 14Residential Building Flat Fee PermitsManufactured Home installed on land parcel 390Manufactured Home installed in a mobile home park 130Adult Family Home (per IRC R324) 130Re-Roofing 130Spa or Hot Tub 130Pool 390Demolition 130Simplified Drainage ReviewTransitory – Single Family 1,040 130Commercial Building Flat Fee PermitsTransitory Housing – Indoor, Large, Safe Park, Small (inspection hours charged hourly) 390Certificate of Occupancy 130Revised Certificate of Occupancy (no work) 75Temporary building installation and removal 130Home Business 500Sign Permit (inspection time charge separately at issuance) 260Plan Processing for Basic Development Sets*Setup Fee for Establishing a Basic Plan SetEstablish Basic Plan Set (See Valuation Table for Building Permit fee)Utilization of Basic Plan Set 260½ ResidentialPermit Fee65%ResidentialPermit Fee and 260Fixture Fees (Exempt from base application fee)Mechanical Permit - Minimum Fee (includes standard fixtures, based on valuation) 75Plumbing Permit - Minimum Fee (includes standard fixtures, based on valuation) 75*Basic Plan Sets are plan sets approved for construction, which may be used multiple times and on different lots.Kitsap County Department of Community Development614 Division Street, MS-36Port Orchard, WA 98366-4682www.kitsapgov.com/dcd/Revision Date: 1/1/2021Phone: (360) 337-5777Form Number: 1200DEmail: Kitsap1@co.kitsap.wa.usPage 2 of 8

Building and Construction Fees - Title 14 continuedPermit Fee Multipliers (PFM) (multiplied by the project valuation to determine fee amount).0174– Residential projects and commercial mechanical/plumbing elements – includes plan review.For new residential construction only, the fee includes mechanical and plumbing.0137 – All commercial projects except tenant improvements – includes plan review.Main structure only. Mechanical and plumbing calculated separately using .0174.024 – Commercial Tenant Improvement projects – includes plan review.Main structure only. Mechanical and plumbing calculated separately using .0174.029 – Fire Code Construction - new automatic sprinkler installations and modifications exceeding twenty heads –includes plan review.071 – Fire Code Construction – new installation or modification of a fire alarm or Emergency Responder RadioCommunication System – includes plan review.Fire Code Permit FeesFees shall be included with the building permit application when the project includes a process for which a permit isrequired by the International Code CouncilFire Construction – Sprinklers New or Major ModificationSee PFMFire Construction – Alarms NewSee PFMFire Construction – Sprinklers existing sprinkler modifications 20 heads or less 325Fire Construction – Alarms existing alarm minor modifications 325Fire Construction – Marijuana Extraction 715Fire Construction – Compressed Gases 520Fire Construction – Solar Panels 390Fire Construction permits unless otherwise listed 325Fire Operational – Carnivals and Fairs 520Fire Operational – Marijuana Extraction 715Fire Operational – High Piled Storage 390Fire Operational – Carbon Dioxide Systems 390Fire Operational permits unless otherwise listed 325Emergency Responder Radio Communication SystemTemporary stand for the sale of fireworks (in accordance with RCW 70.77)Includes permit inspection, (Base fee waived)Kitsap County Department of Community Development614 Division Street, MS-36Port Orchard, WA 98366-4682www.kitsapgov.com/dcd/Revision Date: 1/1/2021See PFM 100Phone: (360) 337-5777Form Number: 1200DEmail: Kitsap1@co.kitsap.wa.usPage 3 of 8

Building and Construction Fees - Title 14 continuedMiscellaneous FeesWashington State Building Code Council - surcharge per building permit.There is imposed a fee of six dollars and fifty cents on each residential building permit and a fee oftwenty-five dollars for each commercial building permit issued by a county or a city, plus anadditional surcharge of two dollars for each residential unit, but not including the first unit, on eachbuilding containing more than one residential unit. (RCW 19.27.085)Building Permits Supplied with Well WaterEach new domestic use that proposes a new withdrawal from a water right permit-exempt wellapproved after January 19, 2018 shall be assessed a 500 fee.( 350 to Department of Ecology / 150 DCD program administration)Residential 6.50/1st unit 2/ea addt’l unitCommercial 25.00/ea 500Use of outside consultants (for plan checking and inspections, or both) shall have a fee equal tothe actual costs. (KCC 14.04.120C)Actual CostAdditional ReviewAdditional plan review required by changes, revisions, or additions to the plans shall have a feeequal to the hourly rate per hour or the total cost of the permit, whichever is less.(KCC 14.04.120C) 130/hourReactivation Fee ( 1 Year)To reactivate a permit after permit expiration, if within one year of expiration, the Permit Fee shallbe one-half of the current amount required for a new permit, provided no changes have beenmade, or will be made in the original plans and specifications for such work. (KCC 14.04.120C)VariesReactivation Fee ( 1 Year)To reactivate a permit any time after the permit has been expired for more than one year, a fullpermit fee shall be paid in the amount required for a new permit. (KCC 14.04.120C)VariesReactivation Fee (Final Inspection Only)To reactivate a permit after permit expiration, to perform a final inspection only for a permit thatpreviously had all required inspections approved other than the Final Inspection.(KCC 14.04.120C) 130/hourReinspection FeeWhenever an Inspection is requested but the project is not yet ready for inspection, if access tothe site is prevented, or if temporary silt and erosion control measures are not in place, a fee shallbe paid of an hourly rate beginning with the third inspection for the same issue. (KCC 14.04.120C)VariesInvestigation FeeWhenever any work for which a permit is required by this code has commenced without firstobtaining such permit, an investigation fee shall be paid in an amount equal to the permit fee forsuch project, in addition to the required plan review and permit fees. (KCC 14.04.120C)VariesPosted Stop Work Fee 130Donation: Kitsap Nuisance AbatementsDonated funds will support ongoing public nuisance abatement efforts to protect the health andwelfare of residents of Kitsap County. (KCC 9.56)Kitsap County Department of Community Development614 Division Street, MS-36Port Orchard, WA 98366-4682www.kitsapgov.com/dcd/Revision Date: 1/1/2021VariesOptionalPhone: (360) 337-5777Form Number: 1200DEmail: Kitsap1@co.kitsap.wa.usPage 4 of 8

Land Use and Development Fees - Title 21Pre-Permit Activity (Exempt from base application fee and technology fee)Staff Consultation – Cross-functional team of technical experts (30 minute maximum; credit towardsapplication within 12 months, unless extended by the Director due to extenuating circumstances)Pre-Application Meeting (Detailed Analysis; Department prepares a report)Pre-Submittal/Pre-Construction Meeting (without permit)Zoning Confirmation Letter or Rebuild LetterTitle Elimination Request (Collected as required for the Kitsap County Auditor’s Office) 350 2,210 130/hour 195VariesAdministrative Land Subdivision and Land Use Decisions (Type I & II)Large Lot SubdivisionsPreliminaryPreliminary AmendmentFinalFinal Alteration 2,470 2,080 1,430 520Short Lot SubdivisionsPreliminaryPreliminary AmendmentFinalFinal Alteration 2,730 2,080 1,430 1,560Binding Site PlanBinding Site Plan Alteration 1,300 3,770Administrative Conditional Use PermitAdministrative Conditional Use Permit - AmendmentAdministrative Conditional Use Permit - ShorelineAdministrative Conditional Use Permit - Additional Dwelling UnitAdministrative Conditional Use Permit - AgricultureAdministrative Conditional Use Permit - Wireless 3,900 3,120 2,470 2,730 2,340 3,900Vacation BSP/LL/SP - Type II 1,040Hearing Examiner and BOCC Decisions (Type III & IV)If application requires a Hearing Examiner decision, an additional 800 fee will be assessedConditional Use PermitConditional Use Permit - Additional Dwelling UnitConditional Use Permit - Revision MinorConditional Use Permit - Revision MajorConditional Use Permit - ShorelineConditional Use Permit - WirelessPlats – PreliminaryPreliminary Amendment - Minor Type 2Preliminary Amendment - Major Type 3FinalFinal AlterationPerformance Based DevelopmentPerformance Based Development - Revision MinorPerformance Based Development - Revision Major 6,890 4,160 1,950 2,600 3,250 6,630 7,410 4,160 2,600 2,470 1,950 2,080 2,730 2,600Vacation Plat – Type III 1,040Development Agreement 1,950Kitsap County Department of Community Development614 Division Street, MS-36Port Orchard, WA 98366-4682www.kitsapgov.com/dcd/Revision Date: 1/1/2021Phone: (360) 337-5777Form Number: 1200DEmail: Kitsap1@co.kitsap.wa.usPage 5 of 8

Land Use and Development Fees - Title 21Hearing Examiner and BOCC Decisions (Type III & IV)If application requires a Hearing Examiner decision, an additional 800 fee will be assessedShoreline Substantial Development Permit (Residential or Commercial) 4,160Shoreline Substantial Development Permit Revision 1,040Rezone 2,470VariancesType III permits will require a Hearing Examiner decision, an additional 800 fee will be assessedEngineering Variance - Type III 5,200Critical Area Variance - Type III 4,940Shoreline Variance - Type III 3,380Zoning Variance - Type III 2,470Administrative Variance - Type II 1,560Director’s Variance - Type l 1,430Flood Hazard Area Variance 650Site Development Activity Permits (SDAPs)Road Maintenance. The following road maintenance practices are exempt: pothole and square cut patching,overlaying existing asphalt or concrete pavement with asphalt or concrete without expanding the area of coverage,shoulder grading, reshaping/regarding drainage systems, crack sealing, resurfacing with in-kind material withoutexpanding the road prism, and vegetation maintenance. (Kitsap County Code 12.10.040)Grading 0 to 149 cubic yards 0Grading: 150 but 500 cubic yards (fee includes inspection hours) 1,820Grading: 500 but 5000 cubic yards (Inspection hours charged separately) 2,340Grading: 5000 cubic yards or greater (Inspection hours charged separately) 3,510SDAP Single Family Residence (Inspection hours charged separately) 2,340SDAP Commercial (Inspection hours charged separately) 4,810SDAP Short Plats (Inspection hours charged separately) 4,940SDAP Large Lots (Inspection hours charged separately) 4,940SDAP Land Subdivision (Inspection hours charged separately) 5,460SDAP ROW Use/Improvement - Minor Development (Inspection hours charged separately) 1,820SDAP ROW Use/Improvement - Major Development (Inspection hours charged separately) 1,950All other SDAPs (Inspection hours charged separately) 2,340SDAP Addendum (for permits which are issued. Application Fee Deposit (AFD) includes 9 hoursof review and will be subject to refund/additional charges outside of the AFD)Road Approach (fee waived if submitted with SDAP or building permit)(includes inspection hours)Kitsap County Department of Community Development614 Division Street, MS-36Port Orchard, WA 98366-4682www.kitsapgov.com/dcd/Revision Date: 1/1/2021 1,170 AFD/hourly 260Phone: (360) 337-5777Form Number: 1200DEmail: Kitsap1@co.kitsap.wa.usPage 6 of 8

Environmental PermitsCritical Area or Shoreline Buffer Reduction 1,430Conditional Waiver from View Blockage Requirement 1,820Timber HarvestMinorMajor 1,170 1,430Mooring Buoy 390Open Space 500Site Evaluation 260SEPA Checklist Review 650Shoreline Exemption 650Environmental Impact Statement Review (EIS) (base fee waived) 130/hourCommunity Development Reactivation FeesSDAP Permit Renewal Fee and Reactivation (within 180 days of expiration) 130 and50% of initial feeRe-inspection fees charged after 2 disapproved inspections (per inspection) 130Revoked Permit Fee (to re-activate permits which were revoked for non-payment of fees)Returned Check or electronic payment Fee 130 andfees owed 35Other Community Development FeesAdditional Plan Review (base fee waived) 130/hourAddress Request (fee waived if submitted with building permit) (base fee waived) 130Appeals of permit decision (base fee waived) 500Hourly Rate (minimum of 1 hour charged, then by the quarter hour per staff member) 130Miscellaneous Permits 130/hourInspections (including Level 2 inspections) (base fee waived) 130/hourRoad Name Petition (fee waived if part of land subdivision) 260 minimumTemporary Land Use PermitThird Party Review of Application 130/hour110% of ContractRate and ListedFeeHearing Examiner decision, Type 3 or 4 800Transfer of Development Right 650Public Records: All fees related to public records will be in accordance with Kitsap Countyapproved fees.VariesRecording Fees - Collected as required for the Kitsap County Auditor’s OfficeVariesKitsap County Department of Community Development614 Division Street, MS-36Port Orchard, WA 98366-4682www.kitsapgov.com/dcd/Revision Date: 1/1/2021Phone: (360) 337-5777Form Number: 1200DEmail: Kitsap1@co.kitsap.wa.usPage 7 of 8

Kitsap County Public Works FeesRight of Way Permits – Base Fee 350Utility Pole Permits – base fee up to 8 poles, addition fee for each additional 8 poles 125Additional Inspections based on scope of project 125Re-inspection Fee 125Non-Disturbing Activity (Trenching 10’ or less, dumpster fee, etc ) 230Oversize Vehicle Permit 50Right-of-Way Use and Improvement 1,500Right-of-Way Vacation Petition – Petition for the Vacation of a County Road 800Traffic Concurrency Test (No fee if submitted with Building Permit) 200Capacity Inquiry 25Capacity Reservation 25Certificate of Concurrency 25Renewal of any Concurrency test listed above 25Private Utility Easements Crossing Rights of Way and County Property 500Kitsap County Department of Community Development614 Division Street, MS-36Port Orchard, WA 98366-4682www.kitsapgov.com/dcd/Revision Date: 1/1/2021Phone: (360) 337-5777Form Number: 1200DEmail: Kitsap1@co.kitsap.wa.usPage 8 of 8

Fire Construction - Alarms existing alarm minor modifications . 325 : Fire Construction - Marijuana Extraction . 715 : Fire Construction - Compressed Gases . 520 : Fire Construction - Solar Panels . 390 : Fire Construction permits unless otherwise listed . 325 : Fire Operational - Carnivals and Fairs . 520 : Fire Operational .

Related Documents:

Contractor: Kitsap Recovery Center Amount: 101,000 Contract Term: January 1, 2021 - December 31, 2021 . (45) days after Kitsap County Risk Management has received written notice of changes. e. SBHASO and Clallam, Jefferson and Kitsap Counties have no obligation

The Johns Hopkins Bloomberg School of Public Health Center for Health Security recently released Public Health Principles for a Phased Reopening During COVID-19: Guidance for Governors. . KITSAP COUNTY PARKS EVENT RECOVERY PLAN - UPDATED 3.22.21 5 KITSAP COUNTY PARKS EVENT RECOVERY PROJECTED TIMELINE Kitsap County Parks will modify

Puget Sound Steelhead East Kitsap DIP Recovery Plan. Executive Summary The Suquamish Tribe - April 2020. East Kitsap: South. Sinclair Inlet. Christiansen Cr. r r. North Fork Olalla Cr. Kitsap. Vashon Island Curley Creek-Frontal Colvos Passage Blackjack Creek-Frontal Port Orchard. O l l l a C r G o r s t C r C e s c e n t C r r

2016 WSU KITSAP COUNTY EXTENSION. IMPACT S VOLUNTEER PROGRAMS # VOLUNTEERS 2016 VOLUNTEER HOURS REPORTED VOLUNTEER RATE ( 24.14) Master Gardeners 285 18,839 454,773 Rain Garden Mentors 37 765 18,467 4-H Youth Development 233 13,380 322,993 Beach Naturalists 49 2,312 55,812

Kitsap County Pathway to Recovery Playbook Page 1 Introduction Kitsap County's Four-Phased Pathway to Recovery On May 4 th, 2020 Governor Inslee signed Proclamation 20-25.3 and outlined the " Safe Start" plan, a data-driven, four-phased approach to reopen Washington and its counties and modify physical distancing measures while minimizing

Kitsap Recovery Center Outpatient Services: 1026 Sidney Road Port Orchard, WA 98366 Inpatient and Detox Services: Port Orchard, WA 98366 . 2014 - 2019 Kitsap County Continuum of Care Outpatient 4,579,974 Crisis Intervention 3,452,681 Early Intervention 4,105,662 Prevention 696,447 Recovery Support Services

KITSAP COUNTY SUBSTANCE ABUSE ADVISORY BOARD Kitsap County Department Human Services 614 Division Street, MS-23 Port Orchard, Washington 98366-4676 . Cascade Recovery Center has a noted steady decline in youth program. A performance improvement plan has been implemented.

those they serve, and promote the health and well-being of all Kitsap area residents. *Homes for all who served project reduced the number of Veterans living without Shelter from 45 in September 2015 to functional zero in January of 2017. *Kitsap Recovery Center moved inpatient and outpatient rehabilitation and detox services from Bremerton to Port