Instructions On Reviewing 2020 NEC Changes From 2017 . - Florida Building

1y ago
6 Views
2 Downloads
3.84 MB
12 Pages
Last View : 29d ago
Last Download : 3m ago
Upload by : Mika Lloyd
Transcription

Instructions on Reviewing 2020 NEC Changes from 2017 andAccessing the Archived Revision Information1. Identify changes to the 2020 NFPA 70 – NEC Document byreviewing the hard copy or viewing through NFPA LiNK for“Change Markers” (screenshots from NFPA LiNK – Subscriptionrequired)** Δ indicates a section has a change made (see the highlighted text)** Highlighted text indicates where changes have been made.1

** N Symbol indicates the entire section is new.2

2. Go to www.nfpa.org/70 . The NFPA codes and standardsdevelopment system can be used with most of the recent versionsof Google Chrome, Firefox and Internet Explorer.3

3. Scroll down to “Archived Revision Information” for the 2020NEC and click on “VIEW” for First Draft Report.4

4. Sign in to your NFPA profile or if first time user, create your NFPAprofile. NFPA membership is optional when using the Codes andStandards Development platform, but a log-in is required.5

5. Once signed in you will be directed to the NFPA StandardsDevelopment site. Use the Table of Contents in the leftwindow to navigate.6

6. Expand Chapters, Articles, Sections and First Subdivisions to locatesections of interest that have indicated changes. Click on any linkto get to beginning of Chapter, Article, Section or FirstSubdivision, the “ ” symbol expands sections below.NOTE: We are going to use 702.4 and 702.5 noted in NFPA LiNK above as examples.7

7. By clicking on 1st subdivision “702.4” it opens up thatrequirement and shows the First Revision (FR) in legislative text.The link identified as “FR-7603” takes you to the committeeaction. The link identified as “PIs” takes you to the PublicInput(s) that were received with proposed changes to thissection. Both of these links will open up a new page.8

8. The “FR-7603” link shows the Technical Committee Action,supporting statement from the Committee, and the ballotresults.9

9. The “PIs[1]” link takes you to the actual public inputsubmitted by the proponent. The number in brackets [1]indicates the number of Public Inputs submitted in thissection.This page shows the proposed change(s), the “Statement ofProblem and Substantiation” for the change, and anyrelated comments if there are any.10

10. The two significant code development steps in the NFPA codes andstandards revision process are the First and Second Draft meetingswith the resultant First and Second Draft Reports (FDR and SDR).Actions taken on Public Comments during the Second Draftmeetings are documented in the Second Draft Report.The changes accepted at the Second Draft Meeting is what ispublished, and may have made some changed from the approvedFirst Draft.Access to this report is from the NEC Document Information Pageat the same location as the First Draft Report link. Access to andnavigating through the Second Draft Report is done in the samemanner as in the First Draft Report.10

For more information or questions, contact:Robby DawsonSoutheastern Regional Director, NFPArdawson@nfpa.org804-401-906310

10. The two significant code development steps in the NFPA codes and standards revision process are the First and Second Draft meetings with the resultant First and Second Draft Reports (FDR and SDR). Actions taken on Public Comments during the Second Draft meetings are documented in the Second Draft Report.

Related Documents:

Dec 02, 2017 · Based on 2017 National Electrical Code (NFPA 70) The Philippine Electrical Code Part 1 2009 Edition was based on NEC 2005 Regularly revised (every three years) to reflect the evolution of products, materials, and installation techniques. NEC 2008, NEC 2011, NEC 2014 & NEC 2017 NEXT NEC REVISION: NEC 2020, 2023, 2026, 2029

NEC 3 Professional Services Contract (PSC). NEC 3 Short Contract (ECSC) and Short Subcontract (ECSS). NEC 3 Adjudicator’s Contract (AC). NEC 3 Term Services Contract (TSC). NEC 3 Term Service Short Contract (TSSC). NEC 3 Framework Contract (Framework Contract). NEC 3 Supply Contract (SC).

5 Location NEC 2008 NEC 2011 NEC 2014 NEC 2017 NEC 2020 Family Rooms AFCI AFCI AFCI AFCI AFCI Dining Rooms AFCI AFCI AFCI AFCI AFCI Kitchens - 125V Receptacles GFCI GFCI AF/GF AF/GF AF/GF Kitchens - 250V Receptacles TM TM TM TM GFCI1 Bedrooms AFCI AFCI AFCI AFCI AF/GF1 Living Rooms AFCI AFCI AFCI AFCI AFCI Garage - 125V Receptacles GFCI GFCI GFCI GFCI GFCI Garage - 250V Receptacles TM TM .

The NEC-IIC Incubation Center aims to be the hub of innovative and high impact ventures in social, technical, educational, commercial and other domains. It hopes to bring forth a revolution in how and what students learn and achieve while in college.NEC-IIC support members of the NEC including staff, students, alumni, faculty, and R&D partners .

Lecture, Vision Track: C&C User Forum 2005 NEC's Technology Innovation Strategy * T his article has been compiled by the NEC Technical Journal Editorial Office. It is based on the panel discussion between Ms. Atsuko Fukushima, a newscaster/essayist, and Mr. Kazuhiko Kobayashi, Executive Vice President of the NEC Corporation, on

with the idea in 1999 and NEC voted to give members a choice to choose their power provider in 2000. In 2005 NEC officially introduced NEC Co-op Energy, the Co-op's competitive retail division. Today, NEC Co-op Energy serves the retail electric needs of more than 28,000 meters across Texas. In the Texas electric industry, there are six investor .

the 2011 NEC include groundbreaking changes that broaden the Code's scope to cover alternate energy sources, green technologies, IT systems, and high voltage installations. (Softbound, 870 pages) 2011 NEC Handbook — Source for practical solu-tions and Code rationale. The NEC Handbook has the full 2011 NEC text, expert commentary on NEC

NEC. Part 1 of this text will break down the structure of the . NEC, instructing on the layout and . focusing on each chapter of the , one at a time. Part 2 of this text delves into applying the . NEC knowledge learned in Part 1, providing you an opportunity to apply your knowledge of the . NEC. to find the necessary information to complete a task.