STANDARD DESIGN DETAILS Division 26 - ELECTRICAL Release 1.0 April 2011 Released by: Cleveland Clinic Facilities and Construction 9500 Euclid Ave. Cleveland OH 44195 All information within this Document is considered CONFIDENTIAL and PROPRIETARY. By receipt and use of this Document, the recipient agrees not to divulge any of the information herein and attached hereto to persons other than those within the recipients’ organization that have specific need to know for the purposes of reviewing and referencing this information. Recipient also agrees not to use this information in any manner detrimental to the interests of Cleveland Clinic.

Cleveland Clinic Standard Design Details Copyright 2011 By the Cleveland Clinic These Specifications, or parts thereof, may not be reproduced in any form without the permission of the Cleveland Clinic.

Cleveland Clinic Cleveland Clinic Standard Design Details: Division 26 - Electrical The following pages contain standard details for the design and construction of new and renovated facilities at all domestic Cleveland Clinic locations. They shall be used by A/E firms in the preparation of drawings and specifications for construction of facilities. The general purpose of each Detail is to provide the preferred method for installation of construction materials and equipment at Cleveland Clinic facilities regarding Codes and FM Global compliance, execution and uniformity. These Details are to be used as a part of Electrical Bid and Construction documents. They are intended to be used to address system design aspects of equipment and materials that Cleveland Clinic desires to standardize among facilities, and identify prohibited materials and construction practices. The use of these Details is mandatory for all design or maintenance projects. Deviations are discouraged. If project conditions arise which require a deviation, it shall be thoroughly documented by the user and submitted to Cleveland Clinic for review and approval using the Design Standards Revision Request document. Additionally, all Cleveland Clinic staff, architects, engineers, and contractors are encouraged to participate in the ongoing development of these guidelines by communicating any suggestions by use of the Revision Request document. The Detail Drawings are in AutoCad format and categorized by system. *****

Cleveland Clinic STANDARD DESIGN DETAILS: DIVISION 26 - ELECTRICAL I. SITE LIGHTING DETAILS a. E-001 Site Lighting Pole Base Detail (Non-Parking Area) b. E-002 Site Lighting Pole Base Detail (Parking Area) c. E-003 Bollard Lighting Base Detail II. SITE POWER DETAILS a. b. c. d. E-101 Typical High Voltage Duct Bank Section E-102 Typical Low Voltage Duct Bank Section E-103 Typical Direct Buried Conduit Section E-104 Typical Hand Hole Detail III. GROUNDING DETAILS a. b. c. d. e. E-201 Grounding Test Well Detail E-202 Typical Steel Column and Rebar Grounding Detail E-203 Main Electrical Ground Bus Detail E-204 Main Electrical Ground Bus Connections E-205 Typical 480V-208Y-120V Dry Type Transformer Grounding Detail IV. LIGHTING CONTROL DETAILS a. b. c. d. e. E-301 Ceiling Mounted Occupancy Sensor Wiring Diagram E-302 Photocell 'ON' Time Clock 'OFF' Wiring Diagram E-303 Emergency Relay Control Device Wiring Diagram E-304 Occupancy Sensor Switch Wiring Diagram E-305 Occupancy Sensor Switch With Bi-Level Lighting Wiring Diagram V. POWER DETAILS a. b. c. d. e. f. g. h. E-401 Emergency Power Off Button E-402 Isolation Power Center Detail E-403 (3) Duplex (3) Twist Lock Isolation Power Module Detail E-404 (1) Duplex (1) Twist Lock Isolation Power Module Detail E-405 Electrical Equipment Nameplate Detail E-406 Double Ended Substation Electrical One-Line Diagram E-407 Single Ended Substation Electrical One-Line Diagram E-408 Three Phase Motor Starter Wiring Diagram ** End of List **

a. E-101 Typical High Voltage Duct Bank Section b. E-102 Typical Low Voltage Duct Bank Section c. E-103 Typical Direct Buried Conduit Section d. E-104 Typical Hand Hole Detail III. GROUNDING DETAILS a. E-201 Grounding Test Well Detail b. E-202 Typical Steel Column and Rebar Grounding Detail c. E-203 Main Electrical Ground Bus Detail d.

Related Documents:

2016 NHDOT Division 600 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 600-6 The following table list design requirements for 3750-D RCP pipe. Design Requirements For Reinforced Concrete Pipe (3) .

2016 NHDOT Division 400 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 400-6 The State's Asphalt Plant Inspector should visit the commercial plant operation or portable plant as soon as it is set up and ready to operate .

2016 NHDOT Division 100 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 100-7 101.5 - INTRA- DEPARTMENTAL RELATIONS Harmonious working relations among all employees are essential to the efficient operation of the .

2016 NHDOT Division 700 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 700-5 Therefore, the inspector is obligated to know the following: Which materials must be sampled

2016 NHDOT Division 800 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 800-2 Speak with the right -of-way agent responsible for agreements made for the project.

2016 NHDOT Division 500 Construction Manual Link to: Division 100 Division 200 Division 300 Division 400 Division 500 Division 600 Division 700 Division 800 Division 900 Master Table of Contents 500-7 Care should be taken to drive the sheets well below the bottom elevation of the excavation (toe-in). The Contract Administrator can put a grade .

Division: Find the Total Number of Groups * Division: Find the Total Number of Objects * Division: Equal Groups (Part One) * Division: Equal Groups (Part Two) * Division: Factor Fun * Division: Repeated Subtraction (Part One) * Division: Repeated Subtraction (Part Two) * Division: Arrays for Division (Part One) * Di

STANDARD SPECIFICATIONS DIVISION 1 General Requirements DIVISION 2 Earthwork DIVISION 3 Production From Quarry and Pit Sites and Stockpiling DIVISION 4 Bases DIVISION 5 Surface Treatments and Pavements DIVISION 6 Structures DIVISION 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits DIVISION 8 Miscellaneous Construction